Ivana Las Vegas

Last updated
Ivana Las Vegas
USA Nevada location map.svg
Red pog.svg
Ivana Las Vegas
Location of Ivana Las Vegas in Nevada
Former namesThe Summit
General information
StatusNever built
ClassificationResidential, commercial
Town or city Las Vegas, Nevada
CountryUnited States
Coordinates 36°08′38″N115°09′25″W / 36.143830°N 115.157018°W / 36.143830; -115.157018 Coordinates: 36°08′38″N115°09′25″W / 36.143830°N 115.157018°W / 36.143830; -115.157018
Named for Ivana Trump
Estimated completionDecember 2008 (2008-12)
Cost$700 million
OwnerRinkai America
Height923 feet (281 m)
Technical details
Floor count73
Grounds2.17 acres (0.88 ha)
Design and construction
Architecture firmJMA Architecture Studios
DeveloperVictor Altomare
EngineerNevada By Design [1]
Main contractorTurner Construction

The Ivana Las Vegas was a proposed 73-floor, 923-foot condominium high-rise, named after Ivana Trump. The project was initially announced in August 2004, as The Summit, and was to be constructed on the 2.17-acre site of the closed Holy Cow Casino and Brewery, located on the Las Vegas Strip in Las Vegas, Nevada. Trump became involved with the project in June 2005, when it was renamed.

Contents

The Ivana Las Vegas was to feature 945 condo units, including a $35 million 20,000 sq ft (1,900 m2) penthouse. The project would have begun construction in summer 2006, with a completion date of December 2008. The property was put up for sale in December 2005, after the project had been cancelled because of rising construction costs. The property later became the site of a two-story Walgreens store.

History

The Summit

The condominium high-rise project was initially announced as The Summit on August 19, 2004. The project was to be built by a company called Sahara Condominiums, with financing from Australian developers Joseph Di Mauro and Victor Altomare. [2] Altomare had been convinced of Las Vegas' "developer-friendly environment" by Las Vegas mayor Oscar Goodman and city officials. [3] The Summit was to feature 73 floors and stand 940 feet, and was to be built at a cost of $700 million. If built, the Summit would have been the tallest habitable structure in the Las Vegas Valley, [2] and one of the tallest residential towers in the world. [4] Di Mauro said the project would be financed by "internal and external funding," such as revenue from other businesses that he owned. [4]

The Summit was designed by JMA Architecture Studios, and was to feature 960 condo units, with nine different floor plans to be offered. Entry-level units were expected to sell for $600,000 to $700,000. [2] The Summit's lower-floor units would be fully furnished, and would be marketed towards people looking to buy a second home, giving owners the option to also rent out their unit when not in use. The top 16 floors would include 151 units ranging from 1,276 sq ft (118.5 m2) to 11,000 sq ft (1,000 m2). [4] A 15,682 sq ft (1,456.9 m2) penthouse would also be featured, [4] which Sahara Condominiums hoped to sell for over $35 million. [2]

The building was to be constructed on the 2.17 acres (0.88 ha) [4] of land that was currently occupied by the closed Holy Cow Casino and Brewery and a small, multi-level parking garage, both located at the northeast corner of South Las Vegas Boulevard and Sahara Avenue on the Las Vegas Strip. Di Mauro and Altomare planned to demolish both structures for the new high-rise. Di Mauro hoped to finish the permit process within three months and begin selling units by late December 2004. The Summit was expected to take approximately three years to complete. Sales offices for The Summit were set up in Asia and Australia to market the project. [2] The project was expected to generate $1 billion in profit. By November 2004, the Summit's height had been reduced to 923 feet. Altomare said that month that the "Summit" name was only a working title, and that he would release a brand name for the project eventually. [3]

The project was approved by the city of Las Vegas in November 2004. The federal government approved the 923-foot project now with 800 condo units in January 2005. By the end of the month, Altomare was in discussions with Turner Construction to build the high-rise, which was expected to take two and a half years to finish. Altomare said at that time that the project's construction would be financed by syndicated bank loans underwritten by presales of the condo units, which were expected to begin selling in late April 2005, with starting prices at $600,000. The tower's 11,000 sq ft (1,000 m2) penthouse was priced at $35 million. Altomare believed that many buyers would be from out of state and from foreign countries. Altomare also said the project's official name would be announced after an agreement was made with a well-known, high-profile woman who would be willing to attach her own name and endorse the project. [5]

