The Baltimore and Potomac Tunnel (or B&P Tunnel) is a double-tracked, masonry arch railroad tunnel on the Northeast Corridor in Baltimore, Maryland, just west of Pennsylvania Station. Opened in 1873, the tunnel is used by about 140 Amtrak and MARC passenger trains and two freight trains every day, as of 2008. [1]

Contents

The 7,669-foot (2,338 m) tunnel, which passes under the Baltimore neighborhoods of Bolton Hill, Madison Park, and Upton, consists of a single tube with two tracks. It is punctuated by two open-air cuts for ventilation of exhaust fumes and smokePennsylvania Avenue Opening and John Street Openingthat divide the main tunnel into three "sub-tunnels", designated (from south to north) Gilmor Street Tunnel, Wilson Street Tunnel, and John Street Tunnel. [1] [2] [3]

History and operations

Constructed by the Baltimore and Potomac Railroad under Winchester Street and Wilson Street in Baltimore, the tunnel opened on June 29, 1873. [4] The construction of the tunnel required 13 million bricks and the waste dirt was used to shore up several areas of the city allowing for the construction of more homes and buildings. [5] The B&P tunnel allowed the Pennsylvania Railroad (PRR) direct access to Washington, D.C., for the first time by connecting its Northern Central Railway affiliate, which arrived in Baltimore from the north, to the Baltimore and Potomac's new spur, which ran to Washington, D.C. [6]

Between 1916 and 1917, the PRR expanded the tunnel to accommodate larger trains. The railroad lowered the tunnel floor about 2+12 feet (0.76 m), underpinned the side walls, installed a concrete invert slab, and rebuilt the track structure. The bases of the tunnel walls were chipped away to improve horizontal clearance. [7]

Before the PRR electrified its New York City–Washington main line in 1935, the poorly ventilated tunnel filled with smoke from steam locomotives. The smoke also was a nuisance to the residential neighborhoods above the tunnel. [7]

In preparation for the electrified operation, the tunnel was lined with gunite to waterproof the arch and prevent icicles from shorting out the catenary wires.

Financial considerations prevented the PRR from constructing a new passenger tunnel on the Presstman Street alignment, for which it previously had acquired rights. The PRR's plan had envisioned using the new Presstman Street tunnel and the original bores of the Union Tunnel for passenger operations, while the old B&P Tunnel and the newer bores of the Union Tunnel (completed in the 1930s) would have been used for freight operations. [7]

In the late 1950s, the tunnel became a hindrance to the growth of PRR's Trailer-on-Train service, which required additional vertical and horizontal clearance to accommodate semi-trailers on top of railroad flatcars. The curve at Pennsylvania Avenue was the biggest constraint. The PRR modified the tunnel walls and ceiling for a distance of 2,200 feet (670 m) to improve clearance and enable high cars and piggyback trailers to traverse the tunnel without damaging their roofs. [7] Additionally, a 928-foot (283 m) gauntlet track was installed on southbound Track 3 to shift trains 17 inches (430 mm) closer to the middle of the tunnel. However, the gauntlet track effectively created a single-track tunnel: trains could not use Track 2 while a train was using the gauntlet track, and if a train using the gauntlet track became disabled, the tunnel would be shut down until the disabled train was moved. [7] In addition, even with the gauntlet track, the tunnel could not accommodate cars that were taller than 16 feet 3 inches (4.95 m) or exceeded the Plate C loading gauge. [7]

In the early 1980s, the tunnel underwent rehabilitation as part of the Northeast Corridor Improvement Project. The repairs included replacing the existing invert, repairing the tunnel lining, upgrading the track structure, installing a new gauntlet track, and rehabilitating the tunnel drainage system. No fundamental change was made in the tunnel's difficult geometry. Eventually,[ when? ] the gauntlet track was removed, due to freight traffic largely shifting to the ex-Baltimore and Ohio route through the Howard Street Tunnel. [7]

Problems

The tunnel has long been one of the worst bottlenecks for rail traffic along the Northeast Corridor [8] and its maintenance is costly:

Collectively, the tunnel's height, speed, and capacity limitations threaten the ability for the Port of Baltimore to be competitive with increased shipping volumes. [10]

Plans for improvements

In June 2008, the U.S. House of Representatives voted to support a study of the environmental impacts of different possible replacement tunnels. [1] On January 28, 2010, $60 million in funding was awarded under the American Recovery and Reinvestment Act to conduct the study, but not the money that would be required for a replacement tunnel. [11] Estimates in 2013 put the cost around $1.5 billion. [12]

An outgrowth of the ARRA funds, the B&P Tunnel Project was an environmental and engineering study by the FRA, MDOT, and Amtrak to evaluate potential improvements to the tunnel. The study held multiple open houses in 20142015 to share information and solicit public input.

