Lean IT is the extension of lean manufacturing and lean services principles to the development and management of information technology (IT) products and services. Its central concern, applied in the context of IT, is the elimination of waste, where waste is work that adds no value to a product or service. [1]

Contents

Although lean principles are generally well established and have broad applicability, their extension from manufacturing to IT is only just[ when? ] emerging. [2] Lean IT poses significant challenges for practitioners while raising the promise of no less significant benefits. And whereas Lean IT initiatives can be limited in scope and deliver results quickly, implementing Lean IT is a continuing and long-term process that may take years before lean principles become intrinsic to an organization's culture. [3]

History

In 1988, American engineer John Krafcik published an article entitled "Triumph of the Lean Production System", based on his thesis at the Massachusetts Institute of Technology's (MIT) Sloan School of Management. Prior to this, Krafcik was a quality engineer at NUMMI (New United Motor Manufacturing), a Toyota - General Motors joint venture in Fremont, California. [4]

At MIT, Krafcik's research continued as part of the International Motor Vehicle Program (IMVP), which led to the publication, in 1990, of The Machine That Changed the World, co-authored by James Tim Womack (en), Daniel T. Jones and Daniel Ross. The book was a worldwide success. [5]

The lean school was formalized in the US in the 1990s, popularized by the book Lean Thinking (1996) by Daniel T. Jones and James P. Womack (the latter trained in Hajime Ohba's methods as part of Toyota's supplier support unit in the USA). [6]

Extension to IT

As lean manufacturing has become more widely implemented, the extension of lean principles is beginning[ when? ] to spread to IT (and other service industries). [7] Industry analysts have identified many similarities or analogues between IT and manufacturing. [7] [8] For example, whereas the manufacturing function manufactures goods of value to customers, the IT function "manufactures" business services of value to the parent organization and its customers. Similar to manufacturing, the development of business services entails resource management, demand management, quality control, security issues, and so on. [8]

Moreover, the migration by businesses across virtually every industry sector towards greater use of online or e-business services suggests a likely intensified interest in Lean IT as the IT function becomes intrinsic to businesses' primary activities of delivering value to their customers. Already, even today, IT's role in business is substantial, often providing services that enable customers to discover, order, pay, and receive support. IT also provides enhanced employee productivity through software and communications technologies and allows suppliers to collaborate, deliver, and receive payment.

Consultants and evangelists for Lean IT identify an abundance of waste across the business service "production line", including legacy infrastructure and fractured processes. [8] By reducing waste through application of lean Enterprise IT Management (EITM) strategies, CIOs and CTOs in companies such as Tesco, Fujitsu Services, and TransUnion are driving IT from the confines of a back-office support function to a central role in delivering customer value. [9]

Types of waste

Lean IT promises to identify and eradicate waste that otherwise contributes to poor customer service, lost business, higher than necessary business costs, and lost employee productivity. To these ends, Lean IT targets eight elements within IT operations that add no value to the finished product or service or to the parent organization (see Table 1).

Table 1 – Targets of waste in lean IT [8]
Waste elementExamplesBusiness outcome
Defects
  • Unauthorized system and application changes.
  • Substandard project execution.

Poor customer service, increased costs.

Overproduction (overprovisioning)
  • Unnecessary delivery of low-value applications and services.

Business and IT misalignment, Increased costs and overheads: energy, data center space, maintenance.

Waiting
  • Slow application response times.
  • Manual service escalation procedures.

Lost revenue, poor customer service, reduced productivity.

Non-Value Added Processing
  • Reporting technology metrics to business managers.

Miscommunication.

Transportation
  • On-site visits to resolve hardware and software issues.
  • Physical software, security and compliance audits.

Higher capital and operational expenses.

Inventory (excess)
  • Server sprawl, underutilized hardware.
  • Multiple repositories to handle risks and control.
  • Benched application development teams.

Increased costs: data center, energy; lost productivity.

Motion (excess)
  • Fire-fighting repeat problems within the IT infrastructure and applications.

Lost productivity.

Employee knowledge (unused)
  • Failing to capture ideas/innovation.
  • Knowledge and experience retention issues.
  • Employees spend time on repetitive or mundane tasks.

Talent leakage, low job satisfaction, increased support and maintenance costs.

