Columbia Energy Center

Last updated
Columbia Energy Center
Coal power plant by Portage, Wisconsin.jpg
Coal ash pond landfill in the foreground
Columbia Energy Center
CountryUnited States
Location Dekorra, south of Portage, Wisconsin
Coordinates 43°29′10″N89°25′13″W / 43.48611°N 89.42028°W / 43.48611; -89.42028
StatusActive, under construction
Commission date 1975–1978
Owner(s) Wisconsin Power and Light Company (46.2%), Wisconsin Public Service (31.8%), Madison Gas and Electric (22%)
Thermal power station
Primary fuel Coal
Cooling sourceLake Columbia
Power generation
Nameplate capacity 1023 MW
Capacity factor 46.99% (2023)
Annual net output 4211 GWh (2023)
External links
Commons Related media on Commons

Columbia Energy Center is a base load, sub-bituminous coal-fired, electrical power station located south of Portage in the Town of Pacific, Columbia County, Wisconsin. [1] Ownership is 46.2% Wisconsin Power and Light Company (Alliant Energy), [2] 31.8% Wisconsin Public Service (Integrys Energy Group), [3] and 22% Madison Gas and Electric (MGE). [4]

Contents

History

Columbia Energy Center was built in the early 1970s. Unit 1 went online in 1975 and Unit 2 went online in 1978, with nameplate capacities of 512 MW and 511 MW, respectively. [5] [6]

In 2009, faced with environmental regulations regarding future operations, the owners of Columbia Energy Center invested in upgrades to the plant. The owners submitted an Electric Generation Expansion Analysis System (EGEAS) summary report to the Public Service Commission of Wisconsin on April 2, 2009. The report presented the results of a planning and scenarios analysis to support Wisconsin Power and Light, Wisconsin Public Service Corporation, and MGE's joint application for a Certificate of Authority (CA) for the installation of emission controls at the facility. [7]

Although not required by law, the Commission held a hearing on the matter of the upgrade after several parties, including the Citizens Utility Board (CUB), Clean Wisconsin (Clean WI), and the Sierra Club, filed a joint request to intervene.

Columbia's owners were granted a Certificate authorizing the installation of air emissions reductions systems and associated equipment on March 11, 2011, at an estimate cost of $627 million. [8] Construction began on April 16, 2012, and was completed in December 2014 at a total cost of $589 million. [9]

On February 2, 2021, Alliant Energy, the majority owner and operator of the Columbia Energy Center announced the plant will shut down by 2025. [10] On June 23, 2022, Alliant announced that CEC's decommissioning date would be delayed until mid-2026, due to the ongoing supply chain issues and to hedge against an energy shortage in upcoming years, with CEC mainly being in service during peak periods. [11]

MGE has since pushed back the retirement date of both units to June 2026. [12]

Future plans

After receiving a $30 million federal grant, Alliant Energy announced it would build a 20MW / 200MWh storage system on the site, similar to a prototype in Italy. The storage system is a novel closed-system carbon dioxide technology that converts the gas to liquid and back again at 75% efficiency, depending on demand. [13] [14] An application to construct, own, and operate the system was filed on August 7, 2024 with the Wisconsin PSC. [15]

Peregrine Falcons

An active peregrine falcon nest has been located on the stack of Unit 1 since 2006. The nest has produced over 60 peregrine falcon young in that time (3.3/yr). [16]

Electricity generation

In 2023, Columbia Energy Center generated 4,211 GWh, approximately 6.6% of the total electric power generated in Wisconsin (63,216 GWh) [17] for that year. The plant had a 2023 annual capacity factor of 46.99%.

