Liquefied natural gas industry in Russia

Last updated

The first plant, Sakhalin II, was completed in Russia in 2009 having utilised the skills of Shell plc, who had sold 50% of the project to Gazprom in 2006. Prior to 2017 Gazprom was the sole producer of Liquefied Natural Gas (LNG) in Russia.

Contents

The cost of a large LNG plant can be massive, with a plant costing $15-25 billion and often needing additional infrastructure of a town, pipelines to bring in gas, storage facilities, a port and ships to export the LNG, raising the cost to $30-50 billion, [1] often needing foreign investment and being given tax concessions to help fund the project.

LNG forms part of Russia's long term Energy strategy. In 2013 private Russian companies were authorized to export LNG. An increase in production capacity from 2017 saw a threefold increase in exports from 11 to 33 million tons per annum (MTPA) by 2022. [2]

LNG life-cycle. LNGprocess.png
LNG life-cycle.

Companies

The leading LNG company in Russia is Novatek who has plans to generate LNG capacity of 70 MTPA by 2030. [3] In December 2022, French company TotalEnergies withdrew from the Novatek board and wrote off their $3.7 billion shareholding in Novatek as a result of sanctions following the 2022 Russian invasion of Ukraine. [4]

Gazprom is undertaking very few developments, with Portovaya LNG being the only plant that has been built for them, Baltic LNG was under construction in 2023.

Rosneft is only in the design stage of LNG plants. [2]

Exports

In 2022 Russia was the fourth largest LNG exporter with sales expected to increase as the production capacity rises to 15-20% of the world market by 2035. [2]

The global demand for LNG is expected to rise around 85% from 2021 levels to 650-700 MTPA by 2040 with the USA and Qatar, which already export 70-80 MTPA each, expected to fill this new market. [2]

Exports from the Arctic plants relies on ice breaking LNG carriers, only a few Arc7-class tankers have been built of the 21 ordered. [5] 15 are being built in Russia at a cost of $9.6 billion, however the hulls were to be built in South Korea and essential equipment on board the ships is sourced from South Korea and Japan which has sanctions implications, the remaining 6 are being constructed in South Korea. [6] Three Korean construction orders were cancelled in May 2022 when payment deadlines were missed. [7]

From 2014 Russia used Fluxys facilities in Zeebrugge, Belgium for transshipment of LNG exports to the Asia-Pacific region or to feed into the EU network. [8] In 2023 the EU is proposing a law to allow EU countries to block Russia using LNG terminals in Europe, which may block access to the Fluxys terminal, [9] this wider proposed EU law, planned for 2024, would control all gas energy products, allowing the EU to block Russian access to European pipelines and LNG terminals making delivery impossible, allowing countries to cancel long term supply contracts by claiming force majeure . [10]

With the European Union committed to ending the purchase of fossil fuels from Russia by 2027, Russia must seek LNG markets elsewhere. [11]

Plants

Technology

Liquefaction process

The most important infrastructure needed for LNG production and transportation is an LNG plant consisting of one or more LNG trains, each of which is an independent unit for gas liquefaction and purification. A typical train consists of a compression area, propane condenser area, and methane and ethane areas.

Storage

Floating storage units are needed at the arctic plants to hold the LNG before transfer to an Arc7 LNG gas tanker for onward shipment.

Transportation

Transhipment from the arctic plants need a specialist ship. The first-generation Yamalmax LNG carriers were designed to be capable of breaking through ice 1.5 metres (4.9 ft) thick with its bow and 2.1 metres (6.9 ft) ice when travelling backwards. Each ship is 300 metres (980 ft) long and 50 metres (160 ft) wide with a capacity of 172,600 cubic metres (6,100,000 cu ft), powered by 6 diesel electric engines giving 45 megawatts with the propulsion capable of rotating 360 degrees. 15 Arc7 ships serve the Yamal LNG plant. [12]

