Type | state-owned enterprise |
---|---|
Industry | Railway operations |
Predecessor | Taiyuan Railway Administration |
Founded | 19 November 2017 |
Headquarters | 185 Jianshe N Road, Xinghualing, Taiyuan, Shanxi, |
Area served | Shanxi |
Owner | Government of China |
Parent | China Railway |
Website | Official Website |
China Railway Taiyuan Group | |||||||
---|---|---|---|---|---|---|---|
Simplified Chinese | 中国铁路太原局集团 | ||||||
Traditional Chinese | 中國鐵路太原局集團 | ||||||
| |||||||
Taiyuan Railway Administration | |||||||
Simplified Chinese | 太原铁路局 | ||||||
Traditional Chinese | 太原鐵路局 | ||||||
| |||||||
CR Taiyuan | |||||||
Simplified Chinese | 太铁 | ||||||
Traditional Chinese | 太鐵 | ||||||
|
China Railway Taiyuan Group,officially abbreviated as CR Taiyuan or CR-Taiyuan,formerly,Taiyuan Railway Administration is a subsidiaries company under the jurisdiction of the China Railway (formerly the Ministry of Railway). The railway administration was reorganized as a limited liability company in November 2017. [1]
It supervises the railway network within Shanxi and the entire Daqin railway under a subsidiary Daqin Railway Company.
Datong–Qinhuangdao railway or Daqin railway,also known as the Daqin line,is a 653 km coal-transport railway in north China. Its name is derived from its two terminal cities,Datong,a coal mining center in Shanxi province,and Qinhuangdao in Hebei province,on the Bohai Sea.
China Railway Shanghai Group,officially abbreviated as CR Shanghai or CR-Shanghai,formerly,Shanghai Railway Administration is a subsidiaries company under the jurisdiction of the China Railway. The railway administration was reorganized as a company in November 2017.
China Railway Chengdu Group,officially abbreviated as CR Chengdu or CR-Chengdu,formerly,Chengdu Railway Administration is a subsidiaries company under the jurisdiction of the China Railway. The railway administration was reorganized as a company in November 2017.
China Railway Zhengzhou Group,officially abbreviated as CR Zhengzhou or CR-Zhengzhou,formerly,Zhengzhou Railway Administration is a subsidiaries company under the jurisdiction of the China Railway. It is in charge of the railways in Henan Province.
China Railway Jinan Group,officially abbreviated as CR Jinan or CR-Jinan,formerly,Jinan Railway Administration is a subsidiaries company under the jurisdiction of the China Railway. The railway administration was reorganized as a company in November 2017.
China Railway Beijing Group,officially abbreviated as CR Beijing or CR-Beijing,formerly,Beijing Railway Administration is a subsidiaries company under the jurisdiction of the China Railway. The railway administration was reorganized as a company in November 2017.
Datong–Xi'an high-speed railway or Daxi HSR is a dual-track,electrified,high-speed rail line operated by CR Taiyuan Group and CR Xi'an Group between Datong,Shanxi and Xi'an,Shaanxi. It has a length of 859 km (534 mi) through the provinces of Shanxi and Shaanxi Province,traversing the north-south axis of the former,and will accommodate trains traveling at speeds up to 250 km/h (160 mph). Travel time between the two terminal cities will be reduced from 16.5 hours to about three hours.
Ningwu–Kelan railway or Ningke railway,is a single-track regional railroad in Shanxi Province of northern China between Ningwu and Kelan Counties. The line is 95.95 km (60 mi) long,and was built between 1967 and 1971 as a national defense railroad to support the building of the Third Front in China's mountainous interior. The Taiyuan Satellite Launch Center in Kelan County,a space rocket and strategic missile launch facility,is located along route. In recent years,the railway has been used to transport growing coal output from northern Shanxi and was electrified in 2008 to increase transport capacity.
