Measure R

Last updated

Measure R
Flag of Los Angeles County, California.svg
November 4, 2008 (2008-11-04)

County of Los Angeles Sales Tax
Results
Choice
Votes %
Check-71-128-204-brightblue.svgYes2,039,21467.93%
Light brown x.svgNo962,56932.07%
Los Angeles County Official Results [1]

Measure R was a ballot measure during the November 2008 elections in Los Angeles County, California, that proposed a half-cent sales taxes increase on each dollar of taxable sales (originating in or made from Los Angeles County) for thirty years in order to pay for transportation projects and improvements. The measure was approved by voters with 67.22% of the vote, just over the two-thirds majority required by the state of California to raise local taxes. [2] The project was touted as a way to "improve the environment by getting more Angelenos out of their cars and into the region's growing subway, light rail, and bus services." [3] It will result in the construction or expansion of a dozen rail lines in the county. [4]

Contents

Funding

The ballot measure created an ordinance called the Traffic Relief and Rail Expansion Ordinance, which included an expenditure plan defining specific projects to be funded, timeframes for availability of funds, and expected levels of funding. The ordinance became effective on 2 January 2009 and is set to expire in year 2039. [5] [6] Projects to be funded include expansion of light rail and subway services, freeway improvements, and funds for local cities to spend on their own transportation infrastructure. [7]

After the passage of Measure R in November 2008, the new sales tax rate in Los Angeles County rose to 8.75% (since 2013, 9-10%), second only to Alameda County in California (though there were a few cities whose sales tax rates exceeded the new rate). [2] Before passage, the Los Angeles Economic Development Agency estimated that it would cost each county resident about $25 a year, and each family about $80. [7]

Allocation

The tax is expected to raise $40 billion over thirty years. After subtracting 1.5% for administrative costs, the remaining money must be spent as follows:

Transportation projects

Geographic map of the LA Metro system showing all transit projects included in Measure R LA Metro Measure R map.svg
Geographic map of the LA Metro system showing all transit projects included in Measure R

Examples of transportation projects and improvements cited by proponents of Measure R include beginning the so-called Subway to the Sea, get the Green Line light rail to Los Angeles International Airport, widen the 5 Freeway at the bottleneck before the Orange County line, and add carpool lanes. The sales tax froze regular fares until 2010 and froze fares for seniors, the disabled, students, and those on Medicare thru 14 September 2014. [2]

Most of the projects depending on Measure R for money will require additional funding. This is because in order to secure political support, proponents aimed to offer "something for many constituencies", leading to an ambitious list of transportation projects, which relies in part on federal and state funds making up part of the funding of proposed projects, as has been the case for past projects. [2] Planned expenditures included: [8]

Political support

Proponents

Among prominent politicians, Los Angeles Mayor Antonio Villaraigosa, county Supervisor Zev Yaroslavsky, and Assemblyman Mike Feuer (D-Los Angeles) were the most vocal proponents. The Los Angeles County Federation of Labor and the Los Angeles Area Chamber of Commerce supported it.

Having donated $900,000, the Los Angeles County Museum of Art (LACMA) was the "largest single donor to the effort to raise the sales tax in the county and build more mass transit". According to LACMA surveys, the top three reasons people do not visit the museum pertain to transportation: prospective visitors "live too far, there's too much traffic, and the museum is inconvenient to freeways and mass transit". [9]

Opponents

Los Angeles County Supervisors Michael D. Antonovich, Don Knabe, and Gloria Molina were opposed to the measure, claiming that the "spending plan favors the Westside" and denies other parts of the county such as San Fernando Valley their "fair share of sales tax revenues". [10] MTA board member John Fasana opposed Measure R because he believed it does not "provide enough assurances" that funds will be spent as planned. [2]

Expansion of Measure

Measure J

Measure J
November 6, 2012 (2012-11-06)

Los Angeles County Sales Tax for Transportation
OutcomeDid not reach 2/3 supermajority; failed to pass
Results
Yes
66.11%
No
33.89%

The Los Angeles County Board of Supervisors decided to ask voters on the November 2012 ballot whether or not to extend the half-cent sales tax increase for an additional 30 years until 2069. The board's 10–3 vote came just one day before the opening of the expanded Metro Orange Line - the first project funded by Measure R. [11] Proponents such as Mayor Villaraigosa maintain that it would save money by allowing Metro to take advantage of record low interest rates and construction costs, create thousands of jobs, and speed up the completion of certain projects. [10] In order to fund more transportation projects at the present time, the measuring would permit "bonding against future revenues"—i.e., to "take out loans from the investment market that will not be paid back until beginning in 2039". The extension would not result in new transportation projects; it would merely allow projects on the current list to be completed more quickly, in 10 years instead of 30. [12] The proposal, Measure J, went before the voters on November 6, 2012. It failed to pass, receiving 66.1% of the vote where 66.7% was required. [13] [14]