Second-generation Arc7 ships were designed in December 2020 by Finnish icebreaker designer Aker Arctic, along with South Korea’s Daewoo Shipbuilding & Marine Engineering. The first are currently under construction, with 51 MW power units making them capable of dealing with thicker ice. Novatek needs 42 of the new design to serve the new Arctic LNG 1, 2 and 3 plants and deliver the LNG eastwards to Kamchatka for onward delivery to Asian customers. [12]

Operational plants

Russian and Western politicians visit the Sakhalin-II project on 18 February 2009 Dmitry Medvedev in Yuzhno-Sakhalink 18 February 2009-2.jpg
Russian and Western politicians visit the Sakhalin-II project on 18 February 2009

Planned plants

Sanctions

In 2014 US sanctions prohibited Western companies from working on Russian Arctic offshore oil projects. Novatek was also sanctioned to block western finance of projects. [31]

Following the February 2022 invasion of Ukraine, international sanctions have been placed on many Russian exports, but not directly on Russian LNG exports, although some countries have imposed bans on imports into their own countries including the USA, the Baltic states and the UK. [32] [33]

The EU continues to import LNG from Russia, and in 2022 increased their purchases by 35% to 13.8 million tons (19.2bcm). Spain is a major importer of Russian LNG in 2022 and 2023 at around 5m tons. [34] [2] France bought 3.6m tonnes and 4.9m tonnes went through Zeebrugge. In 2023 the EU was importing roughly the same amount of gas in LNG form, as it was receiving via pipelines, both around 25bcm p.a. [35]

The sanctions that apply to the LNG industry in Russia comprise mainly embargoes on technology and the supply of equipment from Europe and the USA that are needed to build new LNG plants as well as finance for projects. [6] It is believed in 2023 by the sanction countries that the current restrictions will drastically reduce the opportunities for the industry’s expansion in Russia. [2] In July and September 2023 the USA sanctioned individuals and entities, including non-Russian, the aim being to target engineering and construction companies that are involved in various oil and gas projects in Russia including the Arctic LNG 2 plant and transshipment terminals. [5]

Arctic LNG 2 trains two and three will be delayed as gas turbines are not available from the west to power the plant needing a reconfiguration of the system. [22] Delays are also expected in completion of Arc7 gas ships, until late 2024 and an LNG floating storage unit ordered from South Korea. [36] Additional delays from sanctions means that 10 Arc7 ships being built by Russia may not be all completed by 2030 as Samsung Heavy Industries has refused to build blocks and equipment essential for these ships [37] and Gaztransport & Technigaz suspended working with Russia in January 2023. [38]

In December 2023 Novatek announced that the start of Arctic LNG2 will be delayed after sending force majeure notices to some buyers citing sanctions imposed by the US in November make it impossible to supply gas, [39] foreign investors from France, China and Japan had themselves declared “force majeure” halted their participation. [40]

The main Baltic LNG equipment supply company Linde plc pulled out in 2022 due to sanctions issues and additional project suppliers of equipment have also been sanctioned by the US Treasury. [41]

Taxation

LNG exporters are taxable on profits at 20% plus 3% in 2017-24, which increased from 2023-25 with an elevated profits tax of 34%. However Gazprom was exempt from the rise, resulting in complaints from Novatek. [42]

Novateks Yamal LNG does not benefit from the elevated tax exemption, but has a tax break with a 13.5% tax rate for 12 years or until production reached 250bcm [42] and is also exempt from export taxes and mining taxes for nine years.

Government intervention

In 2020, the Russian government approved an incentive program worth over $300 billion for Arctic infrastructure, industrial, LNG and oil and gas extraction projects, to encourage others to invest in the Arctic. [31]

In 2021, the government agreed to the Russian National Wealth Fund providing loans for the expansion of the Baltic LNG plant, an unprecedented size of loan for a single lender. [28] Gazprom noted it wished to strengthen its position in foreign LNG markets. [27]

In December 2023 a Russian presidential decree gave the government the power to confiscate and forcibly sell off assets belonging to European energy firms. New Russian-run companies have been created to take over shares in the Yuzhno-Russkoye oil and gas field, currently owned by Austria’s OMV and Germany’s Wintershall Dea. [43]

