Lansing Board of Water & Light

Last updated
Lansing Board of Water & Light
Industry Public utility
Founded1885
Headquarters Lansing, Michigan, U.S.
Key people
Dick Peffley, General Manager
Products Electricity (510 megawatts), Water, Steam, Chilled Water
Revenue$348,122,943 (FY 2014)
$41,304,739 (FY 2014)
$2,792,527 (FY 2014)
Total assets $1,172,041,452.87 (FY 2014)
Total equity $2,792,529.72 (FY 2014)
Website www.lbwl.com

The Lansing Board of Water & Light is a publicly owned, municipal utility that provides electricity and water to the residents of the cities of Lansing and East Lansing, Michigan, and the surrounding townships of Delta, Delhi, Meridian and DeWitt. The Lansing Board of Water & Light also provides steam and chilled water services within the City of Lansing. It is the largest public utility in Michigan. [1]

Contents

History

The Lansing Board of Water & Light is a municipal utility, owned by the citizens of Lansing, Michigan. The utility's roots go back to 1885, when Lansing citizens approved a $100,000 bond issue to build a water system to provide for drinking water and fire protection. Electricity was added to its list of utility services in 1892, and steam heat in 1919.

Governance

The utility is governed by a board of commmissioners which includes 8 voting members appointed by the mayor with consent of the city council: 1 from each of the city's 4 municipal wards, and 4 for the city at-large. [2] Since 2014, the board also includes an additional 3 non-voting advisory members from the city of East Lansing, and the townships of Delta and Meridian to represent parts of the utility's service area outside the city of Lansing. [3]

System Information

The Lansing Board of Water & Light has an electric generating capacity of 510 megawatts. The BWL's transmission line voltage is 138,000 volts. The BWL's distribution voltages are 13,200/7,620Y, 8,320/4,800Y and 4,160/2,400Y.

The Lansing Board of Water & Light pumps an average of approximately 24 million gallons per day (MGD) from two conditioning plants through approximately 775 miles (1,247 km) of water main. Maximum daily demand is on the order of 33 MGD, while the maximum hourly demand rate can be on the order of 42 MGD. Raw water is obtained exclusively by pumping from 124 wells located throughout the Lansing area. All system pressure is generated via pumping; the Lansing Board of Water & Light does not maintain any elevated water storage tanks.

Water Utility

The Lansing Board of Water & Light obtains all raw water from a series of wells located throughout the city of Lansing, making it one of the few public utilities for large cities that provides water exclusively from wells. The city sits atop, and draws its water from, the Saginaw Aquifer, a natural, but limited, [4] underground reservoir 4 cubic miles (17 km3), and 550 square miles (1,400 km2) in size. The raw water is pumped directly to two conditioning plants: the John Dye plant located in downtown Lansing and the Wise Road plant located on the southwest side of the city. At these plants, water hardness is reduced from approximately 411 parts per million (ppm) to about 85 ppm. The finished water is then chlorinated and fluorinated, and sent to storage prior to distribution.

At the John Dye conditioning plant, two pumping stations draw finished water from three ground level storage facilities and pump to the distribution system. The Dye pump station, pumps water to the north towards Dewitt Township, Bath Township, and Watertown Township, to the west to Delta Township, and to the local distribution system. The Cedar Street pump station provides supplemental pumping capacity during periods of high demand. The Wise Road conditioning plants similarly pumps water directly into the distribution system, and generally feeds portions of Windsor Township, Delhi Township, and Alaiedon Township.

The Lansing Board of Water & Light retail customers consist of residential, commercial and industrial customers within the service areas, totaling approximately 56,000 customers. Approximately 48,000 of these customers are residential, 7,000 commercial, while the remaining customers consist of industrial customers. In addition, the Lansing Board of Water & Light sells water on a wholesale basis to the local distribution systems in Delta Township and Meridian Township.

Electric Utility

Otto E. Eckert Station. Lbwl.jpg
Otto E. Eckert Station.

