This article needs additional citations for verification .(October 2009) |
CATS pipeline | |
---|---|
Location | |
Country | North Sea, United Kingdom |
General direction | north-south-west, 210° |
From | CATS Riser Platform (Block 22/10a) bridge linked to North Everest |
Passes through | Central North Sea |
To | CATS processing terminal in Teesside, England |
General information | |
Type | natural gas |
Partners | Antin Infrastructure Partners, Eni, Chrysaor |
Operator | Kellas Midstream Limited |
Commissioned | 1993 |
Technical information | |
Length | 404 km (251 mi) |
Maximum discharge | 1.7 billion standard cubic feet per day |
Diameter | 36 in (914 mm) |
CATS Terminal | |
---|---|
General information | |
Type | Gas terminal |
Location | Seal Sands, Middlesbrough, TS2 1UB |
Coordinates | 54°36′44″N1°11′42″W / 54.6123°N 1.1951°W |
Elevation | 5 metres |
Inaugurated | May 1993 |
Owner | Antin Infrastructure Partners |
Technical details | |
Floor area | 70 acres (280,000 m2) |
The Central Area Transmission System (known as CATS) is a natural gas transportation and processing system that transports natural gas through a 404 kilometre pipeline from the Central North Sea to a reception and processing terminal at Teesside in the North East of England.
Plans for the site began from the discovery of BP's Lomond field in May 1972. In addition, other fields were discovered in the Central Graben Area of the North Sea. [1]
The receiving terminal site for the system was built between 1990 and 1993. It was originally operated by Amoco. [1] The CATS pipeline was completed in 1993, receiving gas from two of Amoco's fields: [1] Everest and Lomond, now owned by Chrysaor. [2]
Together with the development of the Everest and Lomond fields, the project, which included the construction of an offshore riser platform and pipeline, was one of the largest construction projects ever undertaken in the UK, second only to the Channel Tunnel at that time. [3]
Due to increased demand within the Central North Sea, the decision was taken to provide a processing service to future users of the CATS pipeline, enabling delivery of their gas into the National Transmission System. This required the construction of a pipeline reception and gas treatment facility, and the CATS gas and liquids processing plant, comprising two processing trains, each with the capacity to handle around 17 million standard cubic metres of gas per day. [4] The first of the new trains went into operation four months ahead of schedule in May 1997, and the second train was commissioned in 1998.
In July 2007, the CATS pipeline was damaged by the anchor of the vessel 'Young Lady'. The pipeline was shut-in for two months. [5]
The 36-inch diameter pipeline runs from the CATS riser platform, which is located in Block 22/10a of the Central North Sea, 230 kilometres (140 mi) east of Aberdeen, to Teesside in England. [5] The pipeline reaches the shore at Coatham Sands near Redcar where there is a Beach Valve Station, remotely operated from the CATS terminal. The pipeline is routed under the River Tees for 5-mile (8.0 km) to the gas terminal. [6]
The CATS pipeline was originally conceived to carry natural gas from the Everest and Lomond fields and was built oversized to accommodate future production from fields in the surrounding area. The CATS pipeline now transports gas from over 30 producing fields including J-block, MONARB, ETAP, Erskine, Armada, Andrew, Huntington, Banff, Stella, Culzean and Everest. Customers can connect directly to CATS at any one of six connection points along the pipeline (known as 'tees'), at the riser platform, or via one of 11 hubs. [6]
The CATS riser platform gathers natural gas from a number of fields. The incoming gas from Everest and other fields connected by separate pipelines including Armada, Lomond and Erskine, is aggregated on the riser platform. From the riser platform, the gas is transported via the CATS pipeline, a 404 kilometre long natural gas subsea pipeline. The pipeline has a diameter of 36 inches (910 mm) and the capacity to handle up to 1.7 billion standard cubic feet of natural gas per day (48 million standard cubic metres per day). [4] The outside of the pipe is coated in concrete which gives added protection and also ensures that it remains on the seabed while the gas is in transit. The inside of the pipe is lined with an epoxy film, which reduces friction and corrosion, thus maximising its capacity and prolonging the life of the pipeline. [6]