In December 2023 the Russian government ordered oil and gas producers to install anti drone protection at their installations, to ward off Ukrainian drone attacks. [44]

Environment

The exploitation of fossil fuels, especially in the Arctic is of concern to environmentalists. Russia’s 2020 Arctic strategy envisions transforming it into a competitive Asia-Europe maritime corridor by 2035, [31] assisted by global warming which is making the normally frozen solid Northern Sea Route (NSR) more accessible. Due to its shorter length, navigation on the NSR contributes to reducing the carbon footprint of maritime transport, although this entails considerable risks for fragile Arctic ecosystems.

A 2022 report from the Russian Federal Service for Hydro-meteorology and Environmental Monitoring found that average temperatures along the Russian Arctic coast have increased by approximately 5 degrees Celsius since 1998. [45] Russia has no plans to become carbon neutral before 2100 and intends to exploit fossil fuels in the Arctic for the Asian market. [46]

The Arctic Council which represents the eight countries that have sovereignty in the Arctic and the resident Circumpolar peoples (Indigenous peoples), is limited to environmental protection, scientific research, and sustainable development but seems ineffective at controlling industrial development.

LNG is associated with climate change awareness, as the use of LNG generates about 50% less carbon dioxide than coal and 30% less carbon dioxide than oil. [11]

It was reported in August 2022 that the Portovaya LNG plant was burning off 4.34 million cubic metres of gas, worth $10m by flare every day, generating 9,000 tonnes of CO2 and soot. [47]

Statistics

LNG production and exports
YearProductionExportsNote
million tons
201610.9 (16Bcm)10.8 [2]
201711.811.1 [2]
201820.018.3 [2]
201929.829.3 [2]
202030.729.6 [2]
202130.529.6 [2]
202233.5 (49Bcm)32.9 [2] [48]
202332.3 [49]

Related Research Articles

<span class="mw-page-title-main">Gazprom</span> Russian oil and gas company

PJSC Gazprom is a Russian majority state-owned multinational energy corporation headquartered in the Lakhta Center in Saint Petersburg. As of 2019, with sales over $120 billion, it was, until 2023, ranked as the largest publicly listed natural gas company in the world and the largest company in Russia by revenue. In the 2020 Forbes Global 2000, Gazprom was ranked as the 32nd largest public company in the world. The Gazprom name is a contraction of the Russian words gazovaya promyshlennost. In January 2022, Gazprom displaced Sberbank from the first place in the list of the largest companies in Russia by market capitalization. In 2022, the company's revenue amounted to 8 trillion rubles. In 2023, the company is delisted from international markets, and continues substantial constriction in its operational results.

<span class="mw-page-title-main">Yamalo-Nenets Autonomous Okrug</span> Autonomous okrug in Ural, Russia

The Yamalo-Nenets Autonomous Okrug or Yamalia is a federal subject of Russia and an autonomous okrug of Tyumen Oblast. Its administrative center is the town of Salekhard, and its largest city is Novy Urengoy. The 2021 Russian Census recorded its population as 510,490.

<span class="mw-page-title-main">Liquefied natural gas</span> Form of natural gas for easier storage and transport

Liquefied natural gas (LNG) is natural gas (predominantly methane, CH4, with some mixture of ethane, C2H6) that has been cooled down to liquid form for ease and safety of non-pressurized storage or transport. It takes up about 1/600th the volume of natural gas in the gaseous state at standard conditions for temperature and pressure.

The Sakhalin-2 project is an oil and gas development in Sakhalin Island, Russia. It includes development of the Piltun-Astokhskoye oil field and the Lunskoye natural gas field offshore Sakhalin Island in the Okhotsk Sea, and associated infrastructure onshore. The project is managed and operated by Sakhalin Energy Investment Company Ltd..

Polskie Górnictwo Naftowe i Gazownictwo S.A., abbreviated to PGNiG, is a Polish state-controlled oil and gas company, headquartered in Warsaw, Poland. The company has branches and representative offices in Russia, Pakistan, Belarus and Ukraine and holds equity interests in some 30 subsidiaries, including providers of specialist geophysical, drilling and well services.