As of 2023, LBWL's power utility has 86,789 residential customers and 12,368 commercial and industrial customers for a total of 99,137 customers. [5]

Former facilities

In 2020, BWL decommissioned Otto E. Eckert Station, named after the utility's general manager from 1927 to 1966. The former coal-fired generating station is located in downtown Lansing on the Grand River, adjacent to General Motors' Grand River Assembly Plant and the now-demolished Lansing Car Assembly Plant. Begun in 1922 and completed the following year, the power station has undergone numerous expansions and additions since, with the addition of the three chimneys in 1981. The station had a generating capacity of 351 megawatts, produced by burning coal from Wyoming's Powder River Basin. This plant has three 615-foot (187 m) smokestacks, the tallest self-supporting structures in south central Michigan. These stacks are visible from fifteen miles (24 km) on a clear day. The stacks are known locally by the names of Wynken, Blynken, and Nod, after the fishermen in a poem of the same name by Eugene Field. It was announced in December 2017 that the plant decommissioning had been accelerated, and would go offline in 2020. [6]

From 1973 to 2022, BWL operated the Claud R. Erickson Station, named after general manager of the utility from 1966 to 1972. [7] The plant located in Delta Township on Canal Road just south of Mt. Hope Road. This coal-fired plant had a single generating unit with a capacity of 159 MW connected to the power grid by three 138 kV lines. The LBWL announced in December 2017 that they would be replacing Erickson Station with a $500 million natural gas-fired power plant capable of generating 250 MW. [6] The Delta Energy Park opened in March 2022 with a nameplate capacity of 260 MW on the site of the site of the former Erickson Station. [8]

The utility's power plant inventory once included the 25 megawatt Ottawa Street Station on the Grand River in downtown Lansing. This steam and electrical plant operated from its completion in 1940 until 1992, when it was decommissioned as a power station, with steam and electrical production transferred to the Eckert Station. The station was put back into partial usage as a water chiller plant for the utility in 2001 to cool downtown buildings. In late 2007, LBWL sold the mostly vacant station to Accident Fund Insurance Company, which was renovated into their headquarters. At the end of December of that year, in preparation for the renovation, the iconic smokestack portion of the building was taken down.

Current facilities

As an eventual replacement for the aging Eckert Station, the utility began operating the REO Town Cogeneration Plant on July 1, 2013. [9] The eight-story, 160,000 sq ft (15,000 m2) cogeneration facility located on Washington Avenue in Lansing's REO Town district has a capacity of 100 megawatts, and burns natural gas to generate electricity and steam. It also includes the utility's headquarters and a restored Grand Trunk Western Railroad depot, which is used as the boardroom for the utility and as meeting space. [10]

To achieve the state-mandated 10% renewable energy requirement by 2015, the company has built or acquired power through purchase agreements from several new sources. They contracted for 19.2MW from eight new wind turbines at the Beebe Wind Farm in Gratiot County. [11] [12] Lansing Board of Water and Light owns the 0.5MW Moores Park hydroelectric plant on the Grand River and the 0.16MW Cedar Street Solar Array. [13] It also purchases power from the Tower/Kleber Hydro plant near Cheboygan and the Granger Landfill Energy plant. [14] Lansing Board of Water & Light has issued a request for proposals for 20MW of additional solar power.

During periods of high demand, the Lansing Board of Water and Light purchases electricity from MISO. The BWL has two 138KV interconnections (Davis-Oneida line and the Davis-Enterprise line) with Consumers Energy/METC from its substation on Jolly Road just east of Pennsylvania Ave on Lansing's south side. The utility also owns a portion of Detroit Edison's Belle River Power Plant near St. Clair, Michigan. [15]

Generation mix

For the fiscal year that ended with June 2023, LBWL consumed 464 GWh of renewable energy, out of a total of 2,883 GWh for a total of 16% renewable energy. [5] In 2023, they announced plans to build 160 MW of battery storage generating capacity, 65 MW of solar, and 433 MW of wind power by end of the 2027. LBWL received $12 million from the MPSC to install 10 MW of solar and 4 hours of 40 MW battery storage (160 MWh capacity) on the Delta Energy Park site. [16]

Although it claims to have met its self-imposed goal to use 30% clean energy by 2020, the metrics they used to determine this are unclear. LBWL has described natural gas as "clean," despite the fact that it is a significant source of CO2 emissions. [17] Critics allege that they have engaged in misleading messaging and greenwashing. [18]

See also

Related Research Articles

<span class="mw-page-title-main">Electricity generation</span> Process of generating electrical power

Electricity generation is the process of generating electric power from sources of primary energy. For utilities in the electric power industry, it is the stage prior to its delivery to end users or its storage, using for example, the pumped-storage method.

