NuScale Power Corporation is a publicly traded American company that designs and markets small modular reactors (SMRs). It is headquartered in Tigard, Oregon. A 50 MWe version of the design was certified by the US Nuclear Regulatory Commission (NRC) in January 2023. [3] The current scalable 77 MWe SMR VOYGR design was submitted for NRC review on January 1, 2023, and as of December 2023 was about a third complete. [4]
NuScale's SMR designs employ 9 feet (2.7 m) diameter by 65 feet (20 m) high reactor vessels that use conventional cooling methods and run on low enriched uranium fuel assemblies based on existing light water reactor designs. Each module is intended to be kept in an underground pool and is expected to produce about 77 megawatts of electricity. Its coolant loop uses natural convection, fed from a large water reservoir that can operate without powered pumps. [5]
NuScale had agreements to build reactors in Idaho by 2030, but this was cancelled in 2023 due to the estimated cost having increased from $3.6 billion to $9.3 billion for a 460 MWe power plant. [6] [7]
NuScale was founded based on research funded by the United States Department of Energy (DOE) and conducted by a team of nuclear scientists at Oregon State University and the Idaho National Laboratory. [8] [9] [10] beginning in 2000. Oregon State's nuclear department had been developing passive water-circulation techniques for cooling in nuclear plants. [11] DOE funded the research from 2000 to 2003.
The Oregon State team continued their work building a one-third scale test lab, while inheriting related patents from the university in 2007, [11] [12] in exchange for an equity stake. [13] NuScale was founded that year. Its first funding round came in January 2008. [10] It began seeking certification with the NRC in February 2008. [11]
By 2011, NuScale had raised $35 million and had 100 employees in Tigard; Richland, Washington; and Corvallis, Oregon. [14] NuScale was the first to submit small reactor plans to the NRC [10] and the first to gain approval. [15] [16] It was evaluated by a consortium of utility companies called Energy Northwest. [17]
In January 2011, NuScale's largest investor, Kenwood Group, was investigated by the U.S. Securities and Exchange Commission (SEC) and later pleaded guilty to operating a Ponzi scheme. The SEC investigation was not related to Kenwood's dealings with NuScale, but Kenwood's assets were frozen just as NuScale was expecting additional funding. The company started making staffing and pay cuts as executives looked for new funding sources [18] [19] and most of the company's employees were laid off. [20]
That September, NuScale obtained a loan to re-hire 60 employees. [21] In October, Fluor Corporation acquired a majority interest in the company for $3.5 million and promised almost $30 million in working capital. [13] According to The Energy Daily, Fluor's investment saved the company, which had been "financially marooned" by its prior investor. [22] A separate agreement gave Fluor the rights to construct NuScale-based power plants. [23]
In August 2012, Rolls-Royce Holdings said it would support NuScale's commercialization efforts and help it obtain funding from DOE's funding opportunity announcement. [11] In December 2012, co-founder Paul G. Lorenzini was replaced by John Hopkins as CEO. [24] It was not funded in the first DOE's round. [25] In the second round in December 2013, NuScale won up to $226 million in "cost-sharing" funding to share the expense of obtaining government approval, through the SMR Licensing Technical Support program. [26] This was followed by an agreement in May 2014 for up to $217 million in funding over a five-year period, whereby DOE would match private funding. [27] [28]
In September 2020, the U.S. Department of Energy reported that it had provided more than $400 million since 2014 to support the NuScale development and that of other earlier stage domestic SMR designs. [29]
In December 2021, the Fluor Corporation reported that it had invested over $600 million in NuScale since 2011, and that NuScale was expected to go public in 2022 with Fluor owning about 60% of the stock. [30] In May 2022, NuScale completed a merger with the special-purpose acquisition company (SPAC), Spring Valley Acquisition Corp, raising $380 million of investment. NuScale Power Corporation then listed on the New York Stock Exchange. [31]
In November 2014, NuScale announced it would build what it expected to be the first US SMR at the Idaho National Laboratory. [32] The plant was for Utah Associated Municipal Power Systems (UAMPS), a subdivision of the State of Utah, on the Carbon Free Power Project (CFPP). [33] UAMPS operates power plants in Wyoming, New Mexico, California, and Utah, selling to local utilities. The DOE could provide supporting funds of about $140 million/year over 10 years, awaiting more Congressional support. [34]
The company submitted designs to the NRC in January 2017 for a 12 reactor power plant producing 570 MWe at a build cost under $3 billion. [35] [29] In 2020, DOE approved a $1.355 billion cost-share award. [36]
As of 2021, 8 cities had withdrawn from CFPP. [37] In July 2021, the proposal was downsized to 6 reactors, and the expected electricity price increased to $58/MWh (¢5.8/kWh). [38]
In April 2022, Doosan Enerbility was contracted to begin manufacturing power module components for CFPP. Doosan Enerbility expected to reach full-scale production at their plant in Changwon, South Korea, in the second half of 2023. [39] [40]