<span class="mw-page-title-main">Novatek</span> Russian natural gas producer

Novatek is Russia's second-largest natural gas producer, and the seventh-largest publicly traded company globally by natural gas production volume. The company was originally known as OAO FIK Novafininvest. Novatek is based in the Yamalo-Nenets Autonomous Region in West Siberia, and maintains a head office in Moscow. In the 2020 Forbes Global 2000, Novatek was ranked as the 316th-largest public company in the world.

<span class="mw-page-title-main">Petroleum industry in Russia</span> One of the largest in the world

The Petroleum or oil industry in Russia is one of the largest in the world. Russia has the largest reserves and was the largest exporter of natural gas. It has the sixth largest oil reserves, and is one of the largest producers of oil. It is the fourth largest energy user.

<span class="mw-page-title-main">GAIL</span> Central Public Sector Undertaking

GAIL (India) Limited is a central public sector undertaking. It has the following business segments: natural gas, liquified natural gas, liquid hydrocarbon, liquefied petroleum gas transmission, petrochemicals, city gas distribution, renewable energy including solar & wind, exploration and production, GAILTEL and electricity generation. GAIL was given the Maharatna status on the 1 February 2013 by the Indian Government, a status which 11 other Public Sector Undertakings (PSUs) have.

<span class="mw-page-title-main">Ust-Luga</span> Village in Leningrad Oblast, Russia

Ust-Luga is a settlement and railway station in Kingiseppsky District of Leningrad Oblast, Russia, near the Estonian border, situated on the Luga River near its entry into the Luga Bay of the Gulf of Finland, about 110 kilometres (68 mi) west of St. Petersburg.

Baltic LNG is a liquefied natural gas plant under construction on the Gulf of Finland of the Baltic Sea in Ust-Luga, Leningrad Oblast, Russia. The plant's capacity would be 13 million tons of LNG per year. The planned launch date has changed many times, and according to the latest plans, the first line will start operating in 2024 and the second line in 2025. The cost of the project is estimated at 2.4 trillion rubles. On October 7, 2021, it was announced that the LNG plant might be expanded to three lines. The third line could be introduced by 2026, which would increase the plant's capacity to 20 million tons per year, reaching the capacity of Arctic LNG-2.

<span class="mw-page-title-main">Energy in Russia</span> Overview of the production, consumption, import and export of energy and electricity in Russia

The Energy in Russia is an area of the national economy, science, and technology of the Russian Federation, encompassing energy resources, production, transmission, transformation, accumulation, distribution, and consumption of various types of energy.

Gryazovets–Vyborg gas pipeline is a branch pipeline of the Northern Lights pipeline from Gryazovets in central part of Russian Federation through Vologda and Leningrad oblasts to Saint Petersburg, Vyborg, and Finland. The third line of this pipeline was built to feed the Nord Stream 1 pipeline.

<span class="mw-page-title-main">Russia in the European energy sector</span>

Russia supplies a significant volume of fossil fuels to other European countries. In 2021, it was the largest exporter of oil and natural gas to the European Union, (90%) and 40% of gas consumed in the EU came from Russia.

<span class="mw-page-title-main">Energy in Hungary</span>

Energy in Hungary describes energy and electricity production, consumption and import in Hungary. Energy policy of Hungary describes the politics of Hungary related to energy.

<span class="mw-page-title-main">Świnoujście LNG terminal</span> LNG terminal in Poland

The Świnoujście LNG terminal is a liquefied natural gas (LNG) import terminal at Świnoujście, in the extreme north-west of Poland near the Polish-German border. The LNG terminal is operated by Polskie LNG S.A., a subsidiary of Gaz-System. The cornerstone for construction was laid on 23 March 2011 and it took its first LNG delivery on 11 December 2015. The terminal's regasification capacity is 5 billion cubic metres per annum. The terminal is currently being expanded and once the expansion is complete in 2023, it will have a capacity of 7.5 billion cubic metres per annum and be able to satisfy about half of Poland's annual natural gas demand. Together with the 10 bcm of natural gas that Poland will receive annually from Norway via the Baltic Pipe natural gas pipeline, the Świnoujście LNG terminal will allow Poland to achieve its long-term goal of becoming fully independent of Russian natural gas, which had previously been the source of almost all of the country's natural gas.