Whereas each element in the table can be a significant source of waste in itself, linkages between elements sometimes create a cascade of waste (the so-called domino effect). For example, a faulty load balancer (waste element: Defects) that increases web server response time may cause a lengthy wait for users of a web application (waste element: Waiting), resulting in excessive demand on the customer support call center (waste element: Excess Motion) and, potentially, subsequent visits by account representatives to key customers' sites to quell concerns about the service availability (waste element: Transportation). In the meantime, the company's most likely responses to this problem — for example, introducing additional server capacity and/or redundant load balancing software), and hiring extra customer support agents — may contribute yet more waste elements (Overprovisioning and Excess Inventory).

Principles

Value streams

In IT, value streams are the services provided by the IT function to the parent organization for use by customers, suppliers, employees, investors, regulators, the media, and any other stakeholders. These services may be further differentiated into:

The distinction between primary and secondary value streams is meaningful. Given Lean IT's objective of reducing waste, where waste is work that adds no value to a product or service, IT services are secondary (i.e. subordinate or supportive) to business services. In this way, IT services are tributaries that feed and nourish the primary business service value streams. If an IT service is not contributing value to a business service, it is a source of waste. Such waste is typically exposed by value-stream mapping.

Value-stream mapping

Lean IT, like its lean manufacturing counterpart, involves a methodology of value-stream mapping [10] — diagramming and analyzing services (value streams) into their component process steps and eliminating any steps (or even entire value streams) that do not deliver value.

Flow

Flow relates to one of the fundamental concepts of Lean as formulated within the Toyota Production System — namely, mura . A Japanese word that translates as "unevenness," mura is eliminated through just-in-time systems that are tightly integrated. For example, a server provisioning process may carry little or no inventory (a waste element in Table 1 above) with labor and materials flowing smoothly into and through the value stream.

A focus on mura reduction and flow may bring benefits that would be otherwise missed by focus on muda (the Japanese word for waste) alone. The former necessitates a system-wide approach whereas the latter may produce suboptimal results and unintended consequences. For example, a software development team may produce code in a language familiar to its members and which is optimal for the team (zero muda). But if that language lacks an API standard by which business partners may access the code, a focus on mura will expose this otherwise hidden source of waste.

Pull/demand system

Pull (also known as demand) systems are themselves closely related to the aforementioned flow concept. They contrast with push or supply systems. In a pull system, a pull is a service request. The initial request is from the customer or consumer of the product or service. For example, a customer initiates an online purchase. That initial request in turn triggers a subsequent request (for example, a query to a database to confirm product availability), which in turn triggers additional requests (input of the customer's credit card information, credit verification, processing of the order by the accounts department, issuance of a shipping request, replenishment through the supply-chain management system, and so on).

Push systems differ markedly. Unlike the "bottom-up," demand-driven, pull systems, they are "top-down," supply-driven systems whereby the supplier plans or estimates demand. Push systems typically accumulate large inventory stockpiles in anticipation of customer need. In IT, push systems often introduce waste through an over-abundance of "just-in-case" inventory, incorrect product or service configuration, version control problems, and incipient quality issues. [8]

Implementation

Implementation begins with identification and description of one or more IT value streams. [11] For example, aided by use of interviews and questionnaires, the value stream for a primary value stream such as a point-of-sale business service may be described as shown in Table 2.

Table 2 – Example: Description of a point-of-sale value stream [8]
  Value metricsDemand pulls SLIs
"Owner" of Business ResultEVP of Store Operations [12]
  • Budget reviews
  • Strategic reviews
  • Store redesign
  • Store openings
  • Transaction speed
  • Service continuity
  • Implementation speed
End Customer Cashiers
  • Check-out speed
  • Ease of use
  • Transactions
  • Log ons
  • Transaction speed
  • Service continuity
End CustomerShoppers
  • Payment types
  • Check-out speed
  • Ease of use
  • Transactions
  • Transaction speed
  • Service continuity

Table 2 suggests that the Executive Vice President (EVP) of Store Operations is ultimately responsible for the point-of-sale business service, and he/she assesses the value of this service using metrics such as CAPEX, OPEX, and check-out speed. The demand pulls or purposes for which the EVP may seek these metrics might be to conduct a budget review or undertake a store redesign. Formal service-level agreements (SLAs) for provision of the business service may monitor transaction speed, service continuity, and implementation speed. The table further illustrates how other users of the point-of-sale service — notably, cashiers and shoppers — may be concerned with other value metrics, demand pulls, and SLAs.

