Hexham and Allendale Railway

Last updated

Hexham and Allendale Railway
Overview
StatusDisused
Locale Northumberland
Termini
Former connections Newcastle and Carlisle Railway (1867–1950)
Service
Type Heavy rail
History
Commenced19 August 1867
Completed1 March 1869
Closed to passengers22 September 1930
Closed to freight20 November 1950
Technical
Line length12+14 miles (19.7 km)
Number of tracks Single track
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge

The Hexham and Allendale Railway was a railway company formed in 1865 to build a branch line from the lead mining district of Allendale in Northumberland to a junction near Hexham on the Carlisle to Newcastle line. It opened to goods and mineral traffic in two stages from 1867, and to passengers in 1869.

Contents

The area was thinly populated apart from the lead mining and smelting settlements, and a slump in lead prices around the time of opening made the financial status of the line difficult, and it was not completed to its intended southern terminus of Allenheads.

The company was absorbed by the North Eastern Railway in 1876, and the passenger service was withdrawn in 1930; the line closed completely in 1950.

First railways

The Newcastle and Carlisle Railway was built to connect the east and west coasts of northern England, but in its construction, priority was given to opening the section between Hexham and Blaydon. This was to give early access to the River Tyne for lead ore extracted in the area, considered to be the most lucrative potential traffic for the line. The Newcastle and Carlisle Railway was completed (from Carlisle to Gateshead) in 1837.

Much of the ore was extracted from hilly locations north and south of the N&CR main line, and for some time it was carted down to the N&CR at Hexham or Haydon Bridge for onward conveyance by train. This was an improvement on the previous arrangement, but it was not long before proposals for railway connections were put forward. As early as 1841 the Newcastle and Carlisle Railway considered a connection to Alston and Nenthead, high in the hills south of and above Haltwhistle. The Nenthead part of that was dropped, but the branch line from Alston to Haltwhistle was opened in two stages in 1851 and 1852.

A rival proposal to the N&CR Alston branch had been the Wear Valley Extension Railway, which was proposed in 1845 to build from Frosterley on the Wear Valley Railway to near Milton on the Newcastle and Carlisle Railway main line. Sponsored by the Stockton and Darlington Railway this was conceived as part of a future through main line route to Scotland. The terrain was very challenging, and attempts to keep to main line curvatures and gradients had to compromise with realistic earthworks. Opposition from the Earl of Carlisle, the major landowner in the area, resulted in the proposal being dropped in 1846.

Now in the same year the Newcastle and Carlisle published their intention to build a branch to Allendale from Morralee, but they were unable to prepare timely and accurate survey documents for the line through difficult terrain and the plan was deferred; even the Alston branch, serving a greater concentration of the lead industry, was much delayed in opening..

The independently promoted Border Counties Railway ran north from Hexham, connecting mineral deposits to the main line as well as harbouring strategic plans to reach further, which it later achieved. The first part opened in 1858. [1] [2]

Allendale

The Allendale branch Allendale branch.png
The Allendale branch

The Beaumont Lead Company was operating at Allendale, 12 miles east of Alston. The Alston branch was of no benefit to it, and it continued to convey its output by road down to Haydon Bridge on the Newcastle and Carlisle Railway, while its competitors now had the advantage of a railway connection. The company was owned by Wentworth Blackett Beaumont and on 31 August 1864 he chaired a meeting in Allendale to promote a locally financed railway to Hexham, on the N&CR. The Greenwich Hospital Estates, trading as the London Lead Company had a lead smelting plant at Langley, and had become major proprietors of smelting facilities in the area and they supported the scheme, being prepared to invest £10,000. Beaumont stated that he would invest £20,000. [2]

Hexham and Allendale Railway Act 1865
Act of Parliament
Coat of Arms of the United Kingdom (1837).svg
Citation 28 & 29 Vict. c. lxxxvii
Dates
Royal assent 19 June 1865

The company's manager was Thomas J. Bewicke, and he arranged a survey; although a steep and continuous gradient of 1 in 40 was required there were no major engineering difficulties and no landowner opposition, and the North Eastern Railway was amenable to a junction being made with its main line. The line was to run from Hexham to Allendale, with a 7-mile extension to Allenheads. Parliamentary plans were deposited in November 1864; the bill was unopposed and the Hexham and Allendale Railway Act 1865 (28 & 29 Vict. c. lxxxvii) received royal assent on 19 June 1865. [1] [2]

