The topic of this article may not meet Wikipedia's notability guideline for geographic features .(September 2024) |
Centre Street S | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
CTrain station | |||||||||||
General information | |||||||||||
Coordinates | 51°02′32″N114°03′43″W / 51.042332°N 114.062028°W | ||||||||||
Owned by | Calgary Transit | ||||||||||
Platforms | Centre loading | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Parking | None | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Fare zone | TBD | ||||||||||
History | |||||||||||
Opening | TBD | ||||||||||
Electrified | Overhead catenary | ||||||||||
Services | |||||||||||
|
Centre Street S station is a planned and approved CTrain light rail station in Calgary, Alberta, part of the Green Line. Construction was slated to begin in 2024 and finish in 2030 as part of construction phase 1, segment 2A. [1] However the station was deferred as part of a alignment change on July 30, 2024. [2] The station is located in the Beltline, immediately south of downtown Calgary.
The station will be located under 11 Avenue South, near Centre Street South and will have a concourse level above the platform. It will provide access to the urban community's high-density residential, commercial and retail buildings, as well as the Calgary Tower, the Central Library and the Sheldon M. Chumir Hospital. [3] The station and the surrounding streetscape will feature Crime Prevention Through Environmental Design principles to mitigate crime.
Calgary Transit is the public transit agency which is owned and operated by the city of Calgary, Alberta, Canada. In 2019, an estimated 106.5 million passengers boarded approximately 1,155 Calgary Transit vehicles. It operates light metro (LRT), urban tramway, bus rapid transit (BRT), para-transit, and regular bus services. In 2023, the system had a ridership of 144,385,200, or about 464,800 per weekday as of the second quarter of 2024.
CTrain is a light rail system in Calgary, Alberta, Canada. Much of the system functions as a high-capacity light metro, while in the downtown free-fare zone, trains run like a modern tram with a dedicated right-of-way. This subway-surface alignment is known as semi-metro.
10 Street SW station was a CTrain light rail station in Calgary, Alberta, Canada. It was the western terminus of Route 202. It was closed and replaced with Downtown West–Kerby station.
3 Street SW station is a Calgary C-Train light rail station in Downtown Calgary, Alberta, Canada. The 3 Street SW platform is used by eastbound trains, with the nearest stations serving westbound trains being and the 4 Street SW station and the 1 Street SW station. The platforms is located on the south side of 7 Avenue S and is located within the free-fare zone serving both Routes 201 and 202.
1 Street SW Station is a stop in Downtown Calgary on the city's CTrain light rail system. The 1 Street platform is served by westbound trains only, with the nearest eastbound train platforms being Centre Street station and 3 Street SW station, both of which only serve eastbound trains. The platform is located on the north side of 7 Avenue South, west of Centre Street within the free fare zone, serving both routes 201 and 202.
Victoria Park/Stampede station is a CTrain light rail station in the Calgary, Alberta, neighbourhood of Beltline, used as a part of the Red Line. The station is adjacent to Stampede Park, the site of the Calgary Stampede. The station opened on May 25, 1981, under the name Stampede Station, as part of the original line.
Southland Station is a Calgary C-Train light rail station in Southwood, Calgary, Alberta. It serves the South Line and opened on May 25, 1981, as part of the original line. The station is located on the exclusive LRT right of way, 9.5 km (5.9 mi) south of the City Hall interlocking at Southland Drive.
Edmonton Light Rail Transit, commonly referred to as the LRT, is a light rail system in Edmonton, Alberta. Part of the Edmonton Transit Service (ETS), the system has 29 stations on three lines and 37.4 km (23.2 mi) of track. Much of the system has a dedicated right-of-way, while in the downtown area, vehicles run underground. This subway-surface alignment is known as semi-metro. As of 2018, it was number seven on a list of the busiest light rail transit systems in North America, with over 113,000 daily weekday riders.
Centre Street is a major road in Calgary, Alberta, and defines the east and west halves of the city for the purposes of street addresses.
Line 5 Eglinton, also known as the Eglinton Crosstown LRT or the Crosstown, is a light rail transit line that is under construction in Toronto, Ontario, Canada. Owned by Metrolinx and operated by the Toronto Transit Commission (TTC), the line will be part of the Toronto subway system as its fifth route. The line is being constructed in two phases, with two extensions approved by the Toronto government but not yet under construction.
Sunalta Station is a CTrain light rail station in Calgary, Alberta, Canada. It serves the West segment of the Blue Line.
Centre Street station is a stop in downtown Calgary on the city's CTrain light rail system. It is only used by eastbound trains, with the nearest stations serving westbound trains being 1 Street Southwest station and City Hall/Bow Valley College, serving both directions. The platform is located on the south side of 7 Avenue South, east of Centre Street, and is located inside the free fare zone serving both routes 201 and 202.
Downtown West–Kerby station is a Calgary CTrain station in Calgary, Alberta, Canada. It is located in the free-fare zone on the 7 Avenue transit-only corridor. It is the only station in the downtown corridor that is exclusively for the Blue Line. A public preview occurred on December 8, 2012, and the station opened for revenue service on December 10, 2012.
The Capital Line is a light rail line on the Edmonton LRT system. The line operates from northeast Edmonton to the south. Operated by the Edmonton Transit Service, the line provides access to Downtown Edmonton and the University of Alberta. The Capital Line currently consists of fifteen stations, six of which are underground. Seven stations are shared with the Metro Line.
The Green Line, also known as Route 203, is a proposed expansion of the light rail (LRT) network in Calgary, Alberta, planned to run between Calgary's north-central and southeastern boundaries, connecting with the Red Line and Blue Line in the city's downtown. The Green Line would be the largest public infrastructure project in Calgary's history and the first rail line in the city to operate low-floor trains if built. When completed, the full vision of the Green Line would be comprised of 29 stations spanning 46 kilometres (29 mi), bringing the total number of CTrain stations in Calgary to 74.
Urban rail transit in Canada encompasses a broad range of rail mass transit systems, including commuter rail, rapid transit, light rail, and streetcar systems.
16 Avenue N station is a planned CTrain light rail station in Calgary, Alberta, part of the Green Line Phase 2. On June 16, 2020, Calgary City Council approved the alignment of Green Line Stage 1, Phase 1 and 2, running between this station and Shepard station. As of July, 2024, a decision of building Phase 2 has not been made. The station serves as the northern terminus station for stage one of construction and is expected to be one of the busiest stations on opening day. It will serve as a transfer point between the Green Line and MAX Orange BRT, connecting riders to the city's northwest, northeast, the Southern Alberta Institute of Technology, the University of Calgary, the Foothills Medical Centre, the Alberta Children's Hospital and future Calgary Cancer Centre.
Eau Claire station is a planned and approved CTrain light rail station in Calgary, Alberta, part of the Green Line. Construction is expected to begin in 2022 and complete in 2027 as the northern terminus of construction phase one. The station is named for and located in the high density urban community of Eau Claire, immediately north of downtown Calgary.
7 Avenue SW station is a planned and approved CTrain light rail station in Calgary, Alberta, part of the Green Line. Construction will begin in 2024 and complete in 2027 as part of construction stage one, phase one.
4 Street SE station is a planned and approved CTrain light rail station in Calgary, Alberta, part of the Green Line. Construction will begin in 2024 and complete in 2030 as part of construction stage one, segment 2A. The station is located in Beltline, immediately southeast of downtown Calgary near the confluence of the Bow River and Elbow River.