Callide Power Station | |
---|---|
Country | Australia |
Location | 1092 Biloela Callide Road, Mount Murchison, Shire of Banana, Queensland |
Coordinates | 24°20′42″S150°37′11″E / 24.3450°S 150.6196°E |
Status | Offline November 2022 |
Commission date | 1965 |
Construction cost | $28.7 million |
Owners | CS Energy (50%), Intergen (50%) [1] |
Operator | |
Thermal power station | |
Primary fuel | Coal |
Turbine technology | Steam turbines |
Cooling source | Fresh |
Power generation | |
Units operational | 8 |
Nameplate capacity | 1,720 MW |
Callide Power Station is an electricity generator at Mount Murchison, Shire of Banana, Queensland, Australia. It is coal powered with eight steam turbines with a combined generation capacity of 1,720 megawatts (MW) of electricity. Callide A was commissioned in 1965, refurbished in 1998 and decommissioned in 2015/16. [2] As of 2018, generation capacity was 1510 MW. [2] In 2024, Peter Dutton said he intends, if elected, to build one of seven government-owned nuclear power plants on this site, to be operational by 2035–2037. [3]
The coal for Callide comes from the nearby Callide Coalfields and water from the Awoonga dam and Stag Creek Pipeline. [4]
An explosion and fire at the Callide C power plant in late May 2021 caused a significant power outage that affected over 375,000 premises and raised electricity prices for weeks afterwards.
November 2022 all four units at the coal-fired Callide Power Station were not operating after a structural failure at the cooling plant brought the C3 unit offline, and later on the B2 unit tripped during scheduled testing, followed by the last unit, B1, also tripping. [5] [6]
CS Energy owns 100 per cent of Callide A and Callide B, and owns Callide C in a 50/50 joint venture with IG Power.
At the end of 1962 approval was granted for a new power station near Biloela. [7] Work commenced at the site in February 1963. The design of the plant based around separate generating units and a control room was a first for Queensland. [7] It was also the first power station in Queensland to use dry cooling towers. [7]
It had four 30 MW steam turbines, the first of which was operating by June 1965. From its commissioning a drought meant water restrictions at the station reduced output. [7] The second set was expected to be operating by May 1966, but was lost at sea while being transported from England. [7] A replacement unit arrived in June 1967. The third set was operating in October 1967 and the fourth in May 1969. [7] The total cost of the project was A$28.7 million. [7]
Callide A has been in storage since 2001, except for Unit 4 which was being used for the Callide Oxyfuel project. [8] The Callide Oxyfuel project was decommissioned in 2015/16 after demonstrating carbon capture technology for two years. [2]
Following on from an aggressive construction program at Tarong Power Station, Callide B was commissioned in 1988 with two 350 MW steam turbines. The Hitachi machines are almost identical to those in Tarong and Stanwell.
In October 2019, Federal Energy Minister Angus Taylor announced that Callide B's originally planned 2038-39 closure was being brought forward to 2028. [9]
The Callide Power Plant (a.k.a. Callide C) was commissioned in 2001 with two 405 MW advanced cycle steam turbines. [10] Callide C uses a more efficient "supercritical" boiler technology to burn coal to generate electricity. [11] It was built to operate to 2050. [12]
Carbon Monitoring for Action estimates this power station emits 5.73 million tonnes of greenhouse gases each year as a result of burning coal. [13] The Australian Government introduced a Carbon Pollution Reduction Scheme in 2011 to help combat climate change, intended to reduce emissions from power stations. The scheme was replaced in 2014 by a 'direct action' program. The National Pollutant Inventory provides details of other pollutant emissions, but, as at 23 November 2008, not CO2. [14]
On 25 May 2021, an explosion and subsequent fire at Callide C caused a significant power outage (including Callide B and parts of Stanwell and Gladstone power stations) [15] that affected over 375,000 premises, [16] [17] [18] and caused increased power prices for weeks. [19] The hydrogen-filled generator had a catastrophic failure, resulting in significant damage. Despite speculation that the plant would close, Callide C3 was repaired at an estimated cost of $200M and reopened in April 2024. [20]
As of 25 June 2024, Callide C4 turbine had not returned to service. It was destroyed in May 2021. As of February 2024, insurance carriers had refused to pay the $300M claimed by CS Energy. [21] In June 2024, news reporter Josh Bavas joined Gary Hardgrave on 4BC radio to discuss maintenance failures which led to the catastrophic Callide explosion. [22] However, a February 2024 technical report found that the explosion was caused by a voltage collapse during installation of a new battery charger. [23] In addition, a June 2024 commissioned report into the explosion by a forensic engineer found that a lack of "effective process safety practices" contributed to the incident. [24]
Callide Unit C4 was returned to service on 30 August 2024 [25] .