Construction proceeded reasonably rapidly, although the deep embankment at Coastley Dene proved difficult to stabilise. The parliamentary plans had shown the junction with the Newcastle and Carlisle Railway at about 400 yards west of Border Counties Junction, where the BCR diverged. This was too far to control the junction to the Allendale from the Border Counties Junction signalbox, and a separate signalbox was inappropriate, so informal arrangements were made to make the junction close to the Border Counties Junction and within the control of that signalbox. [3] [1]

The company had difficult raising capital; the large subscriptions taken by Beaumont, the Greenwich Hospital and certain other principals with an interest in the line were not matched by individual subscriptions, and the decision was taken to stop construction about a mile short of Allendale, and not to proceed to Allenheads at all.

Opening

The line was opened for mineral traffic between Border Counties Junction and Langley on 19 August 1867. The line was worked by the North Eastern Railway. The next section to Allendale was opened for goods and mineral traffic on 13 January 1868; the "temporary terminus" was named Catton Road. The junction at Border Counties was also a temporary arrangement, unsuitable for passenger operation, and the North Eastern Railway had undertaken to improve Hexham station but had not yet done so.

The Hexham and Allendale company paid for the use of the 1+12 miles of NER line into Hexham station, and for the use of Hexham station. The cost of a locomotive on the H&AR was three guineas a day, and the H&AR paid the crews’ wages, any locomotive repairs, and stores used. [4]

On 2 February 1869 the Board of Trade Inspecting Officer visited the line to approve it for passenger operation, but he declined to do so because of deficiencies in the signalling; he also criticised the arrangements at the North Eastern Railway's Hexham station. Yolland visited again on 25 February 1869 and this time passed the line for passenger opening. Passenger trains ran from 1 March 1869; there were two services each way every weekday, with a third on Hexham market day, Tuesday. [5] [6] [1] [7] [8]

At this time the world price of lead had slumped considerably, and the commercial viability of the lead works, and the business they brought to the line, declined. In fact the slump led to a collapse, and depopulation of the area followed rapidly, with serious consequences for the line. Allendale parish's population fell from 6,401 in 1861 to 5,397 by 1871. In 1881 it was down to 4,030. The collapse of the lead industry occurred from about 1880, most mines closing, and by 1886 the Allendale and Langley smelters had closed and the Beaumont lead concern had given-up its local interests entirely. [4] Nonetheless it carried 240,000 passenger journeys during its independent existence. [8]

Receipts for the half year to 30 June 1868 were:

In 1876 the company sold its line to the North Eastern Railway, and its shareholders received about 60% of their investment, effective on 13 July 1876. [6] [7] [8] Dividends had been paid on three occasions. [1]

The line continued but the depopulation and industrial decline had an adverse effect on business. Nonetheless for many years there were two goods trains daily on the branch; milk was an exceptionally buoyant traffic.

The line was single, worked on the one engine in steam principle, intermediate sidings being served by ground frame connections released by the train staff. [8]

After 1923

Following the Railways Act 1921, the North Eastern Railway was a constituent of the new London and North Eastern Railway (LNER), as part of the "grouping" of the main line railways of Great Britain, effective from 1 January 1923.

The new owner was unable to sustain the passenger service, and it was withdrawn from 22 September 1930.

After nationalisation of the railways on 1 January 1948 the line was under the control of British Railways. The residual goods service was unprofitable and the line closed completely in November 1950. [9] [10]

Topography

Hexham and Allendale Railway
BSicon CONTg@G.svg
BSicon HST.svg
Hexham
BSicon STRc2.svg
BSicon eABZg3.svg
Border Counties Junction
BSicon exCONT1.svg
BSicon eSTR+c4.svg
BSicon evABZg2-.svg
BSicon exdSTRc3.svg
BSicon lCONTf@G.svg
BSicon excSTRc1.svg
BSicon exdHST+4.svg
Elrington Halt
BSicon exHST.svg
Langley-on-Tyne
BSicon exHST.svg
Staward Halt
BSicon exKBHFe.svg
Allendale

The passenger service on the line started on 1 March 1869 and closed 22 September 1930. Station list:

The line climbed steeply to a summit at Langley, 800 feet above sea level, and then descended to Staward, then falling gently to the terminus. [8]

Related Research Articles

<span class="mw-page-title-main">Glasgow and South Western Railway</span> British pre-grouping railway company

The Glasgow and South Western Railway (G&SWR) was a railway company in Scotland. It served a triangular area of south-west Scotland between Glasgow, Stranraer and Carlisle. It was formed on 28 October 1850 by the merger of two earlier railways, the Glasgow, Paisley, Kilmarnock and Ayr Railway and the Glasgow, Dumfries and Carlisle Railway. Already established in Ayrshire, it consolidated its position there and extended southwards, eventually reaching Stranraer. Its main business was mineral traffic, especially coal, and passengers, but its more southerly territory was very thinly populated and local traffic, passenger and goods, was limited, while operationally parts of its network were difficult.

