Silver Star (NZR train)

Last updated

The Silver Star
Silver Star Entering Auckland Along Hobson Bay 1973.jpg
Silver Star arriving in Auckland alongside Hobson Bay and Tamaki Drive in March 1973, hauled by two DA class locomotives.
Overview
Service typeOvernight Passenger Train
StatusTerminated
Predecessor Night Limited
First service6 September 1971
Last service8 June 1979
Successor Northerner
Former operator(s) New Zealand Railways Department (NZR)
Route
Termini Wellington
Auckland
Line(s) used North Island Main Trunk
Technical
Rolling stock AR/AT class Silver Star carriages [1]
Track gauge 1,067 mm (3 ft 6 in)

The Silver Star was a luxury passenger train that ran overnight between Auckland and Wellington on the North Island Main Trunk (NIMT) railway of New Zealand, operated by New Zealand Railways (NZR). The train ran from Monday 6 September 1971 until Sunday 8 June 1979. It replaced the Night Limited express passenger trains which provided a faster service than the ordinary express trains, by stopping at only six intermediate stations (Palmerston North, Marton, Taumarunui, Taihape, Te Kuiti, Frankton) [2] en route and not hauling a postal (sorting) van as on previous trains.

Contents

Designed as a "hotel on wheels", the service was unsuccessful and attempts to re-use the rolling stock were thwarted by the presence of asbestos in the carriages. NZR eventually sold the carriages to the Eastern and Oriental Express, where they remain in use. [3]

Introduction

The train was NZRs attempt to compete with the introduction of jet aircraft for business traffic between Auckland and Wellington. It was intended to improve the Railway's staff morale and image, and the concept was based on a shorter version of New South Wales Government Railways Southern Aurora , with its 75-foot, 20-berth sleeping carriages introduced in 1962, providing Pullman-style luxury equal to the last United States trains, the Broadway Limited , the San Francisco Chief , the Crescent and the Panama Limited . Planning for the new Auckland to Wellington overnight express began in 1963, and the concept of the train as two sets of all stainless-steel sleeping carriage trains, the north and southbound trains, usually consisting of 10 sleeping carriages, five with double and twin ensuite rooms and five more sleepers with single bedrooms (16 beds per carriage), a licensed buffet carriage and a power carriage, never changed.

The public announcement of plans for the new train was made in December 1965. [4] Extensive study was made of other early 1960s Australian overnight trains, particularly the Queensland Rail Sunlander , the Victorian Railways/South Australian Railways The Overland , and similar designs in the United States, such as the final Santa Fe Railroad Hi-Level and Burlington Railroad carriages.

Building carriages in New Zealand was ruled out on time cost and quality grounds.[ citation needed ] NZR staff were preoccupied with rail freight van and wagon design and construction and this slowed the Silver Star design and meant both redesign and reconstruction of existing carriages for the Northerner and projected carriages for provincial express trains were limited and delayed until 1974, when Minister of Railways, Ron Bailey said NZR workshops could build only four carriages a year, in addition to wagon building. [5] NZR carriage production had finished in 1946 and the first class and sleeping carriage designs built by NZR between 1938-1946 would have been very expensive to build in small production runs and were too small and narrow to accommodate economical numbers of sleeping units or reclining seats with leg rests. The final 1946 model NZR first-class seats later used on the Endeavour were estimated by NZR Chief Mechanical Engineer John Black in 1958 to have increased in cost from £5,940 in 1941 to £25,000 in 1958 for a second-class carriage, and from £7,140 to £35,000 for a first-class carriage. [6]

By 1960, NZR had concluded that stainless steel carriages, which reduced maintenance costs, including avoiding the need to paint were preferable, even though this was at a cost premium of 12–20%. That meant in 1970 a per-carriage cost of $100,000+ for Japanese or Australian stainless steel construction, with $60,000 to $70,000 for conventional Italian or Swedish-built first-class carriages.[ citation needed ]

In 1966 the NZR General Manager Alan Gandell said that two modern express trains were being designed for the NIMT, to have sleeper accommodation and a buffet carriage but not a dining carriage; to be introduced in three to four years. [7] Travel time would be cut from 13½ hours to between 11½ and 12 hours.