Having identified and described a value stream, implementation usually proceeds with construction of a value stream map — a pictorial representation of the flow of information, beginning with an initial demand request or pull and progressing up the value stream. Although value streams are not as readily visualizable as their counterparts in lean manufacturing, where the flow of materials is more tangible, systems engineers and IT consultants are practiced in the construction of schematics to represent information flow through an IT service. [8] To this end, they may use productivity software such as Microsoft Visio and computer-aided design (CAD) tools. However, alternatives to these off-the-shelf applications may be more efficient (and less wasteful) in the mapping process.

One alternative is use of a configuration management database (CMDB), [15] which describes the authorized configuration of the significant components of an IT environment. Workload automation software, which helps IT organizations optimize real-time performance of complex business workloads across diverse IT infrastructures, and other application dependency mapping tools can be an additional help in value stream mapping. [16]

After mapping one or more value streams, engineers and consultants analyze the stream(s) for sources of waste. The analysis may adapt and apply traditional efficiency techniques such as time-and-motion studies as well as more recent lean techniques developed for the Toyota Production System and its derivatives. Among likely outcomes are methods such as process redesign, the establishment of "load-balanced" workgroups (for example, cross-training of software developers to work on diverse projects according to changing business needs), and the development of performance management "dashboards" to track project and business performance and highlight trouble spots. [3]

Recessionary pressure to reduce costs

The onset of economic recession in December 2007 [17] was marked by a decrease in individuals' willingness to pay for goods and services [18] — especially in face of uncertainty about their own economic futures. Meanwhile, tighter business and consumer credit, [19] a steep decline in the housing market, [20] higher taxes, [21] massive lay-offs, [22] and diminished returns in the money and bond markets [23] have further limited demand for goods and services.

When an economy is strong, most business leaders focus on revenue growth. During periods of weakness, when demand for good and services is curbed, the focus shifts to cost-cutting. [9] In-keeping with this tendency, recessions initially provoke aggressive (and sometimes panic-ridden) actions such as deep discounting, fire sales of excess inventory, wage freezes, short-time working, and abandonment of former supplier relationships in favor of less costly supplies. Although such actions may be necessary and prudent, their impact may be short-lived. [18] Lean IT can expect to garner support during economic downturns as business leaders seek initiatives that deliver more enduring value than is achievable through reactive and generalized cost-cutting. [24]

Proliferation of online transactions

IT has traditionally been a mere support function of business, in common with other support functions such as shipping and accounting. More recently, however, companies have moved many mission-critical business functions to the Web. [25] This migration is likely to accelerate still further as companies seek to leverage investments in service-oriented architectures, decrease costs, improve efficiency, and increase access to customers, partners, and employees. [26]

The prevalence of web-based transactions is driving a convergence of IT and business. [27] In other words, IT services are increasingly central to the mission of providing value to customers. Lean IT initiatives are accordingly becoming less of a peripheral interest and more of an interest that is intrinsic to the core business.

Green IT

Though not born of the same motivations, lean IT initiatives are congruent with a broad movement towards conservation and waste reduction, often characterized as green policies and practices. Green IT is one part of this broad movement. [28]

Waste reduction directly correlates with reduced energy consumption and carbon generation. Indeed, IBM asserts that IT and energy costs can account for up to 60% of an organization's capital expenditures and 75% of operational expenditures. [29] In this way, identification and streamlining of IT value streams supports the measurement and improvement of carbon footprints and other green metrics. [30] For instance, implementation of Lean IT initiatives is likely to save energy through adoption of virtualization technology and data center consolidation. [31] [32]

Challenges

Value-stream visualization

Unlike lean manufacturing, from which the principles and methods of Lean IT derive, Lean IT depends upon value streams that are digital and intangible rather than physical and tangible. This renders difficult the visualization of IT value streams and hence the application of Lean IT. Whereas practitioners of lean manufacturing can apply visual management systems such as the kanban cards used in the Toyota Production System, practitioners of Lean IT must use enterprise IT management tools to help visualize and analyze the more abstract context of IT value streams. [33]

Reference implementations

As an emerging area in IT management (see Deployment and Commercial Support), lean IT has relatively few reference implementations. Moreover, whereas much of the supporting theory and methodology is grounded in the more established field of lean manufacturing, adaptation of such theory and methodology to the digital service-oriented process of IT is likewise only just beginning. This lack makes implementation challenging, as evidenced by the problems experienced with the March 2008 opening of Heathrow Terminal 5. British airports authority BAA and airline British Airways, which has exclusive use of the new terminal, used process methodologies adapted from the motor industry to speed development and achieve cost savings in developing and integrating systems at the new terminal. [34] However, the opening was marred by baggage handling backlogs, staff parking problems, and cancelled flights. [35]

