Majestic Las Vegas | |
---|---|
Alternative names | Conrad Las Vegas The Waldorf-Astoria Residences |
General information | |
Status | Never built |
Type | Condominiums and hotel |
Architectural style | Art Deco |
Location | Las Vegas Strip |
Town or city | Winchester, Nevada |
Country | United States |
Coordinates | 36°08′03″N115°09′42″W / 36.134224°N 115.161750°W |
Estimated completion | February 2006 |
Owner | Majestic Resorts / Conrad Hotels |
Height | 654-foot (199 m) (2006 redesign) |
Technical details | |
Floor count | 42 (initial design) 40 (2005 redesign) |
Grounds | 5.4 acres (2.2 ha) |
Design and construction | |
Architecture firm | Paul Steelman Design Group [1] |
Developer | Majestic Resorts / Conrad Hotels |
Other information | |
Number of units | 144 or 378 (initial design) 560 (2005 redesign) |
Parking | 574 (initial design) |
Website | |
Official website |
Majestic Las Vegas is a cancelled high-rise condominium project that was to be built on property previously occupied by the La Concha Motel on the Las Vegas Strip, in Winchester, Nevada. The project was announced by La Concha owner Lorenzo Doumani in February 2004. The 42-story condominium tower was to be accompanied by Hilton's Conrad Las Vegas, a Conrad-branded, 37-story hotel that would operate in a separate high-rise building on the same property. The project was initially expected to open in February 2006.
In 2005, the project was redesigned to combine the Majestic and the Conrad into a single tower. Later that year, a new two-tower design was announced as a result of rising construction costs, which made the previous one-tower design financially impossible. In 2006, it was announced that the project would again consist of a single tower, with the top 10 floors to be occupied by The Waldorf-Astoria Residences. In 2007, Majestic Resorts filed a request for arbitration against Hilton after the company pulled out of the project. The undeveloped property was sold that year for $180 million.
In 2019, Doumani received county approval to build a new version of Majestic Las Vegas on the former site of the nearby Clarion Hotel and Casino, which he had imploded four years earlier. This version of Majestic Las Vegas would be a 45-story, non-gaming hotel with 720 rooms. The project would cost $850 million and stand 620 feet, and would be located near the Las Vegas Convention Center and the Las Vegas Strip. The project has been delayed several times due to the COVID-19 pandemic, with groundbreaking rescheduled for February 2024.
In 2001, the 5.4-acre site occupied by the La Concha Motel on the Las Vegas Strip – south of the Riviera hotel and casino [2] – was approved for a 520-foot hotel tower, as well as a 645-foot condominium tower that would include a shopping mall. The property was owned by Lorenzo Doumani, whose family had owned the motel since its opening in 1961. Doumani was also the chief executive officer of a Las Vegas film company known as Majestic Entertainment. Demolition of the La Concha began in December 2003, to make room on the property for a new project that would replace it. [3]
On February 18, 2004, Doumani and Hilton Hotels Corporation announced plans for a $250 million joint project for the property that would consist of the Majestic Resort and Residences – a $150 million, 42-story condominium tower – and the Conrad Las Vegas, a $100 million, 37-story all-suite hotel. Both towers would feature an Art Deco appearance. The Conrad Las Vegas would be the third Conrad-branded hotel property to be built in the United States. Hilton stated that there were no plans to add a casino onto the property because of a lack of adequate room for one. The hotel would be aimed primarily at business travelers, while also including amenities such as a spa, a fitness center, and a heated Olympic-sized outdoor swimming pool. The hotel suites were to be an average size of 780 sq ft (72 m2), the largest in Las Vegas. [2]
The Majestic would be the second-tallest structure in Las Vegas, behind the Stratosphere tower. Although the Majestic would have fewer floors than other resort towers in Las Vegas, several of those floors would have rooms that would be taller than the standard size. Condominium units would range from 2,450 to 3,600 sq ft (228 to 334 m2), with prices between $850,000 and $3 million. The Majestic would be the first condominium project to be located on the Las Vegas Strip, and would also be accessible from Paradise Road. [2] The project would include the Majestic Court and Marketplace, consisting of 100,000 sq ft (9,300 m2) of restaurants and shops that would be located on three floors. [4] The project would also include a four-story, 574-space parking garage. [2] A sales office for Majestic was expected to open in late February 2004. [4] The Majestic Las Vegas was to include either 144 condominium units, [4] or 378, [2] while the Conrad Las Vegas would include either 442 rooms, [5] [4] or 378 as well. [2] [6]
