Wellington railway station

Last updated

Wellington
Metlink regional rail
Wellington Railway Station 2021-08-21.tif
Wellington railway station façade, 2021.
General information
LocationBunny Street, Pipitea, Wellington, New Zealand
Coordinates 41°16′43″S174°46′51″E / 41.27861°S 174.78083°E / -41.27861; 174.78083
Owned by New Zealand Railways Corporation [1]
Line(s) North Island Main Trunk
Wairarapa Line
Johnsonville Line
Platforms9
Connections Services
Construction
Structure typeAt-grade terminal station
ParkingYes
Accessiblemost Metlink services (operated by Transdev Wellington)
Other information
Station codeWELL (Metlink)
WLG (KiwiRail Network)
Fare zone1 [2]
History
Opened19 June 1937
Electrified1938
Services
Preceding station Transdev Wellington Following station
Crofton Downs
towards Johnsonville
Johnsonville Line Terminus
Ngauranga
towards Melling
Melling Line
Ngauranga
towards Upper Hutt
Hutt Valley Line
Takapu Road
towards Waikanae
Kapiti Line
Petone
towards Masterton
Wairarapa Connection
Preceding station KiwiRail Following station
Paraparaumu Capital Connection Terminus
Preceding station Great Journeys New Zealand Following station
Paraparaumu Northern Explorer Terminus
Designated25 September 1986
Reference no.1452
Location
New Zealand (location map).svg
Disc Plain red.svg
Wellington
Location within New Zealand
Wellington railway station

Wellington railway station, Wellington Central station, or simply Wellington station, is the main railway station serving Wellington, New Zealand, and is the southern terminus of the North Island Main Trunk, Wairarapa Line and Johnsonville Line.

Contents

The station opened in June 1937, replacing the two previous Wellington termini, Lambton and Thorndon. The building was originally the head office of the New Zealand Railways Department or NZR. Today, the building houses the Wellington office of KiwiRail in the east wing of the building. Victoria University of Wellington occupies the west wing.

A number of alterations have been made to the railway station over the years. The building was registered on 25 September 1986 as a Category 1 Historic Place by Heritage New Zealand. [3]

History

Entrance to Wellington Railway Station in 2006. Wellington Railway Station Entrance.JPG
Entrance to Wellington Railway Station in 2006.

Development

The capital's first Wellington railway station was a group of small buildings at Pipitea Point built in 1874 on earthquake-raised harbour floor for a temporary terminus of the railway line to the Hutt Valley. A series of reclamations allowed the line to reach well down Featherston Street and in 1880 a new Wellington railway station was, as it turned out, temporarily placed near the goods station for the new Railway Wharf. Traffic at the wharf quickly grew beyond expectations. The 1880 building was pulled north on rollers in 1885 to a less congested site on Featherston Street opposite the junction of Mulgrave Street and Sydney Street now Kate Sheppard Place. [4]

The third site named Wellington railway station was only the passenger terminus for the Hutt and Wairarapa lines. After the Government took control of the Manawatu line in December 1908, the Wellington railway station was renamed Wellington Lambton station and the Manawatu station which became the terminus for the North Island Main Trunk was named Wellington Thorndon station. The Thorndon station had been opened in September 1885 by the private Wellington and Manawatu Railway Company. The Government bought the line from its shareholders in 1908 to incorporate the Manawatu line into their system. [5]

Once both stations were under government control, public pressure began to build for a single terminal. In 1908, a joint reclamation scheme was drawn up by the Railways Department and the Wellington Harbour Board and in 1912 a new railway station was proposed, to supersede the Lambton and Thorndon stations. [6] The government decided on a co-ordinated development that included a new station building, and after an agreement in 1922 between the Railways Department and the Wellington Harbour Board, the reclamation of about 68 acres (27 hectares) incorporating a new double-track line, train marshalling areas, goods yards and sheds and using fill from the Tawa Flat Deviation. [7] The Thorndon reclamation began in 1923 and was on track to be completed by 1932, which allowed the government in 1929 to confirm that Bunny Street would be the location of a new station, so removing the inconvenience of two separate stations.