A 200 MW solar park with 200 MW / 800 MWh battery is planned for the site. [26]
Electricity generation is the process of generating electric power from sources of primary energy. For utilities in the electric power industry, it is the stage prior to its delivery to end users or its storage, using for example, the pumped-storage method.
Biloela is a rural town and locality in the Shire of Banana, Central Queensland, Australia. It is the administrative centre of the shire. In the 2021 census, the locality of Biloela had a population of 5,692 people.
The Wivenhoe Power Station is situated between the Splityard Creek Dam and Lake Wivenhoe. The Splityard Creek Dam is located in hills adjacent to Lake Wivenhoe and is about 100 metres (330 ft) above it. The power station is the only pumped storage hydroelectric plant in Queensland.
The Moss Landing Power Plant is a natural gas powered electricity generation plant located in Moss Landing, California, United States, at the midpoint of Monterey Bay. Its large stacks are landmarks, visible throughout the Monterey Bay Area. The plant is owned and operated by Houston-based Dynegy and currently has a generation capacity of 1020 MW (net) from its two combined cycle generation units. It was once the largest power plant in the state of California, with a generation capacity of 2560 MW, before its two large supercritical steam units were retired in 2016.
Eraring Power Station is a coal-fired power station consisting of four 720 MW Toshiba steam-driven turbo-alternators for a combined capacity of 2,880 MW. The station is located near the township of Dora Creek, on the western shore of Lake Macquarie, New South Wales, Australia and is owned and operated by Origin Energy. It is Australia's largest power station. The plant has two smokestacks rising 200 m (656 ft) in height. It was scheduled for closure by mid-2025, after a failed attempt to sell the loss making power station back to the state government. The New South Wales Government in May 2024 extended the operational life of Eraring to August 2027.
The Swanbank Power Stations are located in Swanbank within South East Queensland, Australia. The original power station was coal fired, but the site has since moved to gas. By 2007 the site had consisted of the highly efficient 385 megawatts (516,000 hp) gas-fired Swanbank E Power Station and the smaller 28 megawatts (38,000 hp) gas-fired Swanbank C Power Station. Swanbank E was written off by the Queensland Audit Office as having no value, as it is uneconomical to run in 2021.
The Tarong Power Station is a coal fired power station located on a 1,500 hectares site in Tarong in the South Burnett Region near the town of Nanango, in Queensland, Australia. The station has a maximum generating capacity of 1,400 megawatts, generated from four turbines. Coal is supplied via a conveyor from Meandu Mine, which is 1.5 kilometres (0.93 mi) away and is also owned by Stanwell. Water is supplied from Boondooma Dam. In 2024, Peter Dutton said he intends, if elected, to build one of seven government-owned nuclear power plants on this site, to be operational by 2035–2037.
The Huntly Power Station is the largest thermal power station in New Zealand and is located in the town of Huntly in the Waikato. It is operated by Genesis Energy Limited, a publicly listed company. The station has five operational generating units – three 250 MW coal-and-gas-fired steam turbine units, a 50 MW gas peaking plant, and a 403 MW combined cycle gas turbine plant. The station also plays an important role in voltage support for the Northland, Auckland and Waikato regions.