Ivana Las Vegas

By June 2005, Ivana Trump, an ex-wife of businessman Donald Trump, had partnered with Altomare on the project, now named The Ivana. [6] [7] At 73 floors, Ivana Trump's condominium tower would have been taller than her ex-husband's planned Trump Hotel Las Vegas. Jack Wishna, a partner in Donald Trump's condo project, was skeptical that Ivana Trump's condo tower would be better: "Donald is a mega-developer who is so much more than just a name on a building. Other projects may use the Ivana name but no one will ever mistake it for a Donald Trump luxury project." Wishna also noted that another Ivana Trump project, located in Florida, also "went down the tubes." [7] At that time, the tower was to begin construction in July 2005. [6]

On the morning of July 12, 2005, while Donald Trump was breaking ground on his condo project, officials for Ivana Trump's condo project now called Ivana Las Vegas were preparing an educational sales meeting for real estate agents and brokers later that afternoon. It was believed that the events were purposely scheduled for the same day, although Luke Chadwick, director of sales for Ivana Las Vegas, said the scheduling was merely a coincidence. Approximately 1,500 agents 500 more than expected attended the sales meeting for Ivana Las Vegas, held at the Bellagio hotel and casino. Chadwick said about the event, "I've done hundreds of projects, and I've never seen this level of interest before." [8]

Many agents were not impressed by the event, but still believed the project would eventually open, despite industry experts and Donald Trump questioning the likelihood that the project could obtain financing for construction. At that time, the Ivana Las Vegas was to feature 943 units ranging from 500 sq ft (46 m2) to 1,900 sq ft (180 m2), with prices ranging from $800,000 to $1.7 million. On-site amenities would have included a gym, a spa, an ultra lounge, and restaurants. In addition to lending her name to the project, Ivana Trump also planned to assist in designing the interiors. [8]

Ivana Las Vegas' sales launch took place at the Mandalay Bay Convention Center on August 14, 2005. Ivana Trump attended the event, where more than 487 condo units were sold, two of which were purchased by Trump herself. With more than half of the project's planned 945 units now sold, Ivana Las Vegas passed a minimum that was required to qualify for construction financing. Advanced sales generated nearly $500 million, while Chadwick believed that the ultimate number would be over $1 billion, [9] making it the most expensive residential building ever sold. [10] Ivana Trump said at the event that Ivana Las Vegas "is for the person who appreciates privacy and has a certain style." Trump said many of her buyers were entertainers, casino executives, and high rollers "who want privacy." [9]

Trump said she was closely involved with many of the building's aspects, including the approval of floor plans and advertising, and was also currently holding meetings with architects to create color schemes for the project. The event served as the beginning of a national sales campaign that would feature Ivana Trump. Chadwick expected the project to sell its remaining condo units in the next month as marketing and advertising increased. Some local real estate analysts, as well as Donald Trump, criticized the project's viability due to its location on the northern Las Vegas Strip, where little development had occurred in recent years. [9]

It is believed that because of its location, Ivana Las Vegas would have had a tougher time selling if it had not been for Trump's name being attached to the project. Altomare believed that new projects such as the nearby Fontainebleau Resort Las Vegas would help to improve the area. Ivana Trump believed that the project's location was the best in Las Vegas because of flight patterns from McCarran International Airport, which prevented buildings taller than 40 floors from being erected on either side of Ivana Las Vegas. Ivana Trump said, "I will forever dominate the skyline of Las Vegas." [9]

Units on the upper floors cost nearly $2,000 per square foot, which was somewhat higher in comparison to other high-rise projects. Prices for a one-bedroom unit started at $550,000, while the tower's $35 million penthouse was now expected to be 20,000 sq ft (1,900 m2), and would include nine bedrooms, a recording studio, and security measures such as retina scanners. The interiors would include stone and marble finishes. Additional amenities that were announced included a business center, a coffee shop, a pool, and a Zen garden.