Resistance to change

The conclusions or recommendations of Lean IT initiatives are likely to demand organizational, operational, and/or behavioral changes that may meet with resistance from workers, managers, and even senior executives. Whether driven by a fear of job losses, a belief that existing work practices are superior, or some other concern, such changes may encounter resistance. For example, a lean IT recommendation to introduce flexible staffing whereby application development and maintenance managers share personnel is often met with resistance by individual managers who may have relied on certain people for many years. Also, existing incentives and metrics may not align with the proposed staff sharing. [3] [36]

Fragmented IT departments

Even though business services and the ensuing flow of information may span multiple departments, IT organizations are commonly structured in a series of operational or technology-centric silos, each with its own management tools and methods to address perhaps just one particular aspect of waste. Unfortunately, fragmented efforts at Lean IT contribute little benefit because they lack the integration necessary to manage cumulative waste across the value chain. [8]

Integration of lean production and lean consumption

Related to the aforementioned issue of fragmented IT departments is the lack of integration across the entire supply chain, including not only all business partners but also consumers. To this end, lean IT consultants have recently proposed so-called lean consumption of products and services as a complement to lean production. [37] In this regard, the processes of provision and consumption are tightly integrated and streamlined to minimize total cost and waste and to create new sources of value.

Deployment and commercial support

Deployment of lean IT has been predominantly limited to application development and maintenance (ADM). This focus reflects the cost of ADM. [8] Despite a trend towards increased ADM outsourcing to lower-wage economies, [38] the cost of developing and maintaining applications can still consume more than half of the total IT budget. [3] In this light, the potential of Lean IT to increase productivity by as much as 40% while improving the quality and speed of execution [3] makes ADM a primary target within the IT department.

Opportunity to apply Lean IT exists in multiple other areas of IT besides ADM. For example, service catalog management is a Lean IT approach to provisioning IT services. When, say, a new employee joins a company, the employee's manager can log into a web-based catalog and select the services needed. This particular employee may need a CAD workstation as well as standard office productivity software and limited access to the company's extranet. On submitting this request, provisioning of all hardware and software requirements would then be automatic through a lean value stream. In another example, a Lean IT approach to application performance monitoring would automatically detect performance issues at the customer experience level as well as triage, notify support personnel, and collect data to assist in root-cause analysis. [8] Research suggests that IT departments may achieve sizable returns from investing in these and other areas of the IT function. [39]

Among notable corporate examples of Lean IT adopters is UK-based grocer Tesco, [40] which has entered into strategic partnerships with many of its suppliers, including Procter & Gamble, Unilever, and Coca-Cola, eventually succeeding in replacing weekly shipments with continuous deliveries throughout the day. By moving to eliminate stock from either the back of the store or in high-bay storage, Tesco has gotten markedly closer to a just-in-time pull system (see Pull/demand system). [9] [41] [42] Lean IT is also attracting public-sector interest, in-keeping with the waste-reduction aims of the lean government movement. One example is the City of Cape Coral, Florida, where several departments have deployed lean IT. [43] The city's police records department, for instance, reviewed its processing of some 20,000 traffic tickets written by police officers each year, halving the time for an officer to write a ticket and saving $2 million. Comparable benefits have been achieved in other departments such as public works, finance, fire, and parks and recreation. [44] [45]

Complementary methodologies

Although Lean IT typically entails particular principles and methods such as value streams and value-stream mapping, Lean IT is, on a higher level, a philosophy rather than a prescribed metric or process methodology. In this way, Lean IT is pragmatic and agnostic. It seeks incremental waste reduction and value enhancement, but it does not require a grand overhaul of an existing process, and is complementary rather than alternative to other methodologies.

Agile, Scrum and lean software development

Agile software development is a set of software development methods that originated as a response for the indiscriminated use of CMMI, RUP and PMBOK creating fat and slow software development processes[ citation needed ] that normally increased the lead time, the work in progress and non-value added/value added activities ratio on projects. Agile software development methods include XP, Scrum, FDD, AUP, DSDM, Crystal, and others.

Scrum is one of the more well known agile methods for project management, and has as one of its origins concepts from Lean Thinking. Scrum also organizes work in a cross-functional, multidisciplinary work cell. It uses some form of kanban system to visualize and limit work in progress, and follows the PDCA cycle, and continuous improvements, that is the base of Lean.

