Rendering of the Polar Security Cutter design to be built by VT Halter Marine | |
Class overview | |
---|---|
Builders | Bollinger Shipyards |
Operators | United States Coast Guard |
Preceded by | Polar-class icebreaker |
Cost | |
In service |
|
Planned | 3 |
On order | 2 [3] |
General characteristics | |
Displacement | 22,900 long tons (23,300 t) |
Length | 460 ft (140 m) |
Beam | 88 ft (27 m) |
Ice class | Polar Class 2 |
Installed power | Caterpillar main diesel generators |
Propulsion | Diesel-electric; two ABB Azipod propulsion units and one shaft line |
Endurance | 90 days |
Capacity | Berthing for 186 persons |
Armament |
|
Aviation facilities | Helipad and hangar |
The Polar Security Cutter Program is a program to recapitalize the United States Coast Guard's aging fleet of icebreakers, currently consisting of the heavy icebreaker USCGC Polar Star and the medium icebreaker USCGC Healy, with three new multi-mission vessels referred to as Polar Security Cutters (PSC). These heavy polar icebreakers will allow the USCG to perform its statutory missions in the Arctic as well as support the United States Antarctic Program with Operation Deep Freeze. [4] [5]
The PSC program is managed by the USCG and United States Navy through an integrated program office. On 23 April 2019, Halter Marine Inc was awarded the contract for the detail design and construction of the lead PSC. [4] The contract option for the second PSC was exercised on 30 December 2021. [3] As of July 2023 [update] , the first vessel is expected to enter service in mid-to-late-2020s and will be named USCGC Polar Sentinel. [6] [7] [8]
In the future, the PSCs will be followed by the acquisition of three medium icebreakers referred to as Arctic Security Cutters (ASC). [5]
In 2010, the High Latitude Mission Analysis Report identified a need for at least six new polar icebreakers, three of which must be what the USCG refers to as "heavy icebreakers". [5] [note 1] In the same year, the USCG's only operational heavy icebreaker at the time, USCGC Polar Sea, was sidelined following engine failure. [9]
In 2012, the USCG launched a heavy polar icebreaker acquisition program and, in 2016, established an integrated program office with the US Navy to utilize the Navy's shipbuilding expertise for acquiring the new icebreakers. [10]
In February 2017, the USCG awarded five fixed-price contracts for heavy polar icebreaker design studies to Bollinger Shipyards, Italy's Fincantieri Marine Group, National Steel and Shipbuilding Company, Huntington Ingalls Industries, and Singapore's Halter Marine Inc .
In addition to developing heavy polar icebreaker designs with associated cost and schedule figures, the goal of these industry studies was to identify design and system approaches to reduce acquisition costs and accelerate production timelines. [11]
In April 2017, a draft system specification as part of a request for information (RFI) in which the USCG sought questions, comments and feedback related to technology risks, sustainability, producibility, and affordability of heavy polar icebreakers. [12] A draft request for proposal (RFP) was released in October 2017, [13] followed by the official request for proposal for the advance procurement and detail design for a heavy polar icebreaker with options for detail design and construction for up to three vessels in March 2018. [14]
In September 2018, the Coast Guard announced that the icebreakers would be called "Polar Security Cutters", that they would have the designation WMSP, and that the Coast Guard wanted the icebreakers to be capable of carrying deck-mounted weapons if needed. [15] The vessels will be homeported in Seattle, Washington. [16]
On 23 April 2019, the $745.9 million contract for the detail design and construction of the lead PSC was won by Halter Marine. The contract also included options for the construction of two additional PSCs that, if exercised, would bring the total acquisition cost to $1.9 billion excluding government-furnished equipment. [17] Halter Marine, one of the shipyards that had previously participated in the heavy polar icebreaker industry studies, reportedly beat out competing bids from at least Fincantieri Marine Group and Bollinger Shipyards. [18] In its press release on 7 May 2019, Halter Marine stated that it had teamed with Technology Associates, Inc. (TAI) and based its PSC design on the proposed German polar research vessel Polarstern II. Other companies involved included ABB and Trident Maritime Systems for propulsion system, Raytheon for command and control systems integration, Caterpillar for main engines, Jamestown Metal Marine for joiner package, and Bronswerk for the HVAC system. [19]
On 30 December 2021, the USCG exercised the $552.6 million option for the construction of the second PSC. [3] [20]
Initially, Halter Marine anticipated that the lead ship would be delivered in summer 2024, with the second PSC in 2025, and the third vessel in late 2027. However, as of July 2023 [update] the lead ship has been delayed and the delivery may not occur until 2028. [6] The Government Accountability Office has identified four primary factors contributing to delay in PSC design maturity: general lack of experience for designing and building icebreakers in the United States, the complexity of the PSC's design, significant changes from the original design, and impacts of the COVID-19 pandemic. [21]