The closed Holy Cow Casino served as a temporary sales office for Ivana Las Vegas. [11] The sales office was described as having the appearance of a nightclub, as it contained smoke machines, loud music, and flashing lights. [12] Construction of Ivana Las Vegas, to be handled by Turner Construction, was scheduled to begin in summer 2006 and conclude in December 2008, at a cost of $500 million. [9]

By December 14, 2005, the property had been listed for sale at a cost of $49 million. [12] [13] Sales of the tower's units were suspended, with each of the buyers eligible for a refund. [10] On December 16, 2005, Altomare said rising construction costs were responsible for the decision to put the property up for sale. [14] [15] Altomare also said he had a "very credible buyer" who wanted to add a hotel and casino to the project; the height of the tower would need to be reduced or additional nearby acreage would need to be acquired to accommodate parking for such plans. [14] The property was relisted for sale in May 2007, for $50 million. At that time, Altomare was not interested in a joint venture on the property. [16] The property sold later that year for $47 million, [17] and a two-story Walgreens was being built on the site in 2014. [18]

Related Research Articles

Trump International Hotel Las Vegas Hotel in Las Vegas, Nevada USA

The Trump International Hotel Las Vegas is a 64-story hotel, condominium, and timeshare located on Fashion Show Drive in Paradise, Nevada, named for Donald Trump. It is located down the street from Wynn Las Vegas, behind the former site of the New Frontier Hotel and Casino on 3.46 acres (14,000 m2), near the Fashion Show Mall, and features both non-residential hotel condominiums and residential condominiums. The exterior glass is infused with gold.

The Las Ramblas Resort was a proposed mixed-use project that was to be constructed in Paradise, Nevada. The project was to be located on 25 acres (10 ha) of land on Harmon Avenue, east of the Las Vegas Strip. Las Ramblas would have included 11 towers encompassing a hotel and condominium residences for a total of 4,400 units, including 300 hotel rooms. Other amenities would have included a small casino, retail stores, a spa and health club, and nightclubs. The complex would have totaled 8 million sq ft (740,000 m2), and was designed by Arquitectonica. The design was inspired by La Rambla, an open-air street in Barcelona.

The Ogden

The Ogden is a 21-story luxury condominium tower located at 150 North Las Vegas Boulevard in downtown Las Vegas, Nevada. The Ogden was announced in 2004 as the Streamline Tower condominium project, to be built on the former 1-acre (0.40 ha) property of the Golden Inn motel, which was demolished at the end of the year. Work on the property began in 2005, to prepare it for the new project, which began construction the following year. The project was financed by Corus Bank, and was developed by a half-dozen investors, including Las Vegas Stars baseball player Dusty Allen.

Panorama Towers

Panorama Towers is a high-rise condominium complex located in Paradise, Nevada. Developed by Laurence Hallier and Andrew Sasson, the $600 million aqua-blue glass 635-unit complex sits on 8.5 acres (3.4 ha) on Dean Martin Drive and is centrally located across from the Las Vegas Strip one-quarter mile (0.40 km) from CityCenter.

Sky Las Vegas

Sky Las Vegas is a 45-story luxury high-rise condominium tower with 409 units, situated on a 3-acre site on the Las Vegas Strip in Winchester, Nevada. A two-story retail project had initially been planned for the site in 2001, although it ultimately did not materialize. Plans for Sky Las Vegas were announced in July 2004, with construction beginning the following year and its opening occurring in May 2007.

Turnberry Towers

Turnberry Towers is a 45-story twin tower condominium complex in Winchester, Nevada, near the Las Vegas Strip. Initially, plans were announced in 1998 for Great Masters, a $300 million condominium project consisting of 56-story twin towers. The land was sold in 2000 to Turnberry Associates, which announced plans to build Madison Towers on the property. The $250 million condominium project would include 25-story twin towers, but the start of construction was delayed due to poor economic conditions as a result of the September 11 attacks. Conditions improved and the project was redesigned to be larger, with the new name of Turnberry Towers. Construction of the first tower began in June 2005, and was finished in 2007, followed by the completion of the second tower a year later.