In January 2023, CFPP approved a new Budget and Plan of Finance, establishing a target price of $89/MWh (¢8.9/kWh) after an estimated $30/MWh generation subsidy from the 2022 Inflation Reduction Act (IRA). [41] [42] The projected build cost had increased to $9.3 billion for 462 MWe generation capacity from $3.6 billion for 720 MWe in 2020. [43] $4.2 billion of the cost would be covered by the DOE and IRA support, leaving $5.1 billion of acquisition and construction costs to be covered by UAMPS members. [44]
In November 2023, UAMPS announced it was unlikely that the project would have enough subscription to continue due to cost increases, and UAMPS and NuScale jointly decided to cancel the project. [45] [7] POWER magazine reported that the project had received $232 million of DOE financial support by the time it was cancelled. [46]
Following the cancellation, NuScale laid off 154 of its staff (28%) as part of "taking steps to transition from R&D to commercialization". [47]
In March 2012, NuScale signed an agreement with DOE that allowed NuScale and two partners to build and operate a NuScale-based nuclear power plant at a Savannah River site in South Carolina. [48] The following month, Energy Northwest said it had no immediate plans to construct a nuclear power plant, but had evaluated all the available SMR technologies and identified NuScale as the best available option. [49] [50]
In July 2013, NuScale announced an effort to demonstrate NuScale reactors in the western United States, called Program WIN (Western Initiative for Nuclear), [27] with plans to build the first NuScale-based power plant there by 2024. [11]
In January 2018, the NRC agreed that the passive safety features allow NuScale's SMR design to operate safely without back-up power. [51]
In August 2020, the NRC issued a final safety evaluation report, certifying the design as having met safety requirements. [15] [52] [53] [54]
In November 2021, NuScale announced its intent to build with Nuclearelectrica its first reactors in Romania by 2028. [55]
In February 2022, NuScale and mining conglomerate KGHM announced a contract to construct an SMR in Poland by 2029. [56] In April 2023, an application for a decision-in-principle to permit the project was submitted to the Polish government. [57]
On 28 December 2022, Romanian company RoPower Nuclear contracted for Front-End Engineering and Design. The location is expected to be Doicesti. RoPower is a joint venture between Nuclearelectrica and Nove Power & Gas. [58]
In January 2023, the NRC certified NuScale's 50 MWe design for use in the US. [59] However this was for an earlier version of the design to the current 77 MWe design expected to be deployed; this version was resubmitted to the NRC in January 2023 for standard design approval of a six reactor configuration called US460. [3] In its acceptance review of the application, the NRC identified a number of sufficiency issues in the application, and requested supplemental information be supplied before NRC staff could accept the application for docketing and detailed technical review. [60] The supplemental information was supplied in July 2023, and the NRC estimated the evaluation would be complete in July 2025. [61]
On 25 July 2024, RoPower Nuclear and Fluor Corporation signed the second stage Front-End Engineering and Design (FEED 2) contract, for the planned SMR project in Romania which will provide updated cost estimate and other analysis for a final investment decision. [62] The Export–Import Bank of the United States approved a $98 million loan to RoPower Nuclear to support this design study, which would support 400 US jobs. [63]
NuScale reactors take 1% of the space of a conventional reactor and generate 77 MWe. [64] [65] [66] The design uses light water for cooling and power generation as in conventional nuclear plants. Water is heated by the nuclear core at the base of the reactor vessel. Heated water flows up the riser, then down over steam generators. As heat is transferred, the water cools and becomes denser, sinking to the bottom of the device, and the cycle is repeated. The heat creates steam that drives a small dedicated turbine generator producing electricity. [11] [26] [67]
The first version of the reactor vessel was expected to be 9 feet (2.7 m) in diameter and 65 feet (20 m) tall, weighing 650 short tons (590 metric tons). [26] The modules are pre-fabricated, delivered by rail, barge or truck [68] and assembled on-site. [21] [69] [70] [71] As of 2021, the units are expected to produce 77 MWe (gross), or about 73.5 MWe (net), [64] [72] [73] [a] and require refueling with standard 4.95 percent low-enriched uranium-235 fuel every two years. [26]
NuScale's design does not rely on powered water pumps or circulatory equipment. [8] [11] The original 50 MWe reactor was designed to shut down and cool itself indefinitely during most accidents. [11] [b] The devices are intended to be installed in a below-ground pool to absorb earthquake shocks, with a concrete lid over the pool. [75] In the event that power is lost for normal cooling systems, the water in the pool absorbs heat and boils. [11] The pool stores enough water to safely cool the 77 MWe reactor design core for at least 72 hours without needing manual replenishment. [67]
In normal operating conditions the containment vessel pressure is at a near vacuum, which eliminates convection giving simpler heat transfer conditions. This also reduces component corrosion and improves instrumentation reliability. [11]
