The Bombardier Flexity Berlin is a tram type constructed for the Berlin tramway network. It was developed by Bombardier Transportation during the late 2000s and is based on the Bombardier Flexity family of 100% low-floor trams. [1]
The design is based upon earlier Adtranz Incentro models and like them, the Flexity Berlin is built from modules. The Berlin public transport operator Berliner Verkehrsbetriebe (BVG) ordered four different prototypes for testing. [2] The variants are one each of 30-metre and 40-metre lengths in double-ended, or single-ended design. The shorter versions use five modules and the longer versions are built with seven modules. Cab and door arrangement can be either bidirectional (two cab) or unidirectional (single cab) format depending upon the intended route. The first were rolled out during the InnoTrans 2008 railway trade fair. The appearance of the trams was especially designed for use in Berlin. [2]
If the new Flexity tram tests are successful, then Bombardier's Hennigsdorf factory is scheduled to produce a further 206 units. The order would allow BVG to replace 452 high-floor ČKD Tatra KT4 trams. [2] The Tatra trams being replaced are shorter and normally operated in pairs.
In 2009 BVG placed an order for an initial 99 trams for delivery from May 2011. [3] The actual roll-in started on 5 September 2011. [4] At the time of the initial order the BVG intended to order 33 more trams after 2017. [3]
In June 2012 the BVG placed a second order for 39 trams – the last tram of the first contract arrived on 10 September 2012 and the first tram of the second contract arrived on 7 September 2012. The second contract included only long versions so that the amount of trams is enough to replace all of the old Tatra trams by 2017. The purchase is fully funded by the Bundesland Berlin at an amount of 439.1 million euros. [5]
The nearby Strausberg Railway joined the delivery framework of the BVG Berlin Transport Company ordering 2 trams on 5 September 2011. The two short double-ended two-cab trams were delivered in February and March 2013 replacing its older trams (mostly Tatra KT8D5). The purchase is part of a 20-year contract with the county ensuring the financial basis. [6] The contract for the two trams is at an amount of about 5.5 million euros. [7]
The pilot batch was assembled in Bautzen which was later building the chassis for further assembly in Hennigsdorf near Berlin using some parts like motors from Bombardier facilities in Mannheim and Siegen. The factory in Hennigsdorf will deliver about 20 to 24 trains per year (with the last train from the second Berlin batch to be delivered during 2017). [8]
GT6-08 / GT8-08 | ||||
---|---|---|---|---|
Model: | GT6-08 x 5 | GT8-08 x 7 | ||
Cabs: | unidirectional | bidirectional | unidirectional | bidirectional |
Build year: | since 2008 | |||
Number: | 4 (2008) / 148 (2010–2015) | |||
Manufacturer: | Bombardier | |||
Gauge: | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | |||
Length: | 30.8 m (101 ft 5⁄8 in) | 40 m (131 ft 2+3⁄4 in) | ||
Width: | 2.4 m (7 ft 10+1⁄2 in) | |||
Height: | 3.45 m (11 ft 3+7⁄8 in) | |||
Floor height: | 355 mm (1 ft 2 in) | |||
Entry height: | 220–295 mm (8+5⁄8 in – 11+5⁄8 in) | |||
Wheel diameter (new/worn): | 660 / 580 mm (25.98 / 22.83 in) | |||
Seats: | 64 | 54 | 88 | 75 |
Standing: | 116 | 123 | 151 | 165 |
Drive power: | 8 × 50 kW (67 hp) | 12 × 50 kW (67 hp) | ||
Rated voltage: | 600 V DC (Berlin) / 750 V DC (Strausberg) | |||
Top speed: | 70 km/h (43 mph) | |||
Weight: | 37.9 t (37.3 long tons; 41.8 short tons) | 39.1 t (38.5 long tons; 43.1 short tons) | 50.1 t (49.3 long tons; 55.2 short tons) | 51.5 t (50.7 long tons; 56.8 short tons) |
Order | Date | Short unidirection unit GT6-08ER | short bi-direction unit GT6-08ZR | long unidirection unit GT8-08ER | long bi-direction unit GT8-08ZR | 50-m-Bi-direction unit of 9 sections | Total |
---|---|---|---|---|---|---|---|
Pre-series | September 2006 | 1 | 1 | 1 | 1 | 4 | |
First order | June 2009 | 24 | 35 | 40 | 99 | ||
Second order | June 2012 | 12 | 27 | 39 | |||
Third order | December 2015 | 47 | 47 | ||||
Fourth order | February 2017 [9] | 21 | 21 | ||||