Allure Las Vegas

Allure Las Vegas is a condominium tower in Las Vegas, Nevada. The 41-story, 466 ft (142 m) tower was built between 2005 and 2007 and was designed by EDI Architecture. Construction was managed by Bovis Lend Lease.

Holy Cow Casino and Brewery

Holy Cow! Casino and Brewery was a locals casino and microbrewery on South Las Vegas Boulevard, north of the Las Vegas Strip, in Las Vegas, Nevada. The property began in 1955 as Foxy's Deli, which operated until its closure in 1975. A year later, the building was reopened as a casino named Foxy's Firehouse, which later closed in 1988. Tom "Big Dog" Wiesner purchased the building and reopened it as the Holy Cow casino in 1992. Wiesner added a microbrewery the following year, making the Holy Cow the first brewery to open in Las Vegas. Wiesner persuaded the state to change its laws that had prohibited breweries from operating in Las Vegas.

Sandhurst Las Vegas is a cancelled high-rise condominium and mixed-use project that was planned for construction in downtown Las Vegas. The project was announced in October 2004, with the New Jersey-based Sandhurst Development as the developer. The project was designed by JMA Architecture and was to include a 35-story tower with 398 units. Two additional towers were also planned early in the project's history.

Majestic Las Vegas is a cancelled high-rise condominium project that was to be built on property previously occupied by the La Concha Motel on the Las Vegas Strip, in Winchester, Nevada. The project was announced by La Concha owner Lorenzo Doumani in February 2004. The 42-story condominium tower was to be accompanied by Hilton's Conrad Las Vegas, a Conrad-branded, 37-story hotel that would operate in a separate high-rise building on the same property. The project was initially expected to open in February 2006.

Las Vegas Grand is an apartment complex located east of the Las Vegas Strip in Paradise, Nevada. It was developed by Chris DelGuidice through his Florida-based company, Del American. Originally, DelGuidice planned to build apartments on the site around 2001, and he subsequently added a condominium component. The project was announced in August 2003, but the apartment aspect was removed from the project later that year because of rising construction costs. The project, to be known as Vegas Grand, was to consist of 880 condominium units.

Park Towers (Las Vegas)

Park Towers is a 20-story twin-tower condominium property located east of the Las Vegas Strip, in Paradise, Nevada. The project was announced in 1998, and began construction the following year. The property was developed by Irwin Molasky and Steve Wynn, and was completed in 2001.

The Platinum

The Platinum is a 17-story, 255-unit condo hotel located at 211 East Flamingo Road in Paradise, Nevada, east of the Las Vegas Strip. The project was approved in 2003, and began construction in 2005, as a joint venture between Diversified Real Estate Concepts, Inc. and Marcus Hotels and Resorts. The project was topped out in December 2005, and was opened in October 2006. In 2009, buyers filed lawsuits against Marcus for various allegations; the last of the lawsuits were settled in March 2013.

One Las Vegas is a condominium property in Enterprise, Nevada, south of the Las Vegas Strip. It consists of two 20-story towers with a total of 359 condominium units. Construction was underway in 2006, and the towers opened in June 2008. The following year, One Las Vegas entered foreclosure because of low sales, caused by the Great Recession.

Juhl (Las Vegas)

Juhl is a mixed-use property in downtown Las Vegas, Nevada. It features six residential buildings, including a 15-story condominium tower, in addition to restaurants and retailers. Groundbreaking took place in 2006, but construction delays pushed the opening back more than a year. It opened in June 2009, with 341 condominium units, but buyers had difficulty finalizing their condo purchases due to the effects of the Great Recession. In 2013, Juhl's 306 unsold units were sold to a partnership of companies, which turned them into rentals. In 2017, the rental units went back up for sale as condominiums.

Boca Raton is a mid-rise condominium property in Enterprise, Nevada, south of the Las Vegas Strip. The property consists of two seven-story buildings with a total of 378 units. Construction began in 2004, and the property opened in mid-2007. A second phase, consisting of two additional buildings, was canceled due to poor sales in the original buildings, a result of the Great Recession.