Wellington Railway Station plans.jpg

In 1929, W. Gray Young, an architect known for his neo-Georgian styles, of the Wellington architectural firm of Gray Young, Morton & Young, was selected (without a design competition) to design the new station, over the Auckland firm of Gummer & Ford, which had designed Auckland railway station. Gray Young, Morton and Young was formed in 1923 and consisted of William Gray Young, Hubert Morton and Gray Young's brother Jack. The firm had recently finished large commissions for Victoria University, designing the Stout Building (1930) Weir House (1930), and later the Kirk Building (1938).

The need to review building techniques after the 1931 Hawke's Bay earthquake and the impact of the Depression on finances delayed the government formally committing to the project until June 1933.

Design

As the planned location was on reclaimed land, test piles were driven in 1928 to test the quality of the soil. On the basis of the test results the decision was made to use Vibro cast-in-place piles to support the structure. The building was the first major New Zealand structure to incorporate a significant measure of earthquake resistance.

Gray Young was paid a 4% fee based on the initially estimated cost of £470,000. This cost rose to £483,000 once the quantity surveying firm of Maltby & Sommerville compiled a detailed quantity schedule, for which they were paid 1% of the estimated cost. Because of the impact of the Depression on Government finances, it was decided to reduce the cost by eliminating a mailroom and a section of the West wing along Featherston Street and by transferring the £28,000 cost of the platforms and verandahs to a separate budget. As a result, the official estimated cost of the station was reduced to £350,000. [8] To encourage employment of workers out of work due to the Depression the project received a subsidy of £34,000 (10% of the estimated cost) from the Employment Board.

The building is a U-shaped structure with the longest leg 105.5 metres (346 ft) long and 23.5 metres (77 ft) high. Because of delays in importing the specialized boring equipment needed to install the cast-in-place piles called for in the original design, the decision was made to use 1615 15 x 15 inch and 16 x 16 inch reinforced concrete piles. These were driven by a steam-powered hammer. On top of the piles a five- and six-storey steel-framed structure was built. The steel was encased in reinforced concrete and 1.75 million bricks. 21,000 cubic yards of aggregate from the Hutt River with cement from Whangarei were mixed on-site to create the concrete. The bricks used for the outer cladding were of a special design, with slots to accommodate vertical corrosion–resistant steel rods that reinforced the brickwork and bound it to the structural members. 1500 tons of decorative Hanmer and Whangārei granite and marble were used to clad the interior and the entranceway. 2500 gallons of paint were used. The roof was clad in Marseille tiles.

The main entrance is on the south side via a colonnade of eight 13-metre- [42-foot]-high Doric columns opening into a large booking hall decorated with delicately mottled dados extending to a high vaulted ceiling.

The glazed-roof concourse contained waiting rooms and toilets, a large dining room, a barber shop, book and fruit stalls and a first aid room. There was a nursery on the top floor to allow parents to leave their children while they shopped or waited for their train.

Road Services buses at Platform 9 in 1957 Buses at no. 9 Platform, Wellington Railway Station, 1957 (43712546690) (cropped).jpg
Road Services buses at Platform 9 in 1957

When completed the station was New Zealand's largest building, partly covering 0.6 hectares and with a combined floor area of two hectares. It was designed to accommodate the 675 staff of the Railways Department head office and the Wellington district office, which until then had been accommodated in 11 leased buildings throughout the city. [9]

The platforms, designed to accommodate up to 12 carriages, are made of concrete covered with a sealed surface under verandahs held up by railway irons.

Platform 9 was designed to be a roadway without rails for the terminus for certain services provided by New Zealand Railways Road Services.

A park was created in the forecourt with lawns and paths of paving stones with brick edging arranged in a herringbone pattern.

Construction

The construction tender closed on 25 September 1933, extended by two weeks in an attempt to encourage local manufacturers to offer locally manufactured materials. Twelve tenders were received, with Fletcher Building the lowest at £339,000. The next lowest was £350,000 from J T Julian & Son, who had constructed a significant part of the Auckland railway station. [10]

Fletchers was awarded what was believed to be the largest single-building contract let in New Zealand up to that time, to which a performance bond of £3000 was applied.

