Seebach-Wettingen railway electrification trial

Last updated
Locomotives of the pilot scheme: left, number 3 from Siemens-Schuckert, then the Oerlikon-built machines 1 and 2 Seebach-Wettingen Lokomotiven.jpg
Locomotives of the pilot scheme: left, number 3 from Siemens-Schuckert, then the Oerlikon-built machines 1 and 2
Locomotive number 1 MFO Lok Nr 1 Rutenstromabnehmer.jpg
Locomotive number 1
Locomotive number 1, partially dismantled MFO Lok Nr 1 mit Umformer.jpg
Locomotive number 1, partially dismantled
Bogie of the type used on Locomotives 1 and 2 MFO Lok Nr 1 und 2 Drehgestell.jpg
Bogie of the type used on Locomotives 1 and 2
Locomotive number 2 MFO Lok Nr 2.jpg
Locomotive number 2

The Seebach-Wettingen railway electrification trial (1905-1909) was an important milestone in the development of electric railways. Maschinenfabrik Oerlikon (MFO) demonstrated the suitability of single-phase alternating current at high voltage for long-distance railway operation with the Seebach-Wettingen single-phase alternating current test facility. For this purpose, MFO electrified the 19.45-kilometre-long Swiss Federal Railways (SBB) route from Seebach to Wettingen at its own expense with single-phase alternating current at 15,000 volts.

Contents

Overview

By 1900, the use of direct current (DC), usually at 500-600 volts, to supply power to electric trams and trains was well-established. Examples include Trams in Budapest (from 1887) and the Liverpool Overhead Railway (opened 1893). This was satisfactory for urban systems but, for long distance railways, a higher voltage was desirable to reduce energy losses. The 106 km Valtellina line in Italy was electrified using three-phase alternating current (AC) at 3,000 volts and opened on 4 September 1902. The system was designed by Kálmán Kandó and a team from the Ganz Works in Budapest. This was an advance but the three-phase system had disadvantages. Two overhead wires were required and this limited the voltage because the two wires had to cross at junctions. The use of single-phase AC, which only required one overhead wire, had been held back by the lack of suitable motors. The three-phase system used induction motors but the single-phase universal motor was in its infancy and problems were experienced with overheating and excessive sparking at the commutator.

The Seebach-Wettingen trial used two different approaches. The first was to supply power at the standard 50 Hz mains frequency and use a rotary converter on the locomotive to convert this to direct current for the traction motors. The second was to use a low-frequency (15 Hz) supply to power universal motors on the locomotive. It was expected that the low frequency would minimise the overheating and sparking problems and this was the case.

The test track was operated between 1905 and 1909 and provided evidence for the construction of overhead line and pantograph types to allow operation with a voltage of 15,000. Because of the high voltage, the wooden passenger coaches were provided with a device that protected the passengers from the consequences of contact with drooping overhead lines.

Experimental operation at 50 hertz

At the suggestion of MFO, the Swiss Federal Railways (SBB) agreed on 31 May 1902 to set up a trial operation on the Seebach-Wettingen route with single-phase alternating current at 15,000 volts. This system allowed a higher overhead line voltage than usual at this time, and thus a greater distance between substations, and a single-wire instead of a two-wire overhead line as was then successfully in use on three-phase routes in northern Italy.

Since the traction motors could not yet be operated with single-phase alternating current with the technology of the time, MFO first built the four-axle pilot locomotive No. 1 with a rotary converter, which converted the overhead line voltage of 15,000 volts AC into direct current for the operation of the traction motors. The rotary converter system was patented, patent US754565 of 1904.

Before the start of operation of the test track, the electrification of the approximately 700-metre-long connecting track of their factory premises with the station at Seebach was completed by MFO and tests with the converter locomotive were started. On 16 January 1905, the regular test runs between Seebach and Affoltern were started with a timetable set by SBB. For these trips, until 10 November 1905, the converter locomotive No. 1 was used.

Experimental operation at 15 hertz

Operation with the converter locomotive did not continue for long. In the summer of 1904, MFO introduced locomotive number 2, with alternating current motors, but using 15 instead of 50 hertz. Thanks to the reduced frequency, as well as the compensation winding, the single-phase series motor developed by Hans Behn-Eschenburg at MFO had similar characteristics to a direct-current motor and sparking at the commutator was greatly reduced. [1] [2]

The 50 Hertz overhead line led to strong interference on the telephone line from Zurich to Baden, which ran parallel to the railway line. The reduction in frequency to 15 hertz led to an improvement. Modification of the motors and the use of twisted pair wiring on the telephone line caused the interference to cease.

