Clifton Hampden Bridge

Last updated

Clifton Hampden Bridge
Clifton Hampden Bridge (4) (Nancy).JPG
Clifton Hampden Bridge
Coordinates 51°39′16.5″N1°12′38″W / 51.654583°N 1.21056°W / 51.654583; -1.21056 Coordinates: 51°39′16.5″N1°12′38″W / 51.654583°N 1.21056°W / 51.654583; -1.21056
Carries Thames Path, Road
Crosses River Thames
Locale Clifton Hampden, Oxfordshire
Maintained by Oxfordshire County Council
Heritage status Grade II* listed
Characteristics
DesignArch
MaterialBrick
Height13 feet 5 inches (4.09 m) [1]
No. of spans6
Piers in water5
History
Designer George Gilbert Scott
Opened1867
Location
Clifton Hampden Bridge

Clifton Hampden Bridge is a road bridge crossing the River Thames in Clifton Hampden, Oxfordshire, England, situated on the reach below Clifton Lock. Originally it joined Oxfordshire on the north bank with Berkshire on the south but in 1974 the area on the south bank was transferred from Berkshire to Oxfordshire. It is a Grade II* listed building. [2]

Contents

Clifton Hampden Bridge was designed by Sir George Gilbert Scott and opened in 1867. The bridge replaced a ferry service which had operated on the site since at least the early 14th century. From its opening a toll was payable but this ceased in 1946 when the County Councils of Berkshire and Oxfordshire joined to buy the bridge from its private owners.

Background

The reach at Clifton Hampden was rocky and shallow, with water levels often dropping to barely 2 feet (0.61 m) [3] so it was usually fordable by cattle and horses. The earliest record of a ferry is a mention of John Broun being ferryman in the early 14th century. [4] The archives of Exeter College, Oxford show that Clifton Ferry was given to the college in 1493 by a Watlington draper called Roger Roper; the college owned the ferry right up until 1861 when it was bought out in preparation for the building of the bridge. [5] In 1607 a ferry at Clifton is mentioned as the downstream limit of improvement works undertaken by the 1605 Oxford-Burcot Commission. [3] In Thomas Baskerville's travel journal of 1692 he notes "At Clifton fferry [sic] is a great boat to carry horse and man" [3] whilst an 1829 tour notes "an ancient ferry" with a "boat passing continually to and fro". [6]

The events that led to the building of the bridge started in August 1826 when the Lord Mayor of London made a ceremonial progress down the Thames from Oxford to London. The Mayoral barge grounded on the rocky outcrops in the shallows at Clifton Ferry and was stuck for several hours whilst the weirs further upstream were opened to raise the water level. This episode led to the building of Clifton Lock and weirs in 1835 which allowed better water management on the reach. [7] Whilst the deeper channel was welcomed by river traffic it prevented the fording of the river by herds of cattle and thus prompted demands for a bridged crossing. [5]

Present structure

The bridge and village from Clifton Lock upstream Cliftonhampden01.JPG
The bridge and village from Clifton Lock upstream

The driving force behind the building of the bridge was Henry Hucks Gibbs, a banker, businessman and Governor of the Bank of England. Gibbs inherited the Lord of the Manor of Clifton Hampden on the death of his father in 1842 and devoted time and money to modernising the estate. He built new estate cottages, a new manor house, renovated and restored the Church of St Michael and All Angels as well as building the bridge. [5]

In 1861 Gibbs purchased the ferry rights from Exeter College and applied for permission to build a bridge. This was granted in an Act of Parliament of 23 June 1864 stating the "local and public advantage" of linking Clifton Hampden with the Parish of Long Wittenham [5] and granting the right to levy a toll. [4] Gibbs selected George Gilbert Scott as the architect for all his improvements and a popular story, possibly apocryphal, tells how Scott drew the initial design for the bridge on his starched shirt-cuff over dinner with Gibbs. [5]

The bridge was built of red brick supplied from a kiln that Gibbs had built on Clifton Heath to service his other modernisations. Scott's design has six gothic arches with spans from 24 feet (7.3 m) to 34 feet (10 m). The five brick piers have triangular cutwaters which extend upwards to provide pedestrian refuges. The total cost of the construction was £3,617 (equivalent to £341,000 today [8] ) which was met by Gibbs, the unusually low tolls being levied only to meet the cost of ongoing maintenance. The bridge opened in 1867 with its builder, Richard Casey, as toll keeper.

