Kaniv Hydroelectric Power Plant

Last updated
Kaniv Hydroelectric Power Plant
Kn ges-1.jpg
The dam of Kaniv Hydroelectric Power Plant
Cherkasy province physical map.svg
Red pog.svg
Location of Kaniv Hydroelectric Power Plant in Cherkasy Oblast
Location Kaniv, Ukraine
Coordinates 49°45′59.5″N31°28′18.2″E / 49.766528°N 31.471722°E / 49.766528; 31.471722 Coordinates: 49°45′59.5″N31°28′18.2″E / 49.766528°N 31.471722°E / 49.766528; 31.471722
Construction began1964
Opening dateNovember 4, 1972 (first turbine) – April 16, 1975 (completion)
Owner(s) Government of Ukraine
Dam and spillways
Type of dam power plant
Impounds Dnieper River
Height39.5 m (130 ft)
Length343 m (1,125 ft)
Spillway capacity13,200  m3/s (466,154  cu ft/s)
Reservoir
Creates(Run-of-river)
Total capacity2.6 km3 (1 cu mi)
Power Station
Operator(s) Ukrhydroenergo
Turbines 24 x 18.5 MW
Installed capacity 444 MW
Annual generation 972 GWh

Kaniv Hydroelectric Power Plant is a hydroelectricity generating complex on the Dnieper River in Kaniv, Ukraine. It is operated by the Ukrhydroenego that is part of the state company Energy Company of Ukraine.

Contents

The power plant was projected by the Ukrainian department of project-research institute "UkrHydroProject" of S.Zhuk. The construction was conducted by several specialized in this field companies. During the construction also there was built a small settlement for the power plant's working personnel.

Turbines for the plant were produced by the Kharkiv Factory "Turboatom", generators - Kharkiv Factory "Elektrovazhmash".

The dam has a lock to allow water travel along the Dnieper river. It is a single-stage, a single chamber lock. The lock's size is 288 by 18 metres (945 ft × 59 ft).

History

In 1997, the Kaniv Hydroelectric Power Plant started to be renovated. The first stage lasted until June 2002, while the second one - 2017. The first stage was financed through the IBRD, while the second World Bank invested $106 million with the addition of the Ukrainian government budget.

See also

Related Research Articles

<span class="mw-page-title-main">Dnieper</span> Longest river of Ukraine and Belarus

The Dnieper or Dnipro is one of the major transboundary rivers of Europe, rising in the Valdai Hills near Smolensk, Russia, before flowing through Belarus and Ukraine to the Black Sea. It is the longest river of Ukraine and Belarus and the fourth-longest river in Europe, after the Volga, Danube, and Ural rivers. It is approximately 2,200 km (1,400 mi) long, with a drainage basin of 504,000 square kilometres (195,000 sq mi).

<span class="mw-page-title-main">Kaniv</span> Town in Cherkasy Oblast, Ukraine

Kaniv city located in Cherkasy Raion, Cherkasy Oblast (province) in central Ukraine. The city rests on the Dnieper River, and is also one of the main inland river ports on the Dnieper. It hosts the administration of Kaniv urban hromada, one of the hromadas of Ukraine. Population: 23,503

<span class="mw-page-title-main">Kárahnjúkar Hydropower Plant</span> Dam

Kárahnjúkar Hydropower Plant, officially called Fljótsdalur Power Station is a hydroelectric power plant in Fljótsdalshérað municipality in eastern Iceland, designed to produce 4,600 gigawatt-hours (17,000 TJ) annually for Alcoa's Fjarðaál aluminum smelter 75 kilometres (47 mi) to the east in Reyðarfjörður. With the installed capacity of 690 megawatts (930,000 hp), the plant is the largest power plant in Iceland. The project, named after the nearby Kárahnjúkar mountains, involves damming the rivers Jökulsá á Dal and Jökulsá í Fljótsdal with five dams, creating three reservoirs. Water from the reservoirs is diverted through 73 kilometres (45 mi) of underground water tunnels and down a 420-metre (1,380 ft) vertical penstock towards a single underground power station. The smelter became fully operational in 2008 and the hydropower project was completed in 2009.