The CATS pipeline fluid specifications for entry and redelivery are as follows. [7]
Parameter | CATS inlet | CATS redelivery |
---|---|---|
Temperature | 51 °C max | 1 °C to 38 °C |
Pressure | 7,000 kPa gauge | |
Water dew point | -26 °C at 7,500 kPa | <-10 °C at 7,000 kPa |
Hydrocarbon dew point | -2 °C at 10,340 kPa | -2 °C at 7,000 kPa |
Water content | 15 kg / million m3 | |
Hydrogen sulphide | 3 ppm vol max | 3.3 ppm vol max |
Carbonyl sulphide | 1 ppm vol max | |
Methyl Ethyl Mercaptan sulphur | 0.5 ppm vol max | |
Total Mercaptan sulphur | 3.1 ppm vol max | |
Total sulphur | 14.4 ppm vol | 15 pmm vol max |
Carbon dioxide | 2.8 mol % | 2.9 mol % max |
Oxygen | 9 ppm vol | 10.0 ppm vol max |
Nitrogen | 4.5 mol % | 5.0 mol % |
Mercury | 0.01 g / m3 | |
Non hydrocarbon content | 5.5 mol % | |
Wobbe Index | 48.14 to 51.41 MJ/SCM | |
Gross calorific value | 36.9 to 42.3 MJ/SCM |
Antin Infrastructure Partners is the majority owner of CATS and one of the first non-oil and gas companies to own a significant part of UKCS midstream infrastructure.
A European private equity company focused on infrastructure investments, Antin acquired a controlling interest in CATS in July 2014. In April 2015, Antin agreed terms with BP to acquire their share in the CATS business, taking their stake to 99 per cent. The deal with BP completed on 17 December 2015.
Other partners with equity in CATS are Eni (0.3388 per cent) and Chrysaor (0.6630 per cent). [3]
Antin owns its 99 per cent stake in CATS via a wholly owned subsidiary called Kellas Midstream Limited. [8] Kellas Midstream (formerly known as CATS Management Limited), is accountable for setting the strategy and delivering safe and efficient operational and financial performance, along with growing the business. [3]
Kellas Midstream appointed Wood [9] as its operating partner. Wood provide the resources to manage the day-to-day operation of the CATS terminal and pipeline.
Antin's investment in CATS is bringing new focus to the asset, and represents a new business model for the North Sea.
The Central Area Transmission System Terminal is the reception and processing facility for the CATS pipeline.
It is located in Teesmouth (54°36’43”N, 1°11’45”W) at Seal Sands (borough of Stockton on Tees) on the North Sea coast, and occupies a 29-hectare site. It is situated in the middle of Teesmouth's petrochemical area, between an oil terminal to the north, and a chemical works and the former Teesside Oil Refinery (to the south). [3]
The facility processes the gas through processing trains that ensure that its quality meets the requirements for entry to the National Transmission System (NTS). Natural Gas Liquids (NGLs) are removed and the processed natural gas is fiscally metered before leaving the terminal and being fed directly into the NTS. The NGLs are then separated into propane, butane and condensate. [6]
In 2018, CATS delivered over 5 billion cubic metres of gas to UK markets, representing approximately 14% of UK gas production and 7% of demand. [3]
The CATS gas terminal has the capacity to process about 34 million standard cubic metres of natural gas a day in two parallel processing trains. [6]
The pipeline reception and gas treatment facilities [10] comprise:
The propane and butane are produced to the following specification. [7]
Specification | Propane | Butane |
---|---|---|
Dewpoint | <-40 °C at 1.013 bara | 483 <-30 °C at 1.013 bara |
Vapour pressure | 1434 kPa gauge max | 483 kPa gauge max |
Propane | 95 % min | 0.5 % max |
Iso- & n-Butane | 2.5 % max | 95 % min |
Ethane | 2.0 % max | 0.1 % max |
Pentanes | 0.1 % max | 1.5 % max |
Olefins | 1.0 % max | 1.0 % max |
Nitrogen | 0.1 % max | 0.1 % max |
Carbon dioxide | 0.1 % max | 0.1 % max |
Hydrogen sulphide | 1 ppmv max | 1 ppmv max |
Mercury | 10 ppb w max | 10 ppb w max |
Pressure | 19 barg max | 10.5 barg max |
Temperature | 33 °C max | 33 °C max |
Propane and butane are supplied to Norsea. Gasoline (C5+) is supplied to Navigator and Sabic. [6]
The purified natural gas is metered and enters the National Transmission System at an above ground installation (54°36’37”N, 1°11’48”W) in the south-west corner of the terminal site. The four-mile (6 km) spur of Feeder Main FM06 transports gas to a pigging and pressure reduction station at Cowpen Bewley in Stockton-on-Tees, where gas is delivered into the Regional Transmission System, there are also connections to the 24-inch Feeder Main FM06 from Little Burdon to Billingham and into the 42-inch Feeder Main FM13 from Cowpen Bewley to Bishop Auckland.
