General information | |||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Location | 4100 Sheppard Avenue East Toronto, Ontario Canada | ||||||||||||||||
Coordinates | 43°47′10″N79°17′04″W / 43.78611°N 79.28444°W | ||||||||||||||||
Owned by | Metrolinx | ||||||||||||||||
Platforms | 2 side platforms | ||||||||||||||||
Tracks | 2 | ||||||||||||||||
Connections | |||||||||||||||||
Construction | |||||||||||||||||
Structure type | Brick station building | ||||||||||||||||
Parking | 342 spaces | ||||||||||||||||
Bicycle facilities | Yes | ||||||||||||||||
Accessible | Yes | ||||||||||||||||
Other information | |||||||||||||||||
Station code | GO Transit: AG | ||||||||||||||||
Fare zone | 07 | ||||||||||||||||
History | |||||||||||||||||
Opened | September 7, 1982 (as a GO station) [1] | ||||||||||||||||
Rebuilt | October 2021 [2] | ||||||||||||||||
Passengers | |||||||||||||||||
2018 | 134,000 [3] 15.2% | ||||||||||||||||
Services | |||||||||||||||||
| |||||||||||||||||
|
Agincourt GO Station is a GO Transit railway station in Toronto, Ontario, Canada. [4] The Stouffville line station serves the Agincourt neighbourhood of the former suburb of Scarborough.
The station's track was once used by Toronto and Nipissing Railway and later Grand Trunk Railway and finally by Canadian National Railway. TNR opened a simple wooden station at Agincourt in 1871. [5] The CN station lasted into the 1970s and was demolished to accommodate the first Agincourt GO Station built in 1982. [6] There was also a separate CPR Agincourt station located further east, built in 1884 by the Ontario and Quebec Railway which later merged with the Canadian Pacific Railway; it was demolished in 1962 and replaced by a passenger shelter that in turn was demolished in 1975. [7]
In 2018, EllisDon Transit Infrastructure was awarded a contract to expand the station for increased Regional Express Rail service. The project included construction of a second platform, improved pedestrian and vehicle connections, and a new station building. [8] By February 2021, the old station building built in 1982 was demolished. [6] By October 2021, the new station building was completed; however, at that time work still remained for tracks, platforms and the parking area. [2] By November 2022, two new pedestrian tunnels had opened between the north- and southbound platforms which also allows community members to cross the right-of-way underground; the pedestrian level crossing at Marilyn Avenue had closed. A new parking lot with 74 spaces was added at the north end of the station area along with a pick-up, drop-off area for 24 vehicles. [9] In September 2023, Metrolinx announced that all work had been completed at Agincourt. [10]
The station has the following features: [2] [10]
The Toronto Transit Commission's 85 Sheppard East and 985 Sheppard East Express bus routes links Agincourt GO to Don Mills station in the west, the 85 and 985B continues east into Scarborough while the 985A continues express to Scarborough Centre station.
When the Sheppard East LRT was a plan back in 2010, it required a grade separation of Sheppard Avenue East and the GO train tracks. [11] This led contractors from the City of Toronto government and TTC to build a bridge for the GO train tracks, while having Sheppard Avenue move under it, as the light rail vehicles would not have been able to cross the GO tracks at ground level. [12] On July 3, 2012, the underpass was completed and opened to regular traffic, which was five months ahead of schedule. [13] However, in April 2019, Ontario premier Doug Ford announced that the provincial government would extend Line 4 Sheppard to McCowan Road at some unspecified time in the future, replacing the proposed Sheppard East LRT. [14]
The new underpass improves not only the flow of traffic along Sheppard Avenue, as vehicles no longer have to wait at a rail crossing, but also GO train service. The bridge also allows for two-way service on this portion of the line. [13] Building the bridge also meant that the parking capacity of the station could be expanded. Before that project, parking capacity was only 297, but it has now been increased to 342 spaces.[ citation needed ]
Line 3 Scarborough, originally known as Scarborough RT (SRT), was a light rapid transit line that was part of the Toronto subway system in Toronto, Ontario, Canada. The line ran entirely within the eastern district of Scarborough, encompassing six stations and 6.4 kilometres (4.0 mi) of mostly elevated track. It connected with Line 2 Bloor–Danforth at its southwestern terminus, Kennedy, and terminated in the northeast at McCowan. Until its closure in July 2023, the system had a ridership of 3,908,000.
The Toronto subway is a rapid transit system serving Toronto and the neighbouring city of Vaughan in Ontario, Canada, operated by the Toronto Transit Commission (TTC). As of September 2023, the subway system is a rail network consisting of three heavy-capacity rail lines operating predominantly underground. As of December 2022, three new lines are under construction: two light rail lines and one light metro line.
Malvern is a neighbourhood in the city of Toronto, Ontario, Canada, with a population of 44,315. It is located in the northeast corner of the city.
