Green Lane Rapidway

Last updated
Green Lane Rapidway
Overview
System Viva Rapid Transit
Operator York Region Transit
VehicleTBD
StatusProposed
Route
Route type Rapidway
Locale York Region, Ontario
(Newmarket)
StartNewmarket Terminal
End East Gwillimbury GO
Length8.1 km (5.0 mi)
Stations5 (planned)

The Green Lane Rapidway is a proposed bus rapid transit extension in Newmarket and East Gwillimbury, Ontario. It does not have a committed schedule under the Vivanext plan. It is listed in Metrolinx's regional transportation for the Greater Toronto and Hamilton Area, The Big Move under the 25-year plan. [1] It will extend from Davis Drive (Regional Road 31) west of Yonge, then north along Yonge Street (York Regional Road 1) from Davis Drive to Green Lane, then from Yonge Street in the west along Green Lane East (Regional Road 19) to the East Gwillimbury GO Station just east of Main Street North (Regional Road 34) in the east.

Bus rapid transit Public transport system

Bus rapid transit (BRT), also called a busway or transitway, is a bus-based public transport system designed to improve capacity and reliability relative to a conventional bus system. Typically, a BRT system includes roadways that are dedicated to buses, and gives priority to buses at intersections where buses may interact with other traffic; alongside design features to reduce delays caused by passengers boarding or leaving buses, or purchasing fares. BRT aims to combine the capacity and speed of a metro with the flexibility, lower cost and simplicity of a bus system.

Newmarket, Ontario Town in Ontario, Canada

Newmarket is a town and regional seat of the Regional Municipality of York in the Canadian province of Ontario. It is part of Greater Toronto in the Golden Horseshoe region of Southern Ontario.

East Gwillimbury Town in Ontario, Canada

East Gwillimbury is a town on the East Holland River in the Regional Municipality of York. It is part of the Greater Toronto Area of southern Ontario, in Canada. It was formed by the amalgamation of the Township of East Gwillimbury with all the previously incorporated villages and hamlets within the township. The main centres in East Gwillimbury are the villages of Holland Landing, Queensville, Sharon, and Mount Albert. The Civic Centre are located along Leslie Street in Sharon. The northernmost interchange of Highway 404 is at the North edge of East Gwillimbury, just south of Ravenshoe Road. The hamlets of Holt and Brown Hill are also within town limits.

Stations

Yonge Street from Davis Drive to Green Lane and Green Lane from Yonge Street to GO station will need to be widened to accommodate platforms and dedicated bus lanes. The following stops were included in the initial design:

East Gwillimbury GO Station railway station in Ontario, Canada

East Gwillimbury GO Station is a train and bus station in the GO Transit network located in East Gwillimbury, Ontario, Canada. It is a stop on the Barrie line train service. The station was opened on November 1, 2004.

Related Research Articles

Regional Municipality of York Regional municipality in Ontario, Canada

The Regional Municipality of York, also called York Region, is a regional municipality in Southern Ontario, Canada, between Lake Simcoe and Toronto. It replaced the former York County in 1971, and is part of the Greater Toronto Area and the inner ring of the Golden Horseshoe. The regional government is headquartered in Newmarket.

Ontario Highway 404 highway in Ontario

King's Highway 404, also known as Highway 404 and colloquially as the 404, is a 400-series highway in the Canadian province of Ontario connecting Highway 401 and the Don Valley Parkway (DVP) in Toronto with East Gwillimbury. The 50.1-kilometre (31.1 mi) controlled-access highway also connects with Highway 407 in Markham. Highway 404 provides access to the eastern edge of Richmond Hill, Aurora and Newmarket and the western edge of Whitchurch-Stouffville, in addition to the southern edge of Keswick.

Finch Avenue road that travels east–west through the city of Toronto

Finch Avenue is an arterial thoroughfare that travels east–west in Toronto, Ontario, Canada. The road continues west into the Regional Municipality of Peel as Regional Road 2 and east into the Regional Municipality of Durham Regions as Regional Road 37.

Barrie line railway line in Ontario, Canada

Barrie is one of the seven train lines of the GO Transit system in the Greater Toronto Area, Ontario, Canada. It extends from Union Station in Toronto in a generally northward direction to Barrie, and includes ten stations along its 101.4 kilometres (63.0 mi) route. From 1982 to 1990 and again from 1993 to 2007, it was known as the Bradford line, named after its former terminus at Bradford Station until the opening of Barrie South Station.

Eglinton Avenue road in Toronto, Canada

Eglinton Avenue is a major east-west arterial thoroughfare in Toronto and Mississauga in the Canadian province of Ontario. The street begins at Highway 407 at the western limits of Mississauga, as a continuation of Lower Baseline in Milton. It traverses the midsection of both cities and ends at Kingston Road. Eglinton Avenue is the only street to cross all six former boroughs of Metropolitan Toronto.

