Milton line

Last updated
Milton
GO Milton logo.svg
Milton GO Train Eastbound.jpg
GO Train south of Queen Street West,
travelling eastbound to Union Station
Overview
Owner Canadian Pacific Kansas City
Locale Greater Toronto Area
Termini
Stations9
Service
Type Commuter rail
System GO Transit rail services
Operator(s) GO Transit
Daily ridership15,300 (2019) [1]
History
OpenedOctober 25, 1981;43 years ago (1981-10-25)
Technical
Line length50.2 km (31.2 mi)
Track gauge 1,435 mm (4 ft 8+12 in) standard gauge
Operating speed75 mph (120 km/h)
Route map

Contents

BSicon KBHFa.svg
50.2 km
Milton
BSicon SHI2gl.svg
BSicon BS2c3.svg
BSicon KSTRe~L.svg
BSicon lDST~L.svg
BSicon STR.svg
BSicon lDST~R.svg
BSicon KSTRe~R.svg
Milton Yard
BSicon STR+GRZq.svg
BSicon dRP4q.svg
BSicon SKRZ-G4o.svg
BSicon dRP4q.svg
BSicon BHF.svg
Lisgar
BSicon BHF.svg
37.2 km
Meadowvale
BSicon ABZg+l.svg
BSicon CONTfq.svg
BSicon BHF.svg
32.7 km
Streetsville
BSicon dWASSERq.svg
BSicon hKRZWae.svg
BSicon dWASSERq.svg
BSicon dRP4q.svg
BSicon SKRZ-G4o.svg
BSicon dRP4q.svg
BSicon BHF.svg
29.1 km
Erindale
BSicon uexCONTgq.svg
BSicon uxINTq.svg
BSicon STR.svg
BSicon uexCONTfq.svg
24.8 km
Cooksville
BSicon TRAM.svg
BSicon BHF.svg
20.0 km
Dixie
BSicon dWASSERq.svg
BSicon hKRZWae.svg
BSicon dWASSERq.svg
BSicon dGRZq.svg
BSicon dWASSERq.svg
BSicon GRZq.svg
BSicon hKRZWae.svg
BSicon dGRZq.svg
BSicon dWASSERq.svg
BSicon CONTgq.svg
BSicon ABZgr+r.svg
GO Transit logo.svg Canpa Sudbdivision
to Long Branch
BSicon dRP4q.svg
BSicon SKRZ-G4u.svg
BSicon dRP4q.svg
BSicon HUBaq.svg
BSicon BHF.svg
BSicon HUBeq.svg
BSicon uKBHF2.svg
15.6 km
Kipling
BSicon SUBWAY.svg TTC - Line 2 - Bloor-Danforth line.svg
BSicon dWASSERq.svg
BSicon hKRZWae.svg
BSicon dWASSERq.svg
Mimico Creek
BSicon dWASSERq.svg
BSicon hKRZWae.svg
BSicon dWASSERq.svg
Humber River
BSicon ABZg+l.svg
BSicon CONTfq.svg
BSicon pBHF.svg
Bloor
BSicon ABZg+l.svg
BSicon CONTfq.svg
BSicon CONTgq.svg
BSicon ABZg+r.svg
BSicon DST.svg
North Bathurst Yard
BSicon INT.svg
0 km
Union Station
VIA Rail Canada simplified.svg BSicon SUBWAY.svg TTC - Line 1 - Yonge-University-Spadina line.svg BSicon CLRV.svg
BSicon CONTf.svg
GO Transit logo.svg GO Lakeshore East logo.svg GO Richmond Hill logo.svg GO Stouffville logo.svg

Milton is one of the seven train lines of the GO Transit system in the Greater Toronto Area, Ontario, Canada. It extends from Union Station in Toronto to Milton, by way of Mississauga. It opened on October 25, 1981.

