Columbus Southern Railway

Last updated
Columbus Southern Railway
Overview
Locale Southwest Georgia, Northwest Florida
Dates of operation18961944
Successor Georgia and Alabama Railway
Technical
Track gauge 1,435 mm (4 ft 8+12 in) (standard gauge)
Length88 miles (142 km)

The Columbus Southern Railway is a historic railroad that operated in the U.S. state of Georgia. The railroad operated an 88-mile line from Columbus to Albany that opened in 1890.

Contents

History

It was originally chartered in 1885 as the Columbus and Florida Railway. The Columbus Southern Railway was created in 1886 after the C&F's charter was amended. It rapidly ran into financial difficulties. In 1889 the State of Georgia demanded its assets be handed over to local counties for unpaid taxes. The company fought the order and the case made its way to the Supreme Court which in 1894 decided in Columbus Southern Ry. Co. v. Wright that the 14th Amendment did not protect the company from these actions. [1]

Soon after the decision the railway was sold to John Skelton Williams's Georgia and Alabama Railway in 1896. [2]

In January 1899, John Skelton Williams's syndicate offered to purchase a majority of shares in railroads along the east coast of the United States that would become the Seaboard Air Line Railroad. By 1900, the Georgia and Alabama Railway formally became part of the Seaboard Air Line. John Skelton Williams served as the first president of the Seaboard Air Line, and he would later serve as the United States Comptroller of the Currency.

The Seaboard Air Line discontinued passenger service from Columbus to Albany in 1932 and the line became a freight-only line. [3] [4]

In 1944, the Seaboard Air Line acquired the Georgia Florida and Alabama Railway (GF&A), which paralleled the Columbus Southern between Richland and Kimbrough. [5] As a result, the Seaboard Air Line abandoned the former Columbus Southern between Richland and Kimbrough and consolidated service on the former GF&A. The Seaboard then designated the former Columbus Southern north of Richland (along with the GF&A) as their Richland Subdivision. The Columbus Southern south of Kimbrough became their Albany Subdivision. [6]

In 1967, the Seaboard Air Line merged with its rival, the Atlantic Coast Line Railroad, and the combined company was named the Seaboard Coast Line Railroad. The former Columbus Southern segments continued to operate, though the segment from Kimbrough to Albany was renamed the Kimbrough Subdivision. [7] By 1982, track had been abandoned from Kimbrough to Dawson and the remaining segment from Dawson to Albany was known as the Dawson Subdivision. [8]

In 1980, the Seaboard Coast Line's parent company merged with the Chessie System, creating the CSX Corporation. The CSX Corporation initially operated the Chessie and Seaboard Systems separately until 1986, when they were merged into CSX Transportation.

CSX sold much of the line to the Georgia Southwestern in 1989. [9]

The Georgia Southwestern abandoned the line from Cusseta to Richland in 1995, with the rails being removed in September 1997. Rails remained in place from Columbus to Cusseta in order to serve a large pulpwood yard near the latter which are still in place today but are out of service. [10]

At the south end, the line was abandoned from Albany to Sasser in 1994. The Georgia Southwestern still operates the remaining line from Sasser to Dawson. [10]

Historic stations

MilepostCity/LocationStation [6] Connections and notes
SLB 0.0 Columbus Union Station junction with:
SLB 3.8 Fort Benning junction with Fort Benning Railroad
SLB 6.6 Sand Hill
SLB 10.5Ochillee
SLB 13.4Central Springs
SLB 18.5Cusetta
SLB 27.8Renfroe
SLB 32.3Brooklyn
SLB 38.3 Richland Richlandjunction with:
SLB 44.7Kimbroughjunction with Georgia Florida and Alabama Railway (SAL)
SLB 47.8 Weston
SLB 55.7 Parrott, Georgia Parrott
SLB 64.9 Dawson Dawsonjunction with Southwestern Railroad (CoG/SOU)
SLB 71.8 Sasser Sasser
SLB 87.2 Albany Albany junction with:

Related Research Articles

<span class="mw-page-title-main">Florida Central and Peninsular Railroad</span> Historic railroad system

The Florida Central and Peninsular Railroad was the final name of a system of railroads throughout Florida, becoming part of the Seaboard Air Line Railway in 1900. The system, including some of the first railroads in Florida, stretched from Jacksonville west through Tallahassee and south to Tampa. Much of the FC&P network is still in service under the ownership of CSX Transportation.