Preliminary alternatives

In December 2014, the study published the Preliminary Alternatives Screening Report, in which four alternatives from 16 were selected to be carried forward for further consideration and study: [13] [14] [15]

Among the criteria used to evaluate the alternatives was the ability to accommodate double-stack container cars. The 12 eliminated alternatives included several that varied greatly from the existing alignment and bypassed Pennsylvania Station entirely (including one using the former I-170 right of way), as well as several that reused one or more of the three existing tunnel sections. [15] [18]

Selected alternative

In November 2016, Alternative 3B (Great Circle) was chosen as the preferred alternative in the Final Environmental Impact Statement (FEIS) over Alternative 1 (No Build) and two other variations of the Great Circle Alternative (Alternatives 3A and 3C). [19] Highlights of Alternative 3B are:

The Federal Railroad Administration released its Record of Decision on the new tunnel, the final step in the NEPA process, in March 2017. [20]

Final plan

In June 2021, Amtrak and Maryland announced that they would be moving forward with design and construction of the new tunnel, albeit with several significant changes from the previously announced plan (Alternative 3B): [21] [22]

The changes were made to reduce the project's cost by $1 billion and to address concerns about diesel exhaust fumes from communities near the ventilation facilities. The changes did not trigger the need for a new Environmental Impact Statement. [22]

Frederick Douglass Tunnel

The new tunnel, which will be named for Frederick Douglass, is scheduled to open in 2035. [23] [24] Amtrak started the process to procure construction services in June 2022. [25] On January 30, 2023, President Joe Biden visited the tunnel to kick off the project and promote the $1 trillion Infrastructure Investment and Jobs Act (IIJA). Biden, who had taken "a thousand trips" through the tunnel on Amtrak between Wilmington and Washington during his time as Senator from Delaware, remarked that "you wonder how in the hell [the B&P Tunnel] is still standing". [26] [27] Amtrak was awarded $4.7 billion in Infrastructure Investment and Jobs Act funds in November 2023. Amtrak and Maryland MTA will contribute an additional $1.2 billion. [28] [29] Amtrak awarded a construction contract in February 2024 and demolition of several buildings began later that month. [30] [31] [32]

See also

Related Research Articles

<span class="mw-page-title-main">New York Penn Station</span> Major rail hub in New York City

Pennsylvania Station is the main intercity railroad station in New York City and the busiest transportation facility in the Western Hemisphere, serving more than 600,000 passengers per weekday as of 2019. The station is located beneath Madison Square Garden in the block bounded by Seventh and Eighth Avenues and 31st and 33rd Streets and in the James A. Farley Building, with additional exits to nearby streets, in Midtown Manhattan. It is close to several popular Manhattan locations, including Herald Square, the Empire State Building, Koreatown, and Macy's Herald Square.

<span class="mw-page-title-main">Northeast Corridor</span> Electrified railroad line in the Northeastern U.S.

The Northeast Corridor (NEC) is an electrified railroad line in the Northeast megalopolis of the United States. Owned primarily by Amtrak, it runs from Boston in the north to Washington, D.C. in the south, with major stops in Providence, New Haven, Stamford, New York City, Newark, Trenton, Philadelphia, Wilmington, and Baltimore. The NEC closely parallels Interstate 95 for most of its length. Carrying more than 2,200 trains a day, it is the busiest passenger rail line in the United States by ridership and service frequency.

<span class="mw-page-title-main">Washington Union Station</span> U.S. train station and transport hub

Washington Union Station, known locally as Union Station, is a major train station, transportation hub, and leisure destination in Washington, D.C. Designed by Daniel Burnham and opened in 1907, it is Amtrak's headquarters, the railroad's second-busiest station, and North America's 10th-busiest railroad station. The station is the southern terminus of the Northeast Corridor, an electrified rail line extending north through major cities including Baltimore, Philadelphia, New York City, and Boston, and the busiest passenger rail line in the nation. In 2015, it served just under five million passengers.

<span class="mw-page-title-main">MARC Train</span> U.S. passenger rail system in Baltimore–Washington metropolitan area

MARC is a commuter rail system in the Washington–Baltimore area. MARC is administered by the Maryland Transit Administration (MTA) and operated under contract by Alstom and Amtrak on track owned by CSX Transportation (CSXT) and Amtrak. In 2023, the system had a ridership of 3,860,600, or about 10,800 per weekday as of the first quarter of 2024, less than pre-COVID-19 pandemic weekday ridership of 40,000.

