Kainji Dam

Last updated
Kainji Dam
River Niger at Kainji Dam Niger State.jpg
Nigeria relief location map.jpg
Red pog.svg
Map of Nigeria showing the location of Kainji Dam.
Location Kainji, Niger, Nigeria
Coordinates 09°51′45″N04°36′48″E / 9.86250°N 4.61333°E / 9.86250; 4.61333
Construction began1964
Opening date1968
Construction cost US$209 million
Owner(s) Federal Government of Nigeria
Operator(s) Mainstream Energy
Dam and spillways
Impounds Niger River
Height65 m (213 ft)
Length550 m (1,804 ft)
Reservoir
Creates Kainji Lake
Power Station
Commission date1968
Turbines 8
Installed capacity 760 megawatts (1,020,000 hp)
960 megawatts (1,290,000 hp) (max)
Kainji Dam Kainji Dam 10.jpg
Kainji Dam

Kainji Dam is a dam across the Niger River in Niger State of Central Nigeria. [1] Construction of the dam was carried out by Impregilo (a consortium of Italian Civil Engineering Contractors) to designs by Joint Consultants, Balfour Beatty and Nedeco, and began in 1964 to be completed in 1968. [2] The total cost was estimated at US$209 million (equivalent to about US$1.4 billion in 2022 dollars [3] ), with one-quarter of this amount used to resettle people displaced by the construction of the dam and its reservoir, Kainji Lake. [4] [5]

Contents

Dimensions

Kainji Dam extends for about 10 kilometres (6.2 mi), including its saddle dam, which closes off a tributary valley. The primary section across the outflow to the Niger is 550 metres (1,800 ft). Most of the structure is made from earth, but the centre section, housing the hydroelectric turbines, was built from concrete. This section is 65 metres (213 ft) high. Kanji Dam is one of the longest dams in the world. [6]

Power station

The dam was designed to have a generating capacity of 960 megawatts (1,290,000 hp); however, only 8 of its 12 turbines have been installed, reducing the capacity to 760 megawatts (1,020,000 hp). [7] The dam generates electricity for all the large cities in Nigeria. [8] Some of the electricity is sold to the neighbouring country of Niger. In addition, occasional droughts have made the Niger's water flow unpredictable, diminishing the dam's electrical output. [9]

Lock

The dam has a single-lock chamber capable of lifting barges 49 metres (161 ft).

Discharge flooding

In October 1998, in response to upstream flooding, a torrent of water was released from the dam, bursting the river banks. Downstream from the dam 60 villages were flooded. Domestic animals drowned and dikes as well as several farms were washed away. Dam officials were criticized for waiting too long before starting, then dumping too much water. [10]

Lake Kainji

Kainji Lake measures about 135 kilometres (84 mi) long and about 30 kilometres (19 mi) at its widest point, and supports irrigation and a local fishing industry. [11] In 1999, uncoordinated opening of floodgates led to local flooding of about 60 villages. [12]

See also

Related Research Articles

<span class="mw-page-title-main">Dartmouth Dam</span> Dam in Victoria

Dartmouth Dam is a large rock-fill embankment dam with an uncontrolled chute spillway across the Mitta Mitta, Gibbo and Dart rivers, the Morass Creek and a number of small tributaries. The dam is located near Mount Bogong in the north-east of the Australian state of Victoria. The dam's purpose includes irrigation, the generation of hydro-electric power, water supply and conservation. The impounded reservoir is called Dartmouth Reservoir, sometimes called Lake Dartmouth. The Dartmouth Power Station, a hydro-electric power station that generates power to the national grid, is located near the dam wall.

<span class="mw-page-title-main">Lake Chad</span> Lake in Central Africa

Lake Chad is an endorheic freshwater lake located at the junction of boundaries of Nigeria, Niger, Chad, and Cameroon in western and central Africa respectively. It is also an important wetland ecosystem in West Africa. The catchment area of Lake Chad is 1 million square kilometres (390,000 sq mi). In the 19th century, Lake Chad was substantially larger with an area of 28,000 square kilometres (11,000 sq mi). However, due to climate change and human water diversion, Lake Chad has been greatly reduced since the mid-1970s, and its area has fluctuated between 2,000 and 5,000 square kilometres.

<span class="mw-page-title-main">Akosombo Dam</span> Dam in Akosombo, Ghana

The Akosombo Dam, also known as the Volta Dam, is a hydroelectric dam on the Volta River in southeastern Ghana in the Akosombo gorge and part of the Volta River Authority. The construction of the dam flooded part of the Volta River Basin and led to the subsequent creation of Lake Volta. Lake Volta is the largest man-made lake in the world by surface area. It covers 8,502 square kilometres (3,283 sq mi), which is 3.6% of Ghana's land area. With a volume of 148 cubic kilometers, Lake Volta is the world's third largest man-made lake by volume; the largest being Lake Kariba which contains 185 cubic kilometers of water.