The reactors are installed in the reactor pool in individual bays separated by concrete walls. For refueling the entire reactor is moved underwater through a transfer channel to a connected pool which has the refueling equipment. There is also an extra reactor bay for maintenance or possible storage of a spare module. At a 12-reactor plant the bays are arranged in two rows of six reactors with the transfer channel centrally between the rows. [11]
NuScale is expected to be the first US SMR to market, because it is similar to the systems used in conventional power plants. [76] The company estimates a twelve-unit NuScale plant would cost $4,200 (an earlier estimate was $5,000) per kilowatt. In comparison, the Energy Information Administration in 2013 estimated overnight costs to be $4,700 per kilowatt for conventional nuclear power, $4,600 for a carbon sequestration coal plant and $931 at a gas-fired plant or in excess of $1,800 for a gas-fired plant with carbon sequestration (all 2011 dollars). [11] David Mohre, executive director of NRECA's Energy and Power Division, said SMRs like NuScale's are ideal for rural towns that need small power plants. [22]
NuScale power plants are expected to take less time, materials and space to construct than other power sources and can be expanded incrementally to meet growing power needs. [10] [70] [77] [78] With the steam generators internal to the movable steel reactor assembly, the SMR does not have a large concrete secondary containment building as used in large PWRs. There is a single control room for up to 12 reactors. [79] One disadvantage of the design is that the reactors lie in a large pool of water, for emergency cooling, and this pool requires much more reinforced concrete per MWe produced than a conventional nuclear reactor building, adding considerably to cost. [66]
New Scientist reported peer‑reviewed analysis from Stanford University that assessed nuclear waste production from SMR reactors and concluded that "SMR performed worse on nearly all of our metrics compared to standard commercial reactors". [80] [81] The results of the study were rejected by NuScale as based on outdated information. [80]
Potential SMR competitors include Babcock & Wilcox, GE Hitachi Nuclear Energy, Gen4 Energy, Holtec International, [82] Intellectual Ventures, OPEN100, [83] Westinghouse Electric Company, and X-energy. [84]
In March 2020, a panel of independent experts from the NRC's Advisory Committee on Reactor Safeguards (ACRS) claimed to find reactor design flaws. [85] The main issue was that in the event of an emergency shutdown condensed steam returning to the reactor vessel would be low in boron and might not absorb enough neutrons. NuScale modified its design to ensure that more boron would spread to the returning water. ACRS was concerned that operators could accidentally add deboronated water to the core. The panel found other problems: the steam generator could be prone to damaging vibrations. However, on 29 July ACRS recommended that the safety evaluation report be issued and the reactor be certified. [85]
NuScale has offices in Tigard, Oregon; Corvallis, Oregon; Charlotte, North Carolina; and Rockville, Maryland. [86] Its headquarters are in Tigard, while its factory is in Corvallis. [87] It maintains a test facility at Oregon State University [8] and Italy. [11]
The company is publicly traded as SMR on the New York Stock Exchange. [31]
Columbia Generating Station is a nuclear commercial energy facility located on the Hanford Site, 10 miles (16 km) north of Richland, Washington. It is owned and operated by Energy Northwest, a Washington state, not-for-profit joint operating agency. Licensed by the Nuclear Regulatory Commission in 1983, Columbia first produced electricity in May 1984, and entered commercial operation in December 1984.
The Toshiba 4S is a micro sodium-cooled nuclear fission reactor design.
Generation IVreactors are nuclear reactor design technologies that are envisioned as successors of generation III reactors. The Generation IV International Forum (GIF) – an international organization that coordinates the development of generation IV reactors – specifically selected six reactor technologies as candidates for generation IV reactors. The designs target improved safety, sustainability, efficiency, and cost. The World Nuclear Association in 2015 suggested that some might enter commercial operation before 2030.
The AP1000 is a nuclear power plant designed and sold by Westinghouse Electric Company. The plant is a pressurized water reactor with improved use of passive nuclear safety and many design features intended to lower its capital cost and improve its economics.
Oregon State University's College of Engineering is the engineering college of Oregon State University, a public research university in Corvallis, Oregon. By enrollment, the college is now the largest at the university and the seventh-largest engineering college in the nation (2023).
A Next Generation Nuclear Plant (NGNP) is a specific proposed generation IV very-high-temperature reactor (VHTR) that could be coupled to a neighboring hydrogen production facility. It could also produce electricity and supply process heat. Up to 30% of this heat could be used to produce hydrogen via high-temperature electrolysis significantly reducing the cost of the process. The envisioned reactor design is helium-cooled, using graphite-moderated thermal neutrons, and TRISO fueled.