<span class="mw-page-title-main">Georgia Southwestern Railroad</span>

The Georgia Southwestern Railroad is a Class III short line railroad company that operates over 234 miles (377 km) of track in southwestern Georgia and southeastern Alabama. Beginning in 1989 as a division of the South Carolina Central Railroad on a pair of former CSX Transportation lines, the railroad has since undergone a number of transformations through abandonments and acquisitions, before arriving at its current form. The railroad was formerly a RailAmerica property before going independent, and in 2008 it was acquired by Genesee & Wyoming Inc.

The Tifton, Thomasville and Gulf Railway (TT&G) was a railway that operated from Tifton, Georgia southwest to Thomasville, Georgia in the early 1900s. It later became part of the Atlanta, Birmingham and Atlantic Railway and Atlantic Coast Line Railroad networks.

The Brunswick and Western Railroad is a historic railroad in southern Georgia that at its greatest extent ran from Brunswick near the coast to Albany. Segments of the line still exist today. The Brunswick and Florida Railroad ran from Brunswick west to Glenmore, where it would connect with the Atlantic and Gulf Railroad.

The Savannah, Americus and Montgomery Railway (SA&M) was a historic railroad located in the U.S. states of Georgia and Alabama. SA&M was built in the 1880s running between Montgomery, Alabama and Lyons, Georgia. It would be completed to Savannah, Georgia in 1896 after being renamed the Georgia and Alabama Railway. The line would notably become part of the Seaboard Air Line Railroad network in 1900.

The Southwestern Alabama Railway (SWA) was incorporated in Alabama, United States, in 1897 and tasked with the construction of a branch line from a connection with the Alabama Midland Railway near Newton, Alabama towards Elba, Alabama. The route was completed to Elba in October 1898, totaled 37.2 miles (59.9 km), and was operated by the Alabama Midland Railway.

The Palmetto Railroad was a Southeastern railroad that served South Carolina and North Carolina in the late 19th century.

The Callahan Subdivision is a CSX Transportation railroad subdivision within the Jacksonville Division on the former Seaboard Air Line Railroad. The sub extends northward 20 miles from Baldwin, Florida, where the Jacksonville Terminal Subdivision's S Line and Florida Gulf & Atlantic Railroad meet just north of Baldwin Yard, a classification yard. According to Jacksonville Division Timetable Number 4 published in 2005, the sub runs from milepost SM 0.18 to milepost SM 20.0, where it joins the Nahunta Subdivision, a former Atlantic Coast Line Railroad, in Callahan, Florida. The line serves as a bypass to Jacksonville.

The Jesup Subdivision is a railroad line owned and operated by CSX Transportation in Georgia. The line runs from Jesup, Georgia to Folkston, Georgia for a length of 72.7 miles. It notable passes through Waycross, Georgia, a major CSX freight terminal and CSX operates numerous freight trains over the line. The Jesup Subdivision was once a major route for the Atlantic Coast Line Railroad, one of CSX's predecessors.

The Savannah Subdivision is a railroad line owned by CSX Transportation in the U.S. state of Georgia. Through the middle of Savannah, the Savannah Subdivision splits into an east route and a west route. The East Route runs from Savannah, Georgia, to Ogeechee, Georgia, for a total of 15.6 miles (25.1 km). At its north end it continues south from the Charleston Subdivision and the Columbia Subdivision both of the Florence Division and at its south end it continues south as the Nahunta Subdivision. The West Route is located in Savannah, Georgia, and is 9.7 miles (15.6 km) in length. At its north end it branches off of the Savannah Subdivision East Route and at its south end it comes back into the Savannah Subdivision East Route.

The Lineville Subdivision is a railroad line currently operated by CSX Transportation in Georgia and Alabama. It runs from Parkwood southeast though Lineville, Alabama to Manchester, Georgia, a distance of 179.4 miles (288.7 km). It connects with CSX's Manchester Subdivision and Fitzgerald Subdivision in Manchester.

The Manchester Subdivision is a railroad line currently operated by CSX Transportation in Central Georgia. Its northern terminus is in Peachtree City, where it continues south from the Atlanta Terminal Subdivision. From Peachtree City, it runs for 38.8 miles (62.4 km) south to Manchester, Georgia, where it connects with CSX's Lineville Subdivision and Fitzgerald Subdivision. It is a major north-south route for CSX in Georgia.

