Keilor East railway station

Last updated

Keilor East
PTV commuter rail station
General information
LocationNear border of Keilor East, Keilor Park and Airport West (exact location to be confirmed)
Australia
Owned by VicTrack (projected)
Operated by Metro Trains (projected)
Line(s) Melbourne Airport
Platforms2
Tracks4
Construction
Structure typeGround
ParkingYes
AccessibleYes—step free access
Other information
StatusUnder Construction
Fare zone Myki Zone 2
History
Opened2029 (projected)
Electrified1500 V DC overhead
Services
Preceding station Melbourne train logo.svg Metro Trains Following station
Sunshine
towards Cranbourne or Pakenham
Melbourne Airport
(under construction)
Melbourne Airport
Terminus

Keilor East railway station is a railway station currently under construction as a part of the Melbourne Airport railway line that will serve the suburbs of Keilor East, Keilor Park and Airport West. It is scheduled to open in 2029. [1]

Contents

History

The Melbourne Airport Rail project plans to build a new Metro line through the north-west of Melbourne using the rail reservation currently used by the Albion-Jacana freight corridor. Since the announcement of the project, local councils have advocated for a station to be added to serve nearby suburbs, arguing the area is currently underserved by public transport. [2]

In September 2022, the Victorian Government announced the project would add a station on the border of Keilor East and Airport West, connecting 150,000 people to the metropolitan rail network. [3] [4] According to media reports, the Government did not plan to include the new station in the initial project, but after local advocacy and the public intervention of Public Transport Minister Ben Carroll in parliament, the project's business case was supplemented to add the station. [5]

The Government's supplementary business case argued delivering the station at the same time as the link would save 15% compared with building the station after the line was operational. [6]

Services and platforms

The station will be situated along the Melbourne Airport rail link, as part of two planned stations along the line. Trains will run from Melbourne Airport to Keilor East before continuing to Sunshine, through the Metro Tunnel and then along the Pakenham/Cranbourne lines. [7] Services are planned to run every ten minutes all-day. [3]

Trains will take 6 minutes to travel to Melbourne Airport, 8 minutes to Sunshine, and 27 minutes to the Melbourne CBD. [8]

Related Research Articles

<span class="mw-page-title-main">Sunshine railway station, Melbourne</span> Railway station in Melbourne, Australia

Sunshine railway station is located on the Sunbury line in Victoria, Australia. Originally named Braybrook Junction for the convergence of the major railways from central Melbourne to Ballarat and Bendigo, it was renamed when the suburb of Sunshine, which it serves, took its name from the nearby Sunshine Harvester Works. With the expansion of the railway network in Melbourne's west, Sunshine grew in importance, with cross-suburban goods routes constructed to Newport and from the adjacent Albion to Jacana line. From the mid-20th century, it became an interchange for the main interstate routes to South Australia and New South Wales, when the through line from Melbourne to Sydney was completed, although the main line to Adelaide was later diverted. In the early 21st century, the station was demolished and reconstructed to serve the diversion of the main passenger route to Geelong and beyond. It has been identified as a possible route for a future line to Melbourne Airport and as an interchange for the orbital Suburban Rail Loop.

<span class="mw-page-title-main">Albion railway station, Melbourne</span> Railway station in Melbourne, Australia

Albion railway station is located on the Sunbury line in Victoria, Australia. It serves the western Melbourne suburb of Albion, and it opened on 5 January 1860 as Albion and Darlington. It closed on 1 January 1861, and reopened on 24 March 1891 as Albion.

<span class="mw-page-title-main">Essendon railway station</span> Railway station in Melbourne, Australia

Essendon railway station is located on the Craigieburn line in Victoria, Australia. It serves the northern Melbourne suburb of Essendon, and it opened on 1 November 1860.

<span class="mw-page-title-main">Deer Park railway station</span> Railway station in Melbourne, Australia

Deer Park railway station is located on the Serviceton line in Victoria, Australia. It serves the western Melbourne suburb of Deer Park, and it opened on 2 April 1884 as Kororoit. It was renamed Deer Park on 3 December 1889.

