This article needs additional citations for verification .(May 2019) |
The list of ship commissionings in 1908 includes a chronological list of ships commissioned in 1908. In cases where no official commissioning ceremony was held, the date of service entry may be used instead.
USS Grampus (SS-4), a Plunger-class submarine later named A-3, was the fourth ship of the United States Navy to be named for a member of the dolphin family, Grampus griseus.
USS Adder, later renamed A-2, was one of seven Plunger-class submarines built for the United States Navy (USN) in the first decade of the 20th century.
USS Moccasin (SS-5) was one of seven Plunger-class submarines built for the United States Navy (USN) in the first decade of the 20th century.
The first USS Pike (SS-6) was a Plunger-class submarine in the service of the United States Navy, later renamed as A-5.
The third USS Porpoise (SS-7) was an early Plunger-class submarine in the service of the United States Navy, later renamed as A-6.
USS Shark (SS-8) was the third vessel of the U.S. Navy to bear the name. She was an early Plunger-class submarine in the service of the United States Navy, later renamed as A-7.
USS S-15 (SS-120) was a second-group S-class submarine of the United States Navy. Her keel was laid down on 13 December 1917 by the Lake Torpedo Boat Company in Bridgeport, Connecticut. She was launched on 8 March 1920 sponsored by Mrs. Simon Lake, and commissioned on 15 January 1921 with Lieutenant Commander David R. Lee in command.
USS B-3 (SS-12) was one of three B-class submarines built for the United States Navy in the first decade of the 20th century.
USS B-2 (SS-11) was one of three B-class submarines built for the United States Navy in the first decade of the 20th century.
The C-class submarines were five United States Navy submarines built by the Fore River Shipbuilding Company in Quincy, Massachusetts, under a subcontract from the Electric Boat Company. Built between 1906 and 1909, and in commission from 1908 to 1919, all five were subsequently sold for scrap in 1920. They were considerably larger than the preceding B class at 275 tons submerged vs. 173 tons submerged, and were the first United States submarines with two-shaft propulsion, doubling the machinery of the B class.
USS Pompey (AF-5) was an auxiliary ship of the United States Navy, acquired in 1898 for service in the Spanish–American War, which went on to serve as a collier, tender, and storeship in the Philippines, before being sold into commercial service after World War I. She was sunk by Japanese aircraft in 1941.
Decommissioned on 28 November 1906, Pike remained inactive until 8 June 1908
Decommissioned at Mare Island on 28 November 1906, Grampus remained inactive until recommissioned on 13 June 1908.
Shark was launched soon after her arrival at Cavite in July and was recommissioned on 14 August 1908.
Arriving at the Naval Station at Cavite, Porpoise was launched on 8 July 1908, and recommissioned on 20 November.
Ship events in 1908 | |||||||||||
Ship launches: | 1903 | 1904 | 1905 | 1906 | 1907 | 1908 | 1909 | 1910 | 1911 | 1912 | 1913 |
Ship commissionings: | 1903 | 1904 | 1905 | 1906 | 1907 | 1908 | 1909 | 1910 | 1911 | 1912 | 1913 |
Ship decommissionings: | 1903 | 1904 | 1905 | 1906 | 1907 | 1908 | 1909 | 1910 | 1911 | 1912 | 1913 |
Shipwrecks: | 1903 | 1904 | 1905 | 1906 | 1907 | 1908 | 1909 | 1910 | 1911 | 1912 | 1913 |