<span class="mw-page-title-main">Allendale, Northumberland</span> Human settlement in England

Allendale, often marked on maps as Allendale Town, is a village and civil parish in south west Northumberland, England. It is located within the North Pennines Area of Outstanding Natural Beauty.

<span class="mw-page-title-main">North British Railway</span> British pre-grouping railway company (1844–1922)

The North British Railway was a British railway company, based in Edinburgh, Scotland. It was established in 1844, with the intention of linking with English railways at Berwick. The line opened in 1846, and from the outset the company followed a policy of expanding its geographical area, and competing with the Caledonian Railway in particular. In doing so it committed huge sums of money, and incurred shareholder disapproval that resulted in two chairmen leaving the company.

<span class="mw-page-title-main">Lancaster and Carlisle Railway</span> United Kingdom legislation

The Lancaster and Carlisle Railway was a main line railway opened between those cities in 1846. With its Scottish counterpart, the Caledonian Railway, the Company launched the first continuous railway connection between the English railway network and the emerging network in central Scotland. The selection of its route was controversial, and strong arguments were put forward in favour of alternatives, in some cases avoiding the steep gradients, or connecting more population centres. Generating financial support for such a long railway was a challenge, and induced the engineer Joseph Locke to make a last-minute change to the route: in the interests of economy and speed of construction, he eliminated a summit tunnel at the expense of steeper gradients.

<span class="mw-page-title-main">Brampton railway station (Cumbria)</span> Railway station in Cumbria, England

Brampton (Cumbria) is a railway station on the Tyne Valley Line, which runs between Newcastle and Carlisle via Hexham. The station, situated 10 miles 62 chains (10.8 mi; 17.3 km) east of Carlisle, serves the hamlet of Milton and the town of Brampton, Cumberland in Cumbria, England. It is owned by Network Rail and managed by Northern Trains.

<span class="mw-page-title-main">Hexham railway station</span> Railway station in Northumberland, England

Hexham is a railway station on the Tyne Valley Line, which runs between Newcastle and Carlisle via Hexham. The station, situated 22 miles 22 chains west of Newcastle, serves the market town of Hexham in Northumberland, England. It is owned by Network Rail and managed by Northern Trains.

<span class="mw-page-title-main">Caledonian main line</span> Former railway line in Scotland

The Caledonian Railway main line in Scotland connected Glasgow and Edinburgh with Carlisle, via Carstairs and Beattock.

The Border Counties Railway was a railway line connecting Hexham in Northumberland, with Riccarton Junction on the Waverley Route in Roxburghshire.

<span class="mw-page-title-main">Allendale railway station</span> Disused railway station in Northumberland, England

Allendale railway station was the terminus of the single track branch of the Hexham and Allendale Railway, in north east England. The line connected villages in the area to the railway network via a junction at Hexham.

<span class="mw-page-title-main">Tyne Valley line</span> Railway line in north of England

The Tyne Valley Line is a 58-mile (93 km) route, linking Newcastle upon Tyne with Hexham and Carlisle, England. The line follows the course of the River Tyne through Tyne and Wear and Northumberland. Five stations and two viaducts on the route are listed structures.

The Wansbeck Railway was a single-track railway line in Northumberland, England, that ran from Morpeth to Reedsmouth, where it made a junction with the Border Counties Railway. Conceived as part of a through trunk route for the North British Railway, it never achieved its potential. It opened in stages from 1862 to 1865. The population was sparse and mineral traffic kept the line going.

Elrington Halt station is a closed stone-built railway station situated on a single-track branch railway line in Northumberland, England, that runs from Allendale through the Border Counties Junction to Hexham.

<span class="mw-page-title-main">Staward Halt railway station</span> Disused railway station in Northumberland, England

Staward Halt is a closed stone built railway station situated on a single track branch railway line in Northumberland, England, that ran from Allendale through to Hexham.