The site has two tall chimneys and one taller flare stack. [6]
The site belongs to the Teesmouth Industry and Wildlife Partnership.
From 1999, gas that was not processed by the CATS terminal went to the plant immediately to the west (54°36’38”N, 1°12’01”W) which was originally operated by px Ltd. Originally some of this gas went through the px Ltd plant to the (former Enron) 1875MW Teesside power station, next to the former ICI plant at Wilton, Redcar and Cleveland. This power station was de-commissioned in 2015 and subsequently demolished, [11] only the 2 x GIS (gas insulated substations) 275kV feeder points to the National Grid remain.
This terminal is known as the Teesside Gas Processing Plant or TGPP. In addition to CATS it also processes gas from Breagh field in the Southern North Sea, Block 42/13a. [4] Gas and associated condensate from Breagh Alpha platform is transported via 20-inch diameter 110 km pipeline to Coatham Sands, Redcar and then by a 10 kilometre onshore pipeline to TGPP at Seal Sands. The Breagh Alpha platform is unmanned and is operated remotely from the TGPP Control Room. There is a dedicated gas treatment train for Breagh fluids. [4]
The Breagh Southern North Sea (SNS) pipeline is available to third party production. The fluid specification for entry into the SNS pipeline is as follows. [4]
Parameter | SNS |
---|---|
Pressure | 85 barg max |
Temperature | 15 °C max |
Calorific value | 37.5 to 42.3 MJ/m3 |
Wobbe Index | 47.5 to 51.2 MJ/m3 |
Methane content | 80 mol % minimum |
Propane+ content | 2 mol % max |
Heptane+ content | 0.5 mol % max |
Hydrogen sulphide | 3 ppm vol max |
Carbonyl sulphide | 1 ppm vol max |
Methyl Ethyl Mercaptan sulphur | 0.5 ppm vol max |
Total Mercaptan sulphur | 3.1 ppm vol |
Total sulphur | 14.4 ppm vol |
Carbon dioxide | 2.8 mol % |
Oxygen | 9 ppm vol |
Nitrogen | 4.5 mol % |
Non hydrocarbon content | 5.5 mol % |
The CATS processing train uses turbo-expanders to reduce the temperature of the gas to remove natural gas liquids. [4] CATS gas is first dehydrated with TEG to remove water. The gas is routed to two turbo-expanders in series which chills the gas and condenses out the natural gas liquids, the product is mainly methane. NGL goes to the deethanizer fractionation column which removes ethane, this is mixed with the methane and is supplied to the National Transmission System. The NTS access point is the above ground installation (54°36’37”N, 1°11’48”W) on the CATS terminal site. NGLs from the deethanizer goes successively to a depropanizer and debutanizer which produce Propane and Butane and natural gasoline. The petroleum products are then transferred by pipeline either to liquid storage or to other petrochemical businesses based on Teesside for use as feedstock. [4]
The Southern North Sea pipeline reception and gas treatment facilities include the following. [4]
A pig receiver and slug catcher. Vapour from the slug catcher is cooled and chilled in a gas-to-gas heat exchanger, then by a refrigerant system, and a Joule-Thomson pressure reduction valve before the, now two-phase, mixture passes to a separator. Gas is warmed in the gas-to-gas exchanger and flows through a filter and flow meter and is routed to the National Transmission System. [4]
Liquid from the cold separator is routed to a condensate separator which separates the liquid into monoethylene glycol MEG, which passes to the rich MEG storage tank, and condensate which flows to the 1st stage condensate separator which also receives liquids from the slug catcher. Gas from the 1st stage separator passes to the flash gas compressor, MEG is routed to the rich MEG tank, and condensate is heated and flows to the 2nd stage condensate separator. Gas from the 2nd stage separator passes to the flash gas compressor, and liquid is pumped through a mercury removal bed to the condensate surge drum.