<span class="mw-page-title-main">Eildon Dam</span> Dam in Victorian Alps, Victoria

The Eildon Dam is a rock and earth-fill embankment dam with a controlled spillway across the Goulburn River, is located between the regional towns of Mansfield and Eildon within Lake Eildon National Park, in the Alpine region of Victoria, Australia. The dam's purpose is for the supply of potable water, irrigation, and the generation of hydroelectricity. The impounded reservoir is called Lake Eildon.

<span class="mw-page-title-main">Wivenhoe Power Station</span> Dam in Wivenhoe Pocket, Queensland

The Wivenhoe Power Station is situated between the Splityard Creek Dam and Lake Wivenhoe. The Splityard Creek Dam is situated in hills adjacent to Lake Wivenhoe and is about 100 metres (330 ft) above it.

<span class="mw-page-title-main">Kainji Lake</span> Reservoir

Kainji Lake, in North Central Nigeria, is a reservoir on the Niger River, formed by the Kainji Dam. It was formed in 1968 and is a part of Niger State and Kebbi State. Kainji Lake National Park (KNLP), situated around the lake, is Nigeria's oldest National Park, established in 1976.

<span class="mw-page-title-main">Blowering Dam</span> Dam in Snowy Mountains, New South Wales

The Blowering Dam is a major ungated rock fill with clay core embankment dam with concrete chute spillway impounding a reservoir under the same name. It is located on the Tumut River upstream of Tumut in the Snowy Mountains region of New South Wales, Australia. Purposes for the dam include flood mitigation, hydro-power, irrigation, water supply and conservation. The dam is part of the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro.

<span class="mw-page-title-main">Dalešice Hydro Power Plant</span> Upgraded Czech dam

Dalešice Hydro Power Plant is a power plant on the Jihlava River in the Czech Republic. It has four Francis turbines with a nominal capacity of 120 megawatts (160,000 hp) each and a total capacity of 480 megawatts (640,000 hp). The old turbines before the 1999–2007 reconstruction had a capacity of 112.5 megawatts (150,900 hp) each. The plant includes the lower Dalešice-Mohelno Reservoir.

The Lake Echo Power Station is a conventional hydroelectric power station located in the Central Highlands region of Tasmania, Australia. The power station is situated on the Upper River Derwent catchment and is owned and operated by Hydro Tasmania.

Pindari Dam is a minor concrete faced rockfill embankment dam with an ungated uncontrolled rock cut with concrete sill spillway across the Severn River located upstream of the town of Ashford, in the North West Slopes region of New South Wales, Australia. The dam's purpose includes flood mitigation, hydro-power, irrigation, water supply and conservation. The impounded reservoir is called Lake Pindari.

<span class="mw-page-title-main">Shahid Abbaspour Dam</span> Dam in Khuzestan, Iran

The Shahid Abbaspour Dam, formerly known as Great Reza Shah Kabir Dam before the 1979 Revolution, is a large arch dam providing hydroelectricity from the Karun River; it is located about 50 kilometres (31 mi) northeast of Masjed Soleiman, in the province of Khuzestan, Iran, and originally completed in 1976. The dam was the first of a series of dams planned for development on the Karun River.

<span class="mw-page-title-main">Atiamuri Power Station</span>

Ātiamuri Power Station is a hydroelectric power station on the Waikato River, in the North Island of New Zealand. It is the third of eight hydroelectric power stations on the Waikato River. The station can easily be seen from State Highway 1 between Taupō and Tokoroa.

<span class="mw-page-title-main">Jebba Hydroelectric Power Station</span> Power station in Nigeria

The Jebba Hydroelectric Power Station, also Jebba Power Station, is a hydroelectric power plant across the Niger River in Nigeria. It has a power generating capacity of 578.4 megawatts, enough to power over 364,000 homes. The plant was commissioned on 13 April 1985, although commercial energy production began in 1983.

The Kpong Dam, also known as the Akuse Dam, is a hydroelectric power generating dam on the lower Volta River near Akuse in Ghana. It is owned and operated by Volta River Authority. It was constructed between 1977 and 1982. Its power station has a capacity of 148 megawatts (198,000 hp) with all four units running, though the total nameplate capacity is 160 megawatts (210,000 hp).