<span class="mw-page-title-main">Zaporizhzhia</span> City and administrative centre of Zaporizhzhia Oblast, Ukraine

Zaporizhzhia is a city in southeast Ukraine, situated on the banks of the Dnieper river. It is the administrative centre of the Zaporizhzhia Oblast (region). Zaporizhzhia has a population of 710,052 as of 1 January 2022.

<span class="mw-page-title-main">Dnieper Hydroelectric Station</span> Dam in Zaporizhzhia

The Dnieper Hydroelectric Station, also known as Dneprostroi Dam, in the city of Zaporizhzhia, Ukraine, is the largest hydroelectric power station on the Dnieper river. It is the fifth step of the Dnieper cascade of hydroelectric stations that provides electric power for the Donets–Kryvyi Rih Industrial region. The Dnieper Reservoir stretches 129 km upstream to near Dnipro city.

<span class="mw-page-title-main">Vyshhorod</span> City in Kyiv Oblast, Ukraine

Vyshhorod is a city in Kyiv Oblast (region) in central Ukraine, situated immediately north of Kyiv city, the national capital, and part of the Kyiv metropolitan area. It is on the right (western) bank of the Dnieper river and, as the location of the Kyiv Hydroelectric Power Plant, the northern part of the city is beside the Kyiv Reservoir. It is the administrative center of Vyshhorod Raion and hosts the administration of Vyshhorod urban hromada, one of the hromadas of Ukraine.

<span class="mw-page-title-main">Dnieper reservoir cascade</span> Flood control system in Ukraine

The Dnieper reservoir cascade or Dnieper cascade of hydroelectric power stations is a series of dams, reservoirs and hydroelectric power stations on the Dnieper river in Ukraine. It was created to prevent uncontrolled flooding and improve water transportation infrastructure. Coordination and operation of all dams on the Dnieper is conducted by government company Ukrhydroenergo. In 1970, the Kyiv dam partially prevented flooding in comparison with the 1931 Kyiv flooding.

<span class="mw-page-title-main">Kaniv Reservoir</span> Body of water

The Kaniv Reservoir is a water reservoir located on the Dnieper River in Ukraine. Named after the city of Kaniv, it covers a total area of 675 square kilometers within the Cherkasy and Kyiv Oblasts. It was created in 1972 following construction of the dams of the Kaniv Hydroelectric Power Plant on the Dnieper River. Along with the Kakhovka Reservoir, the Dnipro Reservoir, the Kamianske Reservoir, the Kremenchuk Reservoir, and the Kyiv Reservoir, it has created a deep-water route on the Dnieper, allowing ships to sail upstream as far as the Prypiat River.

<span class="mw-page-title-main">Rybinsk Hydroelectric Station</span>

Rybinsk Hydroelectric Station or Rybinsk GES is a hydroelectric station on the Volga and the Sheksna rivers in Yaroslavl Oblast near the Rybinsk town. it is the third of the Volga-Kama Cascade of dams.

<span class="mw-page-title-main">Tucuruí Dam</span> Dam in Pará, Brazil

The Tucuruí Dam is a concrete gravity dam on the Tocantins River located on the Tucuruí County in the State of Pará, Brazil. The main purpose of the dam is hydroelectric power production and navigation. It is the first large-scale hydroelectric project in the Brazilian Amazon rainforest. The installed capacity of the 25-unit plant is 8,370 megawatts (11,220,000 hp). Phase I construction began in 1980 and ended in 1984 while Phase II began in 1998 and ended in 2010. The dam was featured in the 1985 film The Emerald Forest.

Energy Company of Ukraine is a dissolved state-owned holding company for electricity assets in Ukraine under Ministry of Fuel and Energy. On 4 September 2014, the Government of Ukraine decided to dissolve the company. The process should be carried out within five months.

