Bellevue City Hall | |
---|---|
Former names | 450 Bell Terrace |
General information | |
Status | Completed |
Type | Government office building |
Address | 450 110th Avenue NE Bellevue, Washington |
Coordinates | 47°36′51.7″N122°11′32.9″W / 47.614361°N 122.192472°W |
Completed | 1983 |
Renovated | 2006 |
Renovation cost | $121 million |
Owner | City of Bellevue |
Technical details | |
Floor count | 7 |
Design and construction | |
Architect(s) | Wright Forsen |
Renovating team | |
Renovating firm | SRG Partnership |
Main contractor | Lease Crutcher Lewis |
The Bellevue City Hall is a government office building and city hall in Bellevue, Washington. The current city hall, located in Downtown Bellevue, opened in 2006 after the $121 million renovation of a former Qwest data center. The data center, originally built for Pacific Northwest Bell in 1983, was acquired by the city government in 2002 for use by the Bellevue Police Department and later approved as the new city hall. It incorporates use of wood interiors and a terra cotta exterior that has been recognized with several design awards since its opening.
The city hall replaced an older office complex outside of downtown that was originally built in 1964. The site was renovated and expanded in 1978, but was slated for replacement a decade later. It was demolished in 2007 and replaced with a Lexus car dealership. The current city hall is located adjacent to the Bellevue Transit Center and will be home to a light rail station that opens in 2023.
Following the incorporation of Bellevue as a city on March 31, 1953, the government chose to lease the second floor of the Veterans of Foreign Wars office as its first seat of government. [1] The building, located at Main Street and 100th Avenue, was originally opened in 1893 as the city's first schoolhouse and later served as the city's first library. [2] [3]
An advisory committee was formed by the city council in 1956 to propose sites for a new city hall and civic center campus. [4] The city council placed a $250,000 bond issue on the November 1956 ballot to fund the construction of a new city hall, [5] but voters defeated the proposition. [6] City offices instead moved to a former hardware store near the Bellevue Square shopping center in 1960. [7] [8]
Preliminary plans for a consolidated municipal office building were approved by the city council in February 1963, with the $320,000 cost being funded with regular tax income, rather than a bond measure as previously attempted. The new civic center would be located on the south side of Main Street between Interstate 405 and 116th Avenue. [9] The three-story building, which would serve as Bellevue's city hall, was dedicated on March 7, 1964, by Governor Albert D. Rosellini. [2] [10] A public library was opened adjacent to the municipal building in 1967, [11] as part of the development of the 8-acre (3.2 ha) civic center campus. [12]
By 1969, the city hall was described as "badly crowded" because of Bellevue's rapid population growth, and the campus was seen as a possible home for the Bellevue School District and King County offices. [13] City manager L. Joe Miller proposed a combined civic complex with a city hall, school district offices, and county facilities the following year, but the grand plan was not pursued by the city government. [14] In 1978, a $4 million, five-story office building was constructed on the civic center campus to serve as an addition to the city hall; the new building consolidated offices from three other locations within the city. [2] [15] The new building, called the "ugliest ever built east of Lake Washington", was built for future conversion into a conventional office building once the city's offices moved to Wilburton Hill. [16] The existing city hall was vacated and renovated to add a modern facade, air conditioning, and an additional floor. [16]
In the late 1980s, the city of Bellevue began studying a possible civic center with a new city hall, courthouses, a jail, a museum and a basketball arena for the Seattle SuperSonics. [17] The civic center plan was scaled back to a single convention center in downtown Bellevue, Meydenbauer Center, and a new downtown library, both of which opened in 1993; [18] the plan for a city hall was seen as controversial and unnecessary at the time. [19] In 1990, the city hall area was proposed as the site of a county jail and courthouse to serve the Eastside. [20] The proposed site, located north of city hall, was seen as undesirable because of its existing wetlands and was rejected in favor of a site near Overlake Hospital Medical Center. [21]
After Bellevue's decision to relocate city offices to Downtown Bellevue, the 10.7-acre (4.3 ha) site was sold in 2003 for $24.7 million to a Lexus car dealership. [22] The new dealership opened in 2007, using 7 acres (2.8 ha) of the property. [23]