<span class="mw-page-title-main">Cahora Bassa Dam</span> Dam in Tete, Mozambique

The Cahora Bassa Dam is located in Mozambique. It is one of two major dams on the Zambezi river, the other being the Kariba. The dam was finished in December 1974 after much political debate. This dam is used to convert the Zambezi River power into electricity by turning turbines. That energy is then sent to South Africa. The Cahora Bassa dam forms Cahora Bassa Lake. The dam is jointly owned by Mozambique and Portugal. From independence until 2007, eighteen percent of the dam and lake was owned by Mozambique and eighty-two percent by Portugal. Portugal sold down its share to 15 percent in 2007. The Cahora Bassa dam is the largest hydroelectric power plant in southern Africa and the most efficient power generating station in Mozambique.

<span class="mw-page-title-main">Aldeadávila Dam</span> Dam in Province of Salamanca, Spain

The Aldeadávila Dam is a Spanish concrete arch-gravity dam, straddling the border between Spain and Portugal on the Duero River. The nearest town is Aldeadávila de la Ribera in the Province of Salamanca, about 11.3 kilometres (7.0 mi) to the east. The nearest Portuguese town is Fornos in Bragança District, about 8 kilometres (5.0 mi) to the southwest. The Portuguese side of the river around the dam site lies within the Arribes del Duero Natural Park.

<span class="mw-page-title-main">Paulo Afonso Hydroelectric Complex</span> Brazilian hydroelectric project

The Paulo Afonso Hydroelectric Complex, also known as the Paulo Afonso Complex, is a system of three dams and five hydroelectric power plants on the São Francisco River near the city of Paulo Afonso in Bahia, Brazil. The complex exploits an 80-metre (260 ft) natural gap on the river, known as the Paulo Afonso Falls. Constructed in succession between 1948 and 1979, the dams support the Paulo Afonso I, II, III, IV and Apollonius Sales (Moxotó) power plants which contain a total of 23 generators with an installed capacity of 4,279.6 megawatts (5,739,000 hp).

<span class="mw-page-title-main">Okuyoshino Pumped Storage Power Station</span> Dam in Totsukawa

The Okuyoshino Pumped Storage Power Station (奥吉野発電所) is located 15 kilometres (9.3 mi) north of Totsukawa in Nara Prefecture, Japan. Using the pumped-storage hydroelectric method, the power plant has an installed capacity of 1,206 megawatts (1,617,000 hp). To accomplish power generation, the power station shifts water between two reservoirs, the lower Asahi Reservoir and the upper Seto Reservoir. Construction on both the Asahi and Seto Dams began in 1971 and was complete in 1978. The power station was commissioned in 1980. Due to heavy sediment and turbidity in the Seto Reservoir, caused by logging and landslides upstream, a sediment bypass tunnel was constructed between 1992 and 1998.

Zungeru Hydroelectric Power Station is a 700 megawatts (940,000 hp) hydroelectric power plant under construction in Niger State, Nigeria. When completed, as expected, it will be the second-largest hydroelectric power station in the country, behind the 760 megawatts (1,020,000 hp) Kainji Hydroelectric Power Station.

References

  1. "Niger Community Demands Renaming Of Zungeru Dam To Theirs, Lament Injustice In Retaining Current Name". Sahara Reporters. 2021-08-15. Retrieved 2022-02-23.
  2. "Niger River - Hydrology, Basin, Delta | Britannica". www.britannica.com. Retrieved 2023-07-20.
  3. Johnston, Louis; Williamson, Samuel H. (2023). "What Was the U.S. GDP Then?". MeasuringWorth. Retrieved November 30, 2023. United States Gross Domestic Product deflator figures follow the Measuring Worth series.
  4. "Sarafinchin / Kainji and Jebba Dams, Niger River, Nigeria" . Retrieved 2023-07-20.
  5. Simwa, Adrianna (2018-05-04). "Kainji Dam: interesting facts about the biggest dam in Nigeria". Legit.ng - Nigeria news. Retrieved 2023-07-20.
  6. "An inside look at Kainji Dam". Daily Trust Online. Archived from the original on October 14, 2012. Retrieved July 21, 2012.
  7. "An inside look at Kainji Dam". Daily Trust Online. Archived from the original on October 14, 2012. Retrieved July 18, 2012.
  8. "Construction of the Kainji Dam and Lake". Environment & Society Portal. Retrieved 2023-07-20.
  9. Guardian, The (2017-03-29). "Upgrading Kainji dam and improving electricity". The Guardian Nigeria News - Nigeria and World News. Retrieved 2023-07-20.
  10. "The dam which brought disaster". 2009-07-26. Archived from the original on 2009-07-26. Retrieved 2020-02-07.
  11. "Tajikistan to Export Electricity to Afghanistan" . Encyclopædia Britannica. Retrieved July 18, 2012.
  12. "The dam which brought disaster". Archived from the original on 2009-07-26. Retrieved 2008-06-09.