<span class="mw-page-title-main">Power station</span> Facility generating electric power

A power station, also referred to as a power plant and sometimes generating station or generating plant, is an industrial facility for the generation of electric power. Power stations are generally connected to an electrical grid.

<span class="mw-page-title-main">Cogeneration</span> Simultaneous generation of electricity and useful heat

Cogeneration or combined heat and power (CHP) is the use of a heat engine or power station to generate electricity and useful heat at the same time.

Puget Sound Energy (PSE) is an energy utility company based in the U.S. state of Washington that provides electrical power and natural gas to the Puget Sound region. The utility serves electricity to more than 1.1 million customers in Island, King, Kitsap, Kittitas, Pierce, Skagit, Thurston, and Whatcom counties, and provides natural gas to 750,000 customers in King, Kittitas, Lewis, Pierce, Snohomish and Thurston counties. The company's electric and natural gas service area spans 6,000 square miles (16,000 km2).

<span class="mw-page-title-main">District heating</span> Centralized heat distribution system

District heating is a system for distributing heat generated in a centralized location through a system of insulated pipes for residential and commercial heating requirements such as space heating and water heating. The heat is often obtained from a cogeneration plant burning fossil fuels or biomass, but heat-only boiler stations, geothermal heating, heat pumps and central solar heating are also used, as well as heat waste from factories and nuclear power electricity generation. District heating plants can provide higher efficiencies and better pollution control than localized boilers. According to some research, district heating with combined heat and power (CHPDH) is the cheapest method of cutting carbon emissions, and has one of the lowest carbon footprints of all fossil generation plants.

<span class="mw-page-title-main">Duke Energy</span> American electrical power and natural gas company

Duke Energy Corporation is an American electric power and natural gas holding company headquartered in Charlotte, North Carolina.

<span class="mw-page-title-main">Peaking power plant</span> Reserved for high demand times

Peaking power plants, also known as peaker plants, and occasionally just "peakers", are power plants that generally run only when there is a high demand, known as peak demand, for electricity. Because they supply power only occasionally, the power supplied commands a much higher price per kilowatt hour than base load power. Peak load power plants are dispatched in combination with base load power plants, which supply a dependable and consistent amount of electricity, to meet the minimum demand.

<span class="mw-page-title-main">Constellation Energy</span> Energy company headquartered in Baltimore, Maryland

Constellation Energy Corporation is an American energy company headquartered in Baltimore, Maryland. The company provides electric power, natural gas, and energy management services. It has approximately two million customers across the continental United States.

<span class="mw-page-title-main">AES Corporation</span> American energy company

The AES Corporation is an American utility and power generation company. It owns and operates power plants, which it uses to generate and sell electricity to end users and intermediaries like utilities and industrial facilities. AES is headquartered in Arlington, Virginia, and is one of the world's leading power companies, generating and distributing electric power in 15 countries and employing 10,500 people worldwide. AES Corporation is a global Fortune 500 power company. AES Ranks in the Top Ten of Fast Company's 2022 Best Workplaces for Innovators.

Energy Northwest is a public power joint operating agency in the northwest United States, formed 67 years ago in 1957 by Washington state law to produce at-cost power for Northwest utilities. Headquartered in the Tri-Cities at Richland, Washington, the WPPSS became commonly known as "Whoops!", due to over-commitment to nuclear power in the 1970s which brought about financial collapse and the second largest municipal bond default in U.S. history. WPPSS was renamed Energy Northwest in November 1998, and agency membership includes 28 public power utilities, including 23 of the state's 29 public utility districts.

Energy recycling is the energy recovery process of using energy that would normally be wasted, usually by converting it into electricity or thermal energy. Undertaken at manufacturing facilities, power plants, and large institutions such as hospitals and universities, it significantly increases efficiency, thereby reducing energy costs and greenhouse gas pollution simultaneously. The process is noted for its potential to mitigate global warming profitably. This work is usually done in the form of combined heat and power or waste heat recovery.

Madison Gas and Electric Company (MGE) is the primary subsidiary of MGE Energy, Inc.. As a regulated utility, it primarily serves the Madison, Wisconsin metropolitan area with electricity, gas and green energy options.

