HMS Hydra (1871)

Last updated

Cyclops class monitor diagrams Brasseys 1888.jpg
Right elevation plan from Brassey's Naval Annual 1888–1889
History
Naval Ensign of the United Kingdom.svgUnited Kingdom
NameHMS Hydra
Namesake Hydra
Builder Robert Napier and Sons, Govan
Cost£194,334
Laid down28 December 1870
Launched18 July 1871
Completed31 May 1877
CommissionedAugust 1872
Out of service1901
Refit1888–89
FateSold for scrap 7 July 1903
General characteristics
Class and type Cyclops-class breastwork monitor
Displacement3,480 long tons (3,540 t)
Length225 ft (68.6 m) (p/p)
Beam45 ft (13.7 m)
Draught16 ft 3 in (5.0 m) (deep load)
Installed power1,528  ihp (1,139 kW)
Propulsion2 shafts, 2 steam engines
Speed11 knots (20 km/h; 13 mph)
Range3,000  nmi (5,600 km; 3,500 mi) at 10 kn (19 km/h; 12 mph)
Complement156
Armament2 × 2 - 10-inch rifled muzzle loaders
Armour

HMS Hydra was the second ship completed of the four Cyclops-class breastwork monitors built for the Royal Navy during the 1870s. The ships were ordered to satisfy demands for local defence during the war scare of 1870, but the pace of construction slowed tremendously as the perceived threat of war declined. The ship spent most of her career in reserve; her only sustained period in commission was four months during the Russo-Turkish War in 1878 when the British were trying to force the Russians to end the war without seizing Constantinople. Hydra was sold for scrap in 1903.

Contents

Design and description

The ships had a length between perpendiculars of 225 feet (68.6 m), a beam of 45 feet (13.7 m), and a draught of 16 feet 3 inches (4.95 m) at deep load. They displaced 3,480 long tons (3,540 t). Their crew consisted of 156 officers and men. [1]

The Cyclops-class ships and other ships of her type were described by Admiral George Alexander Ballard as being like "full-armoured knights riding on donkeys, easy to avoid but bad to close with." [2] While not unfit to face heavy weather their decks were frequently awash in even a moderate sea. Their accommodations were rated the worst in the fleet, referred to by ordinary seamen as "ratholes with tinned air". [3]

Propulsion

Hydra had two 4-cylinder inverted compound steam engines made by John Elder, each driving a single 12-foot (3.7 m) propeller. The ship's boilers had a working pressure of 60  psi (414  kPa ; 4  kgf/cm2 ). The engines produced a total of 1,472 indicated horsepower (1,098 kW) on 4 July 1872 during the ship's sea trials which gave her a maximum speed of 11.2 knots (20.7 km/h; 12.9 mph). Hydra carried 250 long tons (250 t) of coal, [4] enough to steam 3,000  nmi (5,600 km; 3,500 mi) at 10 kn (19 km/h; 12 mph). [5]

Armament

The ships mounted a pair of 10-inch rifled muzzle-loading guns in each turret. The shell of the 10-inch (254 mm) gun weighed 407 pounds (184.6 kg) while the gun itself weighed 18 long tons (18 t). The gun had a muzzle velocity of 1,365 ft/s (416 m/s) and was credited with the ability to penetrate a nominal 12.9 inches (330 mm) of wrought iron armour at 100 yards (91 m). The guns could fire both solid shot and explosive shells. [6] They were mounted on carriages that used hydraulic jacks to elevate and depress the guns. [7]

Armour

The Cyclops-class ships had a complete waterline belt of wrought iron that was 8 inches (203 mm) thick amidships and thinned to 6 inches (152 mm) at the ends. The superstructure and conning tower was fully armoured, the reason it was called a breastwork, with 8–9 inches (203–229 mm) of wrought iron. The gun turrets had 10 inches on their faces and 9 inches on the sides and rear. All of the vertical armour was backed by 9–11 inches (229–279 mm) of teak. The decks were 1.5 inches (38.1 mm) thick. [8]