In 1967 the new train was promoted by the Minister of Railways, J.B. Gordon, on the grounds that it would deliver a clear return on its purchase cost and operation. Most equivalent overseas passenger rail services ceased that year and following the US Postal Service ending its use of almost all North American rail passenger services for first-class mail in September 1967. Santa Fe applied to the Interstate Commerce Commission to withdraw 33 out of 39 of the long-distance express passenger trains they ran, [8] all but the Super Chief , San Francisco Chief , Texas Chief, and two Los Angeles-San Diego local trains.

The New Zealand Government approved tendering for an all-sleeping carriage train on 19 November 1968. The order for the train was placed with mid-1969 with Hitachi and Nippon Sharyo. [9]

The Silver Star carriages were distinctive in New Zealand in unpainted stainless steel, rather than the traditional red of NZR passenger carriages. Original planning for the train envisaged the sleeping carriages as the basis of new-standard NZR passenger trains of six carriages and van, seven units of 30 tons each (210 tons) hauled by a DA class locomotive. The Silver Star carriages and a seated carriage version projected but never built in the 1970s to replace railcars were heavy carriages,[ citation needed ] weighing 38 tons far away from the light 25-ton, 55-foot stainless steel carriages recommended as the future by John Black in 1958, the standard on Queensland Rail for most trains and the flagship Sunlander to sleeping carriages with a 9 ft 9 in loading gauge. As a result, the usual Silver Star consisted of 38-ton carriages that would weigh 410 tons and contribute to heavy fuel use estimates and counted against the NZR business case for new trains between 1973 and 1976, with sharp increases in fuel costs after the 1973 Arab-Israeli war. NZR's requirement was for the DX class locomotives introduced in 1972 to haul the heavier carriages as well as express freight trains on the NIMT.

This required a large trackside work project on the NIMT and on the Silver Star's alternative route via the Stratford–Okahukura Line, to accommodate greater width carriages.[ citation needed ]

In service

The Silver Star service broke new ground in New Zealand by providing a whole onboard crew of stewards (sourced from the inter-island rail ferry service) who doubled as dining carriage staff at mealtimes. A great deal of study had been made of on-train meal provision, particularly of Deutsche Bahn and British Rail. The high wage and other industrial demands of the ferry stewards were one of the reasons the service failed. The product was ten years too late. Travel by National Airways Corporation Boeing 737 between Auckland and Wellington took just over one hour; the Silver Star, by contrast, took around 12 hours and 30 minutes, thus the business market was lost. Due to the freeze on rail fares and charges imposed by the Kirk Labour Government, which effectively meant the price from Wellington to Auckland was held at $18 from late 1971 to early 1976, use of the train was high in 1974-75 and 1975-76. In the late 1970s, the usual overnight patronage was only about 65 on most runs and only half the carriage stock was used for most of the year except during a few airline strikes.

Withdrawal

In March 1979, the General Manager of NZR, Trevor Hayward, in his booklet Time for Change noted that the average subsidy per passenger on the Silver Star was $20.00, then a substantial amount of money. [10] The service was withdrawn not long after on Sunday 10 June 1979. [11]

Rolling Stock and motive power

The 31 carriages were manufactured by Hitachi and Nippon Sharyo and hauled by diesel-electric locomotives (initially two DA class, and later one DX class) for a six-night-per-week service. All passengers were accommodated in sleeping cars, with 12 of these carriages being designated "Twinette" (8 x two-berth cabins incorporating separate bathrooms/showers for each cabin) and 12 being "Roomette" carriages (16 x single-berth cabins with toilet and basin facilities). Passengers could purchase dinner, breakfast and other refreshments during the night, including alcoholic beverages and souvenirs in the buffet car, of which three were built, with 42 alcove-style tables. Four power and baggage vans completed the fleet.

The carriages were 18.89 metres (62 ft 0 in) long, 2.97 metres (9 ft 9 in) wide and 3.75 metres (12 ft 4 in) high. [12]

Bogies

All 31 carriages ran on bogies of a newer design, classed X28250 by NZR, which offered a superior quality ride through inertial dampers and better suspension and bore a resemblance to the Kinki-Sharyo-manufactured bogies, classed X27250 by NZR, under steam and postal vans built by Kinki. The bogies constructed especially for the Northerner trains four years later and the FM-class guards vans two to six years after that, and classed X28280, were heavily modelled on those under the Silver Star.

