The Big Move rapid transit projects

Last updated

The Big Move is a regional transportation plan (RTP) published in 2008 and consisting of 62 rapid transit projects to be implemented across the Greater Toronto and Hamilton Area (GTHA). [1] These rapid transit projects are intended to form a seamlessly integrated regional rapid transit network, which is the first priority action in the regional transportation plan. [2] These projects form two long-term templates with 15 and 25 year horizons. These templates outline broad projects; specific details about technology, alignment, stations and service levels for each project are subsequently determined though a cost–benefit analysis or an environmental assessment process. [3] [4]

Contents

List of projects

HorizonTypeProjectTermini
15 yearsExpress rail1 Lakeshore West and East Hamilton/West Harbour Oshawa
2 Kitchener Brampton Union Station
Regional rail3 Niagara extension West Harbour Confederation
4 Milton Meadowvale [lower-alpha 1] Union Station
5 Georgetown Mount Pleasant [lower-alpha 1] Union Station
6 Union Pearson Express Pearson Airport Union Station
8 Crosstown Dundas West/Bloor Summerhill
9 Barrie East Gwillimbury [lower-alpha 1] Union Station
10 Richmond Hill Richmond Hill Union Station
11 Richmond Hill Bloomington Richmond Hill
12 Stouffville Mount Joy Union Station
14 Seaton Seaton Union Station / Summerhill
15 Lakeshore East Oshawa Bowmanville
Subway16 Spadina extension Sheppard West Vaughan
17 Yonge extension Finch Richmond Hill Centre
48 [lower-alpha 1] Relief Line Pape Dundas West
Other rapid transit
(LRT/BRT/AGT)
18 A-Line Hamilton Hamilton Airport
19 B-Line McMaster University Eastgate Square
20 Burlington Connector Downtown Burlington Burlington
21 Dundas Street BRT Brant Street Kipling
22Trafalgar Highway 407 Oakville
23 403 Transitway Oakville Renforth
24 Highway 10 Mayfield West Brampton
25Main Street Downtown Brampton Highway 407
26 Hurontario LRT Highway 407 Port Credit
27 Waterfront West LRT Port Credit Union Station
28 Züm Queen Downtown Brampton Peel-York boundary
29 Viva Highway 7 Peel-York boundary Locust Hill
30 Finch West LRT Pearson Airport Finch
31 Eglinton Crosstown LRT Pearson Airport Kennedy
32 Highway 427 South Pearson Airport Kipling
33 Jane Vaughan Jane
34 Don Mills Highway 7 Donlands
35 Viva Yonge Richmond Hill Centre Newmarket
36 Sheppard East LRT Don Mills Meadowvale Road
37 Scarborough RT Kennedy Malvern
38 Highway 2 Scarborough Centre Downtown Oshawa
39Brock Road Pickering Town Centre Highway 407
40 Oshawa Connector Oshawa Central [lower-alpha 1] Downtown Oshawa
BRT in mixed traffic41 Highway 407 Burlington Brooklin
New corridor42 Highway 410 ExtensionBovaird Drive Hurontario Street
43 Highway 427 Extension Highway 7 Major Mackenzie Drive
44 Highway 404 Extension East Gwillimbury Keswick
45 Highway 407 East Highway 7 Highway 35/115
25 yearsExpress rail46 Mississauga Cooksville Union Station
47 Richmond Hill Langstaff Gateway Union Station
Regional rail [lower-alpha 1] 4 [lower-alpha 1] Milton Meadowvale Milton
5 [lower-alpha 1] Georgetown Georgetown Mount Pleasant
7 [lower-alpha 1] Bolton Bolton Union Station
9 [lower-alpha 1] Barrie Bradford East Gwillimbury
13 [lower-alpha 1] Havelock Locust Hill Union Station
Other rapid transit
(LRT/BRT/AGT)
49 T-Line Centre Mall Linc/Mohawk Road
50 Brant Burlington Dundas Street
51Trafalgar/Main Milton Highway 407
52 Züm Steeles Lisgar Highway 427
53 Highway 427 North Pearson Airport Queen Street
54 407 Transitway Highway 427 Unionville
55 Steeles Milliken York University
56Viva NorthDavis Drive East Gwillimbury
57McCowanMarkham Centre Scarborough Centre
58 Scarborough Malvern Kennedy Malvern
59Steeles/Taunton Milliken Downtown Oshawa
60SimcoeDowntown Oshawa Highway 407
New corridor61Niagara-GTA Hamilton Niagara
62GTA-West Guelph Bolton