In November 2022, Bollinger Shipyards announced that it would buy VT Halter Marine and oversee the construction of the Polar Security Cutters. [22] On November 22, 2022, Bollinger Shipyards announced it had completed the acquisition of VT Halter Marine and ST Engineer Halter Marine Offshore. Construction of the Polar Security Cutters will still be completed in Pascagoula, MS at what will be called Bollinger Mississippi Shipbuilding. [23]
In August 2023, Bollinger Shipyards began steel cutting for eight "prototype modules" for the first Polar Security Cutter. [24]
On 7 May 2024, the Congressional Budget Office testified before the Subcommittee on Transportation and Maritime Security of the Committee on Homeland Security. The Congressional Budget Office estimated that the total cost of three vessels would be $5.1 billion, about 60% more than the Coast Guard's estimate in March 2024, and the delivery of the first vessel would be in 2029. [2] When subcommittee chair Carlos A. Giménez asked why the Polar Security Cutter design was only 67% complete after five years of work, a Government Accountability Office witness explained that nothing like the Polar Security Cutter has been built in the United States in 50 years; American shipbuilders have no recent experience building large icebreakers. Coast Guard Vice Admiral Paul Thomas reminded the subcommittee that Halter Marine chose to base the PSC design upon the proposed Polarstern II design, rather than upon an existing Finnish icebreaker suggested by the Coast Guard. Because the Polarstern II has never been built, its design is necessarily incomplete. [25]
The Polar Security Cutters will be the largest icebreakers ever commissioned by the United States Coast Guard and will temporarily be the largest coast guard vessel in the world. With an overall length of 460 feet (140 m), beam of 88 feet (27 m), and a full load displacement of 22,900 long tons (23,300 t), [26] they will be bigger, wider and heavier than the current record-holder, the medium icebreaker USCGC Healy. The general design is reportedly based on the proposed German polar research vessel Polarstern II which has been modified and adapted to USCG requirements such as long open water transit from its home port to Antarctica. [27] The PSCs will have accommodation for up to 186 crew, scientists and other personnel, and endurance time of 90 days. [3]
Like most icebreakers built worldwide, the PSCs will have a diesel-electric power plant rated at over 45,200 hp (33,700 kW). The vessels' main diesel generators will be supplied by Caterpillar and the propulsion system consisting of two Azipod propulsion units and a third fixed shaft line by ABB and Trident Maritime Systems. [5] [19] [27] This will allow the PSCs to break ice with a thickness between 6 and 8 feet (1.8 and 2.4 m). [3] Designed according to the International Association of Classification Societies (IACS) Unified Requirements for Polar Class Ships, the PSCs will be strengthened to Polar Class 2 which is intended for vessels operating year-round in moderate multi-year ice conditions. [28] [29]
The PSCs will feature a combat system derived from the Aegis Combat System. [27] The vessels have been said to include "space, weight, and electrical power set aside to carry offensive weapons". [30] [31]
Ship | Hull Number | Builder | Laid down | Launched | Commissioned | Homeport | Status |
---|---|---|---|---|---|---|---|
Polar Sentinel | WMSP-21 | Bollinger Shipyards | 2027 (planned) | 2028 (planned) [32] | Seattle, Washington | Under Contract [1] [33] | |
TBD | WMSP-22 | Bollinger Shipyards | Seattle, Washington | Under Contract [1] [34] | |||
TBD | WMSP-23 | Bollinger Shipyards | Seattle, Washington | Authorized in National Defense Authorization Act for 2023 [35] |
USCGC Healy (WAGB-20) is the United States' largest and most technologically advanced icebreaker as well as the US Coast Guard's largest vessel. She is classified as a medium icebreaker by the Coast Guard. She is homeported in Seattle, Washington, and was commissioned in 1999. On 6 September 2001 Healy visited the North Pole for the first time. The second visit occurred on 12 September 2005. On 5 September 2015, Healy became the first unaccompanied United States surface vessel to reach the North Pole, and Healy's fourth Pole visit happened on 30 September 2022.
USCGC Polar Star (WAGB-10) is a United States Coast Guard heavy icebreaker. Commissioned in 1976, the ship was built by Lockheed Shipbuilding and Construction Company of Seattle, Washington along with sister ship, USCGC Polar Sea.
USCGC Polar Sea (WAGB-11) is a United States Coast Guard heavy icebreaker. Commissioned on 23 February 1977, the ship was built by Lockheed Shipbuilding and Construction Company of Seattle along with her sister ship, Polar Star (WAGB-10). Her home port is Seattle, Washington.
Polar-class icebreakersUSCGC Polar Star (WAGB-10), USCGC Polar Sea (WAGB-11) are heavy icebreakers operated by the United States Coast Guard (USCG). These cutters, specifically designed for icebreaking, have reinforced hulls, special icebreaking bows, and a system that allows rapid shifting of ballast to increase the effectiveness of their icebreaking. The vessels conduct Arctic and Antarctic research and are the primary icebreakers that clear the channel into McMurdo Station for supply ships. All are homeported in Seattle, Washington.