Fletchers appointed 26-year-old Joe Craig to manage his first major project. His prior experience had been in the construction of Chateau Tongariro, Massey College and earthquake reconstruction in Hastings. His management skills, supported by a large team of experienced foremen and a close working relationship with the architect, ensured that construction progressed very smoothly on a project that was very profitable for Fletchers. [11]

Work commenced on site in January 1934 with a workforce of 12, which built up to 161 in January 1936. Fletchers reduced the cost of the construction steel to £70,000 from an estimated £85,000 by directly importing it rather than purchasing it from local steel merchants, and had it fabricated on-site by Wm Cable Ltd. [12]

Progress was rapid, with 1500 of the piles driven by the time the foundation stone was laid on 17 December 1934 by the Duke of Gloucester, an occasion witnessed by an estimated 5,000 people. [13]

The contract was expanded to include the construction of an electric substation (commenced 1936) at a cost of £2022 and a locomotive maintenance workshop (commenced 1936) along the Thorndon Quay side of the railway yard. This cost £37,406 and is still in use. [14]

In August 1938, to accommodate increasing staff numbers, work commenced on the construction of the section of the Featherston Street Wing removed from the original design to reduce its cost. This was undertaken as a separate project at a cost of £59,662.

A two-storey brick building with a mansard roof containing a social hall and a garage was built in 1937 facing Waterloo Quay to the north of the East wing, at a cost of £15,000. The garage was on the ground floor with the social hall occupying part of the ground floor and the entire first storey. The garage also incorporated rooms for the chauffeur to the Railways Department's General Manager.

Opening

Wellington railway station's booking hall in 2013. Wellington Railway Station (14071807539).jpg
Wellington railway station's booking hall in 2013.

The station was opened on 19 June 1937 by the Governor-General of New Zealand, Viscount Galway. Lambton closed on 19 June 1937 and Thorndon on 8 June 1937.

NZR head office

The Railways Head office had been combined in an ornate three-story brick building at 75 Featherston Street in 1903. The foundation stone was laid by the Duke of Cornwall (later King George V) on 21 June 1901. One of the first Wellington buildings reinforced against earthquakes, the style was Classical Baroque and Jacobean; ornamented in white Oamaru stone with carved cornicles and balustrades and roofed with Marsiette tiles. In 1937 it became the Defence Department headquarters but the decorative features, high roof and lighting turrets were removed, and it was demolished in 1982. [15]

In 1982, the New Zealand Railways Corporation replaced the Railways Department. The application of a more commercial attitude to the running of the organisation resulted in a large reduction in staff employed at the Wellington railway station. Due to the reduction of railway staff numbers in the 1980s, large parts of the building became underutilized.

In 1991, as a result of a major restructuring of the New Zealand Railways Corporation, ownership of the land and buildings was retained by the Railways Corporation while a new organisation known as New Zealand Rail Limited took over rail operations including freight distribution, commuter and long-distance passenger services and the Interisland ferry service. Both organisations retained offices in the building. In 1993, New Zealand Rail Limited was sold to a private business consortium, which became Tranz Rail Holdings Limited in 1995. In 2000, Tranz Rail moved its head office to Auckland but retained space for operational management of the railway network. In 2004, Tranz Rail was sold and renamed Toll NZ Ltd, which then sold the track and infrastructure back to the Railways Corporation. [3]

Victoria University of Wellington west wing

Between August 2003 and October 2008, the building was refurbished at a cost of NZ$14.6 million to house part of Victoria University in the West wing and Toll NZ (now KiwiRail) in the East wing. This work included a seismic upgrade, restoration and refurbishment, and installation of three new lifts and dedicated access in the southwest corner to the university wing from the concourse. The architect was Athfield Architects with construction undertaken by Fletcher Construction. As part of this reorganisation of the building, the 24-hour train control centre was relocated from the western wing to the eastern side of the southern part of the building.

Station concourse in 2016, following a recent upgrade. Railway Hall (27168400915).jpg
Station concourse in 2016, following a recent upgrade.