Replacement

New Zealand Railways at the time also ran another overnight train service, (the Night Express ) which stopped at more than twice the number of stations than the Silver Star did, which had much older rolling stock, and which had no onboard buffet service. It did have cheaper fares and three classes of accommodation. By refurbishing this train in 1975, to become the Northerner , many rail passengers had the option to pay around 33% less for a large reclining seat or 15% less for a 2-berth sleeper cabin without shower or toilet, than pay for a Silver Star cabin.

The Railways Department attempted to replace the Northerner and Silver Star with a refurbished version which would be a 50% seating and 50% sleeper train. This plan would include the redeployment of eight 30-seat carriages from the Northerner fleet to the Wellington-Napier Endeavour service, and relocation of the three 32-seat and three 36-seat Endeavour carriages onto the Christchurch-Picton route. These plans came to nothing after the Silver Star stock was withdrawn from service and blue asbestos insulation was found inside the coaches. The union workforce refused to work with the dangerous material, and the carriages lay parked in sidings for over ten years while their future was debated. In 1982, Minister of Railways, George Gair, facing a cost of $7 million for the asbestos removal and modernisation of the carriages, as well as rail losses and demand for other new rail equipment, commissioned Boston consultants, Booz Allen & Hamilton, to review NZR and in particular to investigate the most economical way of providing rail passenger options. The Ministry of Transport refused to accept the NZR estimate that the rebuilt Silver Star would exceed the Northerner's patronage by 60% and operate profitably [13]

The Railways then suggested that higher utilisation of the rebuilt Silver Star carriages would be achieved by using them on both night and day services on the NIMT allowing Silver Fern railcars, to be redeployed on other routes. In 1985 Minister of Railways, Richard Prebble [14] delayed a decision, and—with the full expected cost of removing the blue asbestos and reconstructing the train having reached $20million—cancelled the conversion in line with the Booz Allen Report, which found modern railcar train-sets vastly more economical than small locomotive-hauled trains. By 1986, the NZR general manager considered the conversion of the Silver Star into a seating-only train as an uneconomical way of renewing the Northerner or Endeavour trains.

In December 1987, the Silver Star carriages were hauled from Wellington to Auckland, where private tourist firm Pacific Trailways intended to convert 27 of them into a luxury tourist train that would travel around both the North and South Islands for NZ$1,000 per passenger. Nothing eventuated and all the carriages languished in Auckland for two more years.

In 1990, the 31-car fleet was purchased by the British luxury travel company, Orient-Express Trains & Cruises (an off-shoot of Orient-Express Hotels) and taken to A & G Price, of Thames (New Zealand), for regauging from New Zealand's 1,067 mm (3 ft 6 in) gauge to 1,000 mm (3 ft 3+38 in) gauge for Thai and Malaysian railway lines. 24 carriages (19 sleepers, three buffet carriages and two power vans) went to Singapore where an extensive internal rebuild and fit-out, as well as exterior painting and badging, was undertaken by the new owners at their (then) newly-constructed maintenance depot on KTMB land in Singapore's Keppel Road rail yards. A 25th car also went to Singapore, and was stored unrefurbished for some years, but was scrapped when E&O moved its engineering workshop from Singapore to Johor. Since then the refurbished consist has operated a regular 5-star luxury cruise-train service between Singapore (now the Woodlands customs terminal on the island's northern coast) and Bangkok as the Eastern & Oriental Express.

Six carriages subsequently remained (still owned by Orient-Express) at A & G Price in Thames; two Twinettes, two Roomettes, and two power vans. They had had their interiors stripped, asbestos removed, and were no longer on bogies, and put up for sale from December 2012 until 2016. All six were sold to individual buyers. [15]

Related Research Articles

<span class="mw-page-title-main">North Island Main Trunk</span> Railway line in New Zealand running between Auckland and Wellington

The North Island Main Trunk (NIMT) is the main railway line in the North Island of New Zealand, connecting the capital city Wellington with the country's largest city, Auckland. The line is 682 kilometres (424 mi) long, built to the New Zealand rail gauge of 1,067 mm and serves the large cities of Palmerston North and Hamilton.