<span class="mw-page-title-main">Baltimore Penn Station</span> Intercity rail station in Maryland

Baltimore Penn Station, formally named Baltimore Pennsylvania Station in full, is the main inter-city passenger rail hub in Baltimore, Maryland. Designed by New York City architect Kenneth MacKenzie Murchison (1872–1938), it was constructed in 1911 in the Beaux-Arts style of architecture for the Pennsylvania Railroad. It is located at 1515 N. Charles Street, about a mile and a half north of downtown and the Inner Harbor, between the Mount Vernon neighborhood to the south, and Station North to the north. Originally called Union Station because it served the Pennsylvania Railroad and Western Maryland Railway, it was renamed to match other Pennsylvania Stations in 1928.

<span class="mw-page-title-main">SEPTA Regional Rail</span> Commuter rail service in Philadelphia, Pennsylvania, US

The SEPTA Regional Rail system is a commuter rail network owned by SEPTA and serving the Philadelphia metropolitan area. The system has 13 branches and more than 150 active stations in Philadelphia, Pennsylvania, its suburbs and satellite towns and cities. It is the sixth-busiest commuter railroad in the United States. In 2016, the Regional Rail system had an average of 132,000 daily riders and 118,800 daily riders as of 2019.

<span class="mw-page-title-main">Suburban Station</span> Station on the SEPTA Regional Rail

Suburban Station is an art deco office building and underground commuter rail station in Penn Center in Philadelphia. Its official SEPTA address is 16th Street and JFK Boulevard. The station is owned and operated by SEPTA and is one of the three core Center City stations on the SEPTA Regional Rail and one of the busiest stations in the Regional Rail System.

<span class="mw-page-title-main">Center City Commuter Connection</span> Railway tunnel in Center City Philadelphia

The Center City Commuter Connection (CCCC), commonly referred to as "the commuter tunnel", is a passenger railroad tunnel in Center City Philadelphia, Pennsylvania, The tunnel was built to connect the stub ends of the two separate regional commuter rail systems, which were originally operated by Pennsylvania Railroad and the Reading Company, two rival rail companies.

<span class="mw-page-title-main">Wilmington station (Delaware)</span> Passenger rail station in Wilmington, Delaware

Wilmington station, also known as the Joseph R. Biden, Jr., Railroad Station, is a passenger rail station in Wilmington, Delaware. It serves nine Amtrak train routes and is part of the Northeast Corridor. It also serves SEPTA Regional Rail commuter trains on the Wilmington/Newark Line as well as DART First State local buses and Greyhound Lines intercity buses.

<span class="mw-page-title-main">Baltimore and Potomac Railroad</span> American railway (1853–1902)

The Baltimore and Potomac Railroad (B&P) operated from Baltimore, Maryland, southwest to Washington, D.C., from 1872 to 1902. Owned and operated by the Pennsylvania Railroad, it was the second railroad company to connect the nation's capital to the Northeastern U.S., and competed with the older Baltimore and Ohio Railroad.

<span class="mw-page-title-main">Philadelphia, Wilmington and Baltimore Railroad</span> Railway company, later part of the Pennsylvania Railroad

The Philadelphia, Wilmington and Baltimore Railroad (PW&B) was an American railroad that operated independently from 1836 to 1881. Headquartered in Philadelphia, it was greatly enlarged in 1838 by the merger of four state-chartered railroads in three Mid-Atlantic states to create a single line between Philadelphia and Baltimore.

<span class="mw-page-title-main">West Baltimore station</span> Railway station in Baltimore, Maryland

West Baltimore station is a commuter rail station located in the western part Baltimore, Maryland, along the Northeast Corridor. It is served by MARC Penn Line trains. The station is positioned on an elevated grade at 400 Smallwood Street near parallel West Mulberry and West Franklin Streets extending off U.S. Route 40. Three large surface lots are available for commuters. The station only has staircases from street level and two low-level side platforms next to the outer tracks and is thus not accessible to people with some mobility disabilities, but MTA Maryland plans to renovate the station with accessible platforms and entrances.