<span class="mw-page-title-main">Lilydale railway line</span> Passenger rail service in Melbourne, Victoria

The Lilydale line is a commuter railway line in the city of Melbourne, Victoria, Australia. Operated by Metro Trains Melbourne, it is the city's sixth longest metropolitan railway line at 37.8 kilometres (23.5 mi). The line runs from Flinders Street station in central Melbourne to Lilydale station in the east, serving 27 stations via Burnley, Box Hill, Ringwood, and Croydon. The line operates for approximately 19 hours a day with 24 hour service available on Friday and Saturday nights. During peak hour, headways of up to 15 minutes are operated with services every 20-30 minutes during off-peak hours. Trains on the Lilydale line run with a two three-car formations of X'Trapolis 100 trainsets.

<span class="mw-page-title-main">Proposed Melbourne rail extensions</span> Extensions to the Melbourne rail network

Proposals for expansion of the Melbourne rail network are commonly presented by political parties, government agencies, industry organisations and public transport advocacy groups. The extensions proposed take a variety of forms: electrification of existing routes to incorporate them into the suburban rail system; reconstruction of former passenger rail lines along pre-existing easements; entirely new routes intended to serve new areas with heavy rail or provide alternative routes in congested areas; or track amplification along existing routes to provide segregation of services. Other proposals are for the construction of new or relocated stations on existing lines, to provide improved access to public transport services.

<span class="mw-page-title-main">Pakenham railway line</span> Passenger rail service in Melbourne, Victoria

The Pakenham line is a commuter railway line in the city of Melbourne, Victoria, Australia. Operated by Metro Trains Melbourne, it is the city's longest metropolitan railway line at 57 kilometres (35 mi). The line runs from Flinders Street station in central Melbourne to Pakenham station in the south-east, serving 27 stations via the City Loop, South Yarra, Caulfield, Oakleigh, and Dandenong. The line operates for approximately 20 hours a day with 24 hour service available on Friday and Saturday nights. During peak hour, headways of up to 5 to 10 minutes are operated with services every 20 minutes during off-peak hours. Trains on the Pakenham line run with a seven-car formation operated by High Capacity Metro Trains.

<span class="mw-page-title-main">Cranbourne railway line</span> Railway line in Melbourne, Australia

The Cranbourne line is a commuter railway line in the city of Melbourne, Victoria, Australia. Operated by Metro Trains Melbourne, it is the city's second longest metropolitan railway line at 44 kilometres. The line runs from Flinders Street station in central Melbourne to Cranbourne station in the south-east, serving 24 stations via the City Loop, South Yarra, Caulfield, Oakleigh, and Dandenong. The line operates for approximately 20 hours a day with 24 hour service available on Friday and Saturday nights. During peak hour, headways of up to 5 to 15 minutes are operated with services every 15-20 minutes during off-peak hours. Trains on the Cranbourne line run with a seven-car formation operated by High Capacity Metro Trains.

<span class="mw-page-title-main">Mernda railway line</span> Passenger rail line in metropolitan Melbourne

The Mernda line is a commuter railway line in the city of Melbourne, Victoria, Australia. Operated by Metro Trains Melbourne, it is the city's eighth longest metropolitan railway line at 33.1 kilometres (20.6 mi). The line runs from Flinders Street station in central Melbourne to Mernda station in the north, serving 29 stations via Clifton Hill, Reservoir, Epping, and South Morang. The line operates for approximately 19 hours a day with 24 hour service available on Friday and Saturday nights. During peak hour, headways of up to 7.5 minutes are operated with services every 10-30 minutes during off-peak hours. Trains on the Mernda line run with a two three-car formations of X'Trapolis 100 trainsets.