Construction

Hydra was laid down on 5 September 1870 by the Robert Napier and Sons in Govan. She was launched on 28 December 1871 and commissioned in August 1872. The ship was towed to Devonport that same month for what proved to be a very lengthy fitting out period that was not completed on 31 May 1876. [9] Cyclops cost £194,334 to build. [1]

Refit

Although a recommendation had been made while the ships were still under construction to extend the superstructure out to the sides of the ship to improve their stability and habitability, this was not acted upon until they were refitted during the 1880s. This refit also strengthened the breastwork and upper decks, added another watertight bulkhead as well as a false keel. Four quick-firing 3-pounder Hotchkiss guns were added on the breastwork for torpedo boat defence as well as five machine guns and several searchlights. [10] This increased their crew to approximately 191 men [1] and added 80 long tons (81 t) to their displacement. [11]

Service

Hydra featured at the Naval Review at Spithead in 1878. The Graphic The Naval Review at Spithead, Royal Flotilla - The Graphic 1878.jpg
Hydra featured at the Naval Review at Spithead in 1878. The Graphic

HMS Hydra was the second ship to be completed, although she was the last ship of the class launched. She was placed in 1st Reserve after her completion. The ship, along with her sisters, was commissioned between April and August 1878 during the Russo-Turkish War for service with Admiral Sir Cooper Key's Particular Service Squadron in Portland Harbour. Hydra was paid off at Sheerness in August 1878 and served as tender to HMS Duncan. The ship was refitted in 1888–89 and was in Fleet Reserve at Chatham until 1901. All four ships of the class participated in the annual fleet manoeuvers in 1887, 1889–90 and 1892. HMS Hydra, like all of her sisters, was placed on the non-effective list in 1901 [9] and sold on 7 July 1903 [12] for £8,400. [9]

Notes

    Footnotes

    1. 1 2 3 Parkes, p. 213
    2. Ballard, p. 219
    3. Ballard, pp. 218
    4. Ballard, pp. 246–49
    5. Silverstone, p. 169
    6. Gardiner, p. 6
    7. Parkes, p. 212
    8. Parkes, pp. 213–14
    9. 1 2 3 Parkes, p. 215
    10. Parkes, pp. 212, 214
    11. Gardiner, p. 25
    12. Silverstone, p. 224

    Related Research Articles

    HMS <i>Agincourt</i> (1865) Minotaur-class armoured frigate of the Royal Navy

    HMS Agincourt was a Minotaur-class armoured frigate built for the Royal Navy during the 1860s. She spent most of her career as the flagship of the Channel Squadron's second-in-command. During the Russo-Turkish War of 1877–1878, she was one of the ironclads sent to Constantinople to forestall a Russian occupation of the Ottoman capital. Agincourt participated in Queen Victoria's Golden Jubilee Fleet Review in 1887. The ship was placed in reserve two years later and served as a training ship from 1893 to 1909. That year she was converted into a coal hulk and renamed as C.109. Agincourt served at Sheerness until sold for scrap in 1960.

    HMS <i>Black Prince</i> (1861) 1861 Warrior-class ironclad ship

    HMS Black Prince was the third ship of that name to serve with the Royal Navy. She was the world's second ocean-going, iron-hulled, armoured warship, following her sister ship, HMS Warrior. For a brief period the two Warrior-class ironclads were the most powerful warships in the world, being virtually impregnable to the naval guns of the time. Rapid advances in naval technology left Black Prince and her sister obsolete within a short time, however, and she spent more time in reserve and training roles than in first-line service.

    HMS Valiant was the second ship of the Hector-class armoured frigates ordered by the Royal Navy in 1861. Her builders went bankrupt shortly after she was laid down, which significantly delayed her completion. After being launched in 1863, she waited a further five years to receive her guns due to supply issues. Upon being commissioned in 1868 the ship was assigned as the First Reserve guard ship for Southern Ireland, where she remained until she was decommissioned in 1885. Valiant was hulked in 1897 as part of the stoker training school HMS Indus before becoming a storeship for kite balloons during the First World War. The ship was converted to a floating oil tank in 1926 and served in that role until sold for scrap in 1956.