The Augusta Subdivision is a railroad line owned by CSX Transportation in the U.S. states of Georgia and South Carolina. The line runs from CSX's A Line at Yemassee, South Carolina to Augusta, Georgia, for a total of 87.7 miles (141.1 km). At its north end it connects with Norfolk Southern Railway and CSX's McCormick Subdivision.

<span class="mw-page-title-main">Georgia Florida and Alabama Railroad</span>

The Georgia, Florida and Alabama Railroad, known as the Sumatra Leaf Route, and colloquially as the Gopher, Frog & Alligator was a 180 miles (290 km)-long railroad from Richland, Georgia to Carrabelle, Florida. It was founded in 1895 as a logging railroad, the Georgia Pine Railway.

The Waycross Short Line was the unofficial name of a railroad line built by Henry B. Plant that ran from Waycross, Georgia to Jacksonville, Florida on the St. Johns River. The line through Georgia was chartered by Plant as the Waycross and Florida Railroad and the Florida segment was chartered as the East Florida Railway. The line crossed the Georgia/Florida border just south of Folkston, Georgia at the St. Marys River.

The Folkston Cutoff is a railroad line in southern Georgia. It runs from Jesup southwest to Folkston, a distance of 54 miles. It was built in 1901 by the Plant System to allow trains from the northeast to Florida to bypass their busy terminal in Waycross.

The Atlantic Coast Line Railroad's DuPont—Lakeland Line was a historic rail line in southern Georgia and the northern west coast of Florida. On employee timetables, the line was actually divided into the DuPont—High Springs Line and the High Springs—Lakeland Line. The line was primarily used for freight, though some passenger services ran on parts of it in Florida. While parts of the line were built as early as 1863, the full line was not complete until 1913. Parts of the line in Florida are still active today.

The Seaboard Air Line Railroad’s Main Line was the backbone of the Seaboard Air Line Railroad's network in the southeastern United States. The main line ran from Richmond, Virginia to Tampa, Florida, a distance of over 800 miles. Along its route it passed through Petersburg, Raleigh, Columbia, Savannah, Jacksonville, and Ocala, Florida. While some segments of the line have been abandoned as of 2022, most of the line is still in service and is owned by the Seaboard Air Line's successor, CSX Transportation as their S Line.

The Atlantic Coast Line Railroad's Waycross—Montgomery Line was one of the company's secondary main lines running from Waycross, Georgia west to Montgomery, Alabama, a distance of over 300 miles. It was built in the late 1800s by the Atlantic Coast Line's predecessor companies. The line is still in service today and is now the Thomasville Subdivision and Dothan Subdivision of CSX Transportation, the Atlantic Coast Line's successor company through various mergers.

The Atlantic Coast Line Railroad's Albany—Thomasville Line was a historic railroad line in southern Georgia. Built in 1869 by the company's predecessors, it carried some of the Atlantic Coast Line's passenger trains on their routes from the Midwest to the Southeastern United States. The line is still in service today and is now operated by the Georgia and Florida Railway.

References

  1. "Columbus Southern Ry. Co. v. Wright, 151 U.S. 470 (1894)". Justia Law. 2022-07-14. Retrieved 2022-07-16.
  2. Jones, R.C. (2017). A History of Georgia Railroads. Transportation. Arcadia Publishing Incorporated. p. 86. ISBN   978-1-4396-6012-6 . Retrieved 2022-07-16.
  3. Official Guide of the Railways, Seaboard Air Line section, February 1932
  4. Official Guide of the Railways, June 1921, Seaboard Air Line section, Table 12
  5. United States. Congress. House. Committee on the Judiciary. Special Subcommittee on Bankruptcy and Reorganization (1947). Railroad Reorganization: Hearings Before Special Committee on Bankruptcy and Reorganization, Eightieth Congress, First Session, on H.R. 3237. U.S. Government Printing Office. pp. 242–.
  6. 1 2 Seaboard Air Line Railroad South Carolina Division Timetable (1944)
  7. Seaboard Coast Line Railroad Savannah & Waycross Division Timetable (1976)
  8. Seaboard Coast Line Railroad Savannah & Waycross Division Timetable (1982)
  9. Lewis, Edward A. (1996). American Shortline Railway Guide (5 ed.). Kalmbach Publishing Company. p. 133. ISBN   0-89024-290-9.
  10. 1 2 Thornhill, Tommy (2002). "Pig Trails of Southwest Georgia: Part 2". Lines South. White River Productions. 19 (1): 22–29.