<span class="mw-page-title-main">Upfield railway line</span> Passenger rail service in metropolitan Melbourne, Victoria, Australia

The Upfield line is a commuter railway line in the city of Melbourne, Victoria, Australia. Operated by Metro Trains Melbourne, it is the city's fifth shortest metropolitan railway line at 20.1 kilometres (12.5 mi). The line runs from Flinders Street station in central Melbourne to Upfield station in the north, serving 19 stations via North Melbourne, Brunswick, Coburg, and Fawkner. The line operates for approximately 19 hours a day with 24 hour service available on Friday and Saturday nights. During peak hour, headways of up to 15 minutes are operated with services every 20-30 minutes during off-peak hours. Trains on the Upfield line run with a two three-car formations of Comeng or Siemens Nexas trainsets.

<span class="mw-page-title-main">Werribee railway line</span> Railway line in Melbourne, Victoria, Australia

The Werribee line is a commuter railway line in the city of Melbourne, Victoria, Australia. Operated by Metro Trains Melbourne, it is the city's ninth longest metropolitan railway line at 32.9 kilometres (20.4 mi). The line runs from Flinders Street station in central Melbourne to Werribee station in the south west, serving 17 stations via Footscray, Newport, and Altona. The line operates for approximately 19 hours a day with 24 hour service available on Friday and Saturday nights. During peak hour, headways of up to 5-20 minutes are operated with services every 20-30 minutes during off-peak hours. Trains on the Werribee line run with a two three-car formations of Comeng, Siemens Nexas, and X'Trapolis 100 trainsets.

<span class="mw-page-title-main">Sunbury railway line</span> Passenger rail service in metropolitan Melbourne, Victoria, Australia

The Sunbury line is a commuter railway line in the city of Melbourne, Victoria, Australia. Operated by Metro Trains Melbourne, it is the city's fifth longest metropolitan railway line at 40.3 kilometres (25.0 mi). The line runs from Flinders Street station in central Melbourne to Sunbury station in the north, serving 18 stations via North Melbourne, Sunshine, St Albans, and Watergardens. The line operates for approximately 19 hours a day with 24 hour service available on Friday and Saturday nights. During peak hour, headways of up to 5 minutes are operated with services every 20-30 minutes during off-peak hours. Trains on the Sunbury line run with a two three-car formations of Comeng or Siemens Nexas trainsets.

<span class="mw-page-title-main">Railways in Melbourne</span> Railway network in Melbourne, Victoria, Australia

The Melbourne rail network is a passenger and freight train system in the city of Melbourne, Victoria, Australia. The metropolitan passenger rail network is centred on the Melbourne CBD and consists of 222 stations across 16 lines, which served a ridership of 99.5 million over the year 2021-2022. It is the core of the larger Victorian railway network, with links to both intrastate and interstate systems.

<span class="mw-page-title-main">Craigieburn railway line</span> Commuter rail in Melbourne, Australia

The Craigieburn line is a commuter railway line in the city of Melbourne, Victoria, Australia. Operated by Metro Trains Melbourne, it is the city's sixth shortest metropolitan railway line at 27.0 kilometres (16.8 mi). The line runs from Flinders Street station in central Melbourne to Craigieburn station in the north, serving 21 stations via North Melbourne, Essendon, and Broadmeadows. The line operates for approximately 19 hours a day with 24 hour service available on Friday and Saturday nights. During peak hour, headways of up to 5 minutes are operated with services every 20-30 minutes during off-peak hours. Trains on the Craigieburn line run with a two three-car formations of Comeng or Siemens Nexas trainsets.

<span class="mw-page-title-main">Geelong V/Line rail service</span>

The Geelong line is a regional passenger rail service operated by V/Line in Victoria, Australia. It serves passengers between state capital Melbourne and the regional city of Geelong.

<span class="mw-page-title-main">Keilor East, Victoria</span> Suburb of Melbourne, Victoria, Australia

Keilor East is a suburb in Melbourne, Victoria, Australia, 13 km (8.1 mi) north-west of Melbourne's Central Business District, located within the Cities of Brimbank and Moonee Valley local government areas. Keilor East recorded a population of 15,078 at the 2021 census.

