This article needs additional citations for verification .(November 2025) |
| | |||||
| Kertanegara train entering to Purwosari, 2021 | |||||
| Overview | |||||
|---|---|---|---|---|---|
| Service type | Inter-city rail | ||||
| Status | Operational | ||||
| Locale | Operational Area VIII Surabaya | ||||
| First service | 10 March 2021 | ||||
| Current operator | Kereta Api Indonesia | ||||
| Route | |||||
| Termini | Purwokerto Malang | ||||
| Distance travelled | 559 kilometres (347 miles) | ||||
| Average journey time | 8 hours 43 minutes | ||||
| Service frequency | daily each way | ||||
| Train number | 167-168 | ||||
| On-board services | |||||
| Classes | economy and executive | ||||
| Seating arrangements |
| ||||
| Catering facilities | On-board cafe and trolley service | ||||
| Technical | |||||
| Rolling stock | CC206/CC203/CC201 | ||||
| Track gauge | 1,067 mm | ||||
| Operating speed | 80–120 kilometres per hour (50–75 mph) | ||||
| |||||
Kertanegara is an Indonesian passenger train, operated by Kereta Api Indonesia. It is run between Purwokerto and Malang via Yogyakarta. [1]
This train support for the Malioboro Express at the same route line.
The name Kertanegara comes from the name of the last king of the Singasari Kingdom, Kertanagara who ruled around 1268–1292. According to the Rajasa dynasty genealogy, Kertanagara was the son of Wisnuwardhana who was appointed as yuwaraja (crown prince) during his reign.
The Kertanegara train was first time operated by KAI on 10 March 2021 (1 month after effected of the enactment of new train travel chart 2021) by extending one of the Malioboro Express routes which previously only reached Yogyakarta. The Kertanegara train was the first to operate using a stainless steel train sets. [2] [ according to whom? ]
As of 26 January 2022, the Kertanegara train sets replaced from stainless steel to mild steel. The executive class service uses executive trains manufactured before 2009, while the economy class service uses the new image economy trains manufactured by PT INKA in 2016. [3] Then on 20 May 2022, The executive train facilities were changed to "new image" executive trains made by PT INKA in 2016-2017.[ citation needed ]
This train series consists of four executive class trains, four economy class trains, one dining train, and one generator train.[ citation needed ]
Here's route of the Kertanegara train in 2025: [4]