Breslau GO Station

Last updated
GO Transit logo.svg Breslau
General information
LocationGreenhouse Road
Woolwich, Ontario
Coordinates 43°29′7″N80°23′45″W / 43.48528°N 80.39583°W / 43.48528; -80.39583 (expected)
Owned by Metrolinx
Platforms Side platforms [1]
Tracks2 [1]
Connections Bus-logo.svg GRT buses
Construction
Parking~1000 [1]
AccessibleYes
History
Opening2025 [2]
Services
Preceding station GO Transit logo.svg GO Transit Following station
Kitchener
Terminus
Kitchener
Planned expansion
Guelph
towards Union Station

Breslau GO Station is a planned GO Transit train station to be built by Metrolinx near the community of Breslau in Woolwich, Ontario, as part of GO Transit's Regional Express Rail (RER) expansion program. The preliminary plan is to provide approximately 1000 parking spaces. A kiss and ride area and a bus loop are also planned to be provided. [1] Metrolinx expects the station's daily ridership to be 2,480 in 2031. [3]

Contents

History

Proposed GO Station

The station was initially proposed in 2009 as part of the extension of the line from Georgetown to Kitchener and was meant to handle Waterloo Region's park and ride demand. [4] The station wasn't built as part of that expansion and station was proposed again in 2015, as part of a larger list of potential future stations. [5] On June 27, 2016, Minister of Transportation Steven Del Duca announced the station would be built as part of the RER program [6] and it was confirmed by Metrolinx the next day. [7] In July 2016, the Initial Business Case analysis report was released, rating the station high for affordability and ease of construction but low for ridership. [1] In November 2019, it was announced that the RER project, which includes the station, will be completed by 2025. [2]

GTR/CNR Breslau Railway Station

The planned train station in Breslau is the community's second; the first was a single storey wood structure built by the Grand Trunk Railway in 1856. [8] The GTR station was located on the south side of the tracks, and the west side of Woolwich Street South. [9] [ self-published source? ] Later assumed by Canadian National Railway as a railway/telegraph station, passenger service was abandoned sometime between 1961 and 1967. [10] [ self-published source? ] The station was demolished and is now the site of Fleischauer Brothers Landscaping.[ citation needed ]

Related Research Articles

<span class="mw-page-title-main">GO Transit</span> Ontario regional public transit system consisting of trains and buses

GO Transit is a regional public transit system serving the Greater Golden Horseshoe region of Ontario, Canada. With its hub at Union Station in Toronto, GO Transit's green-and-white trains and buses serve a population of more than seven million across an area over 11,000 square kilometres (4,200 sq mi) stretching from Kitchener in the west to Peterborough in the east, and from Barrie in the north to Niagara Falls in the south. In 2022, the system had a ridership of 35,234,400. GO Transit operates diesel-powered double-decker trains and coach buses, on routes that connect with all local and some long-distance inter-city transit services in its service area.

<span class="mw-page-title-main">Lakeshore West line</span> Commuter rail line serving Toronto, Canada

Lakeshore West is one of the seven train lines of the GO Transit system in the Greater Toronto Area, Ontario, Canada. It extends from Union Station in Toronto to Hamilton, along the shore of Lake Ontario. Some train trips extend past Hamilton to St. Catharines and Niagara Falls.

<span class="mw-page-title-main">Milton line</span>

Milton is one of the seven train lines of the GO Transit system in the Greater Toronto Area, Ontario, Canada. It extends from Union Station in Toronto to Milton, by way of Mississauga.

<span class="mw-page-title-main">Kitchener line</span> Passenger rail service in Southern Ontario, Canada

Kitchener is one of the seven train lines of the GO Transit system in the Greater Toronto Area, Ontario, Canada. It extends westward from Union Station in Toronto to Kitchener, though most trains originate and terminate in Brampton in off-peak hours. A two-year pilot project which ran from October 2021 to October 2023 extended the line west to London, Ontario.

<span class="mw-page-title-main">Richmond Hill line</span> Commuter rail service in Ontario, Canada

Richmond Hill is one of the seven train lines of the GO Transit system in the Greater Toronto Area, Ontario, Canada. It operates between Union Station in Toronto to Bloomington GO Station in the north in Richmond Hill. Trains on the line operate only during weekday peak hours, while off-peak weekday times are served by the GO bus route 61.