Trains on the Milton line run in the peak direction during peak periods. The Ontario government is working with Metrolinx to have more train service along the Milton line, known as the GO Expansion, over the next decade. During peak hours, trains would run in peak direction every 15 minutes along this line. [2] The Milton line is the fourth-busiest GO Transit line in the rail network. [3]

Milton line
Milton line map (circa 2022)

History

The Canadian Pacific Railway strongly resisted all efforts to put passenger trains on company-owned tracks to avoid disturbance of freight activity into Toronto. [4] Due to the 1979 Mississauga train derailment and efforts made by Mississauga Mayor Hazel McCallion, there was increased pushback for a passenger train line. [5] McCallion and Mississauga City Council threatened to sue CP for the cost of the emergency services and mass evacuation caused by the derailment on the CPR line near Mavis Road. As part of the compromise that got the suit dropped, CP agreed to drop its long-standing objection to passenger service on its freight line. [6]

Following a promotional opening on Sunday October 25, 1981, regular service began the following Monday. [7] [4] Six trips were operated from 2002–2009 and five before this. From 2009–2011, there were seven inbound and seven outbound train trips daily. An eighth train was added to the morning and afternoon runs in 2011 and a ninth train started on January 5, 2015. [8] On February 25, 2016, a tenth train was announced for the 2016–17 fiscal year, as part of the 2016 Ontario budget process.

Bus service was expanded into the cities of Cambridge, Kitchener and Waterloo in October 2009. Several bus routes operate between the University of Waterloo and Wilfrid Laurier University in Waterloo, the Charles Street Transit Terminal in Kitchener, and the Cambridge SmartCentre shopping centre to the Square One Bus Terminal in central Mississauga, including a small number of trips connecting with the train service at Milton GO Station.

In September 2016, GO Transit created a new bus service to connect Cambridge and Milton on weekday mornings during peak travel times, with six return trips in the evening. [9] This bus route averaged only five passengers per trip and was cancelled in June 2019 due to low demand. [10]

In April 2015, Metrolinx in partnership with the Town of Milton launched a pilot project through an app called Rideco which allows GO riders to book transportation to and from the Milton GO Station. This is due to the Milton station's parking lot being full by the time the second morning train arrives. As North America's fastest growing community for the last decade, the parking lot has increasing been in demand by new residents and those driving in from Cambridge. [11]

Service expansion

Improvements to the Milton line were proposed in The Big Move , Ontario's regional transportation plan (RTP) published in 2008. As part of the plan, there would be two-way, all-day rail service to Milton, slated to be in place within 15 years of the announcement (by 2023). In 2013, The Big Move was updated and Milton line enhancements were shifted to a 16-to-25-year planning horizon. [12] [13] The update also cut back the western terminus of two-way service to Meadowvale GO Station in Mississauga. Improvements to the line would therefore not service Lisgar station in Mississauga, nor Milton's station, service which had been promised by the provincial Liberals Halton candidate during the 2011 election. [14] [15] [16] [17]

As a result of this deferral to a longer-term timeline for the improvements, Milton town councillor Rick DiLorenzo has referred to the Milton line as the "orphan" of Metrolinx. [12] Regional Chair Gary Carr said it feels like the rug was being pulled from underneath them with these sudden changes that affected Halton towns such as Milton and Georgetown. "If the Big Move projects benefiting Halton are delayed, Halton will not be able to meet provincial growth plan targets. The transportation system mode split and level of service objectives will not be met," said Tim Dennis, Halton's regional transportation services director. [18]

An objective of the update to The Big Move was to align The Big Move with GO 2020,[ citation needed ] a transportation plan published by GO Transit in 2008. GO 2020 called for all-day 30-minute service to Meadowvale with bus connections to Milton. It also proposed 15-minutes service to Meadowvale in peak periods with express service during high-demand periods. [19] Reports cited "significant infrastructure and operational challenges that mean it will not be possible to deliver two-way, all-day service all the way to Milton in the 15-year time horizon. Additional tracks and potentially numerous grade separations are necessary are a prerequisite to the expansion of service to Milton. The construction is especially challenging through built-up areas. This rail corridor is largely owned by CPR, a private third party operating freight rail. Their approval is required for any service and infrastructure expansion. Two-way, all-day service can be delivered to Meadowvale in the 15-year timeframe, but the full extension to Milton can only be delivered over the 25-year horizon." [13]