Implementation

GO Transit Regional Express Rail

Regional Express Rail is a project to improve GO Transit train service by adding all-day, two-way service to the Barrie line and the inner portions of the Kitchener line and the Stouffville line, and by increasing frequency of train service on various lines to as often as every 15 minutes on five of the corridors. This would be achieved with the full electrification of the Lakeshore East line and the Barrie line and the electrification of the inner portions of the Lakeshore West line, the Kitchener line, the Barrie line and the Stouffville line.

Toronto

LRT projects

A mock-up of the Bombardier Flexity Freedom that was planned to be used on LRT lines across the GTHA FlexityFreedomMockup.jpg
A mock-up of the Bombardier Flexity Freedom that was planned to be used on LRT lines across the GTHA

On September 28, 2012, Metrolinx signed a master agreement with the Toronto Transit Commission (TTC) to implement four new light rail transit lines in Toronto: [6]

These projects were also identified in Transit City, a rapid transit plan announced by former Toronto Mayor David Miller and TTC Chair Adam Giambrone on March 16, 2007. After $4 billion in provincial funding for Transit City from the Ontario government was deferred, the projects were rolled into a "5 in 10" plan, referring to goal of completing the four LRT lines and a BRT line in ten years. [7] The plan also included the purchase of 182 light rail vehicles from Bombardier Transportation. [8]

In December 2010, Rob Ford, who succeeded David Miller as mayor, announced his intention to cancel key parts of Transit City, saying "we will not build any more rail tracks down the middle of our streets." However, he was open to the Eglinton Crosstown LRT, given that it is primarily underground. [9] Ford acknowledged that he will need council's support to put an end to Transit City. [10] In early 2012, Toronto City Council voted in favour of motions to resume work on the Sheppard, Eglinton and Finch LRT lines, and on replacing the Scarborough RT, defeating Rob Ford's campaign for subways. [11] [12]

The subway debate has continued in regards to the replacement of Line 3 Scarborough. Toronto City Council voted in June 2013 for a proposal to build the Scarborough Subway Extension. In light of this, Metrolinx threatened to stop work on Scarborough rapid transit, or even walk away from the project. Meanwhile, the Minister of Transportation Glen Murray was open to a modified project, as long as any costs that were additional to what the province originally committed. [13] In September 2013, the Government of Ontario announced it would build a subway, but it would terminate at Scarborough Centre station, and consist of "a minimum" of two stops. [14] The City of Toronto has moved forward with planning an extension of Line 2 Bloor–Danforth in Scarborough. [15]

Subway projects

On November 29, 2012, Metrolinx CEO Bruce McCuaig announced two subway projects for Toronto region that would be pursued in the upcoming 15 years: [16]

A TTC study was completed in 2012 to address existing capacity constraints on the existing Yonge subway and GO Transit lines. The study projected even with planned improvements on both networks, significant capacity issues would remain by 2031, recommending that a Downtown Relief Line be completed prior to the Yonge subway extension. [17] The Big Move initially ranked the downtown relief line as lower priority, for completion within a 25-year time frame, [4] and Metrolinx Chair Rob MacIsaac stated in 2008 that the line is unlikely to be brought forward from its projected 2020 start date. [18] By March 2012, TTC CEO Andy Byford stressed there was great need for additional subway capacity with the increasing rate of population growth in Toronto, and capacity issues along Line 1 Yonge–University, stating "The downtown relief line has got to be looked at and has got to be talked about right now." Metrolinx accordingly stated that capacity issues may allow the DRL to be given higher priority in The Big Move, which was made official with the Phase 2 announcement. [19]

Peel Region

MiWay 1053 wide crop.jpg
ZumBus.jpg
MiWay and Züm are the bus rapid transit providers for Mississauga and Brampton, respectively.