Lorenzo Doumani also announced that his father, Ed Doumani, would serve as construction manager on the project. Other members of the Doumani family were also partners in the project. The property, occupied by the remaining structures of the La Concha, was expected to be cleared by July 4, 2004, with construction scheduled to begin in November or December 2004. At the time, discussions were underway to choose a contractor. Negotiations were also being held with the Las Vegas Monorail Company to develop a track that would allow the monorail to pass through the new project. An adjacent Peppermill restaurant south of the property was to remain open during the construction. The project was expected to open in February 2006. [2]
By April 2005, plans for a second tower on the property were cancelled because of a dispute regarding an adjacent condominium project by a different development company, which caused investors to become unsure about the Majestic/Conrad project. [7] The project was redesigned to include only one tower on the property that would combine the Conrad hotel and Majestic condominium units. [8] [1] The La Concha's shell-shaped lobby, the only structure on the property that was not demolished, was converted into a sales office for Majestic. [9] In June 2005, sales for Majestic were put on hold because of rising construction costs. [10]
In September 2005, Lorenzo Doumani announced plans for a redesigned two-tower version of Majestic Las Vegas, which was the result of heightened construction costs that had increased 15 percent in the previous 12 months, making it financially impossible to build the project as previously planned. Doumani stated that building one tower would cost $520 million, compared to $600 million for the construction of two towers. In addition, Doumani announced that condominium prices would be raised $200,000 to help finance the project. [8]
With the redesign, a 60-story tower would be used for the Conrad Hotel, with 500 suites, while the condominium tower would be approximately 40 stories and would include 560 units. Plans for the redesigned project were to be finalized in early October 2005. Lorenzo Doumani said he was in the process of locating a contractor for the project, after previously signing with a contractor twice that ultimately became too expensive. Groundbreaking was planned for spring or early summer 2006, with construction of the two towers expected to take 22 months. [8] The Doumanis had wanted to use the La Concha's shell-shaped lobby as the entrance to Majestic Las Vegas' shops or to a club. However, the lobby could not be worked into the design. [11]
Construction was on hold as of November 2005. [12] In October 2006, it was announced that the project would consist of a single 654-foot tower that would contain the Conrad Las Vegas and the condominiums, while the top 10 floors would be occupied by The Waldorf=Astoria Residences. [13] Construction was scheduled to begin in April 2007, with completion in 2009. [1]
In August 2007, Lorenzo Doumani announced that the project was on hold; [1] he later stated that after Hilton was sold to The Blackstone Group in 2007, the company pulled out of the project. [14] In October 2007, the Doumani family sold the undeveloped property to an affiliate of Triple Five Nevada Development Corporation, a real estate development company. The property sold for $180 million, which amounted to a near-record of $33.1 million per acre, [15] and was later put up for sale in 2014, at a price of $16 million per acre. [16] Triple Five still owned the undeveloped site as of 2019. [17]
In 2007, Majestic Resorts filed a request for arbitration, alleging that Hilton broke its 2004 management agreement to join the design, development and construction of the project by pulling out of it. [14] [18] A three-member arbitration panel rejected Majestic's claim and ordered the company to pay Hilton $834,734 to cover attorney fees, as well as an additional $319,817 in costs. Majestic alleged that one member of the panel, Richard Chernick, was biased because of his previous association with the attorney that represented Hilton in the case. The matter had been raised by Majestic prior to the panel's decision, but Chernick declined to excuse himself from the case, and the company withdrew its objection to his presence prior to the decision. Majestic appealed the case to a District Court judge, who ruled in favor of Hilton. In 2010, the Supreme Court of Nevada upheld the decision. [18]