Yamal LNG is a joint venture led by Novatek based around a liquefied natural gas plant located in Sabetta at the north-east of the Yamal Peninsula, northwest Siberia, Russia. In addition to the LNG plant, the project includes production at the Yuzhno-Tambeyskoye gas field, and the transport infrastructure, including the Sabetta seaport and airport.

<span class="mw-page-title-main">Sabetta</span> Place in Yamalo-Nenets Autonomous Okrug, Russia

Sabetta is the location of a port and liquified natural gas (LNG) plant—Yamal LNG—on the Yamal Peninsula, in the north of Russia along the Northern Sea Route.

<span class="mw-page-title-main">2022–2023 Russia–European Union gas dispute</span> Fossil fuel financing-related conflicts

The Russia–EU gas dispute flared up in March 2022 following the invasion of Ukraine on 24 February 2022. Russia and the major EU countries clashed over the issue of payment for natural gas pipelined to Europe by Russia's Gazprom, amidst sanctions on Russia that were expanded in response to Russia's 2022 invasion of Ukraine. In June, Gazprom claimed it was obliged to cut the flow of gas to Germany by more than half, as a result of such sanctions that prevented the Russian company from receiving its turbine component from Canada. On 26 September 2022, three of the four pipes of the Nord Stream 1 and 2 gas pipelines were sabotaged. This resulted in a record release of 115,000 tonnes of methane (CH4) – an equivalent of 15 million tonnes of carbon dioxide (CO2) – and is believed to have made a contribution to global warming.

As part of the sanctions imposed on the Russian Federation as a result of the Russo-Ukrainian War, on 3 December 2022, the European Union (EU) agreed to cap the price of natural gas in order to reduce the volatility created by Russia in the gas market.