Between 2007 and 2009, 13 companies applied to the Nuclear Regulatory Commission (NRC) for construction and operating licenses to build 31 new nuclear power reactors in the United States. However, the case for widespread nuclear plant construction has been hampered due to inexpensive natural gas, slow electricity demand growth in a weak US economy, lack of financing, and safety concerns following the Fukushima nuclear accident at a plant built in the early 1970s which occurred in 2011.
The B&W mPower was a proposed small modular reactor designed by Babcock & Wilcox, and to be built by Generation mPower LLC, a joint venture of Babcock & Wilcox and Bechtel. It was a Generation III+ integral pressurized water reactor concept.
TerraPower is an American nuclear reactor design and development engineering company headquartered in Bellevue, Washington. TerraPower is developing a class of nuclear fast reactors termed traveling wave reactors (TWR).
The small modular reactor (SMR) is a class of small nuclear fission reactor, designed to be built in a factory, shipped to operational sites for installation and then used to power buildings or other commercial operations. The term SMR refers to the size, capacity and modular construction. Reactor type and the nuclear processes may vary. Of the many SMR designs, the pressurized water reactor (PWR) is the most common. However, recently proposed SMR designs include: generation IV, thermal-neutron reactors, fast-neutron reactors, molten salt, and gas-cooled reactor models.
GE Hitachi Nuclear Energy (GEH) is a provider of advanced reactors and nuclear services. It is headquartered in Wilmington, North Carolina, United States. Established in June 2007, GEH is a nuclear alliance created by General Electric and Hitachi. In Japan, the alliance is Hitachi-GE Nuclear Energy. In November 2015, Jay Wileman was appointed CEO.
Poland currently operates a single research reactor, Maria. It has no operational nuclear reactors for power production, but is to start construction of a plant with three Westinghouse AP1000 reactors in 2026 that was originally planned to be completed in 2033-2036 but is currently expected to only be finished by 2040, and is also intending to build small modular reactors.
The RITM-200 is an integrated Generation III+ pressurized water reactor developed by OKBM Afrikantov and designed to produce 55 MWe. The design is an improvement of KLT-40S reactor. It uses up to 20% enriched uranium-235 and can be refueled every 10 years for a 60 year planned lifespan in floating power plant installation. If installed in a stationary power plant the fuel cycle is 6 years.
Holtec International is a supplier of equipment and systems for the energy industry. Founded in Mount Laurel, New Jersey in 1986, Holtec International is a privately-held technology company with domestic operation centers in New Jersey, Florida, Ohio and Pennsylvania and worldwide in Brazil, India Japan, Mexico, Poland, South Africa, Spain, U.K. and Ukraine. It specializes in the design and manufacture of parts for nuclear reactors. The company sells equipment to manage spent nuclear fuel from nuclear reactors.
Moorside nuclear power station is proposed for a site near Sellafield, in Cumbria, England. The original plan by NuGeneration, a British subsidiary of Toshiba-owned Westinghouse Electric Company, had the station coming online from 2024 with 3.4 GW of new nuclear capacity, from three AP1000 reactors. Work up to 2018 would include acquiring the site licence, the development consent order, and other required permits and permissions to start work. Site preparation was to take two years, up to 2020.
X-energy is a private American nuclear reactor and fuel design engineering company. It is developing a Generation IV high-temperature gas-cooled pebble-bed nuclear reactor design. It has received funding from private sources and various government grants and contracts, notably through the Department of Energy's (DOE) Advanced Reactor Concept Cooperative Agreement in 2016 and its Advanced Reactor Demonstration Program (ARDP) in 2020.
The Rolls-Royce SMR, also known as the UK SMR, is a small modular reactor (SMR) design being developed by the Rolls-Royce (RR) company in the United Kingdom.
A nuclear microreactor is a plug-and-play type of nuclear reactor which can be easily assembled and transported by road, rail or air. Microreactors are 100 to 1,000 times smaller than conventional nuclear reactors, and range in capacity from 1 to 20 MWe, compared to 20 to 300 MWe for small modular reactors (SMRs). Due to their size, they can be deployed to locations such as isolated military bases or communities affected by natural disasters. It can operate as part of the grid, independent of the grid, or as part of a small grid for electricity generation and heat treatment. They are designed to provide resilient, non-carbon emitting, and independent power in challenging environments. The nuclear fuel source for the majority of the designs is "High-Assay Low-Enriched Uranium", or HALEU.
Last Energy is an American commercial developer of micro-modular nuclear power plants, established in 2019 by Bret Kugelmass as the commercial spinoff of the Energy Impact Center, an American clean energy research institute.
dashboard ... Overall Review Progress: 31%
Optimization... will increase NuScale Power's small modular reactor (SMR) capacity by 20%... [This] would boost the power capacity of a 12-module SMR plant currently planned by Utah Associated Municipal Power Systems (UAMPS) from 600 MWe to 720 MWe."