The Hurontario LRT in Mississauga and Brampton will represent a replacement of existing express bus services offered by MiWay and Züm. The line will run from Steeles Avenue in the north to Port Credit in the south. This will allow connections to GO Transit's Milton and Lakeshore West lines, and bus terminals at Brampton Gateway, Mississauga City Centre, Square One, and Mississauga Hospital. The LRT was planned to extend further north along Main Street to Brampton GO Station, but Brampton City Council voted against this portion of the route. [20] Construction is expected to commence in 2018, and the line is projected to enter service in 2022. [21]

The Mississauga Transitway is another rapidway being built along Highway 403, Eastgate Parkway and Eglinton Avenue is being built in a partnership between the City of Mississauga and GO Transit. The transit corridor will run east–west across Mississauga, with all-station stop and extensive express bus service for thousands of riders per day. Construction began on the 18-kilometre segment between Winston Churchill Boulevard and Renforth Drive in August 2010. The first stretch opened between Hurontario Street and Dixie Road on November 17, 2014, [22] with the rest of the project targeted for opening in 2016. [23] [24]

Hamilton

The Hamilton B-Line was identified as one of the top 15 priority projects in The Big Move, and along with the A-Line, is identified for completion within 15 years. It is also part of the larger BLAST network of rapid transit proposed for Hamilton. The first phase will see the B-Line run between McMaster University and Queenston Circle, as well as a segment of the A-Line to provide a direct connection to West Harbour GO Station, and a pedestrian corridor to the Hamilton GO Centre. Construction is expected to begin in 2019. [25] [26]

York Region

Metrolinx has also pursued constructing dedicated bus rapid transit (BRT) lanes, also known as "rapidways", for the Viva service in York region. [8] [27] Rapidways are one element of a $1.4 billion investment into York region's transit. The BRT service will include connections with GO Transit, regional transit and future extensions of the TTC subway system. Over 34 kilometres of rapidways are planned, with the goal of buses arriving every 2 to 5 minutes. Construction began in December 2009, and all elements are expected to be completed by 2020. [27]

Notes

  1. 1 2 3 4 5 6 7 8 9 10 11 Changed from the original plan on February 14, 2013, when the Metrolinx board of directors endorsed an update to the Big Move. [5]

Related Research Articles

<span class="mw-page-title-main">Line 4 Sheppard</span> Subway line in Toronto, Ontario, Canada

Line 4 Sheppard is the newest and shortest subway line of the Toronto subway system, operated by the Toronto Transit Commission (TTC). It opened on November 22, 2002, and has five stations along 5.5 kilometres (3.4 mi) of track, which is built without any open sections in the district of North York along Sheppard Avenue East between Yonge Street and Don Mills Road. All stations are wheelchair accessible and are decorated with unique public art.

<span class="mw-page-title-main">Toronto subway</span> Rapid transit system in Ontario, Canada

The Toronto subway is a rapid transit system serving Toronto and the neighbouring city of Vaughan in Ontario, Canada, operated by the Toronto Transit Commission (TTC). It is a multimodal rail network consisting of three heavy-capacity rail lines operating predominantly underground. As of December 2022, three new lines are under construction: two light rail lines and one light metro line.

<span class="mw-page-title-main">Line 2 Bloor–Danforth</span> Subway line in Toronto, Ontario, Canada

Line 2 Bloor–Danforth is a subway line in the Toronto subway system, operated by the Toronto Transit Commission (TTC). It has 31 stations and is 26.2 kilometres (16.3 mi) in length. It opened on February 26, 1966, and extensions at both ends were completed in 1968 and again in 1980.

<span class="mw-page-title-main">MiWay</span> Public transport agency serving Mississauga, Ontario, Canada

MiWay, also known as Mississauga Transit and originally as Mississauga Transit Systems, is the municipal public transport agency serving Mississauga, Ontario, Canada, and is responsible to the city's Transportation and Works Department. MiWay services consist of two types of bus routes: MiLocal, local buses that make frequent stops, and MiExpress, express buses between major destinations. MiWay is the primary operator along the Mississauga Transitway, a dedicated east–west bus-only roadway.