In 1931 the bridge was nearly demolished as part of Berkshire County Council's policy of replacing toll bridges. New plans for a steel beam and trestle bridge were drawn up but the intervention of the Second World War put the plans on hold. In 1946 the Councils of Oxfordshire and Berkshire purchased the bridge from Lady Aldenham for £1,850 (£82,000 [8] ) and decided to retain Scott's brick structure. On 4 October 1946 the bridge was made free, the first vehicle to cross being a fairground caravan. [5]

See also

Related Research Articles

Marsh Lock Lock and weir on the River Thames in Berkshire, England

Marsh Lock is a lock and weir situated on the River Thames in England, about 1 mile upstream of Henley Bridge in Henley-on-Thames, Oxfordshire. The lock is close to the Berkshire bank, but accessed from the Oxfordshire side via two long walkways, the downstream one being near Mill Meadows. The first pound lock was built by the Thames Navigation Commission in 1773.

Mapledurham Lock Lock and weir on the River Thames in Berkshire, England

Mapledurham Lock is a lock and weir situated on the River Thames in England, about 4 miles upstream of Reading. The lock was first built in 1777 by the Thames Navigation Commissioners and the present lock dates from 1908.

Goring and Streatley Bridge

Goring and Streatley Bridge is a road bridge across the River Thames in England. The bridge links the twin villages of Goring-on-Thames, Oxfordshire, and Streatley, Berkshire, and is adjacent to Goring Lock.

Sonning Bridge

Sonning Bridge is a road bridge across the River Thames at Sonning, Berkshire. It links Sonning with Sonning Eye (Oxfordshire) and crosses the Thames on the reach above Shiplake Lock, just short of Sonning Lock. It is a brick arch bridge completed in 1775, to replace an earlier wooden bridge. The bridge has been the subject of many paintings and prints by artists and is a Grade II listed building.

Culham Human settlement in England

Culham is a village and civil parish in a bend of the River Thames, 1 mile (1.6 km) south of Abingdon in Oxfordshire. The parish includes Culham Science Centre and Europa School UK. The parish is bounded by the Thames to the north, west and south, and by present and former field boundaries to the east. It is low-lying and fairly flat, rising from the Thames floodplain in the south to a north-facing escarpment in the north up to 260 feet (80 m) above sea level. The 2011 Census recorded its population as 453.

Cookham Lock Lock and weirs on the River Thames in Berkshire, England

Cookham Lock is a lock with weirs situated on the River Thames near Cookham, Berkshire, about a half-mile downstream of Cookham Bridge. The lock is set in a lock cut which is one of four streams here and it is surrounded by woods. On one side is Sashes Island and on the other is Mill Island connected to Formosa Island, the largest on the non-tidal Thames.

Thames Path National Trail following the River Thames in England

The Thames Path is a National Trail following the River Thames from its source near Kemble in Gloucestershire to the Thames Barrier at Charlton, south east London. It is about 184 miles (296 km) long. A path was first proposed in 1948 but it only opened in 1996.

South Stoke, Oxfordshire Human settlement in England

South Stoke is a village and civil parish on an east bank of the Thames, about 1.5 miles (2.4 km) north of Goring-on-Thames in South Oxfordshire. It includes less than 1 mile (1.6 km) to its north the hamlet and manor house of Littlestoke.

Clifton Hampden Human settlement in England

Clifton Hampden is a village and civil parish on the north bank of the River Thames, just over 3 miles (5 km) east of Abingdon in Oxfordshire. Since 1932 the civil parish has included the village of Burcot, 1 mile (1.6 km) east of Clifton Hampden. The 2011 Census recorded the parish population as 662.

Days Lock

Day's Lock is a lock on the River Thames near Dorchester-on-Thames, Oxfordshire, England on the Dorchester side of the river.

