Bexhill West branch line | |
---|---|
Overview | |
Status | Closed |
Owner | Crowhurst, Sidley & Bexhill Railway (1902-05) South Eastern Railway (1905-22) Southern Railway (1923-47) British Railways (1948-64) |
Locale | East Sussex, United Kingdom |
Termini | |
Stations | 3 |
Service | |
Type | Heavy rail |
System | Hastings Line |
Operator(s) | South Eastern & Chatham Railway (1902-22) Southern Railway (1923-47) British Railways (1948-64) |
History | |
Opened | 1 June 1902 |
Closed | 15 June 1964 |
Technical | |
Line length | 4 miles 40 chains (7.24 km) |
Track gauge | 4 ft 8+1⁄2 in (1,435 mm) standard gauge |
Bexhill West branch line | |||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
The Bexhill West branch line was a short double-track branch line which was opened on 1 June 1902. It was built by the Crowhurst, Sidley & Bexhill Railway under the patronage of the South Eastern Railway. The Chief Engineer to the project was Lt Col Arthur John Barry. [1] Diverging from the Hastings Line at Crowhurst, an intermediate station at Sidley was served before the terminus was reached at Bexhill West. The line was closed under the Beeching Axe on 15 June 1964.
In the late nineteenth century, Bexhill had expanded rapidly. [2] The town had been served by the London, Brighton and South Coast Railway since the opening of Bexhill Central on 27 June 1846. [3] In 1896, a line was promoted by the Crowhurst, Sidley and Bexhill Railway, which was nominally independent. The scheme was supported by the South Eastern Railway, [2] which entered into an operating arrangement with the London, Chatham and Dover Railway which came into effect on 1 January 1899, forming the South Eastern and Chatham Railway. [4] The Crowhurst, Sidley & Bexhill Railway Company was incorporated in 1897, and permission was granted in that year for the line's construction. [5] Lt Col Arthur John Barry was appointed as Chief Engineer to the project. [1]
The construction of the branch included a new station at Crowhurst (grid reference TQ 760 129 ), on the Hastings Line, [2] where a private siding had existed since about 1877; [6] an intermediate station at Sidley ( TQ 743 090 ) and the terminus at Bexhill-on-Sea ( TQ 735 074 ). Between Crowhurst and Sidley, a major viaduct was built to carry the line across a valley. [2] The line was supported by the South Eastern Railway because it was hoped that passengers would use that line instead of the London, Brighton and South Coast Railway's routes to London, which were 10 miles (16 km) or 16 miles (26 km) longer, depending on whether one travelled via Plumpton or Brighton. [2] Seven contractors' locomotives were used in the construction of the line, one of which was an 0-6-0ST named St Leonards. Over 300,000 cubic yards (230,000 m3) of earth was moved during the construction of the line. [7] Initially, the line had some success, but following the electrification of the railway between Hastings and Brighton in 1935, traffic on the branch declined. [5]
The line diverged from the Hastings Line at a point 9 chains (180 m) south of Crowhurst and headed in a generally southerly direction. After crossing the Combe Haven Viaduct, the line swung to the south west. Sidley station was reached at 3 miles 37 chains (5.57 km). The line then continued in a south westerly direction, which became southerly on the approach to Bexhill West, 4 miles 40 chains (7.24 km) from Crowhurst. [8] The line was double track throughout. [2]
The largest structure on the line was the Combe Haven Viaduct (grid reference TQ 763 104 ), [2] which was also known as the Filsham, Sidley or Crowhurst Viaduct. [9] It was 416 yards (380 m) long, [10] and 67 feet (20 m) high, with seventeen arches. The viaduct took two years to build, due to the nature of the ground it was built on. [2] Built at a cost of £244,000, [11] over 9,000,000 bricks were used in the construction of the viaduct. [2] Concrete blocks were used for the foundations, each one measuring 52 by 30 feet (15.8 by 9.1 m) and 32 feet (9.8 m) deep. [11] [12] Following the closure of the line, it was proposed in late 1968 to demolish the viaduct. Local residents were opposed to the plan, and a question was asked in Parliament by Neill Cooper-Key regarding the preservation of the viaduct, which was not listed. Kenneth Robinson answered that British Railways were prepared to transfer ownership of the viaduct to any group willing to take it, but that maintenance costs were considerable. [13]
There were three stations built for the line:
The line was operated from the outset by the South Eastern and Chatham Railway. The South Eastern Railway absorbed the Crowhurst, Sidley and Bexhill Railway Company in 1905. [5] Under the SE&CR, services were worked by the older classes of SER locomotives, which were stationed at Bexhill. These continued until 1936, when push-pull trains were introduced. Under British Railways, push-pull services were operated by H Class 0-4-4T locomotives. [18] Through services between Bexhill and Charing Cross were worked by Schools Class 4-4-0 locomotives.; [9] these were withdrawn at the beginning of the Second World War and never reinstated. [19] Between 27 November 1949 and 5 June 1950, Bo Peep tunnel was closed to traffic and all services on the Hastings line were diverted to Bexhill West. [6] A push-pull service operated between Crowhurst Junction and West St Leonards during the closure of the tunnel. [20]
When steam was eliminated from the Hastings Line, Diesel-Electric Multiple Units took over the services. [18] This took place in June 1958; a new timetable was introduced at the same time, providing the line with an hourly service. [19] During the latter years of steam on the Hastings Line, a service between Etchingham and Bexhill West was operated for schoolchildren. [7] It was continued during the early years of the Hastings Diesel units; these were six-car trains, but the service was not shown in public timetables. [21]
A daily freight train ran from Tonbridge to Bexhill West. In 1958 it was usually hauled by a Q class engine. [22]
It is claimed[ who? ] that the timetables were altered to the detriment of those commuters who wished to use the line. Fares were also raised, adding a further disincentive. The line was closed as part of the Beeching Axe. [23] The last day of public services was 14 June 1964. Some of the services on that day were operated by 6S DEMU № 1007, [24] and 2H DEMU № 1120. The 6S was running reduced to four carriages at the time. [25] The Coombe Valley viaduct was demolished in two stages, on 23 May and 12 June 1969. [11]
Herne Hill railway station is in the London Borough of Lambeth, South London, England, on the boundary between London fare zones 2 and 3. Train services are provided by Thameslink to London Blackfriars, Farringdon, St Pancras International and St Albans on the Thameslink route and by Southeastern to London Victoria and Orpington on the Chatham Main Line. It is 3 miles 76 chains (6.4 km) down the line from Victoria.
The Oxted line is a railway line in southern England. It runs from the Brighton Main Line at South Croydon in Greater London to Hurst Green Junction in Surrey, where its two branches diverge. The western branch continues via Lingfield to East Grinstead in West Sussex, whereas the eastern branch runs via Edenbridge in Kent and Crowborough in East Sussex to Uckfield. The line is named after the town of Oxted in Surrey and also serves parts of the London Borough of Croydon. The 18-mile-26-chain (29.5 km) South Croydon–East Grinstead section is electrified using the 750 V DC third-rail system and is double track throughout. The unelectrified Hurst Green Junction–Uckfield section is 24 mi 53 ch (39.7 km) in length and, south of Hever, is mostly single track.
The Marshlink line is a railway line in South East England. It runs from Ashford, Kent via Romney Marsh, Rye and the Ore Tunnel to Hastings where it connects to the East Coastway line towards Eastbourne and Brighton.
Hastings railway station is the southern terminus of the Hastings line in the south of England and is one of four stations that serve the town of Hastings, East Sussex. It is also on the East Coastway line to Eastbourne and the Marshlink line to Ashford International. It is 62 miles 33 chains (100.4 km) from London Charing Cross measured via Chelsfield and Battle; and 82 miles 33 chains (132.6 km) from Charing Cross via Chelsfield and Ashford.
The East Coastway line is a railway line along the south coast of Sussex to the east of Brighton, England. Trains to the west of Brighton operate on the West Coastway line. Together with the West Coastway and the Marshlink line to the east, the line forms part of a continuous route from Havant to Ashford. The Brighton Main Line route to Eastbourne and Hastings, via Plumpton and Cooksbridge, shares the East Coastway line east of Lewes station.
Ashford International railway station is a National Rail station in the town of Ashford, Kent, England. It connects several railway lines, including High Speed 1 and the South Eastern Main Line. Services are operated by Southeastern and Southern.
The Hastings line is a secondary railway line in Kent and East Sussex, England, linking Hastings with the main town of Tunbridge Wells, and London via Tonbridge and Sevenoaks. Although primarily carrying passengers, the railway also serves a gypsum mine which is a source of freight traffic. Southeastern Trains operates passenger trains on the line, and it is one of their busiest lines.