<span class="mw-page-title-main">Keystone Corridor</span> Rail corridor in Pennsylvania

The Keystone Corridor is a 349-mile (562 km) railroad corridor between Philadelphia and Pittsburgh, Pennsylvania, that consists of two rail lines: Amtrak and SEPTA's Philadelphia-to-Harrisburg main line, which hosts SEPTA's Paoli/Thorndale Line commuter rail service, and Amtrak's Keystone Service and Pennsylvanian inter-city trains; and the Norfolk Southern Pittsburgh Line. The corridor was originally the Main Line of the Pennsylvania Railroad.

<span class="mw-page-title-main">Paoli station</span> Train station in Paoli, Pennsylvania

Paoli station is a passenger rail station located in the western suburbs of Philadelphia at 13 Lancaster Avenue, Paoli, Pennsylvania. It is served by Amtrak's Keystone Service and Pennsylvanian trains, and most SEPTA Paoli/Thorndale Line trains.

<span class="mw-page-title-main">Amtrak Susquehanna River Bridge</span> Bridge in Maryland, U.S.

The Amtrak Susquehanna River Bridge is a Howe deck truss structure, opened in 1906, that carries two tracks of Amtrak's Northeast Corridor line across the Susquehanna River between Havre de Grace and Perryville, Maryland.

<span class="mw-page-title-main">North River Tunnels</span> Rail tunnels in New York and New Jersey

The North River Tunnels are a pair of rail tunnels that carry Amtrak and New Jersey Transit passenger lines under the Hudson River between Weehawken, New Jersey, and Pennsylvania Station in Manhattan, New York City, New York. Built between 1904 and 1908 by the Pennsylvania Railroad (PRR) to allow its trains to reach Manhattan, they opened for service in late 1910.

<span class="mw-page-title-main">Baltimore Belt Line</span> Baltimore USA railroad line

The Baltimore Belt Line was constructed by the Baltimore and Ohio Railroad (B&O) in the early 1890s to connect the railroad's newly constructed line to Philadelphia and New York City/Jersey City with the rest of the railroad at Baltimore, Maryland. It included the Howard Street Tunnel, the Mount Royal Station for B&O's Royal Blue Line passenger trains, and the first mainline railroad electrification in the United States. CSX Transportation currently operates the line as part of its Baltimore Terminal Subdivision.

<span class="mw-page-title-main">North Philadelphia station</span> Railway station in Philadelphia, Pennsylvania, US

North Philadelphia station is an intercity rail and regional rail station on the Northeast Corridor, located on North Broad Street in the North Philadelphia neighborhood of Philadelphia, Pennsylvania, United States. SEPTA Regional Rail's Trenton Line and Chestnut Hill West Line account for most of the station's service. Three Amtrak trains, two southbound and one northbound, stop on weekdays only.

<span class="mw-page-title-main">Virginia Avenue Tunnel</span>

The Virginia Avenue Tunnel is a pair of railroad tunnels in Washington, D.C. owned by CSX Transportation. It is part of the CSX RF&P Subdivision and serves freight trains along the eastern seaboard routes, providing a bypass around Union Station.

<span class="mw-page-title-main">Hell Gate Line</span> Railroad line in New York

The Hell Gate Line is the portion of Amtrak's high-speed Northeast Corridor between Harold Interlocking in Sunnyside, Queens, and Shell Interlocking in New Rochelle, New York, within the New York metropolitan area.