Additional order | Oktober 2018 [10] | 21 | 21 | ||||
Second series | December 2020 July 2024 | 3 (-3) | 17 (+3)20 | 20 | |||
Modification of 1st order | January 2011 | −4 | −16 | +20 | |||
2nd Modification of 1st order | June 2012 | −20 | +18 | +2 | |||
Rebuild of Pre-series | 2013 | −1 | +1 | ||||
Modification of 2nd order | December 2015 | −20 | +20 | ||||
Modification of 1st order 2nd series | ? | -3 | +3 | ||||
1st series | 231 | ||||||
2nd series (Urbaliner) | 20 | ||||||
Total | 0 | 37 | 40 | 157 | 20 | 251 |
The Berlin tramway is the main tram system in Berlin, Germany. It is one of the oldest tram networks in the world having its origins in 1865 and is operated by Berliner Verkehrsbetriebe (BVG), which was founded in 1929. It is notable for being the third-largest tram system in the world, after Melbourne and St. Petersburg. Berlin's tram system is made up of 22 lines that operate across a standard gauge network, with almost 800 stops and measuring almost 190 kilometres (120 mi) in route length and 430 kilometres (270 mi) in line length. Nine of the lines, called Metrotram, operate 24 hours a day and are identified with the letter "M" before their number; the other thirteen lines are regular city tram lines and are identified by just a line number.
The Socimi Eurotram (later sold as the Bombardier Flexity Outlook (E)) was an electric tramcar designed for the tram system of Compagnie de Transports Strasbourgeois (CTS). Initially produced by Socimi, after the company became bankrupt Eurotrams were manufactured first by ABB Group's transportation division, then by Adtranz and finally by Bombardier Transportation, who marketed the tram as part of their Flexity Outlook range.
The ADtranz low floor tram was introduced in the 1990s as the world's first tram with a completely low floor design. This tram was developed by MAN for the Bremen urban transport system. The prototype, tram number 3801, was first publicly introduced on 9 February 1990. From 1991 to 1993, it was being tested in many European cities. Ten German cities have purchased this type. Adtranz took over the rail division of MAN in 1990.
Germany has an extensive number of tramway networks. Some of these networks have been upgraded to light rail standards, called Stadtbahn in German. Straßenbahn and Stadtbahn schemes are usually operated on the legal foundation of the BOStrab, the Tramways Act of Germany.
The Stadler Variobahn is a German-designed model of articulated low-floor tram and light rail vehicle. Since its introduction in 1993, the Variobahn has been manufactured variously by ABB, Adtranz, Bombardier Transportation, and since 2001 by Stadler Rail. As of 2009, 254 trams have been ordered, with an additional 110 on option. A unit costs about €2.5 million.
The Norrköping tramway network is a system of trams forming a principal part of the public transport services in Norrköping, Sweden. It has been in service since 1904, and is, along with the larger Gothenburg tram network, one of only two city-centre tramways in Sweden that survived the switch to right-hand traffic in 1967, which led to the replacement of most Swedish tramways with buses to reduce the cost of replacing their now-unusable fleets.
Berlin has developed a highly complex transportation infrastructure providing very diverse modes of urban mobility. 979 bridges cross 197 kilometers of innercity waterways, 5,334 kilometres (3,314 mi) of roads run through Berlin, of which 73 kilometres (45 mi) are motorways. Long-distance rail lines connect Berlin with all of the major cities of Germany and with many cities in neighboring European countries. Regional rail lines provide access to the surrounding regions of Brandenburg and to the Baltic Sea.
The Strausberg Railway is a light railway serving the town of Strausberg in Brandenburg, Germany. It links central Strausberg with the Strausberg railway station, where it connects with trains on the Berlin S-Bahn and the Niederbarnimer Eisenbahn. Although formally constituted and regulated as a railway, the line uses tramway style rolling stock and is superficially indistinguishable from a tramway.
