New Zealand Railways Road Services

Last updated

New Zealand Railways Road Services
FormerlyNew Zealand Railways Road Motor Service
Founded1926;98 years ago (1926)
Defunct1991;33 years ago (1991)
Fate Restructured & privatised
Successors
Headquarters
Wellington, New Zealand
Area served
New Zealand-wide
Parent New Zealand Railways Department
New Zealand Railways Road Services depot in Dunedin Dunedin NZR Building.JPG
New Zealand Railways Road Services depot in Dunedin

The New Zealand Railways Road Services (NZRRS) was a branch of the New Zealand Railways Department and later the New Zealand Railways Corporation. It operated long-distance, tourist and suburban bus services and freight trucking and parcel services. Its name was New Zealand Railways Road Motor Service until mid-1936.

Contents

History

Back cover of a commemorative publication about Railway Road Services in New Zealand published 1976, showing the buses used from 1926 to 1976. 50 Years of Railways Road Services (10469135934).jpg
Back cover of a commemorative publication about Railway Road Services in New Zealand published 1976, showing the buses used from 1926 to 1976.

The first bus operation by NZR began on 1 October 1907, between Culverden on the Waiau Branch and Waiau Ferry in Canterbury. By the 1920s NZR was noticing a considerable downturn in rail passenger traffic on many lines due to increasing ownership of private cars, and from 1923 it began to coordinate rail passenger services with private bus services.

In November 1926, NZR purchased a private bus firm operating between Hastings and Napier in the Hawke's Bay region. [1] NZR then acquired various other bus services in Dunedin and the Hutt Valley, and by 1928 was operating 56 buses. In 1931 Parliament passed the Transport Licensing Act, which regulated local bus services to ensure that services would not compete with NZR. This further increased acquisitions by NZR of small bus companies. [2]

By 1954 the bus routes covered 6,000 miles (9,700 km), but generally at higher fares than the railways. For example, the 230 miles (370 km) Christchurch-Dunedin return journey cost £2 13s 6d by rail, but £3 10s by bus and took 7hr 10min on the fastest train, but 9hr by bus. [3]

By the 1970s, NZRRS offered a nationwide service. Some routes were direct train replacements, but others extended the reach of the railways to other towns and destinations, including: [4]

In addition, there were many other local and urban services across the country.

There was a certain amount of rivalry within NZR between NZRRS and the rail Traffic Branch and in many ways they competed with rather than complement each other. [5] For example, many cities had bus terminals some distance from railway stations and many NZRRS routes ran parallel to and at similar times to trains. [5] This animosity lasted almost to the end, with complaints as late as 1984 that buses should not be competing with trains. [6]

Fleet

Australian and New Zealand Railways Commissioners, Auckland, February 17, 1951 Australian and New Zealand Railways Commissioners, Auckland, February 17 1951.jpg
Australian and New Zealand Railways Commissioners, Auckland, February 17, 1951
Volvo Roadmaster Road Services - Coaches c1985 CND 30.402 - Road Services - Coaches - Volvo.jpg
Volvo Roadmaster Road Services - Coaches c1985

Early years of the Road Services saw many different brands of buses acquired with the various constituent companies. From Ford Model T-based cars to Straker steam trucks, to various Albion, Cadillac, Dodge and Leyland buses. The builders of the bodies were many and various.

Leading up to World War II, standardisation was the call. During the 1940s Ford V8 and Bedford truck chassis with New Zealand Motor Bodies (NZMB) became the standard NZRRS bus.

In 1950 a 24-seat, forward-control Commer was introduced on the Gisborne-Auckland route. [7] During the 1950s NZRRS began to widely use the Bedford SB chassis fitted with NZMB bodies. So much so, that the Bedford SB was ordered right up until 1980. NZRRS eventually bought 1,240 of these chassis, which were used in suburban, local rural, and long-distance service. This was the largest fleet of Bedford SB buses in the world. [2]

During the late 1970s NZRRS, like many other operators, was having issues with the general reliability of their fleet. Orders were made to Volvo and Hino in an effort to find a better vehicle. Hino and Volvo buses and coaches were purchased right up until the end of the NZRRS.