Electrical Generation (MW-h) of Columbia Energy Center [18]
YearJanFebMarAprMayJunJulAugSepOctNovDecAnnual (Total)
2001642,820247,770518,771637,701649,573661,011702,598651,353586,758733,229611,023670,1107,312,717
2002668,371404,604560,226335,436324,886598,798668,431665,689576,658536,217529,475603,3636,472,154
2003659,943327,988392,363675,770660,647641,584655,060669,915640,918534,049609,723638,7067,106,666
2004383,676619,858670,831429,457494,807641,466639,495637,499657,645632,399678,152624,7617,110,046
2005572,172264,620370,953332,547535,716671,913708,256683,039644,925722,464537,604654,8306,699,039
2006469,660282,812482,381487,178551,345627,756697,236595,374623,681641,130665,286625,1946,749,033
2007458,424531,772407,459584,306626,137668,775612,109662,360651,027633,738672,419576,8147,085,340
2008375,059397,372457,036686,663705,323624,840709,923715,716631,597697,391643,677673,0247,317,621
2009417,796443,918384,220444,501405,887505,353588,817631,489635,711686,061644,015693,6766,481,444
2010435,594412,034433,599652,619711,952679,921719,898723,665570,873649,259586,714680,6597,256,787
2011437,302450,502647,039458,340495,875646,546645,163646,764647,981667,256558,440675,6676,976,875
2012451,980401,013349,374605,789703,619649,765678,785727,720669,136712,572626,653743,7997,320,205
2013709,899548,318436,782419,630393,665619,922679,403743,253642,453732,916621,870690,2997,238,410
2014534,949344,603639,295450,183286,048587,113466,092370,543244,127247,022392,454377,5064,939,935
2015458,555328,153338,570247,374307,023503,666547,214528,561535,086466,017233,831365,6084,859,658
2016272,871178,897217,034223,158466,190543,414617,404677,756519,535548,796338,510373,3344,976,899
2017448,843429,460395,089356,235543,397592,033662,933620,854592,989579,969620,175667,3676,509,344
2018436,005300,944499,424616,208569,643462,686643,897669,221639,473617,291666,096520,7826,641,670
2019571,530481,686317,028268,125492,822445,205599,811477,535485,133409,648501,284316,7565,366,563
2020439,857444,990311,850200,944272,560458,864519,223583,612357,494344,918522,848729,7455,186,905
2021558,710621,069465,640330,631299,028680,295739,397730,481560,869327,610271,034322,0495,906,813
2022489,615435,252280,724264,629176,109309,464463,008476,916283,419230,366287,517326,3704,023,389
2023174,275160,152220,172261,154431,237397,010572,809589,728509,881362,367239,662293,0934,211,540
2024660,934318,463165,707180,279259,343

See also

Related Research Articles

Southern Company is an American gas and electric utility holding company based in the Southern United States. It is headquartered in Atlanta, Georgia, with executive offices located in Birmingham, Alabama. As of 2021 it is the second largest utility company in the U.S. in terms of customer base. Through its subsidiaries it serves 9 million gas and electric utility customers in 6 states. Southern Company's regulated regional electric utilities serve a 120,000-square-mile (310,000 km2) territory with 27,000 miles (43,000 km) of distribution lines.

<span class="mw-page-title-main">Xcel Energy</span> American utility company

Xcel Energy Inc. is a U.S. regulated electric utility and natural gas delivery company based in Minneapolis, Minnesota, serving more than 3.7 million electric customers and 2.1 million natural gas customers across parts of eight states. It consists of four operating subsidiaries: Northern States Power-Minnesota, Northern States Power-Wisconsin, Public Service Company of Colorado, and Southwestern Public Service Co.

<span class="mw-page-title-main">Kewaunee Power Station</span> Decommissioned nuclear power plant located in Carlton, Wisconsin

The Kewaunee Power Station is a decommissioned nuclear power plant, located on a 900 acres (360 ha) plot in the town of Carlton, Wisconsin, 27 miles (43 km) southeast of Green Bay, Wisconsin in Kewaunee County, and south of the city of Kewaunee.

WEC Energy Group is an American company based in Milwaukee, Wisconsin that provides electricity and natural gas to 4.4 million customers across four states.

<span class="mw-page-title-main">Alliant Energy</span> Public utility holding company based in Madison, Wisconsin, US

Alliant Energy Corporation is a public utility holding company headquartered in Madison, Wisconsin, providing power in Iowa and Wisconsin.

<span class="mw-page-title-main">Rock River Generating Station</span>

Rock River Generating Station was an electrical power station located north of Beloit, Wisconsin in the town of Beloit at 827 W. B. R. Townline Road on the west bank of the Rock River. The facility was owned and operated by Wisconsin Power and Light, a wholly owned subsidiary of Alliant Energy.

<span class="mw-page-title-main">Riverside Energy Center</span> Electrical power station in Beloit, Rock County, Wisconsin

Riverside Energy Center is an electrical power station located north of Beloit, Wisconsin in the Town of Beloit, just west of the Rock River. It consists of two 2-on-1 units. The facility is owned and operated by Alliant Energy.

<span class="mw-page-title-main">Oak Creek Power Plant</span> Electrical power station in Oak Creek, Milwaukee County, Wisconsin

Oak Creek Power Plant, also known as South Oak Creek, is a base load, coal- and natural gas-fired, electrical power station located on Lake Michigan in Oak Creek, Wisconsin. Oak Creek Power Plant along with Elm Road Generation Station make up the entire Oak Creek Generating Site.

<span class="mw-page-title-main">Edgewater Generating Station</span> Coal power plant in Sheboygan, Wisconsin

Edgewater Generating Station is a 380 megawatt (MW) coal power plant located on the south side of Sheboygan, Wisconsin, on the shore of Lake Michigan, whose waters are used to provide cooling. It provides electricity for customers in the northeastern part of Alliant Energy's Wisconsin Power & Light service area and service to several local municipal utilities. In 2009, it was the seventh largest generating station in Wisconsin, with a net summer capacity of 767 MW.