Despite the different electrical equipment, the mechanical parts of locomotives numbers 1 and 2 were similar, except that number 2 had two driver's cabs. The power supply was changed on 11 November 1905 from 50 Hertz to 15 Hertz and locomotive No. 2 took over the train operation. So that locomotive No. 1 could continue to be used, it was rebuilt with 15 Hz AC motors, to match No. 2, and the converter was removed. The two locomotives became the model for the low-frequency AC powered locomotives, as they were built until the 1970s, in Germany, Austria, Switzerland, Norway and Sweden. On 2 June 1906, the trial operation was extended to Regensdorf.

For financial reasons, MFO accepted a proposal from Siemens-Schuckert to participate in further experiments with a third locomotive. Locomotive No. 3 was delivered on 3 August 1907 but failed on 7 October 1907 with overheating problems.

Power generation

Interior view of the converter station Seebach-Wettingen Umformer.jpg
Interior view of the converter station

At Maschinenfabrik Oerlikon, a small steam power plant was built to supply the energy needed for the Seebach-Wettingen line. The tubular boilers in which the steam was produced for the turbine had a heating surface of 300 m² each and an output of 18,000 kilograms of steam per hour. The three-stage steam turbine ran at 3000 revolutions per minute. The three-phase current produced had a voltage of 230 volts and a frequency of 50 hertz to match the factory's existing power plant. The converter station with AC buffering was housed in a special building, which was located near the steam turbine plant. The two converter groups had a capacity of 700 and 500 kilowatts. The 375 element backup battery had a capacity of 592 ampere hours. Next to the engine room was the transformer room, in which four transformers increased the voltage of the single-phase current from 700 to 15,000 volts. The exact layout of the converter station is unclear but the presence of the batteries suggests that it used a back-to-back connection. The three phase AC would have been converted to DC and then the DC converted to single phase AC.

Catenary

Overhead line (MFO system) at Seebach Rutenfahrleitung.jpg
Overhead line (MFO system) at Seebach
Overhead lines, MFO system and Siemens-Schuckert system running parallel Seebach-Wettingen Fahrleitung.jpg
Overhead lines, MFO system and Siemens-Schuckert system running parallel
Seebach to Regensdorf

On the section from Seebach to Regensdorf, MFO tested an overhead line at the side of the track. The current collector mounted on the roof of the locomotive, the so-called tail, consisted of a slightly curved tube with a replaceable contact strip. The tube was pressed by spring force against the contact wire and could describe more than a half circle, so that contact with the contact wire from above, from the side or from below was possible. Normally, the wire was located at the side of the track. The system proved unreliable at speeds above 50 km/hour.

Regensdorf to Wettingen

On the section from Regensdorf to Wettingen, Siemens-Schuckert installed a standard Catenary and, on 1 December 1907, operation was started. At the exit from Regensdorf station, the overhead line ran approximately 400 metres parallel to the side-mounted line so that the current collector could be changed while driving. The contact wire was located six metres above the rail above the middle of the track. To test a low contact wire height in tunnels and underpasses, the contact wire between Otelfingen and Würenlos was laid only 4.8 meters above the rails over a distance of one kilometre. The pantograph (current collector) was usable for both directions of travel and could follow height differences of the overhead line even at high speeds. The lifting of the pantograph was done by compressed air.

After the trial

From 4 July 1909, the Seebach-Wettingen line was again operated with steam traction and the overhead lines were dismantled. Because it was a secondary line with easy gradients, SBB did not consider it economical for electric operation. Locomotives No. 1 and 2 were stored and, in 1919, were sold to SBB. Locomotive No. 3 returned to Berlin and was converted there into a DC locomotive. In 1944 it was destroyed in a bombing raid.