<span class="mw-page-title-main">Bloor GO Station</span> Railway station in Toronto, Ontario, Canada

Bloor GO Station is a railway station on GO Transit's Kitchener line and Union Pearson Express rail services, located in Toronto, Ontario, on Bloor Street east of Dundas Street West. It is near Dundas West station on the TTC's Line 2 Bloor–Danforth, but is not directly connected to it.

<span class="mw-page-title-main">Weston GO Station</span> Railway station in Toronto, Ontario, Canada

Weston GO Station is a train station in Toronto, Ontario, serving the GO Transit Kitchener line and the Union Pearson Express. It is located on the south side of Lawrence Avenue West, just east of Weston Road, in the neighbourhood of Weston.

<span class="mw-page-title-main">Malton GO Station</span> Railway station in Mississauga, Ontario, Canada

Malton GO Station is a train and bus station in the GO Transit network, located near Toronto Pearson International Airport, in the community of Malton in Mississauga, Ontario, Canada. It is a stop on the Kitchener line, and is a flag stop for Via Rail trains operating between Toronto, London and Sarnia.

<span class="mw-page-title-main">Brampton GO Station</span> Railway station in Ontario, Canada

Brampton Innovation District GO Station is a railway station served by GO Transit and Via Rail, located at 27 Church Street West in downtown Brampton, Ontario, Canada. It is directly connected to the Downtown Brampton Terminal which serves GO Transit and Brampton Transit buses.

<span class="mw-page-title-main">Union Pearson Express</span> Airport rail link in Ontario, Canada

The Union Pearson Express is an airport rail link connecting Union Station in Downtown Toronto to Toronto Pearson International Airport. The UP Express began operation on 6 June 2015, in time for the 2015 Pan American Games. The UP Express travels between Union and Pearson in 25 minutes departing every 15 minutes, seven days a week. At the launch announcement, it was stated that the UP Express was projected to carry 2.35 million passengers annually and eliminate approximately 1.2 million car trips in the first year.

<span class="mw-page-title-main">Kitchener station</span> Railway station in Kitchener, Ontario, Canada

Kitchener station is a railway station located in Kitchener, Ontario, Canada, slightly to the northeast of downtown Kitchener, at 126 Weber Street West, near the corner of Victoria Street. It is a heritage building containing a waiting room and ticket counter built beside a set of tracks also used as a freight yard. A separate building to the east of the passenger area, originally built in 1925 as a freight building, now serves as the headquarters for the Goderich–Exeter Railway.

<span class="mw-page-title-main">Metrolinx</span> Crown agency owned by the Government of Ontario

Metrolinx is a Crown agency of the Government of Ontario that manages and integrates road and public transport in the Greater Toronto and Hamilton Area (GTHA), which comprises much of Ontario's Golden Horseshoe region. Headquartered at Union Station in Toronto, the agency was created as the Greater Toronto Transportation Authority on June 22, 2006. The agency adopted its present name as a brand name in 2007 and eventually as the legal name in 2009.

GO Transit is an interregional public transit system in Southern Ontario, Canada, operated by the provincial crown agency Metrolinx. It primarily serves the conurbation referred to by Metrolinx as the "Greater Toronto and Hamilton Area" (GTHA) with operations extending to several communities in the area centred around Toronto and Hamilton.

<span class="mw-page-title-main">GO Expansion</span> Canadian rail expansion project

GO Expansion, previously known as GO Regional Express Rail (RER), is a project to improve GO Transit train service by adding all-day, two-way service to the inner portions of the Barrie line, Kitchener line and the Stouffville line, and by increasing frequency of train service on various lines to every 15 minutes or better on five of the corridors. This would be achieved with the electrification of at least part of the Lakeshore East line, Lakeshore West line, Barrie line, Kitchener line and Stouffville line. GO Expansion is one of the Big Move rapid transit projects.