<span class="mw-page-title-main">Metro Tunnel</span> Underground railway project in Melbourne, Victoria, Australia

The Metro Tunnel is a metropolitan rail infrastructure project currently under construction in Melbourne, Australia. It includes the construction of twin 9-kilometre (5.6 mi) rail tunnels between South Kensington and South Yarra with five new underground stations. The tunnel will connect the Pakenham and Cranbourne lines with the Sunbury line, creating a new cross-city line that bypasses Flinders Street station and the City Loop. From 2029 the line will also serve Melbourne Airport via a new branch line west of Sunshine station.

<span class="mw-page-title-main">Melbourne Airport rail link</span>

Melbourne Airport Rail is a rail link under construction from the Melbourne CBD to Melbourne Airport at Tullamarine. Since October 2022 the project has also been branded as SRL Airport. The rail link is to run through the under-construction Metro Tunnel, running 27 km from the airport to Town Hall station in the city centre with 12 km of new track between the airport and Sunshine station. The link will be a new branch of the Melbourne Metro rail network and run High-Capacity Metro Trains at a 10-minute frequency. The project is being delivered by the Victorian state government agency Rail Projects Victoria.

<span class="mw-page-title-main">Suburban Rail Loop</span> Orbital rapid transit line under construction in Melbourne, Australia

The Suburban Rail Loop (SRL) is a group of new rapid transit lines planned or under construction in Melbourne, Victoria, Australia. The project is divided into four distinct sections. The two main sections, SRL East and SRL North, would together form a single 60 km (37 mi) fully automated orbital metro line through the city's middle suburbs, with 13 stations between Cheltenham and Melbourne Airport connecting to eight existing Melbourne rail lines. SRL East is currently under construction and is planned to open in 2035.

<span class="mw-page-title-main">Western Rail Plan</span>

The Western Rail Plan is a metropolitan rail infrastructure project being undertaken in Melbourne, Australia. The project was initially announced during the 2018 Victorian state election by the State Government. It includes the electrification of two currently existing regional lines to Melton and Wyndham Vale, as well as fast rail to Geelong, and other network capacity upgrades. The project will allow for much higher capacity on the Western Corridor. The electrification to Melton is part of Stage 3 of the PTV Network Development Plan. $100 million is being invested in detailed planning and design work, to deliver the full separation of regional and metro services on the Geelong and Ballarat lines. Staging of the works component of the plan are being developed alongside the business case for the Melbourne Airport Rail Link.

References

  1. "New station at Keilor East". Victoria’s Big Build. 21 September 2022. Retrieved 21 September 2022.
  2. Jacks, Timna (28 October 2019). "Council wants airport trains to make a stop in the suburbs". The Age. Retrieved 26 September 2022.
  3. 1 2 "Plans released for Keilor East train station and above-ground Melbourne Airport station". ABC News. 21 September 2022. Retrieved 26 September 2022.
  4. Hatch, Josh Gordon, Patrick (20 September 2022). "Fight or flight? Conflict with airport looms after government reveals 'sky rail' plan". The Age. Retrieved 26 September 2022.
  5. Hatch, Patrick (25 September 2022). "After 95 years of asking for a train station, this 'transport slum' almost missed out". The Age. Retrieved 26 September 2022.
  6. Build, Victoria’s Big (21 September 2022). "Melbourne Airport Rail Business Case". Victoria’s Big Build. Retrieved 26 September 2022.
  7. "Melbourne Airport Rail overview". Victoria’s Big Build. 21 September 2022. Retrieved 21 September 2022.
  8. "Melbourne Airport Rail Business Case Supplement - Keilor East Station" (PDF). Melbourne Airport Rail - Victoria's Big Build. Retrieved 7 October 2022.{{cite web}}: CS1 maint: url-status (link)