Six Sigma

Whereas Lean IT focuses on customer satisfaction and reducing waste, Six Sigma focuses on removing the causes of defects (errors) and the variation (inconsistency) in manufacturing and business processes using quality management and, especially, statistical methods. [46] Six Sigma also differs from Lean methods by introducing a special infrastructure of personnel (e.g. so-called "Green Belts" and " Black Belts") in the organization. Six Sigma is more oriented around two particular methods (DMAIC and DMADV), whereas Lean IT employs a portfolio of tools and methods. These differences notwithstanding, Lean IT may be readily combined with Six Sigma such that the latter brings statistical rigor to measurement of the former's outcomes. [47]

Capability Maturity Model Integration (CMMI)

The Capability Maturity Model Integration (CMMI) from the Software Engineering Institute of Carnegie Mellon University (Pittsburgh, Pennsylvania) is a process improvement approach applicable to a single project, a division, or an entire organization. It helps integrate traditionally separate organizational functions, set process improvement goals and priorities, provide guidance for quality processes, and provide a benchmark or point of reference for assessing current processes. [48] However, unlike Lean IT, CMMI (and other process models) doesn't directly address sources of waste such as a lack of alignment between business units and the IT function or unnecessary architectural complexity within a software application. [3]

ITIL

ITIL contains concepts, policies, and recommended practices on a broad range of IT management topics. These are again entirely compatible with the objectives and methods of Lean IT. Indeed, as another best-practice framework, ITIL may be considered alongside the CMMI for process improvement and COBIT for IT governance.

Universal Service Management Body of Knowledge (USMBOK)

The Universal Service Management Body of Knowledge (USMBOK) — is a single book published by Service Management 101 and endorsed by numerous professional trade associations as the definitive reference for service management. The USMBOK contains a detailed specification of a service system and organization and leverages the rich history of service management as defined within product management and marketing professions. The service organization specification describes seven key knowledge domains, equivalent to roles, and forty knowledge areas, representing areas of practice and skills. Amongst these, within the Service Value Management knowledge domain, are a number of Lean relevant skills, including Lean Thinking and Value Mapping. The USMBOK also provides detailed information on how problem management and lean thinking are combined with outside-in (customer centric) thinking, in the design of a continuous improvement program.

COBIT

Control Objectives for Information and Related Technology – better known as COBIT – is a framework or set of best practices for IT management created by the Information Systems Audit and Control Association (ISACA), and the IT Governance Institute (ITGI). [49] It provides managers, auditors, and IT users a set of metrics, processes, and best practices to assist in maximizing the benefits derived through the use of IT, achieving compliance with regulations such as Sarbanes-Oxley, and aligning IT investments with business objectives. COBIT also aims to unify global IT standards, including ITIL, CMMI, and ISO 17799. [50]