MEG from the rich MEG storage tank is routed though the MEG regeneration plant where water is stripped out. MEG flows to the lean MEG storage tank from where it is pumped to the Breagh Alpha platform via a 3-inch pipeline piggybacked with the 20-inch gas line.
The NGLs from all the plants are transported by pipeline to petrochemical companies in the Teesmouth area. Condensate is pumped to Sabic for use as a feedstock or to a tanker loading facility. [4] The propane and butane goes to the Phillips Norsea plant, and the condensate goes to Sabic North Tees on the former ICI site at Wilton and to the Tees Storage site owned by Vopak in Seal Sands.
Natural-gas condensate, also called natural gas liquids, is a low-density mixture of hydrocarbon liquids that are present as gaseous components in the raw natural gas produced from many natural gas fields. Some gas species within the raw natural gas will condense to a liquid state if the temperature is reduced to below the hydrocarbon dew point temperature at a set pressure.
Boardwalk Pipeline Partners, LP, which conducts business through its primary subsidiary Boardwalk Pipelines, LP and its subsidiaries, is an energy company based in Houston, Texas. It is a master limited partnership operating in the midstream portion of the natural gas and natural gas liquids (NGLs) industry, primarily providing transportation and storage for those commodities. Boardwalk owns approximately 14,365 miles (23,118 km) of natural gas and NGLs pipelines and underground storage caverns having an aggregate capacity of approximately 205 billion cubic feet (Bcf) of working natural gas and 24.0 million barrels of NGLs. Boardwalk's pipeline system originates in the Gulf Coast region, Oklahoma and Arkansas and extends north and east to the Midwestern states of Tennessee, Kentucky, Illinois, Indiana, and Ohio, and Boardwalk's NGLs pipeline and storage facilities are located in Louisiana and Texas.
The oil and gas industry is usually divided into three major components: upstream, midstream and downstream. The midstream sector involves the transportation, storage, and wholesale marketing of crude or refined petroleum products. Pipelines and other transport systems can be used to move crude oil from production sites to refineries and deliver the various refined products to downstream distributors. Natural gas pipeline networks aggregate gas from natural gas purification plants and deliver it to downstream customers, such as local utilities.
Gassco is a Norwegian state owned company that operates 7,800 kilometres (4,800 mi) of natural gas pipes transporting annually of 100 billion cubic meter (bcm) of natural gas from the Norwegian continental shelf to Continental Europe and Great Britain.
The Mossmorran Natural Gas Liquids (NGL) plant is part of the northern North Sea Brent oil and gas field system and is located on the outskirts of Cowdenbeath, Scotland. The Mossmorran facilities comprise two plants: the Fife NGL Plant operated by Shell and the Fife Ethylene Plant operated by ExxonMobil. An associated sea-going tanker loading facility is located at Braefoot Bay, 4 miles to the south.
Canada's natural gas liquids industry dates back to the discovery of wet natural gas at Turner Valley, Alberta in 1914. The gas was less important than the natural gasoline - "skunk gas" it was called, because of its distinctive odour - that early producers extracted from it. That natural gas liquid (NGL) could be poured directly into an automobile's fuel tank.
Natural-gas processing is a range of industrial processes designed to purify raw natural gas by removing contaminants such as solids, water, carbon dioxide (CO2), hydrogen sulfide (H2S), mercury and higher molecular mass hydrocarbons (condensate) to produce pipeline quality dry natural gas for pipeline distribution and final use. Some of the substances which contaminate natural gas have economic value and are further processed or sold. Hydrocarbons that are liquid at ambient conditions: temperature and pressure (i.e., pentane and heavier) are called natural-gas condensate (sometimes also called natural gasoline or simply condensate).