In 2017, at a Region of Halton planning and public works committee meeting Halton Region director of planning and chief planning official Ron Glenn said, "The timing for the Milton two-way, all-day GO is in the post 25-year horizon. Interestingly enough, we had a discussion with Metrolinx this week about creating a focus group on getting a defined time for the two-way, all-day GO service in Milton as a priority." The information was shared with regional councillors at a February 8 planning and public works committee. On February 17, Metrolinx, through Halton MPP Indira Naidoo-Harris, challenged that assertion, saying, "Metrolinx is not aware of any sources that would lead to the information that was posted in the Milton Canadian Champion article. We are still working toward better service on the Milton GO line." [20]

On August 10, 2021, the federal government indicated a willingness to partially fund an upgrade to the Milton line to handle all-day, two-way train service, but gave no timeline or a specific funding amount. Such an upgrade would cost about $1 billion. Before 2020, the line carried 30,000 passengers per day; however, freight traffic was a constraint against expansion of commuter service. [21]

In February 2024, the Ontario government announced a plan to build dedicated tracks in the Milton corridor to enable two-way all-day service. The unfunded plan was estimated to cost more than $6 billion. [22]

Extension to Waterloo Region

The Regional Municipality of Waterloo funded a study indicating that a $110 million extension of the Milton line could bring trains to Cambridge by 2012, with possible stations at Guelph Line in Campbellville, Highway 6 in Puslinch, and at Franklin Boulevard (a park and ride) and Water Street (downtown with transit connections) in Cambridge. [23] However, the plans didn't come to fruition when an environmental assessment became a victim of budget cuts. GO Transit expects expansion of train service to Cambridge to happen in the 15 to 25 year time frame, after passenger capacity upgrades at Milton to relieve current train overcrowding. [24]

Station list

Milton line locomotives at rest in the Campbellville yard. (circa 1990) Campbellville GO Engines.jpg
Milton line locomotives at rest in the Campbellville yard. (circa 1990)
StationMunicipalityConnectionsNotes
Milton Milton GO Transit logo.svg GO bus symbol.svg
Bus-logo.svg Milton Transit
Lisgar Mississauga GO Transit logo.svg GO bus symbol.svg
Bus-logo.svg MiWay
Bus-logo.svg Brampton Transit
ZUM logo.svg   511  
Bus-logo.svg Milton Transit
Meadowvale GO Transit logo.svg GO bus symbol.svg
Bus-logo.svg MiWay
Streetsville GO Transit logo.svg GO bus symbol.svg
Bus-logo.svg MiWay
Erindale GO Transit logo.svg GO bus symbol.svg
Bus-logo.svg MiWay
Cooksville GO Transit logo.svg GO bus symbol.svg
Bus-logo.svg MiWay
Future connection to Hurontario LRT
Dixie GO Transit logo.svg GO bus symbol.svg
Bus-logo.svg MiWay
Kipling Toronto GO Transit logo.svg GO bus symbol.svg
BSicon SUBWAY.svg TTC - Line 2 - Bloor-Danforth line.svg
Bus-logo.svg TTC
Bus-logo.svg MiWay
Union GO Transit logo.svg GO Lakeshore West logo.svg GO Kitchener logo.svg GO Barrie logo.svg GO Richmond Hill logo.svg GO Stouffville logo.svg GO Lakeshore East logo.svg GO bus symbol.svg
Aiga railtransportation 25.svg UP Express icon white on black.jpg VIA Rail Canada simplified.svg BSicon LOGO Amtrak2.svg
BSicon SUBWAY.svg TTC - Line 1 - Yonge-University-Spadina line.svg
BSicon CLRV.svg Bus-logo.svg TTC

Future

In 2015, Metrolinx released a list of potential sites for construction of new GO train stations. For the Milton line, the sites include: [25]

Selection of some station sites would preclude other sites. Only one of The East Mall and The West Mall sites would result in a potential future station, as would only one of the Liberty Village, Queen Street West-Dufferin, and Dundas West sites. The potential site for The East Mall or The West Mall is south of Dundas Street West near its intersection with Highway 427. After a business case, none of these stations were determined to have a positive economic impact and thus were removed from the Regional Express Rail plan. [26]

See also

Related Research Articles

<span class="mw-page-title-main">Kitchener line</span> Passenger rail service in Southern Ontario, Canada

Kitchener is one of the seven train lines of the GO Transit system in the Greater Toronto Area, Ontario, Canada. It extends westward from Union Station in Toronto to Kitchener, though most trains originate and terminate in Brampton in off-peak hours.