Clifton Lock

Clifton Lock is a lock on River Thames in Oxfordshire, England. It is located south of the village of Clifton Hampden and north of Long Wittenham. It is at the start of the Clifton Cut, which bypasses the river to the north of Long Wittenham. The lock was completed in 1822 by the Thames Navigation Commissioners.

Swinford Toll Bridge

Swinford Toll Bridge is a privately owned toll bridge across the Thames in Oxfordshire, England. It crosses the river just above Eynsham Lock, between the village of Eynsham on the north-west bank and the hamlet of Swinford on the south-east bank. It carries the B4044 between Oxford and Eynsham, which was the A40 road until the north Oxford bypass was completed in 1936.

Cookham Bridge

Cookham Bridge is a road bridge in Cookham, Berkshire, carrying the A4094 road across the River Thames in England. It is on the reach above Cookham Lock and links Cookham on the Berkshire bank with Bourne End in Buckinghamshire.

Shillingford Human settlement in England

Shillingford a hamlet on the north bank of the River Thames in Warborough civil parish in South Oxfordshire, England. Its homes are not quite with Warborough by way of one residential road. It lies mostly on the A4074 between Oxford and Reading, at the junction with the A329.

Shillingford Bridge

Shillingford Bridge is Grade II* listed road bridge near Shillingford, Oxfordshire, carrying an unclassified road across the River Thames in England on the reach above Benson Lock. The bridge provides access between Shillingford to the north of the river and Wallingford to the south. Originally the south side was in Berkshire but was transferred from Berkshire to Oxfordshire in 1974. The bridge is single track and vehicular passage is controlled by traffic lights.

Burcot, Oxfordshire Hamlet in Oxfordshire, England

Burcot is a hamlet in Oxfordshire, England on the left bank of the River Thames, in the civil parish of Clifton Hampden. Until 1932, it lay in the civil parish of Dorchester.

Sutton Bridge, Oxfordshire

Sutton Bridge, Oxfordshire is a road bridge across the River Thames near the village of Sutton Courtenay, Oxfordshire, England. It is a stone structure built in 1807 with three arches over the main river and two smaller ones across the flood plain. An extension was built in 1809 across the Culham Cut, just below Culham Lock. It was originally a toll bridge and replaced an earlier multi-arch bridge over the original weir and a ferry at this site. It is a Grade II listed building.

Abingdon Bridge

Abingdon Bridge crosses the River Thames at the town of Abingdon, Oxfordshire, England. It carries the A415 road from Abingdon to Dorchester, Oxfordshire, over the reach of the Thames between Culham Lock and Abingdon Lock.

Datchet Bridge Road bridge which crossed the River Thames at Datchet

Datchet Bridge, also known as The Divided Bridge, was a road bridge which crossed the River Thames at Datchet from 1706 until it was demolished in 1848. It was situated on the reach between Old Windsor Lock and Romney Lock and linked Windsor on the Berkshire bank to Datchet on the Buckinghamshire side. The bridge replaced a ferry service which had operated at the site since at least the middle of the 13th century.

References

References
  1. River Thames Alliance. Bridge heights on the River Thames.
  2. Historic England. "CLIFTON HAMPDEN BRIDGE (1059815)". National Heritage List for England . Retrieved 18 June 2015.
  3. 1 2 3 Thacker 1920 , p. 173
  4. 1 2 Lobel 1962 , pp. 16–27
  5. 1 2 3 4 5 6 Phillips 1981 , p. 65
  6. Walton 1834 , p. 122
  7. Phillips 1981 , p. 64
  8. 1 2 UK Retail Price Index inflation figures are based on data from Clark, Gregory (2017). "The Annual RPI and Average Earnings for Britain, 1209 to Present (New Series)". MeasuringWorth. Retrieved 11 June 2022.
Bibliography
Next bridge upstream River Thames Next bridge downstream
Appleford Railway Bridge Clifton Hampden Bridge
Grid reference SU5472395382
Little Wittenham Bridge
Next crossing upstream Thames Path Next crossing downstream
northern bank
Abingdon Lock
Clifton Hampden Bridge
Grid reference SU5472395382
southern bank
Day's Lock