Club Renaissance was a proposed 60-story condominium tower that would have been built in downtown Las Vegas, Nevada. Besides residential units, other features would include office space, retail, and restaurants. The project was announced in January 2005, and construction was originally scheduled to begin later that year.

Krystle Sands was a proposed 45-story condo hotel that was to be built on the Las Vegas Strip in Winchester, Nevada. Reservations for the project's condominium units began in 2004, and construction was scheduled to start later that year, with the opening planned for 2006.

Pinnacle was a proposed two-tower condo hotel project that was to be built near the Las Vegas Strip in Paradise, Nevada. The project was announced in 2005, and would have included 1,104 units across two 36-story towers. Construction was to begin in 2006, but was delayed several times. Pinnacle was ultimately canceled in March 2008, due to financing issues caused by the Great Recession.

References

  1. Burbank, Jeff (October 24, 2005). "Ivana Trump's Vegas condo project waits". Reno Gazette-Journal. Retrieved April 29, 2020.
  2. 1 2 3 4 5 Jones, Chris (August 21, 2004). "Duo sets sights sky high". Las Vegas Review-Journal . Archived from the original on November 7, 2004.
  3. 1 2 Smith, Hubble (November 14, 2004). "Housing Market: Looking Up". Las Vegas Review-Journal. Archived from the original on December 5, 2004.
  4. 1 2 3 4 5 Shubinski, Jennifer; Negron, Sito (August 20, 2004). "Another big residential tower proposed for LV". Las Vegas Sun . Retrieved May 5, 2016.
  5. Smith, Hubble (January 27, 2005). "923-foot condo OK'd for Strip". Las Vegas Review-Journal. Archived from the original on November 16, 2005.
  6. 1 2 Rush, George; Molloy, Joanna; Piazza, Jo; Rovzar, Chris (May 31, 2005). "New Tower-Power on the Block: Ivana". New York Daily News . Retrieved May 5, 2016.
  7. 1 2 Clarke, Norm (June 1, 2005). "Ivana planning to trump The Donald". Las Vegas Review-Journal. Archived from the original on June 3, 2005.
  8. 1 2 Robison, Jennifer (July 13, 2005). "The Donald's ex-wife plans Ivana Las Vegas condominiums". Las Vegas Review-Journal. Archived from the original on January 4, 2006.
  9. 1 2 3 4 5 Robison, Jennifer (August 15, 2005). "High-Rise Development: Ivana buys into project". Las Vegas Review-Journal. Archived from the original on October 29, 2005.
  10. 1 2 Hennessey, Kathleen (December 16, 2005). "Ivana Trump selling condo property". Honolulu Advertiser . Retrieved May 5, 2016.
  11. Curtis, Anthony (May 9, 2014). "Question of the Day May 9, 2014". Las Vegas Advisor. Retrieved May 6, 2016.
  12. 1 2 Shubinski, Jennifer (December 16, 2005). "LV condos toppling before they start". Las Vegas Sun. Retrieved May 5, 2016.
  13. Smith, Hubble (December 15, 2005). "Ivana Las Vegas luxury condo tower listed for sale". Las Vegas Review-Journal. Archived from the original on December 17, 2005.
  14. 1 2 Smith, Hubble (December 16, 2005). "Development: Now you see them ..." Las Vegas Review-Journal. Archived from the original on December 30, 2005.
  15. Smith, Hubble (January 13, 2006). "No money, no labor, no way". Las Vegas Review-Journal. Archived from the original on February 5, 2006.
  16. "Ivana Las Vegas site up for sale". Las Vegas Review-Journal. May 26, 2007. Retrieved May 5, 2016.
  17. Nakashima, Ryan (October 19, 2007). "Arizona man buys piece of Las Vegas Strip for $47 million". Associated Press. Retrieved March 17, 2017.
  18. Segall, Eli (2014-08-13). "Long-abandoned corner of Las Vegas Boulevard and Sahara getting Walgreens". VegasInc. Retrieved April 29, 2020.