<span class="mw-page-title-main">Kipling GO Station</span> Railway station in Toronto, Ontario, Canada

Kipling GO Station is a GO Transit railway station along the Milton line rail corridor in Toronto, Ontario, Canada. It is located at 27 St. Albans Road in the Islington-City Centre West neighbourhood of Toronto, near Dundas Street. It is connected to Line 2 Bloor–Danforth and Toronto Transit Commission bus services through the adjacent Kipling subway station, as well as MiWay and GO Transit bus services through the attached Kipling Bus Terminal.

<span class="mw-page-title-main">Cooksville GO Station</span> Transit station in Cooksville, Mississauga, Canada

Cooksville GO Station is a GO Transit train and bus station the Milton line in the community of Cooksville in Mississauga, Ontario, Canada. It is located at 3210 Hurontario Street, near Dundas and Hurontario Streets. The future Hurontario LRT will connect to this station.

<span class="mw-page-title-main">Meadowvale GO Station</span> Railway station in Mississauga, Ontario, Canada

Meadowvale GO Station is a GO Transit railway station on the Milton line in the Greater Toronto Area, Ontario, Canada. It is located at 6845 Millcreek Drive near Derry Road West and Winston Churchill Blvd., in the City of Mississauga in the community of Meadowvale.

<span class="mw-page-title-main">Milton GO Station</span> Railway station in Ontario, Canada

Milton GO Station is the western terminus of GO Transit's Milton line in the Greater Toronto Area, Ontario, Canada. It is located at 780 Main Street East in the Town of Milton, near Main Street and Ontario Street.

<span class="mw-page-title-main">MiWay</span> Public transport agency serving Mississauga, Ontario, Canada

MiWay, also known as Mississauga Transit and originally as Mississauga Transit Systems, is the municipal public transport agency serving Mississauga, Ontario, Canada, and is responsible to the city's Transportation and Works Department. MiWay services consist of two types of bus routes: MiLocal, local buses that make frequent stops, and MiExpress, express buses between major destinations. MiWay is the primary operator along the Mississauga Transitway, a dedicated east–west bus-only roadway.

<span class="mw-page-title-main">Mississauga Transitway</span> Bus rapid transit system in Mississauga, Ontario

The Mississauga Transitway is a bus rapid transit (BRT) system in Mississauga, Ontario, Canada. It comprises a series of purpose-constructed bus-only roadways, as well as reserved lanes on existing city streets and portions of Highway 403, that together form a continuous 18 km (11 mi) route spanning most of the city from Winston Churchill Boulevard in the west to the junction of Highways 401 and 427 in the east on the border with Toronto. Service on the Transitway is provided by MiWay and GO Transit, with some stations providing connections to Brampton Transit and Toronto Transit Commission (TTC) bus services.

<span class="mw-page-title-main">Oakville Trafalgar Memorial Hospital</span> Hospital in Ontario, Canada

The Oakville Trafalgar Memorial Hospital is a full-service acute care community hospital located at 3001 Hospital Gate in Oakville, Ontario. It offers a comprehensive range of primary and secondary care services in addition to some tertiary services. It is operated by Halton Healthcare, an organization which also operates Georgetown Hospital and Milton District Hospital.

<span class="mw-page-title-main">Metrolinx</span> Transportation agency in Ontario, Canada

Metrolinx is a transportation agency in Ontario, Canada. It is a Crown agency that manages and integrates road and public transportation in the Greater Toronto and Hamilton Area (GTHA). It was created as the Greater Toronto Transportation Authority on June 22, 2006, and adopted its present name as a brand name in 2007 and eventually as the legal name in 2009. It is headquartered at Union Station in Toronto.

<span class="mw-page-title-main">CN Halton Subdivision</span>

The CN Halton Subdivision is a major railway line in Southern Ontario, Canada. It is owned and operated by the Canadian National Railway (CN).