Measure M

Measure M
November 8, 2016 (2016-11-08)

Los Angeles County Traffic Improvement Plan
Results
Choice
Votes %
Check-71-128-204-brightblue.svgYes2,259,65471.15%
Light brown x.svgNo916,37528.85%
Los Angeles County Official Results [15]

On the November 2016 ballot, LACMTA proposed a $120 billion plan to expand upon Measure R, adding new transit projects and expediting others previously approved under Measure R. The plan, known as Measure M, would make measure R permanent and add an additional half-cent sales tax. [16] Measure M passed with 70.15% of the vote, clearing the two-thirds majority required. [17]

On the 23rd of July, 2019, the Eno Center of Transportation released a report titled "Measure M: Lessons from a Successful Transportation Ballot Campaign", authored by Michael Manville of the UCLA Luskin School of Public Affairs. This report uses Measure M as a successful example of ballot measures as a means to fund transportation. The horizon year for the tax scheme is 2057.

Measure M programmed funding for the following projects: [18]

In March 2020, the City of Inglewood reallocated $233 million from Measure M highway improvement funds to help finance the Inglewood Transit Connector people mover. [19]

See also

Related Research Articles

<span class="mw-page-title-main">Orange County Transportation Authority</span> Transportation planning commission for Orange County, California

The Orange County Transportation Authority (OCTA) is the transportation planning commission for Orange County, California in the Los Angeles metropolitan area. OCTA is responsible for funding and implementing transit and capital projects for the transportation system in the county, including freeway expansions, express lane management, bus and rail transit operation, and commuter rail funding and oversight.

<span class="mw-page-title-main">Los Angeles County Metropolitan Transportation Authority</span> Public transport agency in Los Angeles County, California, United States

The Los Angeles County Metropolitan Transportation Authority (LACMTA), branded as Metro, is the county agency that plans, operates, and coordinates funding for most of the public transportation system in Los Angeles County, California, the most populated county in the United States.

<span class="mw-page-title-main">Santa Clara Valley Transportation Authority</span> Public transit operator in Santa Clara County, California

The Santa Clara Valley Transportation Authority, more commonly known simply as the Valley Transportation Authority (VTA), is a special district responsible for public transit services, congestion management, specific highway improvement projects, and countywide transportation planning for Santa Clara County, California. It serves San Jose, California, and the surrounding Silicon Valley. It is one of the governing parties for the Caltrain commuter rail line that serves the county. In 2022, the VTA's public transportation services had a combined ridership of 21,381,600, or about 84,800 per weekday as of the third quarter of 2023.

<span class="mw-page-title-main">Los Angeles Metro Rail</span> Urban rail transit system

The Los Angeles Metro Rail is an urban rail transit system serving Los Angeles County, California in the United States. It consists of six lines: four light rail lines and two rapid transit lines, serving a total of 101 stations. It connects with the Metro Busway bus rapid transit system, the Metrolink commuter rail system, as well as several Amtrak lines. Metro Rail is owned and operated by the Los Angeles County Metropolitan Transportation Authority (Metro).

<span class="mw-page-title-main">G Line (Los Angeles Metro)</span> Bus rapid transit line

The G Line is a bus rapid transit line in Los Angeles, California, operated by the Los Angeles County Metropolitan Transportation Authority (Metro). It operates between Chatsworth and North Hollywood stations in the San Fernando Valley. The 17.7-mile (28.5 km) G Line uses a dedicated, exclusive right-of-way for the entirety of its route with 17 stations located at approximately one-mile (1.6 km) intervals; fares are paid via TAP cards at vending machines on station platforms before boarding to improve performance. It is one of the two lines in the Los Angeles Metro Busway system.

<span class="mw-page-title-main">San Jose Diridon station</span> Transit hub in San Jose, California, U.S.

San Jose Diridon station is the central passenger rail depot for San Jose, California. It also serves as a major intermodal transit center for Santa Clara County and Silicon Valley. The station is named after former Santa Clara County Supervisor Rod Diridon Sr.