Notes

  1. Ker, J. I., Wang, Y., Hajli, M. N., Song, J., & Ker, C. W. (2014). "Deploying lean in healthcare: Evaluating information technology effectiveness in US hospital pharmacies". International Journal of Information Management, 34(4), 556–560.
  2. See "Deployment and Commercial Support" below.
  3. 1 2 3 4 5 6 Kindler, Nosh B; Krishnakanthan, Vasantha; Tinaikar, Ranjit. Applying Lean to Application Development. McKinsey Quarterly, May 2007
  4. Krafcik, John F., « Triumph of the Lean Production System », Sloan Management Review, 1988, 30 (1): 41–52.
  5. Tommaso Pardi (2015). "Quand une mode managériale s'institutionnalise: Le rôle de la marchandisation de la recherche universitaire aux États-Unis". Revue d'Anthropologie des Connaissances. 9, 1 (1): 101–124. doi: 10.3917/rac.026.0101 .
  6. Littéralement, « penser maigre ».
  7. 1 2 Hanna, Julia. "Bringing 'Lean' Principles to Service Industries Archived 2015-08-01 at the Wayback Machine ". HBS Working Knowledge. October 22, 2007. (Summary article based on published research of Professor David Upton of Harvard Business School and doctoral student Bradley Staats: Staats, Bradley R., and David M. Upton. "Lean Principles, Learning, and Software Production: Evidence from Indian Software Services.". Harvard Business School Working Paper. No. 08-001. July 2007. (Revised July 2008, March 2009.)
  8. 1 2 3 4 5 6 7 8 9 10 Waterhouse, Peter. "Improving IT Economics: Thinking Lean". CA White Paper. November 2008.
  9. 1 2 3 Masters of Lean IT: How 3 Visionary IT Executives Maximize Value and Minimize Waste. Interviews with John Parkinson (Chief Technology Office, TransUnion), Mike Yorwerth (Group Technology and Architecture Director, Tesco), and Marc Silvester (Chief Technology Office, Fujitsu Services), published by CA, Inc (2009).
  10. The value-stream methodology originated at Toyota, where it is known as Material and Information Flow Mapping. See Learning to See: Value-Stream Mapping to Create Value and Eliminate Muda by Mike Rother and John Shook (Lean Enterprise Institute 1999, ISBN   0-9667843-0-8). The methodology has since been developed by James Womack and Daniel Roos while researching their seminal book The Machine that Changed the World (see References below).
  11. Rother, Mike; Shook, John. Learning to See: Value-Stream Mapping to Create Value and Eliminate Muda. Lean Enterprise Institute 1999. ISBN   0-9667843-0-8
  12. Executive Vice President
  13. capital expenditures
  14. operating expenses
  15. Although repositories similar to CMDBs have been used by IT departments for many years, the term CMDB stems from ITIL (Information Technology Infrastructure Library) — a series of books published by the United Kingdom's Office of Government Commerce containing concepts, policies, and recommended practices on a broad range of IT management topics
  16. The Evolution of Job Scheduling: CA's Approach to Workload Automation. (IDC White Paper, November 2007)
  17. Isidore, Chris. "It's official: Recession since Dec '07". CNNmoney.com. December 1, 2008
  18. 1 2 Jones, Daniel T. Lean Survival Archived 2009-12-29 at the Wayback Machine . Lean Enterprise Academy Letter e-Letter. March 19, 2009.
  19. Rappaport, Liz; Ng, Serena. "New Fears as Credit Markets Tighten Up.". Wall Street Journal. March 9, 2009
  20. Grynbaum, Michael M. "Outlook Grows More Dire for Housing Market.". New York Times. November 25, 2008
  21. Reynolds, Glenn. "Tax Day Becomes Protest Day.". Wall Street Journal. April 15, 2009
  22. Hagenbaugh, Barbara; Krantz, Matt; Kirchhoff, Su. "Wave of layoffs in U.S., Europe show severity of the recession.". USA Today. January 30, 2009
  23. Mamudi, Sam. " Treasury Money-Market Funds Shut the Door.". MarketWatch: Wall Street Journal Digital Network. January 27, 2009
  24. "Technology and the Lean Enterprise" [ permanent dead link ] SAP White Paper, January 18, 2008
  25. These include internal business functions such as enterprise resource planning and human resources management, business-to-business applications such as supply-chain management and hosted solutions, and customer-facing functions such as sales and customer service.
  26. "Customer Experience Manager: Real-Time Visibility into Web-Based Transactions for IT and Business Managers" CA Technology Brief. March 2009
  27. Merging Information Technology and Business, Archived 2008-12-07 at the Wayback Machine a commentary by SAP Chairman Henning Kagermann
  28. Verity, John W. "When Green Delivers Green" Archived 2011-07-16 at the Wayback Machine . Smart Enterprise Magazine. Volume 3. No. 1
  29. "Get Lean an Green in 2009." IBM product page.
  30. Samson, Ted. "The Green IT Leaders of 2009" Infoworld April 22, 2009.
  31. "Green IT: Corporate Strategies". Business Week. February 11, 2008
  32. Weston, Rusty. "Greening the Data Center" Archived 2008-06-12 at the Wayback Machine Smart Enterprise Magazine. Volume 2. No. 1
  33. "CA Enables Lean IT to Help Maximize Value and Minimize Cost. April 27, 2009". Archived from the original on February 5, 2010. Retrieved May 6, 2009.
  34. Chapman, Siobhan. Lean Methods Drive Heathrow Terminal 5 Development Computerworld UK. July 17, 2007
  35. Werdigier, Julia; Clark, Nicola. New Competition and Cancellations at Heathrow Vex British Airways International Herald Tribune. April 1, 2009
  36. More generally, challenges of this kind are the subject of change management.
  37. James Womack and Daniel Jones, leading consultants in the field, emphasize that lean consumption isn't about reducing the amount customers buy. Rather, it is about providing the full value that customers desire from their goods and services, with the greatest efficiency. See Womack, James P. and Jones, Daniel T. "Lean Consumption." Harvard Business Review. March 2005
  38. "ADM Outsourcing: Go/No Go?" Archived 2009-05-16 at the Wayback Machine — commentary on and excerpts from Aberdeen Group report "Does Outsourcing Application Development, Maintenance Pay Off?
  39. Perry, Randy; Grieser, Tim; Hatcher, Eric. "Improving IT Economics and Gaining Business Value with CA's Enterprise IT Management Software: An ROI Study". IDC paper. November 2008. This paper reports that the greatest benefit from adopters of Lean IT is the subsequent increase in IT productivity, which accounted for approximately 61% of the total benefit ($78,000 for every 100 users).
  40. Tesco operates in the United States under the brand "Fresh & Easy'
  41. Griffith, Victoria. "Welcome to Tesco, Your 'Glocal' Superstore." Strategy+Business. First Quarter 2002
  42. Kleiner, Art. "Leaning Toward Utopia: A Profile of Dan Jones and Jim Womack." Archived 2011-10-07 at the Wayback Machine Strategy+Business. July 2005
  43. Lean Government in Cape Coral (Office City Web Site) Archived 2010-06-26 at the Wayback Machine
  44. "Cape Coral Lean Government Update". CapeCoral.net. Archived from the original on April 3, 2008. Retrieved January 28, 2017.
  45. Gilbert, Maria. "The City of Cape Coral Enables Leaner Government with AMX and JD Edwards" Reuters. March 6, 2009
  46. Antony, Jiju. "Pros and cons of Six Sigma: an academic perspective" Archived 2008-07-23 at the Wayback Machine . January 7, 2008
  47. Upton, Malcolm T.; Cox, Charles (2004). Lean Six Sigma: A Fusion of Pan-Pacific Process Improvement. Pan-Pacific Conference XXI, May, Anchorage, AK.
  48. Software Engineering Institute web site: "What is CMMI?" page
  49. ITGI is a U.S.–based research "think tank" on IT governance, oriented predominantly towards enterprises. See the ITGI web site About ITGI [ permanent dead link ] for more.
  50. COBIT 4.1 brochure from the IT Governance Institute (ITGI)