In September 2011, Hilton filed a lawsuit against Majestic Resorts and the Doumani family to obtain the $1.1 million from the arbitration case, which the company had yet to receive despite the family's $180 million sale of the property. Hilton alleged that in October 2007, after selling the property, Majestic distributed $169 million to its shareholders – members of the Doumani family – leaving the company with $355,000 in cash assets. According to the lawsuit, Lorenzo Doumani later distributed $200,000 to himself. Hilton alleged that such transfers of money were fraudulent and were intended to "hinder, delay and/or defraud Hilton." [15] Lorenzo Doumani said he would fight the lawsuit. [14]
On April 11, 2005, a lawsuit was filed against Hilton by the Conrad Hotel, a two-story 30-room hotel in downtown Las Vegas that opened in 1969. The owners of the Conrad Hotel said that Hilton's new hotel was causing confusion among customers; that three letters were sent to executives of the Conrad Hotels brand and were ignored; and that Hilton knew of the Conrad Hotel's existence since April 2, 2004. Hilton filed a counterclaim on May 25, 2005, believing that the hotel did not have the exclusive right to use the name. Hilton also denied the assertion of customer confusion between the two properties. [19]
By April 2005, the Doumanis had concerns that a newly proposed neighboring condominium project to the south, which would be known as Icon and would include two 48-story towers, would overshadow the Majestic/Conrad project and would block its views. The Doumanis also had concerns about traffic flow. The Related Companies, the developer of Icon, held 12 meetings with the Doumanis to devise solutions for the family's concerns. [20] Lorenzo Doumani had previously asked The Related Companies to redesign the back (north) side of their second Icon tower to resemble its front side, so that residents of Majestic would not have to face the Icon tower's brick wall. Doumani later asked the developer to rotate their Icon towers 20 degrees to avoid obstructing the views for Majestic's residents, stating, "It won't cost them millions of dollars. They'll spend more on legal fees fighting us than they would just being good neighbors at the end of the day." [21]
When the Las Vegas County Commission approved the Icon project in April 2005, Lorenzo Doumani said he would sue The Related Companies. Doumani said that investors became unsure about the project because of the dispute, resulting in the brief cancellation of a second tower on the property. [7] [22] Doumani later said that the lawsuit primarily related to a disagreement regarding access corridors, as well as proposed garbage and loading docks that would be located near the Majestic's pool. Doumani dropped the lawsuit in September 2005, after The Related Companies agreed to relocate the docks. A separate lawsuit had also been filed against The Related Company by Doumani, and was related to an easement that he believed would intrude on his property, although he and the company were discussing a solution. [8] The Icon project was ultimately cancelled. [23]
Majestic Las Vegas | |
---|---|
General information | |
Status | Proposed |
Type | Hotel |
Address | 305 Convention Center Drive |
Town or city | Paradise, Nevada |
Country | United States |
Groundbreaking | February 2024 |
Estimated completion | 2027 |
Cost | ~$1 billion |
Owner | Lorenzo Doumani |
Height | 620 feet (190 meters) |
Technical details | |
Floor count | 45 |
Design and construction | |
Developer | Lorenzo Doumani |
Other information | |
Number of rooms | 720 |
Website | |
majesticlasvegas |
In May 2019, Doumani received county approval to build Majestic Las Vegas on the former six-acre site of the nearby Clarion Hotel and Casino, which he had imploded four years earlier. For the Majestic project, Doumani spent a year trying to obtain height approval from the Federal Aviation Administration before he could get county approval. [24] [25] [26]
This version of Majestic Las Vegas would be a health-focused resort. [27] It would include a 45-story, non-gaming hotel with 720 rooms, medical offices, and convention space. [24] [25] The resort would also feature six restaurants and a 70,000 sq ft (6,500 m2) medical wellness spa. [28] [17] The spa would give physical examinations and help people improve their lifestyles. Doumani hoped for Majestic Las Vegas to become the most high-end resort in the United States. [29] The top 10 floors will contain office suites for corporations to occupy. [30] [31] Doumani hoped to attract entertainment, fashion, and technology companies. [31] The resort would be located at 305 Convention Center Drive, near the Las Vegas Convention Center and the Las Vegas Strip. [17] It will cater to business travelers, [32] taking advantage of its location across from the convention center. [31] [33]
