This article needs additional citations for verification .(March 2017) |
R110B | |
---|---|
In service | 1993–2000 |
Manufacturer | Bombardier Transportation [1] |
Built at | La Pocatière, Quebec, Canada |
Constructed | 1992 |
Entered service | June 15, 1993 |
Number built | 9 [1] |
Formation | Three-car sets [1] |
Fleet numbers | 3001–3009 |
Capacity | 54 seated 183 standing (A car), 50 seated 175 standing (B car) [1] |
Operators | New York City Subway |
Specifications | |
Car body construction | Stainless steel [1] |
Car length | 67 ft (20.42 m) [1] |
Width | 10 ft (3.05 m) [1] |
Height | 12.08 ft (3.68 m) [1] |
Doors | 8 sets of 50 inch wide side doors per car |
Maximum speed | 55 mph (89 km/h) [1] |
Weight | Trailer (71,000 lb (32,000 kg)) Motorized (86,000 lb (39,000 kg)) [1] |
Traction system | GTO–VVVF (GE) |
Traction motors | GE GEB 7-B 202 hp (151 kW) 3-phase AC 4-pole asynchronous motors |
Electric system(s) | Third rail, 600 V DC [1] |
Current collector(s) | Contact shoe |
Safety system(s) | dead man's switch, tripcock |
Track gauge | 4 ft 8+1⁄2 in (1,435 mm) standard gauge [1] |
The R110B (contract order R131) was a prototype class of experimental New Technology Train (NTT) New York City Subway cars built by Bombardier of Canada for service on the B Division services. There were nine cars, arranged as three-car sets. They were designed to test features that would be implemented on future mass-production NTT orders.
First announced in 1989, the R110Bs were delivered in 1992 and entered service on June 15, 1993, on the A service. An explosion in 1996 forced three cars to be taken out of service, resulting in the remaining six cars to run on the C service. The six cars not affected by the explosion continued to run until 2000, when they were permanently removed from service due to frequent breakdowns and low Mean Distance Between Failure (MDBF) numbers. Five of the nine cars were sent away to various facilities, with the remaining four still on MTA property.
The R110B cars were ordered from Bombardier in December 1989. [1] The R110B was designed to test various new technology features that would eventually be incorporated into the R143 and were not intended for long-term production use.
There were nine R110B cars, numbered 3001–3009. The cars were linked into three-car sets by consecutive numbers. The cab cars are powered with four traction motors each, while the center car of the 3-car set is an unpowered, cab-less trailer. The cars are typical B-Division size, except that they are 67 feet long, a length shared by the BMT Standards and the SIRT ME-1s.
The R110B uses the standard subway train control stand, but with some added computerized features. The layout of the controls is desk-style, with switches, lamps, and a single lever to control traction and braking. A CRT with function keys on either side is used to monitor speed, train status, etc.
The R110B's design is similar to that of the R68 cars now in use on the BMT and IND services, but the ends are more square and use Lexan glass in the windows. Car ends that do not have cabs have an expanse of glass. The seating configuration is the same as in the R68, but the materials are more advanced.
A matte plastic is used that allows scratches, tags, and stubborn graffiti to be buffed out using a light abrasive. The seats have a reduced bucket. Internal surfaces are tan fiberglass and plastic, with accents provided using a plastic mosaic applique. The floor uses linoleum with a pattern of slightly raised and textured squares. The R110B cars have handholds for shorter passengers.
There are rollsign line indicators in the front of the train, LCD destination signs (on windows) and interior strip route guides on top of the ad space, and an LED indication of stops ahead on both sides. Rollsigns were not used on the subsequent New Technology Train orders; however, the R211 order are equipped with front LED signs that are similar to rollsign-equipped trains.
Another new and important feature was the passenger intercom, which could be used for emergencies.