Related Research Articles

<span class="mw-page-title-main">Lean manufacturing</span> Methodology used to improve production

Lean manufacturing is a method of manufacturing goods aimed primarily at reducing times within the production system as well as response times from suppliers and customers. It is closely related to another concept called just-in-time manufacturing. Just-in-time manufacturing tries to match production to demand by only supplying goods that have been ordered and focus on efficiency, productivity, and reduction of "wastes" for the producer and supplier of goods. Lean manufacturing adopts the just-in-time approach and additionally focuses on reducing cycle, flow, and throughput times by further eliminating activities that do not add any value for the customer. Lean manufacturing also involves people who work outside of the manufacturing process, such as in marketing and customer service.

<span class="mw-page-title-main">Product lifecycle</span> Duration of processing of products from inception, to engineering, design & manufacture

In industry, product lifecycle management (PLM) is the process of managing the entire lifecycle of a product from its inception through the engineering, design and manufacture, as well as the service and disposal of manufactured products. PLM integrates people, data, processes, and business systems and provides a product information backbone for companies and their extended enterprises.

Capability Maturity Model Integration (CMMI) is a process level improvement training and appraisal program. Administered by the CMMI Institute, a subsidiary of ISACA, it was developed at Carnegie Mellon University (CMU). It is required by many U.S. Government contracts, especially in software development. CMU claims CMMI can be used to guide process improvement across a project, division, or an entire organization.

Quality management ensures that an organization, product or service consistently functions well. It has four main components: quality planning, quality assurance, quality control, and quality improvement. Quality management is focused both on product and service quality and the means to achieve it. Quality management, therefore, uses quality assurance and control of processes as well as products to achieve more consistent quality. Quality control is also part of quality management. What a customer wants and is willing to pay for it, determines quality. It is a written or unwritten commitment to a known or unknown consumer in the market. Quality can be defined as how well the product performs its intended function.

Lean software development is a translation of lean manufacturing principles and practices to the software development domain. Adapted from the Toyota Production System, it is emerging with the support of a pro-lean subculture within the agile community. Lean offers a solid conceptual framework, values and principles, as well as good practices, derived from experience, that support agile organizations.

<span class="mw-page-title-main">Operations management</span> In business operations, controlling the process of production of goods

Operations management is concerned with designing and controlling the production of goods and services, ensuring that businesses are efficient in using resources to meet customer requirements.

Lean government refers to the application of Lean Manufacturing principles and methods to both identify and then implement the most efficient, value added way to provide government services. Government agencies have found that when Lean is implemented, they see an improved understanding of how their own processes work, that it facilitates the quick identification and implementation of improvements and that it builds a culture of continuous improvement.