The Dresden tramway network is a network of tramways forming the backbone of the public transport system in Dresden, a city in the federal state of Saxony, Germany. Opened in 1872, it has been operated since 1993 by Dresdner Verkehrsbetriebe (DVB), and is integrated in the Verkehrsverbund Oberelbe (VVO).
The Leipzig tramway network is a network of tramways which together with the S-Bahn Mitteldeutschland forms the backbone of the public transport system in Leipzig, a city in the federal state of Saxony, Germany. Opened in 1872, the network has been operated since 1938 by Leipziger Verkehrsbetriebe (LVB), and is integrated in the Mitteldeutscher Verkehrsverbund (MDV).
The Flexity 2 is a family of tram or light-rail vehicle manufactured by Bombardier Transportation. It is 100% low-floor, in order to easily accommodate wheelchairs and pushchairs. The trams are bi-directional, with cabs at both ends and doors on both sides, and are articulated with five or seven sections. This family of trams debuted on the Blackpool Tramway, England.
The Bombardier M5000, is a model of light rail passenger vehicle. It is part of the Flexity Swift range of vehicles, built specifically as a high-floor, articulated bi-directional tram to operate solely on the Manchester Metrolink system in England. The Metrolink system is the only tram network in the United Kingdom capable of running vehicles in multiple and subsequently the M5000s can operate as either a single vehicle or coupled together to form a "double" unit.
Ferry transport forms part of the transport network of Berlin due to the city's extensive network of rivers, lakes, and canals. 6 routes operate within the city boundaries and one serves the city of Potsdam, which are part of the common public transport tariff run by the Verkehrsverbund Berlin-Brandenburg (VBB).
The Schwerin tramway network is a network of tramways forming the key feature of the public transport system in Schwerin, the capital city of the federal state of Mecklenburg-Vorpommern, Germany.
The Plauen tramway network is a network of tramways forming part of the public transport system in Plauen, a city in the federal state of Saxony, Germany.
The Dessau tramway is a network of tramways forming part of the public transport system in Dessau-Roßlau, a city in Saxony-Anhalt, Germany.
The Magdeburg tramway network is a network of tramways forming part of the public transport system in Magdeburg, the capital city of the federal state of Saxony-Anhalt, Germany.
The Alstom Flexity is a family of trams, streetcars, and light rail vehicles manufactured by Bombardier Transportation until 2021, when French company Alstom took over Bombardier. As of 2015, more than 3,500 Flexity vehicles are in operation around the world in Europe, Asia, Oceania, and North America in 100 cities among 20 countries internationally. Production of the vehicles is done at Bombardier's global production plants and by local manufacturers worldwide through technology transfer agreements.
The Berlin–Hohenschönhausen tram was a tram operated under the Prussian Small Railway Act between Berlin and the rural municipality of Hohenschönhausen, which was incorporated into Berlin in 1920. Opened in 1899, the line was operated by the Continentale Gesellschaft für elektrische Unternehmungen from Nuremberg until 1906, and then by the Aktiengesellschaft der Neue Berliner Straßenbahnen Nordost. In 1910, the Große Berliner Straßenbahn (GBS) bought the company and renamed it the Nordöstliche Berliner Vorortbahn (NöBV). In 1919, the line was absorbed into the GBS and thus became an integral part of the Berlin tram network. Large parts of the route are still in operation and are currently served by the M5 tram line of the Berliner Verkehrsbetriebe (BVG).
Tramlink is a family of three-, five- and seven- section low-floor trams, mostly of multi-articulated type, produced by Stadler Rail Valencia. The Tramlink was originally developed by Vossloh but has been manufactured by Stadler since they took over Vossloh's factory in Valencia in 2016.
Also für beide Bahnen haben wir rund fünfeinhalb Millionen Euro bezahlt (Gesa Reschke, Pressesprecherin)
20 bis 24 Züge pro Jahr will Bombardier fertig stellen. Der „Rohbau" wird im Werk in Bautzen gefertigt, die Endmontage und Inbetriebnahme erfolgt im Werk Hennigsdorf. Teile werden zudem aus den Bombardier-Standorten Mannheim und Siegen zugeliefert.