Central Electricity Authority (India)

Last updated

Central Electricity Authority
HeadquartersSewa Bhawan, R. K. Puram, Sector-1, New Delhi, India
Owner Government of India
Website cea.nic.in

The Central Electricity Authority of India (CEA) advises the government on policy matters and formulates plans for the development of electricity systems. It is a statutory organisation constituted under section 3(1) of Electricity Supply Act 1948, which has been superseded by section 70(1) of the Electricity Act, 2003.

Contents

Officers from the Central Power Engineering Services Cadre, recruited through Engineering Services Examination conducted by the Union Public Service Commission, are posted to the Central Electricity Authority of India.

Responsibilities

Under the Electricity Act 2003, CEA prescribes the standards on matters such as construction of electrical plants, electric lines and connectivity to the grid, installation and operation of meters and safety and grid standards. [1] :259 The CEA is also responsible for concurrence of hydro power development schemes of central, state and private sectors taking into consideration the factors which will result in efficient development of the river and its tributaries for power generation, consistent with the requirement of drinking water, irrigation, navigation and flood control.

Preparation of technical standards for construction of electrical plants, electric lines and connectivity to the grid is the responsibility of CEA as per section 73 (b) of the Electricity Act, 2003. [2] However as per section 7 of this Act, a generating company may establish, operate and maintain a generating station if it complies with the technical standards only relating to connectivity to the grid as given in clause (b) of section 73. This implies that generating stations need not follow compulsory the CEA technical standards specified for construction of electrical plants and electric lines. Similarly, transmission / distribution licensees need not implement compulsory the standards for construction of electric lines except the Grid Code/ Grid Standards for the operation and maintenance of transmission lines specified by CEA under clause 73 (d) of this Act. Many times, these CEA standards are conservative compromising optimum design features /cost/ utility and also do not give full clarity in selection of the system / sub system capabilities of electrical plants and electric line.

The CEA plays a lead role in promoting the integrated operations of the regional power grids and the evolution of a national grid. The eastern, western and north-eastern grids have been integrated and are operating in a synchronous mode. The eastern grid is connected to the northern as well as southern grid through HVDC back to back links. The western grid is also connected to the northern and southern grid through similar arrangements. The CEA facilitates exchange of power within the country from surplus to deficit regions and with neighbouring countries for mutual benefits. [1] :260

The CEA advises central government, state governments and regulatory commissions on all technical matters relating to generation, transmission and distribution of electricity. It also advises state governments, licensees or generating companies on matters which enable them to operate and maintain the electricity system under their ownership or control in an improved manner. [1] :259

CEA responsibility also includes reliable data collection/ management/dissemination of the power sector. However, there is major mismatches (CEA data is nearly 5% more than NLDC data) in the basic electricity data given by CEA and NLDC as shown below.

As per Central Electricity Authority of India data, on October 5, out of 135 thermal plants that use coal for power generation, 106 or nearly 80 per cent are either in critical or super critical stage, i.e. they have stocks only for the next 6-7 days. The combined power capacity of these 106 power projects is 1,33,849 MW. [3]

Electricity generation (MU) data at national level in the year 2015-16 [4] [5]
DataCEANLDCRemarks
Total generation1,107,8221,106,236CEA electricity generation figure excludes non conventional power generation but includes imports from Bhutan. NLDC data termed as 'energy met at national level' which includes non conventional utility generation and net electricity imports.
Hydro121,376131,862NLDC data may include small hydro power generation. CEA data does not include small hydro generation which is part of non conventional utility electricity generation.
Non conventional sourcesna28,604Only wind generation data given by NLDC. Total figure including generation from solar, biomass, etc. not given. If the past years generation data is observed, the total generation from non conventional energy sources is nearly 60,000 MU. na → data not available.
Imports5,2445,557Electricity is imported from Bhutan
Exportsna5,124Electricity is exported to Nepal and Bangladesh
Energy met in India1,102,6981,106,236For CEA, it is 'Total generation' minus 'Exports' excluding generation by non conventional energy sources. The difference between NLDC and CEA data should be nearly 60,000 MU higher but the difference is only marginal which is a major discrepancy in the data.

There is also wide mismatch in source-wise generation and total generation data presented in daily reports of CEA and NLDC. [6] [7] The definitions of terminology used is not available in these web sites.

See also

Related Research Articles

<span class="mw-page-title-main">Electric power transmission</span> Bulk movement of electrical energy

Electric power transmission is the bulk movement of electrical energy from a generating site, such as a power plant, to an electrical substation. The interconnected lines that facilitate this movement form a transmission network. This is distinct from the local wiring between high-voltage substations and customers, which is typically referred to as electric power distribution. The combined transmission and distribution network is part of electricity delivery, known as the electrical grid.

