Holland-class submarine

Last updated

Holland submarine model.jpg
Class overview
NameHolland class
Builders Vickers, Barrow
OperatorsNaval Ensign of the United Kingdom.svg  Royal Navy
Preceded bynone
Succeeded by A class
In commission2 February 1903 - 1914
Completed5
Lost2
Retired3
Preserved1
General characteristics
Type Midget submarine
Displacement
  • 110 long tons (112 t) surfaced
  • 123 long tons (125 t) submerged
Length63 ft 10 in (19.46 m)
Beam11 ft 9 in (3.58 m)
Propulsion
  • Petrol engine, 160 hp (119 kW)
  • Electric motor, 74 hp (55 kW)
Speed
  • 8 knots (9.2 mph; 15 km/h) surfaced
  • 7 knots (8.1 mph; 13 km/h) submerged
Range
  • 250  nmi (460 km) at 8 kn (9.2 mph; 15 km/h) surfaced
  • 20 nmi (37 km) at 7 kn (8.1 mph; 13 km/h) submerged
Complement8
Armament

The Holland class were the first submarines built for the Royal Navy. They were built by Vickers, Barrow-in-Furness. The first three were designed by John Philip Holland. The Hollands were built under licence from the Holland Torpedo Boat Company/Electric Boat Company during the years 1901 to 1903. The Admiralty hoped to keep the Holland class a secret, and very few senior officers even knew of their existence. This led to the myth of the Admiralty not taking any interest in submarines. On the contrary, the Admiralty was well aware of the submarine's destructive potential. It therefore refrained from any submarine development programme so as to avoid provoking similar programmes on the part of foreign navies. Once those navies did begin serious submarine programmes, the Admiralty had no choice but to begin its own. [1]

Contents

Adoption of the submarine

Captain Henry Jackson, British naval attaché in Paris, had been instructed to report on submarine developments which had been underway in France for several years. In 1898 he witnessed trials of the privately developed Le Goubet, a small 11-ton submersible designed to be carried on board a warship. In January 1899 he informed the Admiralty of exercises with the 270-ton experimental submarine Gustave Zédé which had been used to launch a torpedo attack on the battleship Magenta. The Board of Admiralty considered whether it needed to act, but rejected further reports that the French had ordered up to a dozen submarines in the light of other reports on the trial suggesting that its outcome had been stage-managed for political reasons. [2]

In January 1900, the Washington attaché Captain Charles Ottley reported that the US government was considering purchasing a submarine-boat designed by John Holland and provided the Admiralty with US Navy reports on the boat's performance and a set of blueprints. In February the new Paris attaché submitted further favourable reports on the capabilities of Gustave Zédé. Meanwhile, Admiral Fisher commanding the Mediterranean Fleet, which might be required to fight the French, asked the Admiralty for instructions on the best defence against submarines and suggested the use of defensive mines. In May the Admiralty responded by instructing the torpedo school to investigate means of combatting submarines, whereupon they requested a submarine with which to experiment, while in the same month news arrived confirming the US purchase of a Holland boat, USS Holland. First Sea Lord Walter Kerr and the Controller, Rear Admiral Arthur K. Wilson, were convinced of the need to obtain a submarine for the Royal Navy to investigate its capabilities and means to combat submarine attack. [3]

No British shipbuilder had experience of constructing submarines, so the Admiralty began negotiations with the Holland Torpedo Boat Company and Vickers Ltd, which was a major shipbuilder for the Admiralty. It was agreed that The Electric Boat Company (having purchased the rights from Holland) would license Vickers to build submarines in Britain, and an order was placed for five. The Board of Admiralty now considered that the submarines might also be useful in an offensive role, not merely to practice defence, and if trials of the boats were successful further orders would be placed with Vickers. [4]