<span class="mw-page-title-main">Hydroelectric power in India</span>

India is 5th globally for installed hydroelectric power capacity. As of 31 March 2020, India's installed utility-scale hydroelectric capacity was 46,000 MW, or 12.3% of its total utility power generation capacity. Additional smaller hydroelectric power units with a total capacity of 4,683 MW have been installed. India's hydroelectric power potential is estimated at 148,700 MW at 60% load factor. In the fiscal year 2019–20, the total hydroelectric power generated in India was 156 TWh with an average capacity factor of 38.71%.

<span class="mw-page-title-main">Solar power in Michigan</span> Overview of solar power in the U.S. state of Michigan

Solar power in Michigan has been growing in recent years due to new technological improvements, falling solar prices and a variety of regulatory actions and financial incentives. The largest solar farm in Michigan is Assembly Solar, completed in 2022, which has 347 MW of capacity. Small-scale solar provided 50% of Michigan solar electricity as recently as 2020 but multiple solar farms in the 100 MW to 200 MW range are proposed to be completed by the middle of the decade. Although among the lowest U.S. states for solar irradiance, Michigan mostly lies farther south than Germany where solar power is heavily deployed. Michigan is expected to use 120 TWh per year in 2030. To reach a 100% solar electrical grid would require 2.4% of Michigan's land area to host 108 GW of installed capacity.

The following outline is provided as an overview of and topical guide to solar energy:

<span class="mw-page-title-main">Energy in California</span> Overview of the use of energy in California, U.S.

Energy is a major area of the economy of California. California is the state with the largest population and the largest economy in the United States. It is second in energy consumption after Texas. As of 2018, per capita consumption was the fourth-lowest in the United States partially because of the mild climate and energy efficiency programs.

The United States state of Arkansas is a significant producer of natural gas and a minor producer of petroleum.

<span class="mw-page-title-main">Kansas City Board of Public Utilities</span> Utilities company in Kansas City, Kansas, US

The Kansas City Board of Public Utilities (BPU) is a publicly owned, not-for-profit public utility servicing Wyandotte County that is headquartered in Kansas City, Kansas. Overall, BPU provides service to 127.5 square miles of Wyandotte County. Electric services are provided within the Kansas City, Kansas (KCK) area, and water is supplied to KCK, as well as portions of suburban Wyandotte, Leavenworth, and Johnson counties.

References

  1. "Solar Education Training" (PDF).
  2. "Governance". lbwl.com. Lansing Board of Water and Light. Retrieved 30 May 2024.
  3. "About BWL". lbwl.com. Lansing Board of Water and Light. Retrieved 30 May 2024.
  4. McKenna, Brian. E-M:/ Study: The Saginaw Aquifer under Ingham County estimated to be 4 cubic miles! That is four times larger than Lake St. Clair (1 cubic mile)!, EnviroMich Listserv, www.greatlakes.net, Feb 18, 2001, retrieved 2012-Nov-4
  5. 1 2 "BWL Fast Facts 2023" (PDF). Retrieved 2024-05-29.
  6. 1 2 "BWL Announces $500 Million Natural Gas Power Plant". Lansing BWL. Archived from the original on 2018-03-25. Retrieved 7 January 2018.
  7. "Corporate Sustainability Report 2023" (PDF).
  8. "Facilities | lbwl.com". www.lbwl.com. Retrieved 2024-05-30.
  9. Howell, Brandon. Lansing Board of Water & Light's new $182 million REO Town cogeneration plant goes online, MLive.com, July 1, 2013, Retrieved July 7, 2013
  10. "Facilities". LBWL. Retrieved 18 December 2017.
  11. "Lansing inks Beebe wind deal". 2013-09-17. Archived from the original on 2014-09-01.
  12. Lansing to get wind-generated power in 2014, Detroit Free Press, September 13, 2013
  13. BWL Announces Completion of Expanded Cedar Street Solar Array, Lansing Board of Power and Light, 7/22/2014
  14. Renewable Energy Plan 2013 Biennial Review, Lansing Board of Water & Light
  15. "Sierra Club: No Gas, No Coal, No Nukes; Lansing Utility: No Lights, then".
  16. "Lansing BWL Announces Plans for 650MW of Clean Energy | lbwl.com". www.lbwl.com. Retrieved 2024-05-30.
  17. Lansing BWL (2022-07-26). BWL Delta Energy Park Tour . Retrieved 2024-05-30 via YouTube.
  18. Jackson, Brian T. (2023-12-07). "The BWL is not doing enough to meet its clean energy goals". City Pulse. Retrieved 2024-05-30.