Muda is a Japanese word meaning "futility", "uselessness", or "wastefulness", and is a key concept in lean process thinking such as in the Toyota Production System (TPS), denoting one of three types of deviation from optimal allocation of resources. The other types are known by the Japanese terms mura ("unevenness") and muri ("overload"). Waste in this context refers to the wasting of time or resources rather than wasteful by-products and should not be confused with waste reduction.

Genba is a term used in business for the location where value is created, such as a factory floor, construction site, or sales floor.

Takt time, or simply takt, is a manufacturing term to describe the required product assembly duration that is needed to match the demand. Often confused with cycle time, takt time is a tool used to design work and it measures the average time interval between the start of production of one unit and the start of production of the next unit when items are produced sequentially. For calculations, it is the time to produce parts divided by the number of parts demanded in that time interval. The takt time is based on customer demand; if a process or a production line are unable to produce at takt time, either demand leveling, additional resources, or process re-engineering is needed to ensure on-time delivery.

An enterprise portal, also known as an enterprise information portal (EIP), is a framework for integrating information, people and processes across organizational boundaries in a manner similar to the more general web portals. Enterprise portals provide a secure unified access point, often in the form of a web-based user interface, and are designed to aggregate and personalize information through application-specific portlets.

<span class="mw-page-title-main">Value-stream mapping</span> Lean-management method for analyzing the current state and designing a future state

Value-stream mapping, also known as material- and information-flow mapping, is a lean-management method for analyzing the current state and designing a future state for the series of events that take a product or service from the beginning of the specific process until it reaches the customer. A value stream map is a visual tool that displays all critical steps in a specific process and easily quantifies the time and volume taken at each stage. Value stream maps show the flow of both materials and information as they progress through the process.

Lean dynamics is a business management practice that emphasizes the same primary outcome as lean manufacturing or lean production of eliminating wasteful expenditure of resources. However, it is distinguished by its different focus of creating a structure for accommodating the dynamic business conditions that cause these wastes to accumulate in the first place.

Lean services is the application of lean manufacturing production methods in the service industry. Lean services have among others been applied to US health care providers and the UK HMRC.

Lean startup is a methodology for developing businesses and products that aims to shorten product development cycles and rapidly discover if a proposed business model is viable; this is achieved by adopting a combination of business-hypothesis-driven experimentation, iterative product releases, and validated learning. Lean startup emphasizes customer feedback over intuition and flexibility over planning. This methodology enables recovery from failures more often than traditional ways of product development.

Lean enterprise is a practice focused on value creation for the end customer with minimal waste and processes. Principals derive from lean manufacturing and Six Sigma. The lean principles were popularized by Toyota in the automobile manufacturing industry, and subsequently the electronics and internet software industries.

Lean product development (LPD) is an approach to product development that specializes in minimizing waste. Other core principles include putting people over the product and creating new values in services and physical products. This method of product development has been adopted by companies such as Toyota

The Digital Firm is a kind of organization that has enabled core business relationships through digital networks In these digital networks are supported by enterprise class technology platforms that have been leveraged within an organization to support critical business functions and services. Some examples of these technology platforms are Customer Relationship Management (CRM), Supply Chain Management (SCM), Enterprise Resource Planning (ERP), Knowledge Management System (KMS), Enterprise Content Management (ECM), and Warehouse Management System (WMS) among others. The purpose of these technology platforms is to digitally enable seamless integration and information exchange within the organization to employees and outside the organization to customers, suppliers, and other business partners.

Design for lean manufacturing is a process for applying lean concepts to the design phase of a system, such as a complex product or process. The term describes methods of design in lean manufacturing companies as part of the study of Japanese industry by the Massachusetts Institute of Technology. At the time of the study, the Japanese automakers were outperforming the American counterparts in speed, resources used in design, and design quality. Conventional mass-production design focuses primarily on product functions and manufacturing costs; however, design for lean manufacturing systematically widens the design equation to include all factors that will determine a product's success across its entire value stream and life-cycle. One goal is to reduce waste and maximize value, and other goals include improving the quality of the design and the reducing the time to achieve the final solution. The method has been used in architecture, healthcare, product development, processes design, information technology systems, and even to create lean business models. It relies on the definition and optimization of values coupled with the prevention of wastes before they enter the system. Design for lean manufacturing is system design.

Daniel T. Jones is an English author and researcher. He won the Shingo Prize for Operational Excellence in the Research and Professional Publication category multiple times for his books The Machine that Changed the World, Lean Thinking: Banish Waste and Create Wealth in Your Organization and Seeing the Whole: Mapping the Extended Value Stream.

References