The Everest gasfield is located in the Central North Sea, 233 kilometres (145 mi) east of Aberdeen, Scotland. It lies in the United Kingdom Continental Shelf blocks 22/9, 22/10a and 22/14a. The gasfield was discovered by Amoco in 1982 with first gas produced in 1993.
An oil production plant is a facility which processes production fluids from oil wells in order to separate out key components and prepare them for export. Typical oil well production fluids are a mixture of oil, gas and produced water. An oil production plant is distinct from an oil depot, which does not have processing facilities.
Kårstø is an industrial facility located near the village of Susort, along the Boknafjorden, in the municipality of Tysvær in Rogaland county, Norway. The site features a number of natural gas processing plants that refine natural gas and condensate from the fields in the northern parts of the North Sea, including the Åsgard, Mikkel, and Sleipner gas fields. The Kårstø processing complex is Europe's biggest export port for natural gas liquids (NGL) and the third largest in the world. The industrial site is also the location for the now-closed Kårstø Power Station.
Onshore, when used in relation to hydrocarbons, refers to an oil, natural gas or condensate field that is under the land or to activities or operations carried out in relation to such a field.
In chemical engineering, a vapor–liquid separator is a device used to separate a vapor–liquid mixture into its constituent phases. It can be a vertical or horizontal vessel, and can act as a 2-phase or 3-phase separator.
The Bacton Gas Terminal is a complex of six gas terminals within four sites located on the North Sea coast of North Norfolk in the United Kingdom. The sites are near Paston and between Bacton and Mundesley; the nearest town is North Walsham.
Inter Pipeline Ltd. is a multinational petroleum transportation and infrastructure limited partnership that is ranked among North America's leading natural gas and NGL's extraction businesses. It is one of Alberta's top 100 companies in terms of profit (85) and assets (94).
Keyera is one of the largest midstream oil and gas operators in Canada. The company services oil and gas producers in Western Canada and transports natural gas liquids such as propane, ethane, butane, condensate and iso-octane to markets throughout North America. Keyera provides major oil producers with essential services by providing them with the means to store, fractionate, and transport various oil, gas and NGL products. The company operates an industry leading condensate system. It operates the largest iso-octane manufacturing plant in the world.
Natural gas was the United States' largest source of energy production in 2016, representing 33 percent of all energy produced in the country. Natural gas has been the largest source of electrical generation in the United States since July 2015.
SOCAR Gas Processing Plant is a natural gas and gas products processing factory that joined to the structure of State Oil Company of Azerbaijan Republic (SOCAR) with regard to the presidential decree dated October 7, 2009. The factory carries out the production of natural gas, natural gas liquids, natural gasoline, gas condensate, heavy condensates, dry gas, commercial butane and commercial propane-butane mixture. The plant is situated in Lokbatan settlement, Baku. The director of the Gas Processing Plant is Agshin Pashayev.
Crude oil stabilisation is a partial distillation process that renders crude oil suitable for storage in atmospheric tanks, or of a quality suitable for sales or pipeline transportation. Stabilization is achieved by subjecting ‘live’ crude to temperature and pressure conditions in a fractionation vessel, which drives off light hydrocarbon components to form a ‘dead’ or stabilized crude oil with a lower vapor pressure.
The Teesside oil terminal is a major crude oil reception, processing, storage and export facility at Seal Sands, Middlesbrough. It receives and processes crude oil delivered by the subsea NORPIPE pipeline from the Norwegian Ekofisk field and the UK Fulmar and J-Block fields. The terminal includes facilities for exporting stabilised crude oil and liquefied petroleum gases (LPG) by tanker and pipeline.
The Lincolnshire Offshore Gas Gathering System (LOGGS) was a major natural gas collection, processing and transportation complex in the UK sector of the southern North Sea. It comprised five bridge-linked platforms about 118 km east of the Lincolnshire coast, which operated from 1988 to 2018.