<span class="mw-page-title-main">Regional Connector</span> Transit project in Los Angeles

The Regional Connector Transit Project constructed a 1.9-mile (3.1 km) light rail tunnel for the Los Angeles Metro Rail system in Downtown Los Angeles. It connected the A and E lines with the former L Line. The A and E lines previously both terminated at 7th Street/Metro Center station, coming from Long Beach and Santa Monica, respectively, while the L Line ran through Little Tokyo/Arts District to either Azusa or East Los Angeles. Now the A and E lines continue together through new stations at Grand Avenue Arts/Bunker Hill, Historic Broadway, and Little Tokyo/Arts District. From there, they diverge on the former L Line toward Azusa and East Los Angeles, respectively. The project provides a one-seat ride into the core of Downtown for passengers on those lines who previously needed to transfer, thus reducing or altogether eliminating many transfers of passengers traveling across the region via Downtown Los Angeles.

<span class="mw-page-title-main">West Santa Ana Branch</span> Rail line in California, US

The West Santa Ana Branch is a rail right-of-way formerly used by the Pacific Electric's (PE) Santa Ana route in Los Angeles County and Orange County in Southern California. The Los Angeles County Metropolitan Transportation Authority (Metro) owns the segment of the right-of-way in Los Angeles County, and the Orange County Transportation Authority (OCTA) owns the segment in Orange County.

<span class="mw-page-title-main">D Line Extension</span> Rapid transit line extension construction project in Los Angeles, California

The D Line Subway Extension Project, formerly known as the Westside Subway Extension, the Subway to the Sea, and the Purple Line Extension, is a construction project in Los Angeles County, California, extending the rapid transit D Line of the Los Angeles Metro Rail system from its current terminus at Wilshire/Western in Koreatown, Los Angeles, to the Westside region. The project is being supervised by the Los Angeles County Metropolitan Transportation Authority (Metro). The subway has been given high priority by Metro in its long-range plans, and funding for the project was included in two county sales tax measures, Measure R and Measure M.

This article discusses the history of the Los Angeles County Metropolitan Transportation Authority, the regional transportation planning agency for Los Angeles County, California.

<span class="mw-page-title-main">Los Angeles Metro Busway</span> Bus rapid transit system in Los Angeles County, California

Metro Busway is a system of bus rapid transit (BRT) routes that operate primarily along exclusive or semi-exclusive roadways known locally as a busway or transitway. There are currently two lines serving 29 stations in the system, the G Line in the San Fernando Valley, and the J Line between El Monte, Downtown Los Angeles and Gardena, with some trips continuing to San Pedro. The Los Angeles County Metropolitan Transportation Authority (Metro) operates the system.

<span class="mw-page-title-main">Sepulveda Transit Corridor</span> Proposed transit corridor

The Sepulveda Transit Corridor Project is a two-phased planned transit corridor project that aims to connect the Los Angeles Basin to the San Fernando Valley through Sepulveda Pass in Los Angeles, California, by supplementing the existing I-405 freeway through the pass. The corridor would partly parallel I-405, and proposed alternatives include heavy rail rapid transit or a monorail line connecting the G Line in the Valley to the D Line and E Line on the Westside, and the K Line near Los Angeles International Airport.

The East San Fernando Valley Light Rail Transit Project, formerly the East San Fernando Valley Transit Corridor Project, is a transit project which is proposing the construction of a light rail line on the east side of Los Angeles's San Fernando Valley, running on a north/south route along Van Nuys Boulevard and San Fernando Road.

The Southeast Gateway Line, formerly the West Santa Ana Branch Transit Corridor, is a planned light rail line, mostly following the Pacific Electric's historic West Santa Ana Branch, connecting Downtown Los Angeles to the city of Artesia, along with other cities in southeastern Los Angeles County.

<span class="mw-page-title-main">Eastside Transit Corridor</span> Future light rail line extension

The Eastside Transit Corridor is a light rail line extension that currently connects Downtown Los Angeles with East Los Angeles. However, the extension is planned to extend further southeast to connect with the Gateway Cities, continuing from a relocated Atlantic station southeast to a new Lambert station in Whittier.

The Twenty-eight by '28 initiative is an effort set forth by former Mayor Eric Garcetti that the City of Los Angeles complete 28 transportation infrastructure projects before the start of the 2028 Summer Olympics on July 14, 2028 and the 2028 Summer Paralympics the following month.