450 Bell Terrace, [24] a nine-story, 476,270-square-foot (44,247 m2) building, was completed in 1983 for Pacific Northwest Bell. The building housed a computer farm, telecommunications infrastructure, offices, and a parking garage. [25] [26] Pacific Northwest Bell was later acquired by US West Communications, which in turn became part of Qwest in 2000. [27]
In early 2002, Qwest approached the City of Bellevue with an offer to purchase the building from them, as office vacancies had been high in recent years. [28] The city had already been considering a new headquarters for their police department and studied whether to build a new city hall in Downtown Bellevue. [29] On November 25, 2002, the City of Bellevue agreed to purchase the Qwest building for $29 million, primarily to house the police and fire departments after $33 million in renovations. [30] The city council approved a preliminary plan to move other city offices into the Qwest building in March 2003, citing lower maintenance costs and plentiful capacity in the new building. [31] The plan was finalized in July, estimating the total cost of renovation at $102.4 million (including $29 million used to purchase the building in 2002), and returning the city hall to downtown for the first time in 25 years. [32] To finance the project, the city issued $103 million in 40-year municipal bonds, which were partially refunded in 2012. [33]
The existing Qwest building, described as a "foreboding" structure and an "architectural eyesore", [31] [34] would need to undergo a year-long renovation to become a "hub of civic life". [35] SRG Partnership was selected as the project's lead architect, and presented a new design for the building to the city council in February 2004. The concrete exterior would be clad in gray metal and red-brown terra cotta, and the dirt parking lot to the northwest of the block would become a public plaza and grass lawn. The center concourse would receive large windows and wood finishes, ending at a new city council chamber. [35]
A groundbreaking ceremony for the new city hall was held on July 29, 2004, and construction began under the direction of contractor Lease Crutcher Lewis, who built the original city hall, [36] the following month. [37] [38] During construction, inaccuracies and omissions in the design and problems with demolishing parts of the building led to delays and an over-run of $19.6 million, bringing the final budget to $121 million. [36] [39] The new city hall opened on February 21, 2006, and received praise for its use of wood panels and the concourse's terrazzo flooring. [40] The city hall's lower two floors, including the concourse, service desks, and the city council chamber, are open to the public; the remaining five floors house offices for city services. [40] The city hall was granted an American Institute of Architects Honor Award by the Seattle chapter, as well as an Environmental Protection Agency Energy Star award for energy efficiency. [41] [42] [43] The landscaped plaza was also recognized by the Canadian Society of Landscape Architects with a National Merit Award in 2008. [44]
In 2013, Sound Transit finalized its route for the East Link light rail project, serving Seattle, Bellevue and Redmond. It included the selection of the City Hall Plaza for the site of a station to serve Bellevue Transit Center. [45] [46] The light rail line, later named the 2 Line, opened in April 2024 and emerges from a tunnel under the transit center and continues east onto an elevated guideway that crosses 112th Avenue Northeast. [47] The station's entrance is at the northwest end of City Hall Plaza, which was rebuilt from 2017 to 2023 to prepare for the opening of the 2 Line. The plaza includes a bronze sculpture by Dan Corson and statues from Bellevue's sister city of Hualien, Taiwan. [48] A vacant part of the city hall complex is slated to be used for transit-oriented development. [49] [50]
In 2016, the Bellevue city council considered protecting the city hall's view of Mount Rainier, which would have been blocked under a proposed high-rise zoning plan for the East Main light rail station. The proposal, requested by city staffers, was intended to protect the view from public areas of the building, according to city spokespeople. [51] The city council decided against a formal protection of the view, favoring increased development near transit. [52]
Bellevue is a city in the Eastside region of King County, Washington, United States, located across Lake Washington from Seattle. It is the third-largest city in the Seattle metropolitan area, and the fifth-largest city in Washington. It has variously been characterized as a satellite city, a suburb, a boomburb, or an edge city. The population was 151,854 at the 2020 census. The city's name is derived from the French term belle vue.
Mountlake Terrace is a suburban city in Snohomish County, Washington, United States. It lies on the southern border of the county, adjacent to Shoreline and Lynnwood, and is 13 miles (21 km) north of Seattle. The city had a population of 19,909 people counted in the 2010 census.