The Dniester Pumped Storage Power Station is a pumped storage hydroelectric scheme that uses the Dniester River 8 kilometres (5.0 mi) northeast of Sokyriany in Chernivtsi Oblast, Ukraine. Currently, four of seven 324-megawatt (434,000 hp) generators are operational and when complete in 2028, the power station will have an installed capacity of 2,268 megawatts (3,041,000 hp).

<span class="mw-page-title-main">Ukrhydroenergo</span> Ukrainian hydro power company

PJSC «Ukrhydroenergo» is a state company of Ukraine that administers a cascade of major hydro power plants along Dnieper and Dniester rivers. Private Joint Stock Company «Ukrhydroenergo» is Ukraine's main hydropower generating company. It is capable of covering peak loads and providing FCAS for the United Energy Systems of Ukraine (UESU). The company generates electricity at the industry's lowest production cost per kWh. Hydroelectricity is a renewable energy source, and does not require the combustion of fossil fuels in its operation.

<span class="mw-page-title-main">Kyiv Hydroelectric Power Plant</span> Dam in Vyshhorod, Ukraine

Kyiv Hydroelectric Station is a run-of-river power plant on the Dnieper River in Vyshhorod, Ukraine. The 288 m (945 ft) long dam creates the Kyiv Reservoir with the purpose of hydroelectric power generation and navigability with the dam's associated lock. The first of 20 generators in the power station was commissioned in 1964, the last in 1968. Together with the Kyiv Pumped Storage Power Station, it creates a hydroelectricity generating complex. It is operated by the Ukrhydroenergo. Turbines for the plant were produced by the Kharkiv Factory Turboatom, and generators by the Kharkiv Factory "Elektrovazhmash".

<span class="mw-page-title-main">Kyiv Pumped Storage Power Plant</span> Power station in Ukraine

The Kyiv Pumped-Storage Power Plant is a pumped-storage power station on the west bank of the Kyiv Reservoir in Vyshhorod, Ukraine. The Kyiv Reservoir serves as the lower reservoir and the upper reservoir is located 70 m (230 ft) above the lower. Water sent from the upper reservoir generates electricity with three 33.3 megawatts (44,700 hp) conventional hydroelectric generators and three 45 megawatts (60,000 hp) reversible pump-generators. During periods of low demand, such as night time, the pump-generators push water from the lower reservoir to the upper for use during peak hours. The first generator was commissioned in 1970, the last in 1972.

<span class="mw-page-title-main">Middle Dnieper Hydroelectric Station</span> Dam in Kamianske, Ukraine

The Middle Dnieper Hydroelectric Station is a run-of-river power plant on the Dnieper River in Kamianske, Ukraine, operated by Ukrhydroenergo.

<span class="mw-page-title-main">Kakhovka Hydroelectric Power Plant</span> Dam and power plant in Kherson, Ukraine

The Kakhovka Hydroelectric Station is a run-of-river power plant on the Dnieper River in Nova Kakhovka, Ukraine. Nova Kakhovka is a port city located on the reservoir's southern bank. The primary purposes of the dam are hydroelectric power generation, irrigation and navigation. It is the 6th and the last dam in the Dnieper reservoir cascade. The deep water channel allows shipping up and down river. The facility also includes a winter garden.

<span class="mw-page-title-main">Kremenchuk Hydroelectric Power Plant</span> Dam in Svitlovodsk, Ukraine

The Kremenchuk Hydroelectric Power Plant is a run-of-river power plant on the Dnieper River just upstream of Kremenchuk in Svitlovodsk, Ukraine. The primary purpose of the dam is hydroelectric power generation and navigation. It is the third dam in the Dnieper cascade and creates the largest reservoir on the river. The dam has an associated lock and a power station with an installed capacity of 624 megawatts (837,000 hp). Construction on the dam began in May 1954, the reservoir began to fill in October 1959, the last generator was commissioned in 1960 and the dam and power plant were inaugurated in 1961. It is operated by Ukrhydroenergo.

Hydroelectricity in Ukraine is quite developed branch of power engineering. State operating company is Ukrhydroenergo and Energoatom. Design of main power plants is carried out by Ukrhydroproject.