The Datong–Puzhou or Tongpu railway,is a major trunkline railroad in northern China,and the main axial railway of Shanxi Province. The railway is located entirely within Shanxi and diagonally bisects the province from Datong in the northeast to Fenglingdu,near the village of Puzhou,in the southwest corner. The line is named after Datong and Puzhou,and has a total length of 865 km (537 mi). The line is often referred to by its northern and southern halves with Taiyuan,the provincial capital as the midpoint. Southern Tongpu railway from Taiyuan to Fenglingdu is 513 km (319 mi) in length and was built from 1933 to 1935. The Northern Tongpu railway,from Datong to Taiyuan is 351 km (218 mi) in length and was built from 1933 to 1940. Major cities and towns along route include Datong,Huairen,Shuozhou,Ningwu,Yuanping,Xinzhou,Taiyuan,Yuci,Taigu,Qi County,Pingyao,Huozhou,Hongdong,Linfen,Houma and Fenglingdu.
China Railway Wuhan Group,officially abbreviated as CR Wuhan or CR-Wuhan,formerly,Wuhan Railway Administration is a subsidiaries company under the jurisdiction of the China Railway. The railway administration was reorganized as a company in November 2017.
China Railway Nanning Group,officially abbreviated as CR Nanning or CR-Nanning,formerly,Nanning Railway Administration is a subsidiaries company under the jurisdiction of the China Railway. The railway administration was reorganized as a company in November 2017.
China Railway No.2 Group Co.,Ltd. and China Railway Erju Engineering Co.,Ltd. were two closely connected companies. They are formerly parent-subsidiary via China Railway Erju Co.,Ltd. (CREC). The group is a Chinese construction company based in Chengdu.
China Railway Ürümqi Group,officially abbreviated as CR Ürümqi or CR-Ürümqi,also known as CR Xinjiang,formerly,Ürümqi Railway Administration is a subsidiaries company under the jurisdiction of the China Railway. The railway administration was reorganized as a company in November 2017.
China Railway Lanzhou Group,officially abbreviated as CR Lanzhou or CR-Lanzhou,formerly,Lanzhou Railway Administration is a subsidiaries company under the jurisdiction of the China Railway. The railway administration was reorganized as a company in November 2017.
China Railway Hohhot Group,officially abbreviated as CR Hohhot or CR-Hohhot,formerly,Hohhot Railway Administration is a subsidiaries company under the jurisdiction of the China Railway. The railway administration was reorganized as a company in November 2017.
China Railway Shenyang Group,officially abbreviated as CR Shenyang or CR-Shenyang,formerly,Shenyang Railway Administration is a subsidiaries company under the jurisdiction of the China Railway. The railway administration was reorganized as a company in November 2017.
China Railway Harbin Group,officially abbreviated as CR Harbin or CR-Harbin,formerly,Harbin Railway Administration is a subsidiaries company under the jurisdiction of the China Railway. The railway administration was reorganized as a company in November 2017.
China Railway Kunming Group,officially abbreviated as CR Kunming or CR-Kunming,formerly,Kunming Railway Administration is a subsidiaries company under the jurisdiction of the China Railway. The railway administration was reorganized as a company in November 2017.
China Railway Nanchang Group,officially abbreviated as CR Nanchang or CR-Nanchang,formerly,Nanchang Railway Administration is a subsidiaries company under the jurisdiction of the China Railway. The railway administration was reorganized as a company in November 2017.
The Jining–Datong–Yuanping high-speed railway,also referred to in Chinese under the acronym Jidayuan high-speed railway is a Chinese high-speed railway connecting Ulanqab,Inner Mongolia with Datong and Yuanping,Shanxi Province. The line runs from Ulanqab railway station in Inner Mongolia,passes through Datong,Shuozhou,and Xinzhou in Shanxi along the way,and finally connects with the Datong–Xi'an high-speed railway. The total length of the line is about 269.6 km (167.5 mi),including 197.1 km (122.5 mi) in Shanxi. One of the important parts of the Hohhot–Nanning corridor,the Datong–Yuanping section is also an important part of the Beijing–Kunming corridor. The Jining–Datong–Yuanping HSR is an important route between Inner Mongolia and the south. After completion,the travel time between Hohhot and Taiyuan will be shortened from the current 5 hours to 3 hours.