The Downtown Seattle Transit Tunnel (DSTT), also referred to as the Metro Bus Tunnel, is a 1.3-mile-long (2.1 km) pair of public transit tunnels in Seattle, Washington, United States. The double-track tunnel and its four stations serve Link light rail trains on the 1 Line as it travels through Downtown Seattle. It runs west under Pine Street from 9th Avenue to 3rd Avenue, and south under 3rd Avenue to South Jackson Street. 1 Line trains continue north from the tunnel to Lynnwood City Center and south through the Rainier Valley past Seattle–Tacoma International Airport to Angle Lake station as part of Sound Transit's light rail network.
The Seattle Convention Center (SCC), formerly the Washington State Convention Center (WSCC), is a convention center in Seattle, Washington, United States. It consists of two buildings in Downtown Seattle with exhibition halls and meeting rooms: Arch along Pike Street and Summit on the north side of Pine Street. The former straddles Interstate 5 and connects with Freeway Park. The convention center was planned in the late 1970s and funded through $90 million in bonds issued by the state legislature.
Everett Station is a train station serving the city of Everett, Washington, United States. The station has been served by Cascades and Empire Builder since opening in 2002, replacing an earlier station near the Port of Everett. The four-story building also houses social service programs and is the center of a 10-acre (4 ha) complex that includes parking lots and a large bus station used primarily by Community Transit, Everett Transit, and Sound Transit Express. The station has served as the northern terminus of the Sounder N Line since 2003 and the Swift Blue Line since 2009. It consists of two side platforms, one serving Amtrak and the other serving Sounder commuter trains. Everett Station also functions as a park and ride, with 1,067 short-term parking spaces located in lots around the station after it was expanded by Sound Transit in 2009.
The 2 Line, also known as the East Link Extension, is a light rail line serving the Eastside region of the Seattle metropolitan area in the U.S. state of Washington. It is part of Sound Transit's Link light rail system and runs for 6.6 miles (10.6 km) in the cities of Bellevue and Redmond. The initial segment serves eight stations between South Bellevue and Redmond Technology stations and opened on April 27, 2024. The full line is scheduled to open in 2025 and is planned to include 18 miles (29 km) from west to east and serve twelve stations in Downtown Seattle, Mercer Island, Bellevue, and Redmond. The 2 Line will continue through the Downtown Seattle Transit Tunnel and share stations with the 1 Line through to Lynnwood City Center station.
SeaTac/Airport station is a light rail station in SeaTac, Washington, serving Seattle–Tacoma International Airport. It is on the 1 Line between Angle Lake and Tukwila International Boulevard stations. The line, part of Sound Transit's Link light rail system, runs north from SeaTac through the Rainier Valley to Downtown Seattle and the University of Washington. The station consists of an elevated island platform east of the terminals and parking garage of the airport.
Tukwila International Boulevard station is a light rail station in Tukwila, Washington, United States. It is located between SeaTac/Airport and Rainier Beach stations on the 1 Line from Seattle–Tacoma International Airport to Downtown Seattle. The station consists of two elevated side platforms enclosed within a structure northeast of the interchange of State Route 99 and State Route 518. As one of seven park and rides along the line, it includes 600 parking spaces in two lots.
International District/Chinatown station is a light rail station that is part of the Downtown Seattle Transit Tunnel in Seattle, Washington, United States. The station is located at the tunnel's south end, at 5th Avenue South and South Jackson Street in the Chinatown-International District neighborhood, and is served by the 1 Line of Sound Transit's Link light rail system. The station is located adjacent to Sound Transit headquarters at Union Station, as well as intermodal connections to Amtrak and Sounder commuter rail at King Street Station and the First Hill Streetcar.
Kent station is a train station in the city of Kent, Washington, United States, served by the S Line of the Sounder commuter rail network. It is located in downtown Kent and consists of two train platforms connected via a pedestrian overpass, a parking garage, and several bus bays. The station also has 996 parking stalls and is served by King County Metro and Sound Transit Express buses. Train service to Kent began in 2001 and the station's garage opened the following year. King County Metro began service from the bus bays in 2005, after a third phase of construction. Sound Transit plans to build a second parking garage in 2027 to accommodate additional demand at the station.