Restructuring

Road Services - Freightmaster Parcels Van, Wellington c1985 CND 28.328 Road Services - Freightmaster Parcels Van, Wellington.jpg
Road Services - Freightmaster Parcels Van, Wellington c1985

In 1985 the land operations of NZRC was restructured into market-based bi-modal (road and rail) business groups, rather than branches based on mode of transport,. [5] As part of the new Passenger Business Group, NZRRS was progressively rebranded:

The freight trucking business was split off and combined with rail freight into the Freight Business Group, branded Railfreight Systems. [5]

Privatisation

Road and rail services were separated in 1991 when the rail and ferry operations of New Zealand Railways Corporation were transferred to New Zealand Rail Limited and the road transport operations were sold: [5]

The road freight operation stayed with the railways, eventually becoming part of Tranz Link in 1995.

Related Research Articles

<span class="mw-page-title-main">Transport in New Zealand</span> Overview of the transport in New Zealand

Transport in New Zealand, with its mountainous topography and a relatively small population mostly located near its long coastline, has always faced many challenges. Before Europeans arrived, Māori either walked or used watercraft on rivers or along the coasts. Later on, European shipping and railways revolutionised the way of transporting goods and people, before being themselves overtaken by road and air, which are nowadays the dominant forms of transport. However, bulk freight still continues to be transported by coastal shipping and by rail transport, and there are attempts to (re)introduce public transport as a major transport mode in the larger population centres.

<span class="mw-page-title-main">Railway preservation in New Zealand</span>

Railway preservation in New Zealand is the preservation of historically significant facets of New Zealand's rail transport history. The earliest recorded preservation attempt took place in 1925, although the movement itself did not start properly until 1960.

<span class="mw-page-title-main">Rail transport in New Zealand</span>

Rail transport in New Zealand is an integral part of New Zealand's transport network, with a nationwide network of 4,375.5 km (2,718.8 mi) of track linking most major cities in the North and South Islands, connected by inter-island rail and road ferries. Rail transport in New Zealand has a particular focus on bulk freight exports and imports, with 19 million net tonnes moved by rail annually, accounting for more than half of rail revenue.

<span class="mw-page-title-main">NZR RM class (Silver Fern)</span>

The NZR RM class Silver Fern was a class of rail motor in New Zealand. The three air-conditioned and sound-proofed 723-kW 96-seater diesel-electric twin-set railcars were built by Kawasaki under contract with Nissho Iwai of Japan. New Zealand Railways (NZR) classified the railcars as RM (Rail Motor), the same as other railcars, using the Silver Ferns (a national symbol of New Zealand) because of their exterior was made of corrugated stainless steel, like the premier night sleeper train that also ran on the Wellington-Auckland (North Island Main Trunk) route, the Silver Star. The Silver Ferns replaced the three successful Blue Streak railcars on the service.

<i>Silver Star</i> (NZR train) Former New Zealand Passenger Train

The Silver Star was a luxury passenger train that ran overnight between Auckland and Wellington on the North Island Main Trunk (NIMT) railway of New Zealand, operated by New Zealand Railways (NZR). The train ran from Monday 6 September 1971 until Sunday 8 June 1979. It replaced the Night Limited express passenger trains which provided a faster service than the ordinary express trains, by stopping at only six intermediate stations en route and not hauling a postal (sorting) van as on previous trains.

<span class="mw-page-title-main">NZR P class (1885)</span>

The P class was a class of steam locomotives built to haul freight trains on the national rail network of New Zealand. The class consisted of ten individual locomotives ordered from the British company of Nasmyth, Wilson and Company in 1885, but miscommunications about the weight limitations imposed on the locomotives meant they did not start work until 1887. This debacle came at a time when the New Zealand Railways Department (NZR) was suffering from a lack of motive power to work on its rapidly expanding network and was part of what prompted a shift towards American and home-grown manufacturers.