The Marine Protector-class patrol boat is a type of coastal patrol boat of the United States Coast Guard. The 87-foot-long (27 m) vessels are based on the Stan 2600 design by Damen Group and were built by Bollinger Shipyards of Lockport, Louisiana. Almost all of these boats have been delivered to the U.S. Coast Guard, which has named them after sea creatures that fly or swim. Four have been delivered to Malta and Yemen.
The Island-class patrol boat is a class of cutters of the United States Coast Guard. 49 cutters of the class were built, of which 3 remain in commission. Their hull numbers are WPB-1301 through WPB-1349.
USCGC Matagorda (WPB-1303) is an Island-class patrol boat of the United States Coast Guard. She was commissioned 24 April 1986. Matagorda was one of eight of the 110-foot cutters to be modified under the Integrated Deepwater System Program aka. "Deepwater" to 123-foot. She was taken out of service about December 2006 due to problems with the Deepwater conversion.
The Sentinel-class cutter, also known as the Fast Response Cutter or FRC due to its program name, is part of the United States Coast Guard's Deepwater program. At 154 feet (46.8 m), it is similar to, but larger than, the 123-foot (37 m) lengthened 1980s-era Island-class patrol boats that it replaces. Up to 71 vessels are to be built by the Louisiana-based firm Bollinger Shipyards, using a design from the Netherlands-based Damen Group, with the Sentinel design based on the company's Damen Stan 4708 patrol vessel. The Department of Homeland Security's budget proposal to Congress, for the Coast Guard, for 2021, stated that, in addition to 58 vessels to serve the Continental US, they requested an additional six vessels for its portion of Patrol Forces Southwest Asia.
The Heritage-class cutter, also known as the Offshore Patrol Cutter and the Maritime Security Cutter, Medium, is a cutter class of the United States Coast Guard (USCG), developed as part of the Integrated Deepwater System Program and built by Eastern Shipbuilding and Austal USA. Construction of the first vessel in the class began in January 2019. As they are completed, it is expected that they will replace 270-foot (82 m) Famous- and 210-foot (64 m) Reliance-class Medium Endurance Cutters.
Polar Class (PC) refers to the ice class assigned to a ship by a classification society based on the Unified Requirements for Polar Class Ships developed by the International Association of Classification Societies (IACS). Seven Polar Classes are defined in the rules, ranging from PC 1 for year-round operation in all polar waters to PC 7 for summer and autumn operation in thin first-year ice.
Bollinger Shipyards is an American constructor of ships, workboats and patrol vessels. Its thirteen shipyards and forty drydocks are located in Louisiana and Texas. Its drydocks range in capacity from vessels of 100 tons displacement to 22,000 tons displacement. The firm was founded in 1946.
The Damen Stan 2600 is a line of patrol vessels built or designed by Netherlands shipbuilding firm the Damen Group.
Aiviq is an American icebreaking anchor handling tug supply vessel (AHTS) owned by Offshore Surface Vessels LLC, part of Edison Chouest Offshore (ECO). The $200 million vessel was built in 2012 by North American Shipbuilding Company in Larose, Louisiana and LaShip in Houma, Louisiana. She was initially chartered by Royal Dutch Shell to support oil exploration and drilling in the Chukchi Sea off Alaska where the primary task of the vessel was towing and laying anchors for drilling rigs, and oil spill response.
USCGC Raymond Evans is the tenth vessel in the United States Coast Guard's Sentinel-class cutter. All the vessels are named after members of the Coast Guard, or its precursor services, who are remembered for their heroism. Names had already been assigned for the first fourteen vessels, when Commander Raymond Evans died, and the USCG Commandant announced that the next Sentinel class cutter would be named after him. Joseph Napier, who was originally scheduled to be the namesake of the tenth vessel, had his name moved to the beginning of the second list of heroes names, and will now be the namesake of the fifteenth vessel.
VT Halter Marine, Inc. was a shipbuilding company and an American subsidiary of ST Engineering. It was located in Pascagoula, Mississippi. It specializes in ship design and construction and serves both public and private clients, including the United States Department of Defense.
USCGC Benjamin Dailey (WPC-1123) was the United States Coast Guard's 23rd Sentinel-class cutter. She was the first cutter of her class stationed in the Coast Guard's Eight District, with a homeport in Pascagoula, Mississippi.
USCGC Argus (WMSM-915) is the lead ship of the Heritage-class cutters of the United States Coast Guard (USCG), and a part of the OPC Ship Type. She is the second ship to be named after Argus Panoptes, the first being USRC Argus, a Revenue Cutter Service ship which was decommissioned and sold in 1804.
USCGC Chase (WMSM-916) is the second Heritage-class cutter of the United States Coast Guard (USCG).
USCGC Ingham (WMSM-917) is the third Heritage-class cutter of the United States Coast Guard (USCG).
USCGC Rush (WMSM-918) is the fourth Heritage-class cutter of the United States Coast Guard (USCG).