Holland Landing Unincorporated community in Ontario, Canada

Holland Landing is a community in the town of East Gwillimbury, located in the northern part of the Regional Municipality of York, in south-central Ontario, Canada. Its major road is Yonge Street and the community has bus service by GO Transit route 68 and York Region Transit route 52. The East Gwillimbury GO train station is in the southeast corner of Holland Landing, providing weekday commuter train service. The East Holland River runs through the community and has several marinas for recreational boats.

Newmarket GO Station railway station in Newmarket, Canada

Newmarket GO Station is a train station in the GO Transit network located in the Old Davis Tannery Centre on the north side of Davis Drive East in Newmarket, Ontario, Canada, and is a stop on the Barrie line train service. It is a little over two kilometres east of the Newmarket Bus Terminal, at Davis Drive West and Eagle Street, which is a terminus for GO Bus, York Region Transit and Viva BRT services.

Viva Rapid Transit bus rapid transit service in York region

Viva is a bus rapid transit service operating in York Region, Ontario, Canada. Viva service is integrated with York Region Transit's local bus service to operate as one regional transit system providing seamless transit service across York Region with connections to northern Toronto.

Newmarket Bus Terminal

Newmarket Terminal is a bus terminal in Newmarket, Ontario, Canada located at 320 Eagle Street West at the intersection of Eagle Street West and Davis Drive. The facility has 447 parking spaces. The Newmarket GO Train Station is located at Davis Drive about two kilometres to the east.

Bradford Bypass

The Bradford Bypass is a proposed freeway that would travel near Bradford, in the Canadian province of Ontario. The route would serve as a connector between Highway 400 and Highway 404 on the northern edge of the Greater Toronto Area, in York Region and Simcoe County. The planned western terminus would be Highway 400 near Bradford. The planned eastern terminus would be Highway 404 near Queensville.

The Relief Line is a proposed rapid transit line for the Toronto subway system, intended to provide capacity relief to the Yonge segment of Line 1 and Bloor–Yonge station and extend subway service coverage in the city's east end in the first phase. Several routes are being considered. Several plans for an east–west downtown subway date back to the early 20th century, most of which ran along Queen Street. Since the early 21st century, studies propose a line that would run south from Line 2 Bloor–Danforth at a point east of the Don River, before bending westward along Queen Street into Downtown Toronto. Potential extensions could be made northward from its Line 2 connection in the east, as well as westward and northward from downtown to form a wide U-shape.

The Don Mills LRT was a proposed light rail line in Toronto, Ontario, Canada. It was part of the Transit City proposal announced March 16, 2007, to be operated by the Toronto Transit Commission (TTC). It was expected to cost approximately $675 million, with construction to begin in 2012, and an expected opening in 2016. It would have been the fifth of the seven Transit City lines to be complete after the Sheppard East, Finch West, Waterfront West, and Eglinton lines. Ridership was estimated to be 21.2 million trips in 2021.

MoveOntario 2020 was a plan proposed by the Government of Ontario that would fund 52 rapid-transit projects throughout the Greater Toronto and Hamilton Area in Ontario, Canada. It was succeeded by The Big Move and GO Transit's Go 2020.

The city of Markham in Ontario, Canada, offers a complex transportation infrastructure. These include airports, highways, public transit, regional roads, municipality-funded roads, and train services.

Caledonia is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. It will be located along Eglinton Avenue between the GO Transit Barrie rail corridor and the entrance to the Westside Mall. This is about 200 metres west of Caledonia Road opposite Blackthorn Avenue.

Yonge Street Rapidway

The Yonge Street Rapidway is a bus rapid transit corridor on Yonge Street in York Region, Ontario, Canada. Construction of the Yonge Street portion of the network began in 2014.

Viva Yellow or the Davis Drive corridor line, is a Viva bus rapid transit line that serves Newmarket, Ontario, Canada on the Davis Drive Rapidway. This route is within York Region Transit's "North Division", and is operated by Tok Transit under contract from the Region of York.

The Big Move is a regional transportation plan (RTP) published in 2008 and consisting of 62 rapid transit projects to be implemented across the Greater Toronto and Hamilton Area (GTHA). These rapid transit projects are intended to form a seamlessly integrated regional rapid transit network, which is the first priority action in the regional transportation plan. These projects form two long-term templates with 15 and 25 year horizons. These templates outline broad projects; specific details about technology, alignment, stations and service levels for each project are subsequently determined though a cost–benefit analysis, or an environmental assessment process.

References

  1. "The Big Move". Metrolinx. 2008. Retrieved 22 April 2015.