Crowhurst railway station is on the Hastings line in the south of England and serves the village of Crowhurst, East Sussex. It is 57 miles 50 chains (92.7 km) down the line from London Charing Cross. The station and all trains serving it are operated by Southeastern.
Winchelsea railway station is a railway station in East Sussex, England. It is about 0.62 miles (1 km) from Winchelsea and is actually in the neighbouring parish of Udimore. It is on the Marshlink line 9.3 miles (15 km) north east of Hastings, and train services are provided by Southern. The station originally had two platforms, but in 1979, the line was singled and only the up platform is now in use. The former down platform and station building are now converted to a private house.
Eastbourne railway station serves the seaside town of Eastbourne in East Sussex, England. It is on the East Coastway Line. The station is managed by Southern, who operate all trains serving it. It is one of two railway stations in the town, the other being Hampden Park Station. There are also two other stations in the Eastbourne area, one being Pevensey & Westham, in nearby Westham, the other being Polegate.
East Grinstead railway station is one of the two southern termini of the Oxted line in the south of England and serves East Grinstead in West Sussex. It is 30 miles 4 chains from London Bridge, although trains mostly run to and from London Victoria. The station is managed by Southern.
The South Eastern Main Line is a major long-distance railway route in South East England, UK, one of the three main routes crossing the county of Kent, going via Sevenoaks, Tonbridge, Ashford and Folkestone to Dover. The other routes are the Chatham Main Line which runs along the north Kent coast to Ramsgate or Dover via Chatham and High Speed 1 which runs through the centre of Kent to the coast at Folkestone where it joins the Channel Tunnel.
The Redhill–Tonbridge line is a 19-mile-56-chain (31.70 km) railway line in South East England. It runs from the Brighton Main Line at Redhill in Surrey to the South Eastern Main Line at Tonbridge in Kent. There are five intermediate stations: Nutfield, Godstone, Edenbridge, Penshurst and Leigh. All passenger services run as all-stations shuttles between Redhill and Tonbridge, and are operated by Southern using Class 377 electric multiple units.
The Ouse Valley Railway was to have been part of the London, Brighton & South Coast Railway (LBSCR). It was authorised by an Act of Parliament in 1864 and construction of the 20 miles (32 km) long line was begun, but not completed. It never opened to traffic.
St Leonards West Marina is a disused railway station in the Bopeep area of the borough of Hastings, East Sussex. Opened by the Brighton, Lewes and Hastings Railway in 1846, it was the first permanent station to serve the area and became part of a feud between two rival railway companies over access to nearby Hastings. Although not very convenient for local services, the station became an important goods rail-head and the location of a Motive Power Depot for steam locomotives working non electrified services, including those to London. The station was closed in 1967 and the buildings subsequently demolished, although in 2023 the down platform could still be seen.
Sidley railway station is a closed railway station In Sidley, East Sussex. It was on the Bexhill West branch of the Hastings line from Tunbridge Wells. It was opened by the South Eastern and Chatham Railway and was operated by the Southern Region of British Railways on closing. All the station buildings and platforms were demolished soon after closure. The goods shed was the last railway building on the site which was demolished in 2009 having been derelict for many years. The cutting where the station was situated was infilled to about platform level and the levelled land used by a motorbike training centre which closed in 2012. Work started in January 2013 on construction of a new Bexhill to Hastings link road which has been built along the trackbed through the site of the platforms and opened in 2015.
Bexhill West is a closed station in Bexhill-on-Sea in East Sussex. It was the terminus of the Bexhill West branch of the Hastings Line. It was opened by the South Eastern and Chatham Railway and was operated by the Southern Region of British Railways on closing. The station building still survives as an antiques house. The trackbed and site of the demolished platforms are now occupied by commercial industrial buildings.
St Lawrence for Pegwell Bay railway station was a railway station at Ramsgate, Kent, England that was opened by the South Eastern Railway in 1864 and closed in 1916.
The Holborn Viaduct–Herne Hill line is a railway line between Holborn Viaduct in the City of London and Herne Hill in the London Borough of Lambeth. After the closure of Holborn Viaduct station the line ends at the south portal of Snow Hill tunnel merging into Snow Hill lines. From there the Widened Lines to St Pancras and Kentish Town are reached. Today the section north of Blackfriars is part of the Thameslink core. Originally being a branch line of the London, Chatham and Dover Railway (LCDR) towards the City of London, the line is sometimes called LCDR City Branch.