<span class="mw-page-title-main">Eglinton Avenue</span> Road in Toronto and Mississauga, Canada

Eglinton Avenue is a major east–west arterial thoroughfare in Toronto and Mississauga in the Canadian province of Ontario. The street begins at Highway 407 at the western limits of Mississauga, as a continuation of Lower Baseline in Milton. It traverses the midsection of both cities and ends at Kingston Road. Eglinton Avenue is the only street to cross all six former boroughs of Metropolitan Toronto.

The Relief Line was a proposed rapid transit line for the Toronto subway system, intended to provide capacity relief to the Yonge segment of Line 1 and Bloor–Yonge station and extend subway service coverage in the city's east end. Several plans for an east–west downtown subway line date back to the early 20th century, most of which ran along Queen Street.

<span class="mw-page-title-main">Mississauga Transitway</span> Bus rapid transit system in Mississauga, Ontario

The Mississauga Transitway is a bus rapid transit (BRT) system in Mississauga, Ontario, Canada. It comprises a series of purpose-constructed bus-only roadways, as well as reserved lanes on existing city streets and portions of Highway 403, that together form a continuous 18 km (11 mi) route spanning most of the city from Winston Churchill Boulevard in the west to the junction of Highways 401 and 427 in the east on the border with Toronto. Service on the Transitway is provided by MiWay and GO Transit, with some stations providing connections to Brampton Transit and Toronto Transit Commission (TTC) bus services.

<span class="mw-page-title-main">Metrolinx</span> Crown agency owned by the Government of Ontario

Metrolinx is a Crown agency of the Government of Ontario that manages and integrates road and public transport in the Greater Toronto and Hamilton Area (GTHA), which comprises much of Ontario's Golden Horseshoe region. Headquartered at Union Station in Toronto, the agency was created as the Greater Toronto Transportation Authority on June 22, 2006. The agency adopted its present name as a brand name in 2007 and eventually as the legal name in 2009.

<span class="mw-page-title-main">Transit City</span> Proposed Toronto public transit plan

Transit City was a plan for developing public transport in Toronto, Ontario, Canada. It was first proposed and announced on 16 March 2007 by Toronto mayor David Miller and Toronto Transit Commission (TTC) chair Adam Giambrone. The plan called for the construction of seven new light rail lines along the streets of seven priority transit corridors, which would have eventually been integrated with existing rapid transit, streetcar, and bus routes. Other transit improvements outlined in the plan included upgrading and extending the Scarborough RT line, implementing new bus rapid transit lines, and improving frequency and timing of 21 key bus routes. The plan integrated public transportation objectives outlined in the City of Toronto Official Plan, the TTC Ridership Growth Strategy and Miller's 2006 election platform.

<span class="mw-page-title-main">Line 5 Eglinton</span> Light rail line under construction in Toronto, Canada

Line 5 Eglinton is a light rail line that is under construction in Toronto, Ontario, Canada. Owned by Metrolinx and operated by the Toronto Transit Commission (TTC), the line will be part of the Toronto subway system as its fifth route. The first phase of the 19-kilometre (12 mi) line will include 25 stops along Eglinton Avenue, from Mount Dennis station underground to Laird station, after which it will run predominantly at-grade within the street's median to Kennedy station, where it will connect underground with Line 2 Bloor–Danforth and Line 3 Scarborough.. The line is scheduled to open in the third quarter of 2024, with a estimated cost of CA$12.82 billion; the cost when the contract was awarded was pegged at $9.1 billion, although the cost was originally estimated at $11 billion.

The Don Mills LRT was a proposed light rail line in Toronto, Ontario, Canada. It was part of the Transit City proposal announced March 16, 2007, to be operated by the Toronto Transit Commission (TTC). It was expected to cost approximately $675 million, with construction to begin in 2012, and an expected opening in 2016. It would have been the fifth of the seven Transit City lines to be complete after the Sheppard East, Finch West, Waterfront West, and Eglinton lines. Ridership was estimated to be 21.2 million trips in 2021.