    HMS <i>Minotaur</i> (1863) Lead ship of the British Minotaur-class armoured frigates

    HMS Minotaur was the lead ship of the Minotaur-class armoured frigates built for the Royal Navy during the 1860s. Minotaur took nearly four years between her launching and commissioning because she was used for evaluations of her armament and different sailing rigs.

    HMS <i>Iron Duke</i> (1870) Audacious-class central battery ironclad (1870)

    HMS Iron Duke was the last of four Audacious-class central battery ironclads built for the Royal Navy in the late 1860s. Completed in 1871, the ship was briefly assigned to the Reserve Fleet as a guardship in Ireland, before she was sent out to the China Station as its flagship. Iron Duke returned four years later and resumed her duties as a guardship. She accidentally rammed and sank her sister ship, Vanguard, in a heavy fog in mid-1875 and returned to the Far East in 1878. The ship ran aground twice during this deployment and returned home in 1883. After a lengthy refit, Iron Duke was assigned to the Channel Fleet in 1885 and remained there until she again became a guardship in 1890. The ship was converted into a coal hulk a decade later and continued in that role until 1906 when she was sold for scrap and broken up.

    HMS <i>Royal Oak</i> (1862) Prince Consort-class armoured frigate

    HMS Royal Oak was a Prince Consort-class armoured frigate built for the Royal Navy in the 1860s. The lead ship of her class, she is sometimes described as a half-sister to the other three ships because of her different engine and boiler arrangements. Like her sisters, she was converted into an ironclad from a wooden ship of the line that was still under construction.

    HMS <i>Defence</i> (1861) 1861 ship of the Royal Navy

    HMS Defence was the lead ship of the Defence-class armoured frigates ordered by the Royal Navy in 1859. Upon completion in 1862 she was assigned to the Channel Fleet. The ship was paid off in 1866 to be refitted and rearmed and was briefly reassigned to the Channel Fleet when she recommissioned in 1868. Defence had short tours on the North Atlantic and Mediterranean Stations, relieving other ironclads, from 1869 to 1872 before she was refitted again from 1872 to 1874. She became guard ship on the River Shannon when she recommissioned. The ship was transferred to the Channel Fleet again in 1876 and then became guard ship on the River Mersey until 1885. Defence was placed in reserve until 1890, when she was assigned to the mechanical training school in Devonport in 1890. She was renamed Indus when the school adopted that name and served there until sold for scrap in 1935.

    The Hector-class ironclads were a pair of armoured frigates built for the Royal Navy (RN) in the 1860s. Hector was completed in 1864 and assigned to the Channel Fleet until she began a refit in 1867. Valiant's builder went bankrupt, delaying her launching by a year. The ship then had to wait almost another five years to receive her guns and be commissioned. Both ships were assigned to the Reserve Fleet from 1868 until they were paid off in 1885–1886. They were mobilized during the Russo-Turkish War of 1877–1878, but saw no action. They were hulked in the late 1890s and assigned to shore establishments. Hector was scrapped in 1905, but Valiant was converted into a floating oil tank in 1926; she was sold for scrap thirty years later.

    HMS Hector was the lead ship of the Hector-class armoured frigates ordered by the Royal Navy in 1861. Upon completion in 1864, she was assigned to the Channel Fleet. The ship was paid off in 1867 to refit and be re-armed. Upon recommissioning in 1868, she was assigned as the guard ship of the Fleet Reserve in the southern district until 1886. She usually served as Queen Victoria's guard ship when the sovereign was resident at her vacation home on the Isle of Wight. Hector was paid off in 1886 and hulked in 1900 as a storage ship before being sold for scrap in 1905.

    HMS <i>Achilles</i> (1863) Armoured frigate of the Royal Navy

    HMS Achilles was an armoured frigate built for the Royal Navy in the 1860s. Upon her completion in 1864 she was assigned to the Channel Fleet. The ship was paid off in 1868 to refit and be re-armed. When she recommissioned in 1869, she was assigned as the guard ship of the Fleet Reserve in the Portland District until 1874. Achilles was refitted and re-armed again in 1874 and became the guard ship of the Liverpool District in 1875. Two years later, she was rejoined the Channel Fleet before going to the Mediterranean in 1878. The ship returned to the Channel Fleet in 1880 and served until she was paid off in 1885.

