Nkenda | |
---|---|
Coordinates: 00°15′00″N30°06′00″E / 0.25000°N 30.10000°E Coordinates: 00°15′00″N30°06′00″E / 0.25000°N 30.10000°E | |
Country | |
Region | Western Uganda |
District | Kasese District |
Constituency | Busongora North |
Government | |
• MP | William Nzoghu |
Elevation | 4,862 ft (1,482 m) |
Nkenda is a hill in Kasese District in the Western Region of Uganda. The name is also applied to the settlement at the bottom of that hill. [1]
Nkenda is located south of Bugoye and Mubuku, [1] and approximately 13 kilometres (8 mi), by road, northeast of Kasese, the location of the district headquarters. [2] The geographical coordinates of Nkenda are: 0°15'00.0"N, 30°06'00.0"E (Latitude:0.2500; Longitude:30.1000). [1] [3]
Nkenda is in the foothills of the Rwenzori Mountains, at an average elevation of 1,482 metres (4,862 ft), above sea level. [1] It lies along the Fort Portal-Kasese-Mpondwe Road. [3]
Nkenda is a power hub in Western Uganda. The Uganda Electricity Transmission Company Limited (UETCL), maintains a high-voltage substation at this location. The 226 kilometres (140 mi) 220kV Nkenda–Fort Portal–Hoima High Voltage Power Line originates here, and so does the proposed 153 kilometres (95 mi) 220kV Nkenda–Mpondwe–Beni High Voltage Power Line. This location is also the terminus of the 160 kilometres (99 mi) 132kV Mbarara–Nkenda High Voltage Power Line. [4]
Kasese is a town north of Lake George in the Western Region of Uganda. It originally grew around the copper mine at Kilembe, while attention later turned to cobalt mining. It is the chief town of Kasese District, and the district headquarters are located there. Kasese is also the largest town in the Rwenzururu region. Charles Mumbere, the Omusinga of Rwenzururu, maintains a palace in the town.
The Karuma Hydroelectric Power Station is a 600 MW hydroelectric power project under construction in Uganda. When completed, it will be the largest power-generating installation in the country.
Rwimi Hydroelectric Power Station, also Rwimi Power Station, is an operational 5.54 megawatts (7,430 hp) hydroelectric power station in the Western Region of Uganda.
Bugoye is a small town in Western Uganda.
Kawanda is a town in Wakiso District, Central Uganda.
The Uganda Electricity Transmission Company Limited (UETCL) is a parastatal company whose primary purpose is to make bulk electricity purchases and transmit the electricity along high voltage wires to local and foreign distribution points. UETCL is the sole authorized national bulk energy purchaser and the sole authorized electricity importer and exporter in Uganda.
The Fort Portal–Kasese–Mpondwe Road also Fort Portal–Mpondwe Road, is a road in the Western Region of Uganda, connecting the towns of Fort Portal, Hima, Kasese, Kikorongo and the border town of Mpondwe.
Kikorongo, also Kikorongo Junctiom, is a settlement in Kasese District, in the Western Region of Uganda.
Achwa 2 Hydroelectric Power Station is a 42 megawatts (56,000 hp) hydroelectric power plant, in Uganda.
Kawanda–Birembo High Voltage Power Line is a high voltage electricity power line, under construction, connecting the high voltage substation at Kawanda, in Uganda to another high voltage substation at Birembo, in Rwanda.
Nyamagasani II Hydroelectric Power Station, also 'Nyamagasani 2 Hydroelectric Power Station, is a 5 megawatts (6,700 hp) mini hydro power station, under construction in the Western Region of Uganda.
The Nkenda–Fort Portal–Hoima High Voltage Power Line is a high voltage electricity power line, in operation, connecting the high voltage substation at Nkenda, Kasese District, to another high voltage substation at Kabaale, Buseruka sub-county, Hoima District, all in the Western Region of Uganda.
The Tororo–Opuyo–Lira High Voltage Power Line is a high voltage electricity power line, connecting the high voltage substation at Tororo, to another high voltage substation at Lira, in Uganda.
The Nkenda–Mpondwe–Beni High Voltage Power Line is a proposed high voltage electricity power line, connecting the high voltage substation at Nkenda, in Kasese District, in the Western Region of Uganda, to another high voltage substation at Beni, in North Kivu Province, in the Democratic Republic of the Congo.
The Masaka–Mutukula–Mwanza High Voltage Power Line is a proposed high voltage electricity power line, connecting the high voltage substation at Masaka, in Masaka District, in the Central Region of Uganda, to another high voltage substation at Mwanza, in Mwanza Region, in the Republic of Tanzania.
The Achwa 1 Hydroelectric Power Station (A1HPS), also Achwa I Hydroelectric Power Station, is a hydroelectric power station currently under construction (2020) in Uganda, with a planned installed capacity of 41 megawatts (55,000 hp).
The Opuyo–Moroto High Voltage Power Line is a high voltage electricity power line, under construction, connecting the high voltage substation at Opuyo, a southern suburb of the town of Soroti, in the Eastern Region to another high voltage substation at Moroto, in the Northern Region of Uganda.
The Karuma–Juba High Voltage Power Line is a planned high voltage electricity power line, connecting the high voltage substation at Karuma, in Kiryandongo District, in the Western Region of Uganda, to another high voltage substation at Juba, in Jubek State, in South Sudan.
The Hoima–Kinyara–Kafu High Voltage Power Line is a planned high voltage electricity power line, connecting the high voltage substation at Kabaale, Buseruka sub-county, Hoima District, in the Western Region of Uganda to another high voltage substation at Kafu, Nakasongola District, in the Central Region of Uganda. On the way, the power line passes through Kinyara Sugar Works, in Masindi District.
The Mbarara–Nkenda High Voltage Power Line is a high voltage electricity power line, connecting the high voltage substation in the city of Mbarara, in the Western Region to another high voltage substation at Nkenda, also in the Western Region of Uganda.