MoveOntario 2020 was a 2007 plan proposed by the Government of Ontario that would fund 52 rapid-transit projects throughout the Greater Toronto and Hamilton Area in Ontario, Canada. It was succeeded by The Big Move and GO Transit's Go 2020.

<span class="mw-page-title-main">Square One Bus Terminal</span> GO Transit bus terminal in Mississauga, Ontario

Square One Bus Terminal is a GO Transit intercity bus terminal located in central Mississauga, Ontario, Canada. It is situated directly across Rathburn Road West from the City Centre Transit Terminal and the Square One Shopping Centre.

GO Transit is an interregional public transit system in Southern Ontario, Canada, operated by the provincial crown agency Metrolinx. It primarily serves the conurbation referred to by Metrolinx as the "Greater Toronto and Hamilton Area" (GTHA) with operations extending to several communities in the area centred around Toronto and Hamilton.

Canadian Pacific Kansas City's Galt Subdivision is CPKC's 114.6 mile long section of its Montréal-Detroit freight corridor. It is located in Southern Ontario, Canada. Getting its name from the historic City of Galt that it passes through, the track runs from the bustling hub of Toronto, Ontario, to London, Ontario. GO Transit's Milton GO train service operates on this line from Toronto Union Station to Milton GO station. The rest of the line plays host to mixed freight and intermodal traffic, from Toronto to termini like Detroit, and Chicago. This Central Ontario line also had CP passenger rail service till 1971 when it was eliminated. Passenger rail service would be partly restored halfway through the line through the introduction of GO Transit operations in 1981 westward only as far as the Town of Milton.

<span class="mw-page-title-main">Renforth station</span> Bus station in Mississauga, Ontario

Renforth, referred to during planning as Renforth Gateway, is a bus station on the border of the cities of Mississauga and Toronto, in Ontario, Canada. Located at Eglinton Avenue and Renforth Drive, it is the eastern terminus of the Mississauga Transitway and is close to the interchange between Highway 401 and Highway 427.

<span class="mw-page-title-main">Erin Mills station</span> Bus station in Mississauga, Ontario

Erin Mills is a bus station in the community of Erin Mills in western Mississauga, Ontario, Canada. It is located northwest of the Erin Mills Parkway/Highway 403 interchange and is a stop on the Mississauga Transitway.

The Dundas Street bus rapid transit is a proposed bus rapid transit (BRT) corridor proposed by Metrolinx for the western part of the Greater Toronto and Hamilton Area in Southern Ontario, Canada. It is part of the regional transportation plan The Big Move. Metrolinx currently refers to the project as Dundas BRT without the word "Street". The City of Mississauga used the brand Dundas Connects during the development phase.

The Big Move is a regional transportation plan (RTP) published in 2008 and consisting of 62 rapid transit projects to be implemented across the Greater Toronto and Hamilton Area (GTHA). These rapid transit projects are intended to form a seamlessly integrated regional rapid transit network, which is the first priority action in the regional transportation plan. These projects form two long-term templates with 15 and 25 year horizons. These templates outline broad projects; specific details about technology, alignment, stations and service levels for each project are subsequently determined though a cost–benefit analysis or an environmental assessment process.

<span class="mw-page-title-main">Transportation in Mississauga</span>

The transport infrastructure and services in the Canadian city of Mississauga, Ontario include provincial highways and municipal roads, passenger and freight rail, regional and municipal bus service, and an international airport. It is interconnected with air, road, and rail transportation networks spanning the Greater Toronto Area and beyond.

<span class="mw-page-title-main">GO Transit rail services</span> Services provided by GO Transit

GO Transit rail services are provided throughout the Greater Toronto and Hamilton Area (GTHA) and the Greater Golden Horseshoe. The GO Transit rail fleet consists of 90 MPI MP40 locomotives and 979 Bombardier BiLevel Coaches. In 2023, the system had a ridership of 40,807,100 passengers per year. GO Transit started on May 23, 1967, running single-deck trains powered by diesel locomotives in push-pull configuration on a single rail line along Lake Ontario's shoreline. When GO trains began operation, they ran on tracks mostly owned the two major freight railways of Canada: Canadian National (CN) and CPKC. Over time, GO Transit have acquired tracks, ensuring GO Transit has control over track maintenance and expansion. Metrolinx currently owns 80% of the GO's rail corridors.