During the 1970s and 1980s, the Metropolitan Transportation Authority (MTA) had made several large orders for subway cars, such as the R46, which had new components added to them. However, because there was not a prototype built first for testing, many expensive retrofits were required. The MTA was in the process of creating the first technologically-advanced subway car since the R44 in the early 1970s. [2] In order to avoid the aforementioned problem, in 1989, the MTA awarded contracts for two prototype test trains, one of which was the R110A (contract R130) for the A Division built by Kawasaki Heavy Industries, and the R110B (contract R131) for the B Division built by Bombardier Transportation. [3] [4]
These two fleets were called the New Technology Test Trains (NTTTs) and would test features that would be implemented on future mass-production orders, specifically the New Technology Trains. [4] [5] [6] [2] [7] The R110B tested new technology, including AC propulsion with regeneration, microprocessor-controlled doors and brakes, roof-mounted hermetic air-conditioning units, and fabricated trucks with air bags suspension. Passenger emergency intercoms for contacting train crews, passenger alarm strips to press in case of an emergency, improved lighting, glass to see into the next cars and the platform, and computerized announcements were all implemented. [5]
The R110Bs entered service on June 15, 1993, running on the A train.
On November 4, 1996, a fire and explosion occurred on car 3006 while the train was in service on the A train. This resulted in set 3007–3009 being permanently taken out of service and cannibalized of parts to repair car 3006 and to keep the other two sets operating. The two remaining sets (3001–3003 and 3004–3006) ran as a six-car train on the C route.
Throughout 1999, the remaining R110Bs had been in and out of service for both repairs and additional component testing. The train was permanently removed from service in late 2000 due to frequent breakdowns and low Mean Distance Between Failure (MDBF) numbers, and never ran in service again.
After retirement, many of the cars were reused throughout New York City, including:
Cars 3002, 3003, 3007, and 3009 are currently stored at the 207th Street Yard. [8] [9] [10] [11] Plans are unknown for these cars.
Innovia Metro is an automated rapid transit system manufactured by Alstom. Innovia Metro systems run on conventional metal rails and pull power from a third rail but are powered by a linear induction motor that provides traction by using magnetic force to pull on a "fourth rail" placed between the running rails. However, newer versions of the technology are available with standard electric rotary propulsion.
The R32 was a New York City Subway car model built by the Budd Company from 1964 to 1965 for the IND/BMT B Division. A total of 600 R32s were built, numbered 3350–3949, though some cars were re-numbered. The R32 contract was divided into two subcontracts of 300 cars each: R32 and R32A ; the former was paid by the city's capital budget and the latter was paid through a revenue bond. All were arranged as married pairs.
The R142 is the first mass-produced model class of the newest generation or new technology (NTT) A Division cars for the New York City Subway. It was built by Bombardier Transportation in La Pocatière, Quebec, Canada and Barre, Vermont, U.S. with final assembly performed at Plattsburgh, New York, from 1999 to 2003. There are 880 cars numbered 6301–7180 and another 150 cars numbered 1101–1250, for a total of 1,030 cars, all arranged as five-car sets. Together with the R142As, they replaced the Redbird trains, including the R26, R28, R29, R33, R33S, and R36.
The R44 is a New York City Subway car model built by the St. Louis Car Company from 1971 to 1973 for the B Division and the Staten Island Railway (SIR). The cars replaced many R1–9 series cars, and all remaining 1925 Standard Steel built SIRTOA ME-1 trains, providing Staten Island with a new fleet of railcars. The R44 fleet originally consisted of 352 cars, of which 56 remain in service, all on the Staten Island Railway.
The R62 is a New York City Subway car model built between 1983 and 1985 by Kawasaki Heavy Industries in Kobe, Japan, for the A Division. A total of 325 cars were built, originally as single units. When the reliability of the fleet improved, they were converted to five-car sets. The cars replaced the remaining R12s, R14s, and R15s, which were all retired by the end of 1984.
The New York City Subway is a large rapid transit system and has a large fleet of electric multiple unit rolling stock. As of September 2024, the New York City Subway has 6712 cars on the roster.
New York City Subway nomenclature is the terminology used in the New York City Subway system as derived from railroading practice, historical origins of the system, and engineering, publicity, and legal usage. Important terms include lines, or individual sections of subway, like the BMT Brighton Line; services, like the B, which is a single train route along several lines; and stations, such as Coney Island–Stillwell Avenue, which connects multiple lines and services.
The New York City Subway currently uses various letters and numbers to designate the routes that trains use over the differing lines in the system. Along with the color corresponding to the route's trunk line, these form a unique identifier for the route, easing navigation through the complex system. Several service labels have either been phased out or never been used. This list covers the labels not used as of June 2021.
The R68A is a B Division New York City Subway car order consisting of 200 cars built between 1988 and 1989 by Kawasaki Railcar Company in Kobe, Japan, with final assembly done at the Kawasaki plant in Yonkers, New York. A total of 200 cars were built, arranged in four-car sets.