Muja Power Station is a power station in Muja, 22 km (14 mi) east of Collie, Western Australia. It has eight steam turbines served by coal-fired boilers that together generate a total capacity of 854 megawatts of electricity. It is the largest power station in the South West Interconnected System, accounting for roughly 15 percent of capacity. The coal is mined in the nearby Collie Sub-basin. In June 2022 the Government of Western Australia announced that the power station would close by 2029. In 2024, Peter Dutton said he intends, if elected, to build one of seven government-owned nuclear power plants on this site, to be operational by 2035–2037.
Vasilikos Power Station is the newest power plant of Electricity Authority of Cyprus. Located between Larnaca and Limassol and with an installed capacity of 640 MW, it was still under development prior to the Evangelos Florakis Naval Base explosion of 11 July 2011.
Tarong Energy was an electricity generation company in Australia. It was fully owned by the Queensland Government, and had a portfolio of generating sites using thermal coal and hydroelectric power in Queensland. Following a review by the Treasurer of Queensland of the state's electricity sector in 2010, the assets of Tarong Energy were split between Stanwell Corporation and CS Energy on 1 July 2011. Tarong Energy as an entity became a subsidiary of Stanwell Corporation. The restructure was made to save costs.
The Kogan Creek Power Station is a 750 megawatt coal fired power station owned by CS Energy on the Darling Downs in Queensland. The $1.2 billion plant is situated at Brigalow, in the Surat Basin between Dalby and Chinchilla.
Condamine Power Station is a 140 MW combined cycle power station near Miles on the western Darling Downs in Queensland, Australia. The station is located 8 kilometres (5.0 mi) east of Miles on the south side of the Warrego Highway. The Condamine Power Station is owned by QGC Limited, a subsidiary of Royal Dutch Shell. Commissioned in June 2009, it has been claimed to be the world’s first combined-cycle power station entirely fired by untreated coal seam gas direct from the gasfield and Australia's first steam turbine condenser cooled by coal seam methane wastewater. However, the Townsville Power Station at Yabulu was commissioned earlier in February 2005 after being converted from a peak load to a combined cycle configuration but was designed to consume only treated coal seam gas.
The Taichung Power Plant is a coal-fired power plant in Longjing, Taichung, Taiwan (ROC). With an installed coal-fired generation capacity of 5,500 MW, it is the fourth largest coal-fired power station in the world. Together with its gas-fired and wind generation units, the total installed capacity of the plant is 5,824 MW.
Queensland's energy policy is based on the year 2000 document called the Queensland Energy Policy: A Cleaner Energy Strategy. The Queensland Government assists energy development through the Department of Energy and Water Supply. The state is noted for its significant contribution to coal mining in Australia. The primary fuel for electricity generation in the state is coal with coal seam gas becoming a significant fuel source. Queensland has 98% of Australia's reserves of coal seam gas. An expansion of energy-intensive industries such as mining, economic growth and population growth have created increased demand for energy in Queensland.
Carbon capture and storage (CCS) is a technology that can capture carbon dioxide CO2 emissions produced from fossil fuels in electricity, industrial processes which prevents CO2 from entering the atmosphere. Carbon capture and storage is also used to sequester CO2 filtered out of natural gas from certain natural gas fields. While typically the CO2 has no value after being stored, Enhanced Oil Recovery uses CO2 to increase yield from declining oil fields.
CS Energy is an Australia-based electricity generating company fully owned by the Government of Queensland with its head office located in Fortitude Valley, Brisbane. The company was established in 1997 and employs more than 500 staff. Adam Aspinall is the Board Chair and Darren Busine is the Chief Executive Officer.
Mount Murchison is a rural locality in the Shire of Banana, Queensland, Australia. In the 2021 census, Mount Murchison had a population of 128 people.