References

  1. "GO Transit ridership update – how is your station or line doing?". Metrolinx. Archived from the original on 24 February 2024.
  2. "Ontario Improving GO Transit Service Along All Corridors". News.ontario.ca. Retrieved 13 January 2018.
  3. "Ontario adding 300 GO train trips per week to GTA routes". CBC News. April 15, 2024. Retrieved July 18, 2024.
  4. 1 2 Muller, Jane (28 October 1981). "GO officials surprised by use of train". Canadian Champion. p. 1. Retrieved 2022-09-23.
  5. Louise Birks, Mary; Stewart, John (14 November 1979). "The question is: Why chlorine and propane together?". The Mississauga Times. p. 2. Retrieved 2022-09-23.
  6. "Riding the rails into Mississauga's past". Mississauga.com. Retrieved 13 January 2018.
  7. Garcia, Daniel; Bow, James. "GO Transit's Milton Line". Transit Toronto. Retrieved February 25, 2019.
  8. "Extra GO train added". The Milton Canadian Champion. 2009-06-24.[ permanent dead link ]
  9. "New GO bus service between Cambridge, Milton starting Sept. 6". CBC.ca. Retrieved 13 January 2018.
  10. Draaisma, Muriel (5 June 2019). "GO Transit to cut 3 bus routes, reduce service on 2 others to save $3.7M yearly". CBC.ca. Retrieved 10 September 2019.
  11. "Metrolinx, Milton launching pilot project to deal with parking overflow: report - CityNews Toronto". Citynews.ca. 25 March 2015. Retrieved 13 January 2018.
  12. 1 2 Williams, Rachael (7 April 2015). "Milton to press Metrolinx for two-way, all-day GO service". Insidehalton.com. Retrieved 13 January 2018.
  13. 1 2 "The Big Move Update – Recommended Changes" (PDF). Metrolinx.com. Retrieved 13 January 2018.
  14. "The Big Move: Next Wave Projects" (PDF). Metrolinx. Archived from the original (PDF) on 2016-03-04. Retrieved 2015-11-26.
  15. "Halton candidates state their election platforms". Insidehalton.com. 15 September 2011. Retrieved 13 January 2018.
  16. "Liberals promise increased GO train service". Insidehalton.com. 15 September 2011. Retrieved 13 January 2018.
  17. "Final debate". Inside Halton Sep 30, 2011
  18. "Mayor says Metrolinx's Big Move is now 'Big Stall'". Theifp.ca. 17 April 2013. Retrieved 13 January 2018.
  19. "GO Transit Strategic Plan 2020" (PDF). Archived from the original (PDF) on 2012-01-03. Retrieved 2011-06-07.
  20. O’Hara, Catherine (17 February 2017). "Metrolinx challenges Champion story about all-day, two-way GO train service to Milton". Insidehalton.com. Retrieved 13 January 2018.
  21. "Feds say they'll chip in on Milton GO train corridor expansion, but no firm funding announced". Global News . August 10, 2021. Retrieved August 11, 2021.
  22. "Doug Ford ready to spend a 'couple of billion' dollars on Mississauga LRT extension". Global News. February 9, 2024. Retrieved February 27, 2024.
  23. "TheRecord.com - Local - Study supports $110M GO train plan from Milton to Cambridge". 6 October 2009. Archived from the original on 6 October 2009. Retrieved 13 January 2018.{{cite web}}: CS1 maint: bot: original URL status unknown (link)
  24. "Waterloo Region Breaking News - Waterloo Region's Online Newspaper - TheRecord.com". TheRecord.com. Retrieved 13 January 2018.
  25. Woo, Leslie (22 September 2015). "New station analysis: Methodology and process" (PDF). Metrolinx.com. Archived from the original (PDF) on 13 March 2020. Retrieved 26 November 2015.
  26. "Regional Express Rail: Stations for Consideration" (PDF). Metrolinx. Archived from the original (PDF) on March 13, 2020. Retrieved February 3, 2019.