<span class="mw-page-title-main">Kitchener Central Station</span> Light rail station and future railway station in Kitchener, Ontario

Central Station is a light rail station in Kitchener, Ontario, Canada, which is planned to be expanded into an intermodal transit terminal. As of 2021, it consists of an Ion light rail stop and Grand River Transit bus stops. The site is planned to also include a train station served by Via Rail and GO Transit, and an intercity bus terminal.

<span class="mw-page-title-main">GO Transit rail services</span> Services provided by GO Transit

GO Transit rail services are provided throughout the Greater Toronto and Hamilton Area (GTHA) and the Greater Golden Horseshoe. The GO Transit rail fleet consists of 90 MPI MP40 locomotives and 979 Bombardier BiLevel Coaches. In 2022, the system had a ridership of 25,484,600 passengers per year.

Kirby GO Station is a planned GO Transit train station to be built by Metrolinx on Kirby Road in Vaughan, Ontario, as part of GO Transit's Regional Express Rail (RER) expansion program. Approximately 1000 parking spaces will be provided on the east side of the station. A bus loop and a kiss and ride area will also be provided.

Innisfil GO Station is a planned GO Transit train station to be built by Metrolinx on the Barrie line in Innisfil, Ontario as part of its GO Expansion program. A parking lot, a bus loop and a park and ride area will be provided. In 2016, Metrolinx rated the station location highly for affordability of construction but low for ridership, which is expected to be 2,800 per day in 2031. In 2020, the cost to build the station was estimated to be CA$29 million. The town of Innisfil wanted construction to begin in 2022 and the station open by September 2022. However, in May 2022 construction of the station was delayed to 2023.

Lawrence–Kennedy GO Station was a planned GO Transit train station to be built by Metrolinx under Lawrence Avenue in Toronto on the site of the existing Lawrence East station. Parking, a kiss and ride area, a bus loop, and pedestrian access from the Lawrence Avenue overpass will be provided. It was initially proposed as part of SmartTrack but was removed from the plan in January 2021.

Mulock GO Station is a planned GO Transit train station to be built by Metrolinx in Newmarket, Ontario as a part of the approved GO Expansion program. It will be built on Mulock Drive, between Yonge Street and Bayview Avenue. The station is to have approximately 550 parking spaces. A kiss and ride and a bus loop will also be provided at the station. Metrolinx expects the daily ridership at the station to be 3,891 in 2031.

References

  1. 1 2 3 4 5 "RER New Stations Initial Business Case|Breslau Station" (PDF). metrolinx.com. Metrolinx. July 2016. Retrieved 8 March 2020.
  2. 1 2 Tustin, Steve (26 November 2019). "Kitchener-Toronto GO Commute Plan Approved For Completion By 2025". Toronto Storeys. Storeys Publishing Inc. Retrieved 8 March 2020. Metrolinx approved a plan on Friday to bring two-way, all-day GO trains to Kitchener by 2025" "the proposal also adds a station near Breslau
  3. "Kitchener GO Rail Service Expansion Initial Business Case Update" (PDF). metrolinx.com. Metrolinx. November 2019. Retrieved 8 March 2020.
  4. "Georgetown to Kitchener Rail Expansion Environmental Study Report GO Transit". docplayer.net. Metrolinx. 13 July 2009. p. 4. Retrieved 8 March 2020. Breslau – Greenhouse Road: This site is designed to accommodate the Waterloo Region's park and ride demand
  5. Woo, Leslie (22 September 2015). "New Station Analysis: Methodology and Process" (PDF). metrolinx.com. Metrolinx. Archived from the original (PDF) on 13 March 2020. Retrieved 8 March 2020.
  6. Bueckert, Kate (27 June 2016). "New GO station coming to Breslau, says Transportation Minister Steven Del Duca". CBCnews. Canadian Broadcasting Corporation . Retrieved 8 March 2020.
  7. "GO Regional Express Rail 10-Year Program: New Stations Analysis" (PDF). metrolinx.com. Metrolinx. 28 June 2016. Archived from the original (PDF) on 13 March 2020. Retrieved 8 March 2020.
  8. "Waterloo Township". 15 August 2017.
  9. "Charles Cooper's Railway Pages - B".
  10. "Canadian Railway Telegraph History - GTR-GTP & CNR Station Numbers - A to F".