<span class="mw-page-title-main">Hillside Engineering</span>

Hillside Engineering Group is a trading division of the rail operator KiwiRail in Dunedin, New Zealand. Most of its work is related to KiwiRail, but it also does work for the marine industry in Dunedin. On 19 April 2012 KiwiRail announced it was putting Hillside on the market for sale. In November 2012 KiwiRail announced it had sold part of the business to Australian firm Bradken, and the rest would be closed. The workshops continued to be used for some maintenance work by Kiwirail with a skeleton staff. In October 2019, the New Zealand Government announced that it would be investing NZ$20 million into revitalising Hillside Engineering as a major mechanical hub and engineering facility to service Kiwi Rail's locomotives and rollingstock.

<span class="mw-page-title-main">New Zealand Railways Department</span> Government agency (1880–1982)

The New Zealand Railways Department, NZR or NZGR and often known as the "Railways", was a government department charged with owning and maintaining New Zealand's railway infrastructure and operating the railway system. The Department was created in 1880 and was corporatised on 1 April 1982 into the New Zealand Railways Corporation. Originally, railway construction and operation took place under the auspices of the former provincial governments and some private railways, before all of the provincial operations came under the central Public Works Department. The role of operating the rail network was subsequently separated from that of the network's construction. From 1895 to 1993 there was a responsible Minister, the Minister of Railways. He was often also the Minister of Public Works.

<span class="mw-page-title-main">NZR RM class (88 seater)</span>

The NZR RM class 88-seaters were a class of railcar used in New Zealand. New Zealand Government Railways (NZR) classified them as RM (Rail Motor), the notation used for all railcars, numbering the 35 sets from RM100 to RM134. They were the most numerous railcars in NZR service. Their purchase and introduction saw the demise of steam-hauled provincial passenger trains and mixed trains, and was part of a deliberate effort to modernise NZR passenger services at a time of increasing competition from private motor vehicles. Being diesel powered and lighter the railcars were less expensive to operate and able to maintain quicker timetables, although became plagued with mechanical and electrical problems, with a number of the class eventually being turned into depowered locomotive-hauled carriages and reclassified as the AC class "Grassgrubs".

NZR J<sup>A</sup> class

The NZR JA class was a class of fifty-one 4-8-2 steam locomotives operated by the New Zealand Railways Department (NZR). The locomotives were built in two batches; the first batch was constructed in-home at the Hillside Workshops at Dunedin between 1946 and 1956, while the second batch was produced by the North British Locomotive Company (NBL) of Glasgow, Scotland in 1951. To differentiate between the two batches, the locomotives were identified by their builder.

<span class="mw-page-title-main">New Zealand DE class locomotive</span>

The New Zealand DE class was a class of fifteen diesel-electric shunting locomotives, introduced by the New Zealand Railways (NZR) with an intention to replace steam locomotives on shunting duties with diesel power. The class was physically similar to the Tasmanian Government Railways X class, which was also of English Electric design.

The South Island Limited was a passenger express train operated by the New Zealand Railways Department (NZR) between 1949 and 1970. It operated over the almost 590 kilometres (370 mi) route between Christchurch and Invercargill. It was replaced by the Southerner.

Transport in Invercargill, New Zealand is mostly by bus and private car.

<span class="mw-page-title-main">Public transport in New Zealand</span>

Urban bus transport is the main form of public transport in New Zealand. Two of the country's largest cities, Auckland and Wellington, also have suburban rail systems, while some cities also operate local ferry services. There are no rapid transit metros and no remaining tram systems active anywhere in New Zealand, though trams once had a major role in New Zealand's public transport.