References

  1. 1 2 3 Brown, Matthew Hay (June 12, 2008). "House OKs funds for tunnel study: Alternative sought to outmoded passage that runs under city". The Baltimore Sun .
  2. "Existing B&P Tunnel and Vicinity Map" (PDF). B&P Tunnel Project. May 2014. Archived from the original (PDF) on November 29, 2014. Retrieved November 19, 2014.
  3. 1 2 "Alternative 2: Restore/Rehabilitate Existing Tunnel" (PDF). B&P Tunnel Project. October 2014. Archived from the original (PDF) on November 29, 2014. Retrieved November 19, 2014.
  4. Wilson, William Bender (1895). History of the Pennsylvania Railroad Company: With Plan of Organization. Philadelphia: Henry T. Coates. p.  339. tunnel.
  5. "BALTIMORE AND POTOMAC RAILROAD: Stockholders' Annual Meeting". The Baltimore Sun. September 7, 1871.
  6. Robert T. Netzlof (June 12, 2002). "Corporate Genealogy Union Railroad". Archived from the original on December 14, 2007. Retrieved October 1, 2007.
  7. 1 2 3 4 5 6 7 8 9 U.S. Federal Railroad Administration. Washington, DC. "Report To Congress: Baltimore's Railroad Network, Challenges and Alternatives." November 2005. p. 2.16.
  8. Porter, David (September 29, 2015). "A look at the worst bottlenecks on the Northeast Corridor". The Hour . Norwalk, Connecticut. Associated Press . Retrieved October 14, 2020.
  9. "Purpose and Need Statement" (PDF). B&P Tunnel Project. September 29, 2014. Archived from the original (PDF) on November 29, 2014. Retrieved November 19, 2014.
  10. Rector, Kevin (May 22, 2015). "B&P Tunnel replacement new focus of Baltimore's push for double-stacked trains". The Baltimore Sun. Retrieved August 6, 2017.
  11. "Mikulski, Cardin Laud Federal Investment in High-Speed Rail for Maryland" (Press release). U.S. Senator Barbara Mikulski. January 28, 2010. Archived from the original on March 3, 2016.
  12. Rector, Kevin (November 22, 2013). "Aged tunnel where Amtrak train derailed may be replaced". The Baltimore Sun. Archived from the original on December 2, 2013. Retrieved November 25, 2013.
  13. "Preliminary Alternatives Screening Report" (PDF). B&P Tunnel Project. December 2014. Archived from the original (PDF) on March 4, 2016. Retrieved October 13, 2015.
  14. "Next Steps" (PDF). B&P Tunnel Project. October 2014. Archived from the original (PDF) on November 29, 2014. Retrieved November 19, 2014.
  15. 1 2 "Preliminary Alternatives Map" (PDF). B&P Tunnel Project. October 2014. Archived from the original (PDF) on November 29, 2014. Retrieved November 19, 2014.
  16. "Alternative 3: Great Circle Passenger Tunnel" (PDF). B&P Tunnel Project. October 2014. Archived from the original (PDF) on November 29, 2014. Retrieved November 19, 2014.
  17. "Alternative 11: Robert Street South" (PDF). B&P Tunnel Project. October 2014. Archived from the original (PDF) on November 29, 2014. Retrieved November 19, 2014.
  18. "Evaluation of Preliminary Alternatives" (PDF). B&P Tunnel Project. October 2014. Archived from the original (PDF) on November 29, 2014. Retrieved November 19, 2014.
  19. "Final Environmental Impact Statement". B&P Tunnel Project. November 2016. Archived from the original on December 20, 2016. Retrieved December 16, 2016.
  20. "Record of Decision (ROD)". B&P Tunnel Project. Archived from the original on August 3, 2017. Retrieved August 3, 2017.
  21. Lazo, Luz (June 18, 2021). "A 148-year-old tunnel is the biggest rail bottleneck between D.C. and New Jersey. Here's the new plan to replace it". The Washington Post . Retrieved June 22, 2021.
  22. 1 2 "B&P Tunnel Replacement Program: Frequently Asked Questions" (PDF). Amtrak.
  23. "President Biden visits Baltimore to discuss upgrades to newly-named Frederick Douglass Tunnel". CBS News . Retrieved January 31, 2023.
  24. "FREDERICK DOUGLASS TUNNEL PROGRAM FREQUENTLY ASKED QUESTIONS" (PDF). 2023. Retrieved November 6, 2023.
  25. "Amtrak Launches Procurement for Upcoming Major Contract for the B&P Tunnel Replacement Program" (Press release). Amtrak. June 21, 2022.
  26. Megerian, Chris (January 30, 2023). "'Amtrak Joe' Biden hails plans for big East Coast tunnel fix". Associated Press . Retrieved February 1, 2023.
  27. Wanek-Libman, Mischa (January 31, 2023). "B&P Tunnel Replacement Program gets state funding boost and visit from President Biden". Mass Transit Magazine.
  28. "FY 2022-2023 Federal-State Partnership for Intercity Passenger Rail Program for the Northeast Corridor (FSP-NEC) Selections: Project Summaries" (PDF). Federal Railroad Administration. November 6, 2023.
  29. "FACT SHEET: President Biden Advances Vision for World Class Passenger Rail by Delivering Billions in New Funding" (Press release). The White House. November 6, 2023.
  30. "Amtrak selects builder for Frederick Douglass Tunnel". Trains News Wire. February 6, 2024. Retrieved February 6, 2024.
  31. "Amtrak Awards Contract to Build New Frederick Douglass Tunnel in Baltimore" (Press release). Amtrak. February 6, 2024.
  32. Rosa, Luigi; Hunter, Danelle (February 27, 2024). "Frederick Douglass Tunnel Program Update: Initial Demolition Begins" (Press release). Amtrak.