The Eglinton East LRT (EELRT), also known as Line 7 Eglinton East and formerly known as the Scarborough Malvern LRT, is a proposed light rail line in Toronto, Ontario, Canada. The line would be entirely within the district of Scarborough. It was originally part of Transit City, a plan to develop new light rail lines along several priority transit corridors in the city.

MoveOntario 2020 was a 2007 plan proposed by the Government of Ontario that would fund 52 rapid-transit projects throughout the Greater Toronto and Hamilton Area in Ontario, Canada. It was succeeded by The Big Move and GO Transit's Go 2020.

Network 2011 was a plan for transit expansion created in 1985 by the Toronto Transit Commission. It was centred on three proposed subway lines: the Downtown Relief Line, Eglinton West Line, and the Sheppard Line. Only a portion of the Sheppard Line was built. The Eglinton West and Downtown Relief Lines were cancelled; they were superseded by the Eglinton Crosstown light rail line and the Ontario Line respectively.

<span class="mw-page-title-main">Hurontario LRT</span> Light rail line under construction in Mississauga and Brampton, Ontario, Canada

The Hurontario LRT is a light rail line under construction in the cities of Mississauga and Brampton, Ontario, Canada. The line will run along Hurontario Street from Mississauga's Port Credit neighbourhood north to Steeles Avenue in Brampton. The line will be built and operated as a public-private partnership by Mobilinx, a consortium of private European and Japanese companies, with provincial transit agency Metrolinx retaining ownership of the line. It will be the only street railway operating in the Greater Toronto Area outside Toronto proper.

<span class="mw-page-title-main">Renforth station</span> Bus station in Mississauga, Ontario

Renforth, referred to during planning as Renforth Gateway, is a bus station on the border of the cities of Mississauga and Toronto, in Ontario, Canada. Located at Eglinton Avenue and Renforth Drive, it is the eastern terminus of the Mississauga Transitway and is close to the interchange between Highway 401 and Highway 427.

SmartTrack is a municipal proposal to enhance GO Transit rail service within Toronto, Ontario, Canada. It takes advantage of the province's existing GO Transit Regional Express Rail plans. SmartTrack has evolved since it was originally proposed by Toronto mayor John Tory as the centrepiece of his 2014 mayoral election campaign.

A rapid transit corridor is proposed along Steeles Avenue in Toronto, Ontario, Canada, which would be operated by the Toronto Transit Commission. It has not been determined if this corridor would be a bus rapid transit or a light rail transit line. It is identified by Metrolinx in its regional transportation plan The Big Move as a project to be completed in its 25-year plan. In February 2016, City of Toronto and TTC planners recommended implementing the Steeles BRT/LRT within a 15-year horizon. At a meeting on February 20, 2020, the Metrolinx board of directors endorsed a prioritization framework for a proposed Frequent Rapid Transit Network that included a proposed BRT from Pioneer Village station to McCowan Road. The proposed 20.8 km line along Steeles Avenue had a forecasted ridership of 11,700 in 2031. The project scored 'high' with a preliminary benefit-cost ratio of over 0.90. The TTC released their 2020-2024 5-year Service Plan and 10-year Outlook, which discussed the implementation of exclusive bus lanes, stop consolidation, all-door boarding and other transit priority measures to speed up bus service on Steeles Avenue West between Pioneer Village Station and the future Steeles Station that will be constructed as part of the Yonge North Subway Extension. Currently, the implementation timeframe is to be determined following feedback on the RapidTO Eglinton East Bus Lanes and public consultation with the surrounding community.

<span class="mw-page-title-main">Transportation in Mississauga</span>

The transport infrastructure and services in the Canadian city of Mississauga, Ontario include provincial highways and municipal roads, passenger and freight rail, regional and municipal bus service, and an international airport. It is interconnected with air, road, and rail transportation networks spanning the Greater Toronto Area and beyond.