Don Mills is a subway station that is the eastern terminus of Line 4 Sheppard in Toronto, Ontario, Canada. The station is at the northeast corner of Sheppard Avenue East and Don Mills Road, within the residential communities of Don Valley Village and Henry Farm, adjacent to Fairview Mall shopping centre. The station is close to Highways 401 and 404, as well as the Don Valley Parkway. Other nearby landmarks include Fairview Mall, Georges Vanier Secondary School, and the Fairview district branch of the Toronto Public Library.
Kennedy is the eastern terminal station on Line 2 Bloor–Danforth of the Toronto subway system. Opened in 1980, it is located east of the Kennedy Road and Eglinton Avenue intersection. With the adjacent Kennedy GO station on the Stouffville line of GO Transit, Kennedy is an intermodal transit hub and the fifth busiest station in the system, after Bloor–Yonge, St. George, Sheppard–Yonge, and Union, serving a total of approximately 113,961 customer trips a day.
Stouffville is one of the seven train lines of the GO Transit system in the Greater Toronto Area, Ontario, Canada. Its southern terminus is Union Station in Toronto, and its northern terminus is Old Elm in Whitchurch-Stouffville. There are connections from almost every station to Toronto Transit Commission or York Region Transit bus services.
Weston GO Station is a train station in Toronto, Ontario, serving the GO Transit Kitchener line and the Union Pearson Express. It is located on the south side of Lawrence Avenue West, just east of Weston Road, in the neighbourhood of Weston.
Milliken GO Station is a GO Transit train station in Toronto, Ontario, Canada. It is located in the neighbourhood of Milliken which is on the city's northern border with Markham.
Unionville GO Station is a train and bus station in the GO Transit network located in Markham, Ontario, Canada. It is a stop on the Stouffville line. The station is also served by Highway 407 East Express buses, which run westbound to Highway 407 station, northbound to Mount Joy GO Station, and eastbound to the Oshawa GO station.
Scarborough GO Station is a train station served by GO Transit's Lakeshore East line, located in the Scarborough district of Toronto, Ontario, Canada.
Guildwood GO Station is a GO Transit train station in Toronto, Ontario, Canada. It is located on Kingston Road in the Guildwood neighbourhood of the district of Scarborough. The station is situated on the CN Kingston Subdivision. It is a stop on the Lakeshore East line and also for intercity Via Rail Corridor services running from Toronto to Ottawa and Montreal.
Whitby GO Station is a train and bus station in the GO Transit network in Whitby, Ontario, Canada. It is a stop on the Lakeshore East line and was the eastern terminus of the dedicated GO Transit right-of-way until those tracks were extended to Oshawa in 1995. There are connections by GO Bus northward to Port Perry and Beaverton, and local Durham Region Transit routes within Whitby.
Metrolinx is a Crown agency of the Government of Ontario that manages and integrates road and public transport in the Greater Toronto and Hamilton Area (GTHA), which comprises much of Ontario's Golden Horseshoe region. Headquartered at Union Station in Toronto, the agency was created as the Greater Toronto Transportation Authority on June 22, 2006. The agency adopted its present name as a brand name in 2007 and eventually as the legal name in 2009.
The Sheppard East LRT was a proposed light rail line in Toronto, Ontario, Canada. It was first announced as part of the Transit City proposal in 2007. The Sheppard East LRT as proposed was to be 13 kilometres (8.1 mi) long, travel along Sheppard Avenue from Don Mills subway station to east of Morningside Avenue, and be operated by the Toronto Transit Commission (TTC).
The Eglinton East LRT (EELRT), also known as Line 7 Eglinton East and formerly known as the Scarborough Malvern LRT, is a proposed light rail line in Toronto, Ontario, Canada. The line would be entirely within the district of Scarborough. It was originally part of Transit City, a 2007 plan to develop new light rail lines along several priority transit corridors in the city.
MoveOntario 2020 was a 2007 plan proposed by the Government of Ontario that would fund 52 rapid-transit projects throughout the Greater Toronto and Hamilton Area in Ontario, Canada. It was succeeded by The Big Move and GO Transit's Go 2020.
Confederation GO Station is a GO bus stop and planned train station to be built by Metrolinx in East Hamilton, Ontario. The station is named for Confederation Beach Park, nearby on Lake Ontario.
The Big Move is a regional transportation plan (RTP) published in 2008 and consisting of 62 rapid transit projects to be implemented across the Greater Toronto and Hamilton Area (GTHA). These rapid transit projects are intended to form a seamlessly integrated regional rapid transit network, which is the first priority action in the regional transportation plan. These projects form two long-term templates with 15 and 25 year horizons. These templates outline broad projects; specific details about technology, alignment, stations and service levels for each project are subsequently determined though a cost–benefit analysis or an environmental assessment process.
Finch–Kennedy GO Station is a planned commuter train station in Toronto, Ontario, Canada. It will be an infill station on the Stouffville line of GO Transit in Scarborough, between Milliken GO and Agincourt GO. The station is one of five GO stations to be built as part of the SmartTrack Stations Program to adapt regional commuter service for urban public transit. The construction contract was awarded in 2022; construction is to start in October 2023 for completion in August 2027.
Station: Agincourt, Subdivision: Uxbridge, Mileage: 55.66