The R110A was a New York City Subway car model built by Kawasaki Heavy Industries in 1992 as a prototype New Technology Train to test various technologies. There were ten cars arranged as five-car sets. They were designed to test features that would be implemented on future mass-production New Tech Train orders.
The R62A is a New York City Subway car model built between 1984 and 1987 by Bombardier Transportation for the A Division. The cars were built in La Pocatière, Quebec, with final assembly done in Auburn, New York and Barre, Vermont, under a license from Kawasaki Heavy Industries, manufacturer of the previous R62 order. A total of 825 cars were built, arranged as sets of three, four, or five cars per set. The cars replaced the remaining R17s, R21s, and R22s, which were all retired by early 1988.
The R68 is a B Division New York City Subway car order consisting of 425 cars built by the Westinghouse-Amrail Company, a joint venture of Westinghouse, ANF Industrie, Jeumont Schneider, and Alsthom. The cars were built in France from 1986 to 1988 and shipped through New York Harbor. Of the cars in the fleet, 416 are arranged in four-car sets while the other nine are single cars.
The R11 was a prototype class of experimental New York City Subway cars built by the Budd Company in 1949 for the IND/BMT B Division. A total of ten cars were built, arranged as single units. Originally consisting of 400 cars, only ten R11s were built, due to the cancellation of the Second Avenue Subway.
The R30 was a New York City Subway car model built by St. Louis Car Company from 1961 to 1962. The cars were a "follow-up" or supplemental stock for the B Division's R27s and closely resembled them. A total of 320 cars were built, arranged in married pairs. Three versions were manufactured: Westinghouse (WH)-powered cars, General Electric (GE)-powered cars, and R30As.
Most trains on the New York City Subway are manually operated. As of 2022, the system currently uses automatic block signaling, with fixed wayside signals and automatic train stops. Many portions of the signaling system were installed between the 1930s and 1960s. Because of the age of the subway system, many replacement parts are unavailable from signaling suppliers and must be custom-built for the New York City Transit Authority, which operates the subway. Additionally, some subway lines have reached their train capacity limits and cannot operate extra trains in the current system.
The R160 is a class of New Technology Train subway cars built for the New York City Subway's B Division. Entering service between 2006 and 2010, they replaced all R38, R40, and NYCT-operated R44 cars, and most R32 and R42 cars. The R160s are very similar to the earlier R143s and later R179s. The biggest difference between the R160 and R143 is the Flexible Information and Notice Display (FIND) system on the R160s in place of static LED maps on the R143s and all A-Division New Technology fleet.
The R179 is a class of 318 New Technology Train subway cars built by Bombardier Transportation for the New York City Subway's B Division. Entering service between 2017 and 2020, the cars replaced all remaining R32s and R42s.
The Toronto Rocket (TR) is the fifth and latest series of rolling stock used in the Toronto subway system in Toronto, Ontario, Canada. Owned and operated by the Toronto Transit Commission (TTC), the trains were built by Bombardier Transportation in Thunder Bay, Ontario, to replace the last remaining H-series trains, as well as increase capacity for the Spadina subway extension to Vaughan that opened in 2017. They operate in a six-car configuration on Line 1 Yonge–University and a four-car configuration on Line 4 Sheppard. The sets are stored and maintained at the Wilson and Davisville Yards. The first six-car TR train entered passenger service on Line 1 in July 2011, and four-car TR trainsets entered service on Line 4 in May 2016.
The R211 is a class of New Technology Train (NTT) subway cars built for the New York City Transit Authority. Being built by Kawasaki Railcar Manufacturing for the B Division of the New York City Subway and for the Staten Island Railway (SIR), they will replace two aging subway car models: all R44 cars on the SIR and all R46 subway cars. The order is split into three parts: R211A and R211T cars for the subway and R211S cars for the SIR. The R211Ts employ open gangways between cars, allowing passengers to see and walk through the entire length of the train – a feature not present on the subway's other rolling stock. The base order consists of 535 cars, with options for up to 1,077 additional cars.
New Technology Train (NTT) is the collective term for the modern passenger fleet of the New York City Subway that has entered service since the turn of the 21st century. This includes the current R142, R142A, R143, R160, R179, R188 and R211 models, along with the planned R262 and R268 models. Two prototypes, the R110A and R110B, were used to test the features that would be found on all NTT trains today.