The Pearson Regional Transit Centre also known as Union Station West is a proposed second intermodal transportation hub to serve the Greater Toronto Area. The transit hub will be located at the site of Viscount station currently serving the Link Train across from Toronto Pearson International Airport in Mississauga, Ontario. The transit hub will be accommodated with a new passenger and processing facility known as Terminal New. It will handle functions such as check-in, security screenings and baggage claim. The transit hub will also be at the centre of a new mixed-used area including office, retail and commercial space. The plan is to bring Line 5 Eglinton, Line 6 Finch West, the Mississauga Transitway, the Kitchener line and the Union Pearson Express together into the transit hub and it will relieve Union Station. The transit centre is planned to open in the early 2030s.

References

  1. Metrolinx, Schedules 1 & 2
  2. Metrolinx, p. 23
  3. Metrolinx, p. 22
  4. 1 2 Metrolinx, p. 96
  5. Board Report: The Big Move Update – Recommended Changes
  6. Kalinowski, Tess (28 November 2012). "TTC, Metrolinx finally sign off on LRTs". Toronto Star . Retrieved 28 November 2012.
  7. "Rapid Transit for Toronto" (PDF). City of Toronto. 8 February 2012. Retrieved 23 March 2012.
  8. 1 2 "Metrolinx to buy 182 streetcars". CBC News . 14 June 2010. Retrieved 26 March 2012.
  9. "Railway Gazette: Toronto Transit City project in doubt". 2010-12-16. Retrieved 2010-12-16.
  10. CBC.ca December 1, 2010
  11. Church, Elizabeth (8 February 2012). "TTC chair defeats Rob Ford, wins bid to bring transit above-ground". The Globe and Mail. Retrieved 8 February 2012.
  12. Church, Elizabeth; Grant, Kelly (23 March 2012). "Transit defeat leaves Ford on rocky ground". The Globe and Mail. Retrieved 23 March 2012.
  13. Moore, Oliver (2 July 2013). "Metrolinx to Toronto: Subway is yours". The Globe and Mail. Retrieved 3 July 2013.
  14. "Scarborough subway to be built with shortened route, Ontario announces". The Globe and Mail . 4 September 2013. Retrieved 4 September 2013.
  15. "Scarborough Subway Extension". City of Toronto. Retrieved 20 March 2015.
  16. Metrolinx (29 November 2012). "Metrolinx Unveils Next Wave of Big Move Projects". CNW Newswire. Archived from the original on 2 December 2012. Retrieved 30 November 2012.
  17. "Downtown Rapid Transit Expansion Study" (PDF). Toronto Transit Commission. September 2012. Retrieved 13 November 2012.
  18. Hertz, Barry (2008-09-04). "New subway line still a way's off, Metrolinx head says". National Post . Retrieved 2008-09-16.[ permanent dead link ]
  19. Alcoba, Natalie (2012-03-23). "TTC chief: Subway expansion for downtown relief line has to be discussed 'right now'". National Post . Retrieved 2012-03-26.
  20. Grewal, San (27 October 2015). "Brampton council rejects downtown LRT". The Toronto Star. Toronto. Retrieved 27 October 2015.
  21. Kalinowski, Tess (21 April 2015). "Liberals promise $1.6 billion for "transformational" Hurontario LRT". The Toronto Star. Toronto. Retrieved 21 April 2015.
  22. "Mississauga opens 4 Transitway stations". CBC News . 2014-11-17. Retrieved 2014-11-21.
  23. Kalinowski, Tess (2014-05-06). "Key transit projects facing delays". Mississauga News. Retrieved 2014-05-24.
  24. "Mississauga Bus Rapid Transit (BRT) Project". GO Transit. Archived from the original on 21 August 2014. Retrieved 8 March 2012.
  25. "Ontario Investing Up to $1 Billion for Light Rail Transit in Hamilton". Archived from the original on 2018-08-07. Retrieved 2015-12-14.
  26. Hamilton to get a new LRT and GO Train station
  27. 1 2 "Viva in York Region". Metrolinx. Retrieved 8 March 2012.