<span class="mw-page-title-main">J. P. Pulliam Generating Station</span> Electrical power station in Green Bay, Brown County, WIsconsin

J. P. Pulliam Generating Station was an electrical power station powered by sub-bituminous coal, which could also be substituted by natural gas. It was located in Green Bay, Wisconsin in Brown County. The plant was named after the former Wisconsin Public Service Corporation president John Page Pulliam. The plant units were connected to the power grid via 138 kV and 69 kV transmission lines. The remaining coal units on site were decommissioned in 2018 leaving only the natural gas fired P31 unit active at the site.

Madison Gas and Electric Company (MGE) is the primary subsidiary of MGE Energy, Inc.. As a regulated utility, it primarily serves the Madison, Wisconsin metropolitan area with electricity, gas and green energy options.

<span class="mw-page-title-main">Electricity sector in China</span>

China is the world's largest electricity producer, having overtaken the United States in 2011 after rapid growth since the early 1990s. In 2021, China produced 8.5 petawatt-hour (PWh) of electricity, approximately 30% of the world's electricity production.

<span class="mw-page-title-main">Battery energy storage system</span> Energy storage system using electrochemical secondary cells

A battery energy storage system (BESS) or battery storage power station is a type of energy storage technology that uses a group of batteries to store electrical energy. Battery storage is the fastest responding dispatchable source of power on electric grids, and it is used to stabilise those grids, as battery storage can transition from standby to full power in under a second to deal with grid contingencies.

<span class="mw-page-title-main">Two Creeks Solar Park</span> Solar plant in Wisconsin

The Two Creeks Solar Park is a 150 MW solar photovoltaic energy station in Manitowoc County, Wisconsin. Ownership is shared between Wisconsin Public Service Corporation (WPS) and Madison Gas and Electric (MG&E), at 100 MW and 50MW, respectively. It was the first utility-scale solar plant approved and constructed in Wisconsin.

<span class="mw-page-title-main">Badger Hollow Solar Farm</span> Solar photovoltaic energy station

The Badger Hollow Solar Farm is a 300 MW solar photovoltaic energy station in Iowa County in southwestern, Wisconsin. Ownership is shared between Wisconsin Public Service Corporation (WPS), Madison Gas and Electric (MG&E), and Wisconsin Electric Power Company, with each utility owning 100 MW. It was the second utility-scale solar plant approved and constructed in Wisconsin.

References

  1. Lyn Jerde. "Groundbreaking marks air quality project at Columbia Energy Center". Portage Daily Register, October 10, 2016.
  2. "Alliant Energy Corp, Form 10-K, Annual Report, Filing Date Mar 11, 2004". secdatabase.com. Retrieved May 14, 2018.
  3. SEC Form U-3A-2, 12/31/2002. Integrys Energy Group, Inc.
  4. Environmental Responsibility Report on Climate Change Archived 2006-11-01 at the Wayback Machine . Madison Gas and Electric (MGE).
  5. "Our history (Wisconsin Public Service)". accel.wisconsinpublicservice.com. Retrieved 2020-07-12.
  6. "ERF - Search Result". apps.psc.wi.gov. Retrieved 2020-07-12.
  7. "ERF - Search Result". apps.psc.wi.gov. Retrieved 2020-07-12.
  8. "ERF - Search Result". apps.psc.wi.gov. Retrieved 2020-07-12.
  9. POWER (2015-10-01). "TOP PLANTS: Columbia Energy Center, Portage, Wisconsin". POWER Magazine. Retrieved 2020-07-12.
  10. Hubbuch, Chris (2021-02-02). "Columbia power plant to close by 2025, ending coal-fired power in Portage". Wisconsin State Journal . Retrieved 2021-02-02.
  11. Hess, Corrinne (23 June 2022). "We Energies and Alliant Energy coal plants in Wisconsin to stay open longer due to energy supply fears". Milwaukee Journal Sentinel . Retrieved 24 June 2022.
  12. Schmidt, Mitchell (November 3, 2023). "Update: No more coal use by 2032". The Wisconsin State Journal. pp. A3, A5.
  13. Schulz, Joe (2023-09-25). "Wisconsin will house an energy storage facility that's the first of its kind in the US". WPR. Retrieved 2024-08-19.
  14. "Alliant Energy utility wants to demonstrate nation's first CO2-based long-duration 'energy dome'". Utility Dive. 20 August 2024.
  15. Templeton, Carrie (August 7, 2024). "Joint Application of Wisconsin Power and Light Company, Wisconsin Public Service Corporation, and Madison Gas and Electric Company for a Certificate of Authority for Construction, Installation, and Ownership of an Energy Storage System, Known as Columbia Storage, in Columbia County, Wisconsin Docket No. 5-CE-156" . Retrieved August 19, 2024.
  16. Septon, Greg. 2023. Wisconsin Falconwatch – 2023 Nesting Season Report - an account of peregrine falcon nesting activity in WI for 2023. Milwaukee, WI. 89 pp.
  17. "Electricity Data Browser". www.eia.gov. Retrieved 2023-01-15.
  18. "Electricity Data Browser". www.eia.gov. Retrieved 2024-08-19.