A general election in November 1900 led to a change of First Lord of the Admiralty from George Goschen to the Earl of Selborne. The new Parliamentary Secretary to the board was Hugh Oakley Arnold-Forster, who as a backbench Member of Parliament had criticised Goschen for failing to adopt submarines. Now he discovered that the Admiralty had been doing so in secret. Selborne became concerned that even so the Admiralty was lagging some way behind the French in development, and the first boat, whose contract was finally signed December 1900, would not be delivered until October 1901. Arnold-Forster proposed involving other companies in constructing submarines, but this was opposed by the Second Sea Lord, Vice Admiral Archibald Douglass, as well as by Wilson, on the grounds that it remained unwise to encourage the general development of the submarine, which might be of more benefit to smaller navies rather than the RN. Wilson considered that the limited range of existing submarines meant they would only be able to operate in French waters, whereas if further developed could become a weapon to threaten British home ports. He recognised the potential of the submarine to prevent maritime trade, which was essential to the survival of an island nation like Britain. Any steps possible to slow down submarine development should be taken while the navy worked on means of defence against the submarine. [5]

In the event, the story that Vickers was building submarines was leaked by a Glasgow newspaper in February, and confirmed by the Admiralty in March. Arnold-Forster continued to press for more submarines to be built, considering that the navy either needed a great many or none, but although Selborne was inclined to agree, the two were opposed by the Sea Lords. It was agreed that only three per year would be ordered, which was the minimum number needed for Vickers to continue their specialist construction team. It was known that the French design was technically superior to the Holland boats ordered, but the Admiralty had no better design available at that time. [6]

Further development

Construction of the boats took longer than anticipated, with the first only ready for a diving trial at sea on 6 April 1902. Although the design had been purchased entire from the US company, the actual design used, Fulton, was an untested improved version of the original Holland design using a new 180 hp petrol engine. [7]

The Admiralty decided to appoint an Inspecting Captain of Submarines to oversee development work, and Captain Reginald Bacon was appointed in May 1901. Bacon was a technically minded officer experienced with the use of surface torpedo boats. His first recommendations were to note that the Holland submarines were likely to compare poorly to the current French design and would be unable to operate on the surface in anything other than fair weather (the boats had a range of only 20 miles (32 km) underwater). He therefore suggested the designs of boats four and five, which had not yet been started, should be modified to improve their seaworthiness. The Admiralty felt the Holland company would refuse any responsibility for difficulties arising from unauthorised design changes, but agreed to order one submarine of a new design, the A1. [7]

Experiments were conducted in 1901 at the torpedo school attempting to blow up a torpedo with underwater charges. In November 1902 Holland 1 finally became available for testing and was used as target with live explosive charges. It was found that the boat came to no harm from a 200 lb (91 kg) guncotton charge exploded at a distance of 80 yards (73 m). Since there was no known way of locating a submarine even to this accuracy, it was concluded that it was effectively impossible to attack submerged submarines. Destroyers were more at risk themselves from their own experimental charges thrown off the stern but in any case were not big enough to carry more than two charges. However, Bacon was much more optimistic over the offensive capabilities of the submarine, concluding that a group of 3–5 would be an insurmountable obstacle for any enemy ships attempting to operate near a port where the submarines were based. [8]

Service

The submarines initially had serious reliability problems, and a 1903 attempt to sail around the Isle of Wight on the surface resulted in four of the boats breaking down before covering much more than 4 miles (6.4 km). [9]

The Holland class were mostly used for testing, but in October 1904, after a Russian fleet mistakenly sank a number of British fishing vessels in the Dogger Bank incident, the Holland boats left harbour to attack the fleet. They were recalled before any engagement could take place. [10]

Boats

Holland 1 submarine in dry dock PSM V58 D172 The holland submarine in dry dock.png
Holland 1 submarine in dry dock
Holland 1 submarine cross section PSM V58 D175 Cross section of the holland amidships.png
Holland 1 submarine cross section

Notes

  1. Galantin, Ignatius J., Admiral, USN (Ret.). Foreword to Submariner by Johnnie Coote, p. 1.
  2. Lambert pp. 41-42.
  3. Lambert pp. 43-44.
  4. Lambert pp. 45-46.
  5. Lambert pp. 46-48.
  6. Lambert pp. 49-50.
  7. 1 2 Lambert p. 51.
  8. Lambert pp. 52-53.
  9. Gray, Edwyn (2001). British Submarines in the great war. Pen & Sword Books. p. 17. ISBN   0-85052-776-7.
  10. Compton-Hall, Richard (1983). Submarine boats The beginnings of underwater warfare. London: Conway maritime press. p. 11. ISBN   0-85177-288-9.