The project, initially estimated to cost $850 million, would stand 620 feet. Groundbreaking was originally expected for April or May 2020, with completion in the first quarter of 2023. [24] [25] [17] However, the COVID-19 pandemic delayed the start of construction several times, [33] [34] [35] followed by a surge in construction costs, [36] bringing the project to nearly $1 billion. [37] Groundbreaking was rescheduled for February 2024, [38] and construction is expected to take three years, [39] with the opening rescheduled for 2027. [38] [40]
The Trump International Hotel Las Vegas is a 64-story hotel, condominium, and timeshare located on Fashion Show Drive in Paradise, Nevada, US, named for owner Donald Trump, who was later elected president of the United States. It is located down the street from Wynn Las Vegas, behind the former site of the New Frontier Hotel and Casino on 3.46 acres (14,000 m2), near the Fashion Show Mall, and features both non-residential hotel condominiums and residential condominiums. The exterior glass is infused with gold.
The Las Ramblas Resort was a proposed mixed-use project that was to be constructed in Paradise, Nevada. The project was to be located on 25 acres (10 ha) of land on Harmon Avenue, east of the Las Vegas Strip. Las Ramblas would have included 11 towers encompassing a hotel and condominium residences for a total of 4,400 units, including 300 hotel rooms. Other amenities would have included a small casino, retail stores, a spa and health club, and nightclubs. The complex would have totaled 8 million sq ft (740,000 m2), and was designed by Arquitectonica. The design was inspired by La Rambla, an open-air street in Barcelona.
W Las Vegas was a planned condo-hotel and casino resort near the Las Vegas Strip in Paradise, Nevada. It was announced in August 2005 as a joint venture between Edge Resorts and minority partner Starwood. The project was initially expected to cost $1.7 billion, and would include approximately 3,000 hotel, condo hotel, and residential units, as well as a 75,000 sq ft (7,000 m2) casino, in addition to restaurants, nightclubs, and shopping. The project initially was to be built on 21 acres (8.5 ha) located east of the Las Vegas Strip. The cost of the project ultimately increased to $2.5 billion.
Sky Las Vegas is a 45-story luxury high-rise condominium tower with 409 units, situated on a 3-acre site on the Las Vegas Strip in Winchester, Nevada. A two-story retail project had initially been planned for the site in 2001, although it ultimately did not materialize. Plans for Sky Las Vegas were announced in July 2004, with construction beginning the following year and its opening occurring in May 2007.
Allure Las Vegas is a condominium tower in Las Vegas, Nevada. The 41-story, 466 ft (142 m) tower was built between 2005 and 2007 and was designed by EDI Architecture. Construction was managed by Bovis Lend Lease.
The Fontainebleau Las Vegas is a resort and casino on the Las Vegas Strip in Winchester, Nevada. It is a sister property to Fontainebleau Miami Beach, and sits on the 24.5-acre (9.9 ha) site previously occupied by the El Rancho Hotel and Casino and the Algiers Hotel. Ownership and development has changed several times since the project was announced in May 2005. It was originally proposed by developer Fontainebleau Resorts, owned by Jeff Soffer.
The La Concha Motel was a motel that opened in 1961 and closed in 2004. It was designed by architect Paul Williams who was one of the first prominent African American architects in the United States and was also the architect who designed the first LAX theme building. It was located at 2955 Las Vegas Blvd South, on the Las Vegas Strip, in Winchester, Nevada, and was considered one of the best-preserved examples of 1950s Googie architecture. It is believed to be named after the Beach of La Concha in Spain.
The Ivana Las Vegas was a proposed 73-floor, 923-foot condominium high-rise, named after Ivana Trump. The project was initially announced in August 2004, as The Summit, and was to be constructed on the 2.17-acre site of the closed Holy Cow Casino and Brewery, located on the Las Vegas Strip in Las Vegas, Nevada. Trump became involved with the project in June 2005, when it was renamed.