<span class="mw-page-title-main">NZR RM class (Silver Fern)</span>

The NZR RM class Silver Fern was a class of rail motor in New Zealand. The three air-conditioned and sound-proofed 723-kW 96-seater diesel-electric twin-set railcars were built by Kawasaki under contract with Nissho Iwai of Japan. New Zealand Railways (NZR) classified the railcars as RM (Rail Motor), the same as other railcars, using the Silver Ferns (a national symbol of New Zealand) because of their exterior was made of corrugated stainless steel, like the premier night sleeper train that also ran on the Wellington-Auckland (North Island Main Trunk) route, the Silver Star. The Silver Ferns replaced the three successful Blue Streak railcars on the service.

<span class="mw-page-title-main">New Zealand EF class locomotive</span> Class of 22 electric locomotives

The New Zealand EF class locomotive is a class of 25 kV 50 Hz AC electric locomotives that operate on the North Island Main Trunk (NIMT) between Palmerston North and Te Rapa in New Zealand. Built by Brush Traction in Loughborough, England between 1986 and 1988 to run on the new electrified central section of the NIMT, at 3,000 kilowatts (4,000 hp), they are the most powerful locomotives to operate in New Zealand.

The Southerner was a passenger express train in New Zealand's South Island between Christchurch and Invercargill along the South Island Main Trunk, that ran from 1970 to 2002. It was one of the premier passenger trains in New Zealand and its existence made Invercargill the southernmost passenger station in the world.

<span class="mw-page-title-main">NZR RM class (88 seater)</span>

The NZR RM class 88-seaters were a class of railcar used in New Zealand. New Zealand Government Railways (NZR) classified them as RM (Rail Motor), the notation used for all railcars, numbering the 35 sets from RM100 to RM134. They were the most numerous railcars in NZR service. Their purchase and introduction saw the demise of steam-hauled provincial passenger trains and mixed trains, and was part of a deliberate effort to modernise NZR passenger services at a time of increasing competition from private motor vehicles. Being diesel powered and lighter the railcars were less expensive to operate and able to maintain quicker timetables, although became plagued with mechanical and electrical problems, with a number of the class eventually being turned into depowered locomotive-hauled carriages and reclassified as the AC class "Grassgrubs".

The Endeavour was a long-distance passenger train service between Wellington and Napier in the North Island of New Zealand. The service was modelled on the Southerner service in the South Island, and operated from 1972 to 1989.

<i>TranzAlpine</i> Passenger Train in New Zealand

The TranzAlpine is a passenger train operated by the Great Journeys New Zealand division of KiwiRail in the South Island of New Zealand over the Midland Line; often regarded to be one of the world's great train journeys for the scenery through which it passes. The journey is 223 kilometres (139 mi) one-way, taking almost five hours. There are 16 tunnels and four viaducts, with the Staircase Viaduct elevated as much as 75 metres (246 ft).

<span class="mw-page-title-main">New Zealand EW class locomotive</span>

The New Zealand EW class locomotive was a type of electric locomotive used in Wellington, New Zealand. The classification "EW" was due to their being electric locomotives allocated to Wellington. For two decades until the advent of the DX class they were the most powerful locomotives in New Zealand.

<span class="mw-page-title-main">New Zealand DX class locomotive</span> Class of 49 New Zealand diesel locomotives

The New Zealand DX class locomotive is a type of 49 Co-Co diesel-electric locomotives that currently operate on New Zealand's national railway network. All locomotives are owned by KiwiRail.

<span class="mw-page-title-main">New Zealand DA class locomotive</span>

The New Zealand DA class locomotive were a class of diesel-electric mainline locomotives operated on the New Zealand railway system between 1955 and 1989. Consisting of 146 locomotives, it was the most numerous class to ever operate in New Zealand, with five more than the AB class steam locomotive.

<span class="mw-page-title-main">Overlander (train)</span> Former long-distance passenger train in New Zealand

The Overlander was a long-distance rail passenger train between Auckland and Wellington in the North Island of New Zealand, along the North Island Main Trunk (NIMT). It was operated by Tranz Scenic. The service was replaced from 25 June 2012, by the Northern Explorer.