    HMS <i>Northumberland</i> (1866) 1866 ship

    HMS Northumberland was the last of the three Minotaur-class armoured frigates built for the Royal Navy during the 1860s. She had a different armour scheme and heavier armament than her sister ships, and was generally regarded as a half-sister to the other ships of the class. The ship spent her career with the Channel Squadron and occasionally served as a flagship. Northumberland was placed in reserve in 1890 and became a training ship in 1898. She was converted into a coal hulk in 1909 and sold in 1927, although the ship was not scrapped until 1935.

    HMS <i>Lord Warden</i> Ship of the Lord Clyde class of armoured frigates

    HMS Lord Warden was the second and last ship of the wooden-hulled Lord Clyde class of armoured frigates built for the Royal Navy (RN) during the 1860s. She and her sister ship, Lord Clyde, were the heaviest wooden ships ever built and were also the fastest steaming wooden ships. They were also the slowest-sailing ironclads in the RN.

    HMS <i>Bellerophon</i> (1865)

    HMS Bellerophon was a central battery ironclad built for the Royal Navy in the mid-1860s.

    HMS <i>Magdala</i> (1870)

    HMS Magdala was a Cerberus-class breastwork monitor of the Royal Navy, built specifically to serve as a coastal defence ship for the harbour of Bombay in the late 1860s. She was ordered by the India Office for the Bombay Marine. The original specifications were thought to be too expensive and a cheaper design was ordered. While limited to harbour defence duties, the breastwork monitors were described by Admiral George Alexander Ballard as being like "full-armoured knights riding on donkeys, easy to avoid but bad to close with." Aside from gunnery practice Magdala remained in Bombay Harbour for her entire career. The ship was sold for scrap in 1903.

    HMS <i>Neptune</i> (1874) Ironclad turret ship acquired by Royal Navy

    HMS Neptune was an ironclad turret ship originally designed and built in Britain for Brazil, but acquired for the Royal Navy in 1878. Modifications to suit the Royal Navy took three years to complete and the ship did not begin her first commission until 1883 with the Channel Fleet. She was transferred to the Mediterranean Fleet in 1885, but refitted in Portsmouth in 1886–87. Neptune then became the coastguard ship for the 1st Class Reserve at Holyhead until 1893 when she was placed in reserve in Portsmouth. While she was being towed to the breakers in 1903, Neptune unintentionally rammed HMS Victory, then serving as a training hulk for the Naval Signal School, collided with HMS Hero, and narrowly missed several other ships. She was scrapped in Germany in 1904.

    <i>Cyclops</i>-class monitor Class of breastwork monitors

    The Cyclops-class monitor was a group of four ironclad breastwork monitors built for the Royal Navy during the 1870s. They were slightly modified versions of the Cerberus-class monitors. The ships were ordered to satisfy demands for local defence during the war scare of 1870, but the pace of construction slowed tremendously as the perceived threat of war declined. The Cyclops-class monitors spent most of their careers in reserve and were finally sold off in 1903.

    HMS <i>Cyclops</i> (1871) British Cyclops-class monitor

    HMS Cyclops was the lead ship of the Cyclops-class breastwork monitors built for the Royal Navy during the 1870s. The ships were ordered to satisfy demands for local defence during the war scare of 1870, but the pace of construction slowed tremendously as the perceived threat of war declined. The ship spent most of her career in reserve; her only sustained period in commission was four months in Portland Harbour, during the Russo-Turkish War in 1878 when the British were trying to force the Russians to end the war without allowing them to seize Constantinople. Cyclops was sold for scrap in 1903.

    HMS <i>Gorgon</i> (1871)

    HMS Gorgon was the first ship commissioned of the four Cyclops-class breastwork monitors built for the Royal Navy during the 1870s.

    HMS <i>Hecate</i> (1871)

    HMS Hecate was the last ship completed of the four Cyclops-class breastwork monitors built for the Royal Navy during the 1870s.

    References