References

  1. "Russian LNG: The long road to export" (PDF). December 2013.
  2. 1 2 3 4 5 6 7 8 9 10 11 12 13 "Unfulfilled ambitions: Russia's LNG sector in the grip of sanctions". 5 June 2023.
  3. 1 2 "Novatek Discovers New Arctic Gas Field as Russian LNG Exports to Europe Soar". 23 January 2023.
  4. "TotalEnergies Withdraws from Novatek Board Taking $3.7bn Loss As Novatek Announces Discovery of New Arctic Gas Field". 15 December 2022.
  5. 1 2 "US Sanctions Pile Pressure on Russia's LNG Plans". 20 September 2023.
  6. 1 2 3 "Arctic LNG 2 faces major hurdles from new EU sanctions". 25 April 2022.
  7. "South Korean DSME Cancels Contract for Novatek Arctic LNG Carriers". 27 May 2022.
  8. "Belgian Energy Minister regrets flow of Russian gas through country". 8 September 2023.
  9. "EU to give member states power to block Russian gas imports". 8 December 2023.
  10. "EU Contemplating Regulation to Shut Out Russian Gas: Overview of Proposed Changes and Roadmap for Readiness". 9 January 2024.
  11. 1 2 Environment in Times of War: Climate and Energy Challenges in the Post-Soviet Region (PDF). June 2022.
  12. 1 2 "PROJECT SPOTLIGHT: ARC7 LNG CARRIERS [LNG CONDENSED]". 13 January 2021.
  13. Miriam Elder (27 December 2008). "Russia look to control world's gas prices". Telegraph. Archived from the original on 29 December 2008. Retrieved 2008-12-27.
  14. News Service (7 April 2014). "Главный газовый проект на Ямале расширяет навигацию. Он получит перевалочную базу в Европе" [The main gas project in Yamal is expanding navigation. It will receive a transshipment base in Europe]. Znak.com (in Russian). Retrieved 4 January 2020.
  15. "Yamal LNG: an economic project under political pressure". 4 August 2016.
  16. "About the project" . Retrieved 31 October 2023.
  17. "Capacity at Cryogas-Vysotsk LNG plant to rise to 900,000 tonnes/year in Q1 2024 - Novatek CEO". 12 September 2023.
  18. "Gazprom hits Portovaya LNG production milestone". 30 May 2023.
  19. "Gazprom hands bank 50% stake in Russian LNG export plant". 3 January 2024.
  20. "Transport of LNG Modules to Russia Continues, Calling Effectiveness of EU Sanctions Into Question". 11 September 2023.
  21. 1 2 "Novatek's planned Murmansk LNG plant has cleared a key hurdle. The project will benefit from the expected liberalization of the liquefied natural gas sector and would become the company's third project in the Arctic". 10 October 2023.
  22. 1 2 "Russia's largest independent gas producer delivers first train to flagship Arctic LNG 2 project". 14 August 2023.
  23. "Undeterred by Sanctions Novatek Begins Production at Arctic LNG 2". 10 January 2024.
  24. "Lack of Arctic tankers puts Russia's LNG development dreams on ice". 2 January 2024.
  25. "TotalEnergies initiates force majeure on Russia's Arctic LNG 2". 17 January 2024.
  26. Seligman, Ben (12 July 2021). "What do we know about Novatek's potential Arctic LNG 3 Project?".
  27. 1 2 "Gazprom aiming to expand liquefied natural gas production for foreign and domestic markets" (Press release). Gazprom. 28 October 2021. Retrieved 29 October 2021.
  28. 1 2 Afanasiev, Vladimir (22 September 2021). "State lifeline: Russia promises 2 billion to Baltic LNG project". Upstream. Oslo. Retrieved 31 October 2021.
  29. "Linde, Renaissance Heavy score Ust-Luga LNG EPC deal". 9 September 2021.
  30. "Court freezes Linde's Russian assets in Baltic LNG spat". 4 January 2023.
  31. 1 2 3 "Russia in the Arctic—A Critical Examination". 29 March 2021.
  32. "UK Bans the import of liquefied natural gas from the Russian Federation and related funds and services". 28 October 2022.
  33. "Lithuania bans imports of Russian LNG". 26 October 2023.
  34. "Russia's Pipeline Gas Exports to Europe Pick Up". Energy Intelligence. 17 August 2023.
  35. "Do future Russian gas pipeline exports to Europe matter anymore?" (PDF). July 2023.
  36. "Novatek's new 400 meter long LNG storage vessel is entering Arctic waters". 19 June 2023.
  37. "Russia's Ambitious LNG Plans Stalled by Arctic Tanker Shortage and Sanctions". 22 December 2023.
  38. "Court freezes Linde's Russian assets in Baltic LNG spat". 4 January 2023.
  39. "U.S. sanctions halt gas supplies from Russian LNG project - Bloomberg". 22 December 2023.
  40. "Foreign Shareholders Suspend Participation in Russia's Arctic LNG 2 Project – Kommersant". 25 December 2023.
  41. "US targets Baltic LNG suppliers with secondary sanctions". 13 December 2023.
  42. 1 2 "Russian Duma passes law exempting Gazprom and subsidiaries from elevated 34% profit tax for LNG exporters". 9 February 2023.
  43. "Russia to seize energy assets from 'unfriendly' European countries". 20 December 2023.
  44. "Russian players urged to build arsenals at oil and gas installations". 29 December 2023.
  45. "How Is Climate Change Shaping Russia's Arctic Policy and Activities?". 19 July 2022.
  46. "Russia resists tougher climate targets in dash for Arctic gas". 16 November 2020.
  47. "Climate change: Russia burns off gas as Europe's energy bills rocket". 26 August 2022.
  48. "Russian LNG exports to Europe fell 1.9% in 2023 – LSEG data". 3 January 2024.
  49. "Russian LNG exports set to hit record high despite sanctions". 10 January 2024.