<span class="mw-page-title-main">Langley-on-Tyne railway station</span> Disused railway station in Northumberland, England

Langley-on-Tyne is a closed stone built railway station situated on a single track branch railway line in Northumberland, England, that ran from Allendale through the Border Counties Junction to Hexham. It is now a cafe and garden

The Brampton Railway was a mineral railway built in 1798 to bring coal from workings on Tindale Fell to staiths at Brampton. It was a development of short sections of earlier wooden railways.

There were two interlinked railways on the south shore of the Solway Firth.

The Wilsontown, Morningside and Coltness Railway was a railway opened in 1845, primarily for mineral traffic, although a passenger service was run sporadically. The line ran from a junction with the Wishaw and Coltness Railway at Chapel, to Longridge, in South Central Scotland, and it was extended to Bathgate in 1850 after takeover by the Edinburgh and Glasgow Railway. It was built to open up further coal deposits and to connect the Wilsontown Ironworks, although it did not actually reach Wilsontown. In common with the other "coal railways" with which it connected, it adopted the track gauge of 4 ft 6 in, often referred to as Scotch gauge.

<span class="mw-page-title-main">Newcastle & Carlisle Railway</span> United Kingdom legislation

The Newcastle & Carlisle Railway (N&CR) was an English railway company formed in 1825 that built a line from Newcastle upon Tyne on Britain's east coast, to Carlisle, on the west coast. The railway began operating mineral trains in 1834 between Blaydon and Hexham, and passengers were carried for the first time the following year. The rest of the line opened in stages, completing a through route between Carlisle and Gateshead, south of the River Tyne in 1837. The directors repeatedly changed their intentions for the route at the eastern end of the line, but finally a line was opened from Scotswood to a Newcastle terminal in 1839. That line was extended twice, reaching the new Newcastle Central Station in 1851.

<span class="mw-page-title-main">Carlisle railway history</span>

Carlisle, in North West England, formed the focus for a number of railway routes because of the geography of the area. At first each railway company had its own passenger and goods station, but in 1847 passenger terminal facilities were concentrated at Citadel station, which is in use today. Goods facilities remained dispersed, and goods wagons passing through were remarshalled, incurring delay and expense.

<span class="mw-page-title-main">Slaggyford railway station</span> Station in Northumberland on the South Tynedale Railway

Slaggyford was a railway station on the Alston Line, which ran between Haltwhistle and Alston. The station served the village of Slaggyford in Northumberland.

References

  1. 1 2 3 4 5 Dr Tom Bell, Railways of the North Pennines, The History Press, Stroud, 2015, ISBN   978-0-7509-6095-3
  2. 1 2 3 Bill Fawcett, A History of the Newcastle and Carlisle Railway, 1824 to 1870, North Eastern Railway Association, 2008, ISBN   978-1-873513-69-9
  3. The Ordnance Survey maps of the period and subsequently appear to have been based on the parliamentary plans and do not show the actual position of the line as built.
  4. 1 2 G Whittle, The Newcastle & Carlisle Railway, David & Charles, Newton Abbot, 1979, ISBN   0-7153-7855-4
  5. Tomlinson, William Weaver (1915). The North Eastern Railway; its rise and development. Newcastle-upon-Tyne: A. Reid & Company. p. 633.
  6. 1 2 Allen, Cecil J. (1974) [1964]. The North Eastern Railway. Shepperton: Ian Allan. pp. 142–143. ISBN   0-7110-0495-1.
  7. 1 2 K Hoole, A Regional History of the Railways of Great Britain: volume 4: The North East, David and Charles, Dawlish, 1965
  8. 1 2 3 4 5 6 J A Wells. The Railways of Northumberland and Newcastle upon Tyne 1828 - 1998, Powdene Publicity Limited, Newcastle, 1998, ISBN   0-9520226-2-1
  9. Awdry, Christopher (1990). Encyclopaedia of British Railway Companies. Patrick Stephens. p. 137. ISBN   1-85260-049-7.
  10. Hedges, Martin, ed. (1981). 150 years of British Railways. Hamyln. pp. 88, 113–114. ISBN   0-600-37655-9.
  11. M E Quick, Railway Passenger Stations in England Scotland and Wales—A Chronology, The Railway and Canal Historical Society, 2002

Further reading