Related Research Articles

<span class="mw-page-title-main">Imperial German Navy</span> Navy of the German Empire between 1871 and 1919

The Imperial German Navy or the Imperial Navy was the navy of the German Empire, which existed between 1871 and 1919. It grew out of the small Prussian Navy, which was mainly for coast defence. Kaiser Wilhelm II greatly expanded the navy. The key leader was Admiral Alfred von Tirpitz, who greatly expanded the size and quality of the navy, while adopting the sea power theories of American strategist Alfred Thayer Mahan. The result was a naval arms race with Britain, as the German navy grew to become one of the greatest maritime forces in the world, second only to the Royal Navy.

British T-class submarine Class of diesel-electric submarines

The Royal Navy's T class of diesel-electric submarines was designed in the 1930s to replace the O, P, and R classes. Fifty-three members of the class were built just before and during the Second World War, where they played a major role in the Royal Navy's submarine operations. Four boats in service with the Royal Netherlands Navy were known as the Zwaardvisch class.

HMS A5 was an early Royal Navy submarine. She was a member of Group Two of the first British A class of submarines. Like all members of her class, she was built at Vickers Barrow-in-Furness.

A-class submarine (1903)

The A class was the Royal Navy's first class of British-designed submarines. Thirteen were built by Vickers at Barrow-in-Furness between 1902 and 1905 as an improvement on the US Plunger class.

The Naval Laws were five separate laws passed by the German Empire, in 1898, 1900, 1906, 1908, and 1912. These acts, championed by Kaiser Wilhelm II and his Secretary of State for the Navy, Grand Admiral Alfred von Tirpitz, committed Germany to building up a navy capable of competing with the Royal Navy of the United Kingdom.

HMS <i>Holland 1</i> Submarine of the Royal Navy

Holland 1 is the first submarine commissioned by the Royal Navy. The first in a six-boat batch of the Holland-class submarine, she was lost in 1913 while under tow to be scrapped following her decommissioning. Recovered in 1982, she was put on display at the Royal Navy Submarine Museum, Gosport. Her battery bank found in the boat was discovered to be functional after being cleaned and recharged.

The history of the submarine spans the entire history of human endeavour as mankind has since early civilisation sought to explore and travel under the sea. Humanity has employed a variety of methods to travel underwater for exploration, recreation, research and significantly, warfare. While early attempts, such as those by Alexander the Great, were rudimentary, the advent of new propulsion systems, fuels, and sonar, propelled an increase in submarine technology. The introduction of the diesel engine, then the nuclear submarine, saw great expansion in submarine use – and specifically military use – during World War I, World War II, and the Cold War. The Second World War use of the U-Boat by the German Navy against the Royal Navy and commercial shipping, and the Cold War's use of submarines by the United States and Russia, helped solidify the submarine's place in popular culture. The latter conflicts also saw an increasing role for the military submarine as a tool of subterfuge, hidden warfare, and nuclear deterrent. The military use of submarines continues to this day, predominantly by North Korea, China, the United States and Russia.

British U-class submarine 1940 class of British submarines

The British U-class submarines were a class of 49 small submarines built just before and during the Second World War. The class is sometimes known as the Undine class, after the first submarine built. A further development was the British V-class submarine of 1942.

<span class="mw-page-title-main">Royal Navy Submarine Service</span> Military unit

The Royal Navy Submarine Service is one of the five fighting arms of the Royal Navy. It is sometimes known as the Silent Service, as submarines are generally required to operate undetected.

HMS <i>Holland 5</i> Submarine of the Royal Navy

French submarine <i>Gymnote</i> (Q1) Worlds first all-electric submarine

Gymnote was one of the world's first all-electric submarines and the first functional submarine equipped with torpedoes.