<span class="mw-page-title-main">K Line Northern Extension</span> Planned light rail transit corridor extension

The K Line Northern Extension Project, formerly known as the Crenshaw Northern Extension Project, is a project planning a Los Angeles Metro Rail light rail transit corridor extension connecting Expo/Crenshaw station to Hollywood/Highland station in Hollywood. The corridor is a fully underground, north-south route along mostly densely populated areas on the western side of the Los Angeles Basin; it would be operated as part of the K Line. The Los Angeles County Metropolitan Transportation Authority (Metro) is prioritizing the project along with pressure from the West Hollywood residents. Construction is slated to start in 2041 and begin service by 2047 unless means to accelerate the project are found.

The history of the Los Angeles Metro Rail and Busway system begins in the early 1970s, when the traffic-choked region began planning a rapid transit system. The first dedicated busway opened along I-10 in 1973, and the region's first light rail line, the Blue Line opened in 1990. Today the system includes over 160 miles (260 km) of heavy rail, light rail, and bus rapid transit lines, with multiple new lines under construction as of 2019.

The Lincoln Boulevard Transit Corridor is a proposed 10-mile (16 km) bus rapid transit or light rail line in the public transport network of the Los Angeles County Metropolitan Transportation Authority in Los Angeles County, California. It is planned to operate on a north to south route on Lincoln Boulevard between the C and K Line's LAX/Metro Transit Center station with the E Line's Downtown Santa Monica station on the Los Angeles Metro Rail system. A proposed completion date of 2047 for BRT and an unknown date for rail conversion. It is funded by Measure M and Measure R. The route will have signal priority at traffic lights and will have a dedicated right of way.

Arts District/6th Street station is a proposed rapid transit station on the B and D Lines of the Los Angeles Metro Rail system, located in the Arts District of Los Angeles, California. It is planned to serve as the new eastern terminus of both lines, and will be the only at-grade snd surface station on the heavy rail network.

References

  1. "CM".
  2. 1 2 3 4 5 Hymon, Steve (October 30, 2008). "A Closer Look at Half-Cent Sales Tax Hike, Measure R". Los Angeles Times.
  3. Dreier, Peter (November 3, 2012). "LA's Measure J Will Create Jobs and Clean the Environment". Huffington Post. Retrieved February 6, 2013.
  4. Bloomekatz, Ari (May 15, 2011). "Los Angeles County is poised to accelerate its rail projects". Los Angeles Times. Retrieved February 6, 2013.
  5. http://media.metro.net/measure_R/documents/expenditure_plan.pdf Measure R Expenditure Plan
  6. http://media.metro.net/measureR/images/ordinance.pdf Measure R Ordinance
  7. 1 2 Abendschein, Dan (October 11, 2008). "Measure R would boost transit". Pasadena Star-News. Retrieved February 6, 2013.
  8. "Proposed One-Half Cent Sales Tax for Transportation Outline of Expenditure Categories" (PDF). Metro. Retrieved August 17, 2020.
  9. Hymon, Steve (November 3, 2008). "Why LACMA Spent $900,000 on Measure R". Los Angeles Times.
  10. 1 2 Villacorte, Christina (August 7, 2012). "CA: L.A. County Supervisors to Vote on Whether to Put Measure R Extension on Ballot". Mass Transit. Archived from the original on August 14, 2014.
  11. Tan, Caroline (June 30, 2012). "Expansion of Measure R Half-Cent Sales Tax to Hit Ballot in November". NBC 4 Southern California. Retrieved February 6, 2013.
  12. Villaraigosa, Antonio (April 27, 2012). "Not Waiting for Washington: Continue Measure R Until the Voters Themselves Decide to End It". Huffington Post. Retrieved February 6, 2013.
  13. "Measure J, L.A. County transportation tax extension, fails". Los Angeles Times. November 7, 2012. Retrieved February 6, 2013.
  14. "Measure J: Transit tax falling short of two-thirds majority". Daily News Los Angeles. November 7, 2012. Retrieved February 6, 2013.
  15. "Election Results".
  16. Nelson, Laura J. (March 18, 2016). "MTA shows what taxpayers will get if they OK a $120-billion sales tax increase". The Los Angeles Times. Retrieved June 22, 2016.
  17. "LA County Election Results". www.lavote.net. Retrieved November 25, 2016.
  18. Hymon, Steve (November 8, 2016). "Measure M project descriptions". Metro. The Source. Retrieved August 15, 2020.
  19. "Editorial: Want football fans to take transit? Build a people mover to the new Inglewood stadium". Los Angeles Times. March 19, 2020. Retrieved April 22, 2020.