Ahern Hotel and Convention Center is a boutique hotel and former casino in Las Vegas, Nevada. The resort is located on 2.5 acres (1.0 ha) of land at 300 West Sahara Avenue, near the Las Vegas Strip.
Tivoli Village is a mixed-use development center consisting of retail and office space, located on 28.43 acres (11.51 ha) at 410 South Rampart Boulevard in Las Vegas, Nevada, next to the Summerlin community. It is owned by 3D Investments.
Las Vegas Grand is an apartment complex located east of the Las Vegas Strip in Paradise, Nevada. It was developed by Chris DelGuidice through his Florida-based company, Del American. Originally, DelGuidice planned to build apartments on the site around 2001, and he subsequently added a condominium component. The project was announced in August 2003, but the apartment aspect was removed from the project later that year because of rising construction costs. The project, to be known as Vegas Grand, was to consist of 880 condominium units.
Park Towers is a 20-story twin-tower condominium property located east of the Las Vegas Strip, in Paradise, Nevada. The project was announced in 1998, and began construction the following year. The property was developed by Irwin Molasky and Steve Wynn, and was completed in 2001.
The Platinum is a 17-story, 255-unit condo hotel located at 211 East Flamingo Road in Paradise, Nevada, east of the Las Vegas Strip. The project was approved in 2003, and began construction in 2005, as a joint venture between Diversified Real Estate Concepts, Inc. and Marcus Hotels and Resorts. The project was topped out in December 2005, and was opened in October 2006. In 2009, buyers filed lawsuits against Marcus for various allegations; the last of the lawsuits were settled in March 2013.
One Las Vegas is a condominium property in Enterprise, Nevada, south of the Las Vegas Strip. It consists of two 20-story towers with a total of 359 condominium units. Construction was underway in 2006, and the towers opened in June 2008. The following year, One Las Vegas entered foreclosure because of low sales, caused by the Great Recession.
Boca Raton is a mid-rise condominium property in Enterprise, Nevada, south of the Las Vegas Strip. The property consists of two seven-story buildings with a total of 378 units. Construction began in 2004, and the property opened in mid-2007. A second phase, consisting of two additional buildings, was canceled due to poor sales in the original buildings, a result of the Great Recession.
Krystle Sands was a proposed 45-story condo hotel that was to be built on the Las Vegas Strip in Winchester, Nevada. Reservations for the project's condominium units began in 2004, and construction was scheduled to start later that year, with the opening planned for 2006.
Pinnacle was a proposed two-tower condo hotel project that was to be built near the Las Vegas Strip in Paradise, Nevada. The project was announced in 2005, and would have included 1,104 units across two 36-story towers. Construction was to begin in 2006, but was delayed several times. Pinnacle was ultimately canceled in March 2008, due to financing issues caused by the Great Recession.
The Gramercy is a mixed-use development project in Spring Valley, Nevada, west of the Las Vegas Strip. It includes two office buildings and 160 apartment units. Gemstone Development began construction of the project, originally known as ManhattanWest, in 2007. The project initially was to include condominiums, retail, and office space. Construction was suspended in December 2008, because of financial problems. ManhattanWest was sold in 2013, and construction resumed, with the project now known as The Gramercy. It opened in November 2014. An unfinished nine-story condominium tower was imploded in February 2015, as completing it would have been too costly.
Dream Las Vegas is a boutique hotel and casino currently on hold on the southern Las Vegas Strip in Paradise, Nevada. It is being developed by Shopoff Realty Investments and the real estate firm Contour. Dream Las Vegas was announced in February 2020, and construction was expected to begin within a year. However, the project was delayed after the Transportation Security Administration raised numerous safety concerns, regarding its proximity with Harry Reid International Airport.
Tarsadia Hotels, a private hotel company based in Orange County, Calif., has reportedly purchased the 5-acre site of the canceled Icon high-rise condo project on Convention Center Drive from Related Las Vegas for $37 million.