HMS <i>E9</i> Submarine of the Royal Navy

HMS E9 was a British E class submarine built by Vickers, Barrow. She was laid down on 1 June 1912 and was commissioned on 18 June 1914.

HMS <i>Conflict</i> (1894) Conflict-class destroyer

HMS Conflict was the lead ship of the Conflict-class destroyers built by J. Samuel White, at East Cowes, Isle of Wight for the Royal Navy. She was launched on 13 December 1894, and entered service in 1899. After an initial spell in the Mediterranean Fleet, Conflict returned to British waters, where she served the rest of her career. Conflict was part of the Portsmouth Local Defence Flotilla during the First World War, which she survived. Conflict was sold for scrap on 20 May 1920.

HMS <i>Wizard</i> (1895) Conflict-class destroyer

HMS Wizard was a Conflict-class destroyer built by the White shipyard for the Royal Navy, and launched on 26 February 1895. In 1910, she was reconstructed with only two funnels. She is believed to be the only destroyer fitted with in turning screws. She was sold in 1920.

HMS Starfish was a Sturgeon-class destroyer which served with the Royal Navy. Built by Vickers, she was launched in 1895 and sold in 1912.

<span class="mw-page-title-main">QF 3-pounder Hotchkiss</span> Light 47 mm naval gun introduced in 1886

The QF 3-pounder Hotchkiss or in French use Canon Hotchkiss à tir rapide de 47 mm were a family of long-lived light 47 mm naval guns introduced in 1886 to defend against new, small and fast vessels such as torpedo boats and later submarines. There were many variants produced, often under license which ranged in length from 32 to 50 calibers but 40 caliber was the most common version. They were widely used by the navies of a number of nations and often used by both sides in a conflict. They were also used ashore as coastal defense guns and later as an anti-aircraft gun, whether on improvised or specialized HA/LA mounts.

French submarine <i>Gustave Zédé</i> (1893) Early submarine of the French Navy

Gustave Zédé was one of the world's earliest commissioned naval submarines. She was launched on 1 July 1893 at Toulon, France, although only formally entering service with the French Navy in May 1900 after a long series of trials and design alterations. The submarine carried out the first successful torpedo attack by a submerged vessel against a surface ship.

HMS <i>Proteus</i> (N29) Submarine of the Royal Navy

HMS Proteus was a Parthian-class submarine designed and built by Vickers Shipbuilding and Engineering in Barrow-in-Furness for the Royal Navy. She was laid down on 18 July 1928, launched on 22 August 1929 and completed on 17 June 1930. Like other submarines in her class she served on the China Station before the war. In the Second World War, mainly based at Alexandria in the Mediterranean, Proteus sank 15 enemy vessels and damaged several others during her service.

Hrabri (Brave) was the lead boat of the Hrabri-class submarines; built for the Kingdom of Serbs, Croats and Slovenes– Yugoslavia by the Vickers-Armstrong Naval Yard in the United Kingdom. Launched in 1927, her design was based on the British L-class submarine of World War I, and was built using parts from an L-class submarine that was never completed. The Hrabri-class were the first submarines to serve in the Royal Yugoslav Navy (KM), and after extensive sea trials and testing Hrabri sailed from the UK to the Adriatic coast of Yugoslavia, arriving in April 1928. The submarine was armed with six bow-mounted 533 mm (21 in) torpedo tubes, two 102 mm (4 in) deck guns, one QF 2-pounder L/39 anti-aircraft gun and two machine guns. Its maximum diving depth was restricted to 55 metres (180 ft) by Yugoslav naval regulations.

<i>TB 114</i>-class torpedo boat Type of the British torpedo boat

The TB 114 class was a class of four 160-foot torpedo boats built for the British Royal Navy in 1903–1905 by the shipbuilder J. Samuel White. All four ships served in local defence flotillas during the First World War, with one of the ships being sunk in 1918. The remaining three ships were withdrawn from use after the end of the war, with the last of the class sold for scrap in 1921.

References