Despite the cessation of operations, the attempt was successful. In 1907, MFO supplied railcars BCFe 4/4 to the Maggiatalbahn for operation at 5000 volts, 20 Hertz. In July 1910, the Bernese Alpine Railway Company Bern - Lötschberg - Simplon (BLS) opened its Spiez-Frutigen test track electrified at 15,000 Volts, 15 Hertz. In 1913, Prussia, Bavaria and Baden jointly defined a traction current frequency of 16⅔ Hz, whereupon the BLS also adopted this frequency. On 15 July 1913, the BLS started continuous operation between Spiez and Brig using 15,000 volts, 16⅔ Hertz. In the same year, the Rhaetian Railway opened its Engadine line using 16⅔ Hertz, but with a voltage of 11,000 volts. From 7 July 1919, the SBB operated their feeder line from Bern-Thun to Lötschbergstrecke using 15,000 volts, 16 ⅔ Hertz and from 28 May 1922, the trains on the Gotthard route of the SBB began to operate electrically.

See also

Related Research Articles

Three-phase electric power Common electrical power generation, transmission and distribution method for alternating currents

Three-phase electric power is a common method of alternating current electric power generation, transmission, and distribution. It is a type of polyphase system and is the most common method used by electrical grids worldwide to transfer power. It is also used to power large motors and other heavy loads.

Mains electricity Type of lower-voltage electricity most commonly provided by utilities

Mains electricity is the general-purpose alternating-current (AC) electric power supply. It is the form of electrical power that is delivered to homes and businesses, and it is the form of electrical power that consumers use when they plug items such as domestic appliances, televisions and electric lamps into wall outlets.

Electric power distribution Final stage of electricity delivery to individual consumers in a power grid

Electric power distribution is the final stage in the delivery of electric power; it carries electricity from the transmission system to individual consumers. Distribution substations connect to the transmission system and lower the transmission voltage to medium voltage ranging between 2 kV and 35 kV with the use of transformers. Primary distribution lines carry this medium voltage power to distribution transformers located near the customer's premises. Distribution transformers again lower the voltage to the utilization voltage used by lighting, industrial equipment or household appliances. Often several customers are supplied from one transformer through secondary distribution lines. Commercial and residential customers are connected to the secondary distribution lines through service drops. Customers demanding a much larger amount of power may be connected directly to the primary distribution level or the subtransmission level.

Single-phase electric power distribution of AC electric power in a system where the voltages of the supply vary in unison

In electrical engineering, single-phase electric power is the distribution of alternating current electric power using a system in which all the voltages of the supply vary in unison. Single-phase distribution is used when loads are mostly lighting and heating, with few large electric motors. A single-phase supply connected to an alternating current electric motor does not produce a rotating magnetic field; single-phase motors need additional circuits for starting, and such motors are uncommon above 10 kW in rating.

Electric locomotive locomotive powered by electricity

An electric locomotive is a locomotive powered by electricity from overhead lines, a third rail or on-board energy storage such as a battery or a supercapacitor.

Railway electrification system electric power to railway trains and trams without an on-board prime mover or local fuel supply

A railway electrification system supplies electric power to railway trains and trams without an on-board prime mover or local fuel supply. Electric railways use either electric locomotives or electric multiple units . Electricity is typically generated in large and relatively efficient generating stations, transmitted to the railway network and distributed to the trains. Some electric railways have their own dedicated generating stations and transmission lines, but most purchase power from an electric utility. The railway usually provides its own distribution lines, switches, and transformers.

Kálmán Kandó Hungarian engineer

Kálmán Kandó de Egerfarmos et Sztregova was a Hungarian engineer, and a pioneer in the development of AC electric railway traction.

Traction power network electricity grid for the supply of electrified rail networks

A traction network or traction power network is an electricity grid for the supply of electrified rail networks. The installation of a separate traction network generally is done only if the railway in question uses alternating current (AC) with a frequency lower than that of the national grid, such as in Germany, Austria and Switzerland.

Traction substation electrical substation for railways, or trams

A traction substation, traction current converter plant or traction power substation (TPSS) is an electrical substation that converts electric power from the form provided by the electrical power industry for public utility service to an appropriate voltage, current type and frequency to supply railways, trams (streetcars) or trolleybuses with traction current.

25 kV AC railway electrification railway electrification system

Railway electrification systems using alternating current (AC) at 25 kilovolts (kV) are used worldwide, especially for high-speed rail.