<span class="mw-page-title-main">Distributed generation</span> Decentralised electricity generation

Distributed generation, also distributed energy, on-site generation (OSG), or district/decentralized energy, is electrical generation and storage performed by a variety of small, grid-connected or distribution system-connected devices referred to as distributed energy resources (DER).

<span class="mw-page-title-main">Electric power industry</span> Industry that provides the production and delivery of electric energy

The electric power industry covers the generation, transmission, distribution and sale of electric power to the general public and industry. The commercial distribution of electric power started in 1882 when electricity was produced for electric lighting. In the 1880s and 1890s, growing economic and safety concerns lead to the regulation of the industry. What was once an expensive novelty limited to the most densely populated areas, reliable and economical electric power has become an essential aspect for normal operation of all elements of developed economies.

The Central Electricity Generating Board (CEGB) was responsible for electricity generation, transmission and bulk sales in England and Wales from 1958 until privatisation of the electricity industry in the 1990s.

<span class="mw-page-title-main">Ontario Hydro</span> Defunct Canadian provincial utility corporation, 1906–2015

Ontario Hydro, established in 1906 as the Hydro-Electric Power Commission of Ontario, was a publicly owned electricity utility in the Province of Ontario. It was formed to build transmission lines to supply municipal utilities with electricity generated by private companies already operating at Niagara Falls, and soon developed its own generation resources by buying private generation stations and becoming a major designer and builder of new stations. As most of the readily developed hydroelectric sites became exploited, the corporation expanded into building coal-fired generation and then nuclear-powered facilities. Renamed as "Ontario Hydro" in 1974, by the 1990s it had become one of the largest, fully integrated electricity corporations in North America.

India is the third largest producer of electricity in the world. During the fiscal year (FY) 2023–24, the total electricity generation in the country was 1,949 TWh, of which 1,734 TWh was generated by utilities.

<span class="mw-page-title-main">The Electricity Act, 2003</span> Electricity act of government of India

The Electricity Act, 2003 is an Act of the Parliament of India enacted to transform the power sector in India.

<span class="mw-page-title-main">Transmission system operator</span> Energy transporter

A transmission system operator (TSO) is an entity entrusted with transporting energy in the form of natural gas or electrical power on a national or regional level, using fixed infrastructure. The term is defined by the European Commission. The certification procedure for transmission system operators is listed in Article 10 of the Electricity and Gas Directives of 2009.

<span class="mw-page-title-main">Kerala State Electricity Board</span> Electricity Supplier Of Kerala

Kerala State Electricity Board (KSEB) is an Indian public sector undertaking under the Government of Kerala that generates, transmits and distributes electricity in the state under government monopoly. Established in 1957, the agency comes under the authority of the Department of Power. It has been registered under Indian Companies Act 1956 in January 2011.

<span class="mw-page-title-main">Smart grid</span> Type of electrical grid

The smart grid is an enhancement of the 20th century electrical grid, using two-way communications and distributed so-called intelligent devices. Two-way flows of electricity and information could improve the delivery network. Research is mainly focused on three systems of a smart grid – the infrastructure system, the management system, and the protection system. Electronic power conditioning and control of the production and distribution of electricity are important aspects of the smart grid.

Availability Based Tariff (ABT) is a frequency based pricing mechanism applicable in India for unscheduled electric power transactions. The ABT falls under electricity market mechanisms to charge and regulate power to achieve short term and long term network stability as well as incentives and dis-incentives to grid participants against deviations in committed supplies as the case may be.

<span class="mw-page-title-main">Electrical grid</span> Interconnected network for delivering electricity to consumers

An electrical grid is an interconnected network for electricity delivery from producers to consumers. Electrical grids consist of power stations, electrical substations to step voltage up or down, electric power transmission to carry power over long distances, and finally electric power distribution to customers. In that last step, voltage is stepped down again to the required service voltage. Power stations are typically built close to energy sources and far from densely populated areas. Electrical grids vary in size and can cover whole countries or continents. From small to large there are microgrids, wide area synchronous grids, and super grids. The combined transmission and distribution network is part of electricity delivery, known as the power grid.

<span class="mw-page-title-main">Padiham Power Station</span> Coal-fired power station in Lancashire, England

Padiham Power Station was a coal-fired power station in Padiham, east Lancashire, England, which began operation in 1926 and generated power from 1927 until it was closed in 1993.

Central Electricity Regulatory Commission (CERC), a key regulator of the power sector in India, is a statutory body functioning with quasi-judicial status under sec – 76 of the Electricity Act 2003. CERC was initially constituted on 24 July 1998 under the Ministry of Power's Electricity Regulatory Commissions Act, 1998 for rationalization of electricity tariffs, transparent policies regarding subsidies, promotion of efficient and environmentally benign policies, and for matters connected Electricity Tariff regulation. CERC was instituted primarily to regulate the tariff of power generating companies owned or controlled by the Government of India, and any other generating company which has a composite scheme for power generation and interstate transmission of energy, including tariffs of generating companies.