Auburn station is a train station in the city of Auburn, Washington, United States, served by S Line of the Sounder commuter rail network. It is located southwest of downtown Auburn and consists of two train platforms, a bus station, a parking garage, a public plaza, and a pedestrian bridge. The station has 633 parking spaces and is also served by Sound Transit Express, King County Metro, and Pierce Transit buses. Auburn station opened in 2000 and was built on the site of a former railroad station that was demolished in 1979. The parking garage and pedestrian bridge opened in 2003, and a second parking garage is planned to be built by 2027.
Pioneer Square station is a light rail station that is part of the Downtown Seattle Transit Tunnel in Seattle, Washington, United States. The station is located under 3rd Avenue at James Street, between Symphony and International District/Chinatown stations. It is served by the 1 Line, part of Sound Transit's Link light rail system, and provides connections to local buses and Colman Dock, a major ferry terminal serving areas west of Seattle.
3rd & Cherry, formerly Seattle Civic Square, is a planned 629-foot (192 m) tall, 57-story skyscraper in downtown Seattle, Washington, United States. The residential high-rise, located near Seattle City Hall and the Seattle Civic Center, will have 520 condominiums and amenity spaces, including a public plaza at ground level and retail spaces. It was originally proposed in 2007 but has been delayed due to political and financial issues, undergoing several redesigns under various developers. It is set to be built by Bosa Development and open in 2026. The skyscraper is located right next to an entrance to the Pioneer Square station on Line Seattle's Link light rail network.
Downtown Bellevue is the central business district of Bellevue, Washington, United States. It is bounded by I-405 to the east, NE 12th Street to the north, 100th Ave NE to the west, and Main Street to the south, and covers an area of around 400 acres (160 ha). It is the second largest city center in Washington state, with more than 50,000 employees and 12,000 residents. Geographically centered near the heart of the Puget Sound region, downtown Bellevue is a regional growth center offering over 9 million square feet (840,000 m2) of Class A office space, various major retail and entertainment locations, more than 2,500 hotel rooms and almost 10,000 housing units.
South Bellevue station is an elevated light rail station located in Bellevue, Washington, United States, an eastern suburb of Seattle. It opened on April 27, 2024, as the western terminus of the 2 Line of Sound Transit's Link light rail system. The station has a park and ride garage with 1,500 stalls and bus service from King County Metro and Sound Transit Express.
Bellevue Transit Center (BTC) is a bus station and light rail station in Bellevue, Washington, a suburb of Seattle. It is the main transit hub for the Eastside of King County, serving 20 routes from King County Metro and Sound Transit Express. The transit center is the western terminus of the RapidRide B Line, which runs east to Redmond.
Angle Lake station is a Link light rail station in SeaTac, Washington. The elevated station is the southern terminus of the 1 Line, which travels north to Seattle–Tacoma International Airport, the Rainier Valley, Downtown Seattle, and North Seattle, including the University of Washington. It also includes a large parking garage for passengers.
The Microsoft campus is the corporate headquarters of Microsoft Corporation, located in Redmond, Washington, United States, a part of the Seattle metropolitan area. Microsoft initially moved onto the grounds of the campus on February 26, 1986, shortly before going public on March 13. The headquarters has undergone multiple expansions since its establishment and is presently estimated to encompass over 8 million square feet (740,000 m2) of office space and have over 50,000 employees.
The Spring District is a transit-oriented development and neighborhood that is under construction in Bellevue, Washington. The 16-block, 36-acre (15 ha) development is centered around the Spring District station on the East Link Extension, a light rail line in the Link light rail system. It is located in the Bel-Red area between Downtown Bellevue and Redmond, currently used for light industry, roughly bounded on the west by 120th Avenue NE and the Eastside Rail Corridor rail trail, on the north by a King County Metro bus base, on the east by 124th Avenue NE, and on the south by NE 12th Street.
Bellevue 600 is a future high-rise office building developed by Amazon in Bellevue, Washington, United States. It began construction in 2021 and is scheduled to be completed in 2025. The 43-story, 600-foot-tall (180 m) building would join 555 Tower as the tallest building in Bellevue. The project is located in Downtown Bellevue at the intersection of Northeast 6th Street and 110th Avenue Northeast, adjacent to the Bellevue Transit Center and a future Link light rail station. A second phase would construct a 27-story tower to the west, replacing an existing office building.