The Northerner was an overnight passenger train between Wellington and Auckland in New Zealand. The train replaced the unnamed and ordinary express trains supplementing the luxury Silver Star, which had replaced the Night Limited in 1971. The Northerner operated from 1975 to 2004.

The Bay Express was a passenger train between Wellington and Napier in New Zealand's North Island, operating from Monday, 11 December 1989 until Sunday, 7 October 2001. It was operated by New Zealand Railways Corporation's InterCity Rail division, later known as Tranz Scenic.

<span class="mw-page-title-main">Wairarapa Connection</span> New Zealand railway

The Wairarapa Connection is a New Zealand interurban commuter rail service along the Wairarapa Line between Masterton, the largest town in the Wairarapa, and Wellington. It is operated by Wellington suburban operator Transdev under contract from the Greater Wellington Regional Council. It is a diesel-hauled carriage service, introduced by the New Zealand Railways Department in 1964 after passenger demand between Masterton to Wellington exceeded the capacity of the diesel railcars then used.

The Night Limited was an express passenger train that operated in New Zealand between Wellington and Auckland, utilising the entire length of the North Island Main Trunk. It commenced service on 15 December 1924 and was replaced by the Silver Star in 1971 and supplemented by the Northerner express in 1975.

The Connoisseur cars were special railway carriages that were used in a number of passenger trains in New Zealand.

The NZR RM class Westinghouse railcar was an experimental railcar built by the New Zealand Railways Department (NZR) in 1914. Although not the first railcar to operate in New Zealand, it was the first to enter revenue service.

<span class="mw-page-title-main">NZR 56-foot carriage</span> Passenger rolling stock in New Zealand

The NZR 56-foot carriage is a class of 56 ft (17 m) long railway passenger carriage formerly used on almost all long-distance passenger rail transport in New Zealand. 88 carriages have been preserved.

<span class="mw-page-title-main">NZR FM guards van</span>

The New Zealand FM guards van is a rail vehicle in New Zealand originally used on freight trains but now used primarily on passenger trains, reclassified AG.

<span class="mw-page-title-main">Taumarunui railway station</span> Railway station in New Zealand

Taumarunui railway station is the main railway station in Taumarunui, New Zealand, serving the Northern Explorer service between Auckland and Wellington. Historically, it was an important intermediate stop with a refreshment room on the North Island Main Trunk line; the subject of the ballad "Taumarunui on the Main Trunk Line" by Peter Cape.

References

Citations

  1. "AT Sleeping Car of 1971". New Zealand Railway Rolling Stock Lists.
  2. "The New Zealand Gazette" (PDF). 3 December 1973.{{cite web}}: CS1 maint: url-status (link)
  3. "Riding the long steel road". New Zealand Geographic. July–September 1996. Retrieved 17 February 2019.
  4. The Dominion 20-12-65
  5. Whistle 1976-1983 and background interviews, Ron Bailey (ret) and NZR Executive E. McQueen 1980
  6. NZR CME. Lightweight Rollingstock 8 June 1960. File 65/327 NZ National Archives & NZR CME 22/12/64
  7. "New N.I. express trains". Papers Past (National Library of New Zealand ). 1966.
  8. G. Glischinski. Santa Fe Railway. Voyageur Press & MBI publishing (2008) p154
  9. Miles 1995, p. 12.
  10. Leitch & Stott 1988, p. 152.
  11. Leitch & Stott 1988, p. 153.
  12. Pierre 1981, p. 170.
  13. T. Hayward, CME, NZR to G. Gair Minister of Railways, 1 July 1983. National Archives
  14. Richard Prebble (10 July 1985). Letter to NZR General Manager Trevor Hayward (Report). Archives New Zealand.
  15. "Living on board a Silver Star train". Stuff. Stuff Limited. 13 April 2018. Retrieved 13 April 2018.

Bibliography

  • Miles, Robert (1995). The End of the New Zealand Passenger Train. Beynon Printing Company. p. 32. ISBN   0473033208.
  • Leitch, David; Stott, Bob (1988). New Zealand Railways: The First 125 Years. Auckland: Heinemann Reed. p. 176. ISBN   0-7900-0000-8.
  • Pierre, Bill (1981). North Island Main Trunk: An Illustrated History. A.H. & A.W. Reed. ISBN   0-589-01316-5.