<span class="mw-page-title-main">New Zealand Railways Corporation</span>

New Zealand Railways Corporation (NZRC) is the state-owned enterprise that owns the land beneath KiwiRail's railway network on behalf of the Crown. The corporation has existed under a number of guises since 1982, when the old New Zealand Railways Department was corporatised followed by deregulation of the land transport sector. In 1986, the Corporation became a State-owned enterprise, required to make a profit. Huge job losses and cutbacks ensued, and the rail network, rail operations and ferry service of the corporation were transferred to New Zealand Rail Limited in 1990. The Corporation retained ownership of the land beneath the railway network, and charged a nominal rental to New Zealand Rail, which was privatised in 1993, and renamed Tranz Rail in 1995. In 2004, following a deal with Tranz Rail's new owners Toll NZ, the Corporation took over responsibility for maintaining and upgrading the rail network once more, trading under the name ONTRACK. Negotiations with Toll over track access charges concluded after four years with no agreement reached, so the government purchased the entire rail and ferry operations, naming the service KiwiRail. ONTRACK's railway infrastructure and employees were then transferred to KiwiRail in 2008, which itself was initially a subsidiary of the corporation. On 31 December 2012, the Corporation once again became the landowner.

<span class="mw-page-title-main">Trams in New Zealand</span>

Trams in New Zealand were a major form of transport from the 19th century into the mid-20th century. New Zealand's first (horse) tramway was established in 1862 (Nelson), followed by a steam tramway in 1871 (Thames), and the first electric tramway in 1900. In New Zealand railway terminology a bush tramway is an industrial tramway, which usually did not carry passengers.

<span class="mw-page-title-main">Lyttelton Line</span> Railway line between Lyttelton and Christchurch, New Zealand

Lyttelton Line is a name sometimes used to refer to the section of the Main South Line in New Zealand's South Island between Lyttelton and Christchurch, and can also be used to refer to the operations on this section. As it has always been part of the Main South Line, this name has never been officially used to refer to the track itself.

<span class="mw-page-title-main">NZR 56-foot carriage</span> Passenger rolling stock in New Zealand

The NZR 56-foot carriage is a class of 56 ft (17 m) long railway passenger carriage formerly used on almost all long-distance passenger rail transport in New Zealand. 88 carriages have been preserved.

References

Citations

  1. "Railways Buses. Hastings - Napier. First to Run in New Zealand". The New Zealand Railways Magazine. 1 (8). New Zealand Government Railways Department, Wellington: 21. 15 January 1928. Retrieved 5 May 2024.
  2. 1 2 Railway Road Services KiwiRail
  3. Snell, J.B. (June 1954). Cooke, B.W.C. (ed.). "The New Zealand Government Railways - 1". The Railway Magazine. Vol. 100, no. 638. Westminster: Tothill Press. p. 385.
  4. "50 Years of Tradition ...and as modern as tomorrow... Railways Road Services (advertisement)". No. The Press. Christchurch. Papers Past. 10 November 1976. p. 25. Retrieved 6 May 2024.
  5. 1 2 3 4 5 Churchman & Hurst 2001.
  6. Michael Hannah (5 November 1984). "Bus Service Upsets Rail Union". The Press. Christchurch. Papers Past. p. 4. Retrieved 5 May 2024.
  7. "NEW SUPER BUS. OPOTIKI NEWS". paperspast.natlib.govt.nz. 16 June 1950. Retrieved 14 August 2021.
  8. "More Competetive Parcels Service". The Press. Christchurch. Papers Past. 15 September 1987. p. 30. Retrieved 6 May 2024.
  9. "Railways Corp, to Change Name". The Press. Christchurch. Papers Past. 3 December 1987. p. 37.
  10. "Cityline bus and train logo". The Press. No. 11 August 1988. Christchurch. Papers Past. p. 16. Retrieved 6 May 2024.
  11. "From $1 | Bus Tickets | Cheap Bus Tickets | Bus Passes - InterCity From $1 | Bus Tickets | Cheap Bus Tickets | Bus Passes". Intercitycoach.co.nz. Retrieved 3 October 2011.
  12. "Tranzrich Travel Ltd and Guthreys Intercity Coach Services Ltd" (PDF). Commerce Commission. 11 April 1997.

Bibliography

  • Bellamy, AC (1981). New Zealand Railways Road Services. Wellington: Southern Press Limited. ISBN   0-908616-00-7.
  • Churchman, Geoffrey B; Hurst, Tony (2001) [1990, 1991]. The Railways of New Zealand: A Journey through History (Second ed.). Transpress New Zealand. ISBN   0-908876-20-3.