15 kV AC railway electrification railway electrification system is used in Germany, Austria, Switzerland, Sweden and Norway

Railway electrification systems using alternating current (AC) at 15 kilovolts (kV) and 16.7 Hertz (Hz) are used on transport railways in Germany, Austria, Switzerland, Sweden, and Norway. The high voltage enables high power transmission with the lower frequency reducing the losses of the traction motors that were available at the beginning of the 20th century. Railway electrification in late 20th century tends to use 25 kV, 50 Hz AC systems which has become the preferred standard for new railway electrifications but extensions of the existing 15 kV networks are not completely unlikely. In particular, the Gotthard Base Tunnel still uses 15 kV, 16.7 Hz electrification.

Rotary phase converter electrical machine

A rotary phase converter, abbreviated RPC, is an electrical machine that converts power from one polyphase system to another, converting through rotary motion. Typically, single-phase electric power is used to produce three-phase electric power locally to run three-phase loads in premises where only single-phase is available.

TRAXX Family of electric and diesel-electric locomotives manufactured by Bombardier

Bombardier TRAXX is a modular product platform of mainline diesel-electric and electric locomotives produced by Bombardier Transportation, which was built in both freight and passenger variants. The first version was a dual-voltage AC locomotive built for German railways from the year 2000. Later types included DC versions, as well as quadruple-voltage machines, able to operate on most European electrification schemes: 1.5/3.0 kV DC and 15/25 kV AC. The family was expanded in 2006 to include diesel-powered versions. Elements common to all variants include steel bodyshells, two bogies with two powered axles each, three-phase asynchronous induction motors, cooling exhausts on the roof edges, and wheel disc brakes.

Phase converter

A phase converter is a device that converts electric power provided as single phase to multiple phase or vice versa. The majority of phase converters are used to produce three-phase electric power from a single-phase source, thus allowing the operation of three-phase equipment at a site that only has single-phase electrical service. Phase converters are used where three-phase service is not available from the utility, or is too costly to install due to a remote location. A utility will generally charge a higher fee for a three-phase service because of the extra equipment, including transformers, metering, and distribution wire.

Three-phase AC railway electrification

Three-phase AC railway electrification was used in Italy, Switzerland and the United States in the early twentieth century. Italy was the major user, from 1901 until 1976, although lines through two tunnels also used the system; the Simplon Tunnel between Switzerland and Italy from 1906 to 1930, and the Cascade Tunnel of the Great Northern Railway in the United States from 1909 to 1939. The first standard gauge line was in Switzerland, from Burgdorf to Thun, from 1899 to 1933.

Emil Huber-Stockar Swiss engineer and mechanical engineer (1865-1939)

Emil Huber-Stockar (1865-1939) was a Swiss entrepreneur and railway pioneer. After training as a mechanical engineer at the Swiss Federal Institute of Technology at Zurich (ETHZ) and spending some years in America, Huber took over the management of the Maschinenfabrik Oerlikon, founded by his father Peter Emil Huber-Werdmüller, near Zurich, Switzerland. He focussed on solving the difficulties of high power, electrically powered mainline railway systems. In 1904, he electrified the Seebach-Wettingen line with high-voltage alternating current at low frequency. This experimental operation was successful. The first railway to use this system was the Bern–Lötschberg–Simplon railway. In 1925, Emil Huber-Stockar received an honorary doctorate from the ETHZ for his achievements.

The Burgdorf–Thun railway is a railway line in Switzerland, which was built by the Burgdorf-Thun-Bahn. The line from Burgdorf via Konolfingen to Thun was opened by the company in 1899 as the first electrified mainline railway in Europe. It is now part of BLS AG.

The Solothurn–Langnau railway is a railway line in the Emmental in Switzerland. It was built by the Emmentalbahn, which was based in Burgdorf. The line runs from Solothurn via Burgdorf to Langnau im Emmental. It is now part of BLS AG.

The Wettingen–Effretikon railway is a standard-gauge line to the northwest of Zürich, Switzerland. It was opened on 15 October 1877 by the Swiss National Railway. The trains ran past Zürich to its north, which meant that it was not connected to this important centre of industry. This circumstance was one of the reasons for the bankruptcy of the company in 1878. The line was then taken over by the Swiss Northeastern Railway. It has been part of the network of the Swiss Federal Railways (SBB) since 1902.

References

  1. "Data". e-periodica.ch.
  2. "Data". e-periodica.ch.

Sources