<span class="mw-page-title-main">Power System Operation Corporation</span> Division of Ministry of Power (India)

Grid Controller of India Limited (GRID-INDIA) is a division of the Ministry of Power, Government of India. The new name of Power System Operation Corporation Limited (POSOCO) is Grid Controller of India Limited (Grid-India) since 09th November 2022. It is responsible to monitor and ensure round the clock integrated operation of Indian Power System. It consists of 5 Regional Load Despatch Centres (RLDCs) and the National Load Despatch Centre (NLDC).

Smart grid policy in the United States refers to legislation and other governmental orders influencing the development of smart grids in the United States.

<span class="mw-page-title-main">Electricity Act 1989</span> United Kingdom legislation

The Electricity Act 1989 provided for the privatisation of the electricity supply industry in Great Britain, by replacing the Central Electricity Generating Board in England and Wales and by restructuring the South of Scotland Electricity Board and the North of Scotland Hydro-Electric Board. The Act also established a licensing regime and a regulator for the industry called the Office of Electricity Regulation (OFFER), which has since become the Office of Gas and Electricity Markets (OFGEM).

<span class="mw-page-title-main">Electricity sector in the Philippines</span> Overview of the electricity sector in the Philippines

The electricity sector in the Philippines provides electricity through power generation, transmission, and distribution to many parts of the country. The Philippines is divided into three electrical grids, one each for Luzon, the Visayas and Mindanao. As of June 2016, the total installed capacity in the Philippines was 20,055 megawatts (MW), of which 14,348 MW was on the Luzon grid. As of June, 2016, the all-time peak demand on Luzon was 9,726 MW at 2:00 P.M. on May 2, 2016; on Visayas was 1,878 MW at 2:00 P.M. on May 11, 2016; and on Mindanao was 1,593 MW at 1:35 P.M. on June 8, 2016. However, about 12% of Filipinos have no access to electricity. The Philippines is also one of the countries in the world that has a fully functioning electricity market since 2006 called the Philippine Wholesale Electricity Spot Market(WESM) and is operated by an independent market operator.

<span class="mw-page-title-main">Electricity (Supply) Act 1926</span> United Kingdom legislation

The Electricity (Supply) Act 1926 was an Act of the Parliament of the United Kingdom which amended the law on the supply of electricity. Its long title is: ‘An Act to amend the law with respect to the supply of electricity’. This Act was construed as one with the Electricity (Supply) Acts 1882 to 1922, and was cited as the Electricity (Supply) Acts 1882 to 1926. It established a statutory body, the Central Electricity Board (CEB), ‘with the duty of supplying electricity to authorised undertakers’ and to ‘appoint consultative technical committees’. It provided for the Electricity Commissioners to prepare and transmit to the CEB ‘electricity schemes’ for relevant areas, and which identified the most efficient ‘selected’ generating stations which were to be used to generate electricity for the Board. The Act provided for ‘main transmission line’ interconnections between selected stations and undertakings; and to standardise the frequency of generation; and other purposes. The provisions of the Act enabled the construction of the National Grid.

State electricity regulatory commissions in India are autonomous, statutory and regulatory bodies constituted for ensuring generation and distribution of electricity in the states and union territories of India. They are formed by notification in official gazette in accordance with the Electricity Regulatory Commissions Act, 1998. The commissions are vested with legislative and judicial powers to resolve conflicts between licence holders of production and distribution of electricity, or consumers and electricity distribution entities, and authority to draft regulations and sub ordinate regulations. The president and other members of such commissions are appointed by state governments in consultation with the Chief Justice of the state High Court.

References

  1. 1 2 3 India Yearbook 2007. Publications Division, Ministry of Information & Broadcasting, Govt. Of India. 2007. ISBN   978-81-230-1423-4.
  2. "The Electricity Act, 2003" (PDF). Archived from the original (PDF) on 23 September 2013. Retrieved 21 September 2013.
  3. Aggarwal, Piyush (8 October 2021). "Shrinking coal stocks and escalating power crisis in India set alarm bells ringing". India Today. Retrieved 13 October 2021.
  4. "See CEA monthly 'Generation Overview Report - Actual' for March 2016" . Retrieved 21 April 2016.
  5. "See NLDC monthly reports of 2015-16". Archived from the original on 24 April 2016. Retrieved 21 April 2016.
  6. "Daily Generation Report, CEA". Archived from the original on 5 May 2016. Retrieved 11 October 2017.
  7. "Daily Reports, NLDC" . Retrieved 11 October 2017.