| Batang-Semarang Toll Road | |
|---|---|
| Jalan Tol Batang–Semarang | |
| Semartang/Batarang Toll Road | |
| Kalikuto Bridge on Batang–Semarang Toll Road | |
| Route information | |
| Part of | |
| Maintained by PT Jasamarga Semarang Batang (PT Jasa Marga Tbk and PT Waskita Toll Road (Waskita Karya)) | |
| Length | 75 km (47 mi) |
| Existed | 2018–present |
| Major junctions | |
| West end | Batang |
| East end | Semarang |
| Location | |
| Country | Indonesia |
| Major cities | |
| Highway system | |
Batang-Semarang Toll Road is a 75 kilometers long controlled-access toll road that connects Batang area with Semarang, Central Java, Indonesia. This toll road is part of Trans-Java Expressway which will connect Merak to Banyuwangi of the island of Java. [1] The toll road is operational since 2018. [2]
Until November 2017, its construction progress is at 55.7 percent. [3] [4] The construction of this toll road is divided into 5 sections:
Note: The number on the exits is based on the distance from the western terminus of the Jakarta-Cikampek Toll Road, while the distance numbers are based on the distance from the western terminus of this toll road only
| Province | Location | km | mi | Exit | Name | Destinations | Notes |
|---|---|---|---|---|---|---|---|
| Central Java | Kandeman, Batang Regency | 0 | 0.0 | 348 | Kandeman Toll Gate |
| Western terminus |
| Gringsing, Batang Regency | 23.96 | 14.89 | 371 | Gringsing Toll Gate |
| ||
| Weleri, Kendal Regency | 36.10 | 22.43 | 384 | Weleri Toll Gate |
| ||
| Pegandon, Kendal Regency | 47.04 | 29.23 | 395 | Kendal Toll Gate |
| ||
| Kaliwungu, Kendal Regency | 60.40 | 37.53 | 409 | Kaliwungu Toll Gate |
| ||
| Ngaliyan, Semarang | 64.88 | 40.31 | Kalikangkung Toll Gate (Main toll gate) | ||||
| 71.30 | 44.30 | 419 | Krapyak Interchange |
| Eastern terminus, Eastern end of | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
| |||||||