On 4 December 2006, the New World Railway Metro supermarket opened on the ground floor. This coincided with the closure of the Railway Kiosk and the American Hotdog vendor.

Facilities

The ground floor has always provided services for long-distance travellers and local passengers including a restaurant, cafes, a bar, a shoe repair shop, and a dry cleaners. [16] The New World Railway Metro supermarket occupied part of the ground floor from 2006 until its closure in March 2024. [17] [18]

In 1988, the Railways-run bookstall and cafeteria were closed with subsequently the barber's shop and men's toilets being converted into Trax Bar and Cafe, while the women's waiting rooms were converted into toilet blocks. The original dining hall and kitchen were converted to office space. At about this time platforms 2 to 7 were shortened at the concourse end to provide increased space for waiting passengers. Large concrete planter boxes were installed at the end of the tracks to assist in stopping runaway trains.

In 2010, the former social hall was converted into 660 square metres of boutique office space.

Wellington regional stadium

As part of the creation of the WestpacTrust Stadium (completed November 1999) on surplus railway land to the north of the station, an elevated walkway from Thorndon Quay to the stadium was installed with access via ramps from platforms 3/4, 5/6 and 7/8. To facilitate this work, the canopies of platforms 7/8 and 9 were shortened to the same length as platforms 3/4 and 5/6. [3]

World War I Roll of Honour

Railways Department roll of honour board New Zealand Railways WWI Roll of Honour 2012.jpg
Railways Department roll of honour board

In the office entrance to the station, a roll of honour lists 450 members of the New Zealand Railways Department who lost their lives in World War I. (Transcript of the names with links to their records on the Auckland War Memorial Museum's Cenotaph database.) As many as 5,000 of the department's permanent staff, out of a 1914 workforce of 14,000, enlisted during the war, and many casual workers also served.

The roll was unveiled by Prime Minister William Massey in the Railways Department's head office in Featherston St on 30 April 1922. It originally listed 446 names, including two out of alphabetical order at the end, presumably late additions. Four names were added later, including those of three men who died after the war.

When the station opened in 1937, the memorial was moved along the road to its present location. [19]

Heritage listing

The station was registered on 25 September 1986 as a Category I Historic Place. [3] Category I historic places are "places of special or outstanding historical or cultural significance" according to Heritage New Zealand. [20] The Rail Heritage Trust of New Zealand classified the station as "Category A" heritage building. [21]

Filming location

Wellington railway station featured prominently in the 1981 film Goodbye Pork Pie , in which the protagonists drive a Mini through the station concourse in order to escape pursuing police officers.

The station was used in a 2009 TV advert in the United Kingdom for train ticketing company TheTrainLine, where a large flock of sheep use the facilities. [22]

In May 2014, the station foyer was used by celebrity chef Nigella Lawson to film a commercial for Whittaker's a local chocolate manufacturing firm. [23] [24]

Airspace development

In 1972, NZR proposed developing the airspace above the station's platforms. The proposed development included four buildings built north of the current station over the platforms and part of the marshalling yards. [25] The development would include a 200-bed hotel, tavern, car-parking, shopping facilities and a revolving restaurant. [25] NZR made an application to Wellington City Council for consent to begin the project in 1977. [25] The plan was revised in 1986 in a joint venture between Mainzeal and the Railways Corporation under the "Gateway Development." The development included seven tower blocks, a hotel, retail and recreational facilities. [26]

In 2017 the plans were unveiled for a $1 billion redevelopment of Wellington railway station and the concourse to the stadium, named "Project Kupe" and incorporating a tower, retail outlets, apartments and 12,000 seat indoor stadium. [27]

Proposed sale

In August 2018, the proposed sale of the building by KiwiRail was stopped by Winston Peters as the Minister of State-Owned Enterprises as "premature". The building required earthquake strengthening (cost $62 million), and the anticipated sale price of $80 million had already been included in KiwiRail's budget. [28] The Port Nicholson Block Settlement Trust decided not to purchase the building in 2016. [29]

Wellington railway yard

The Wellington railway yard incorporates marshalling and storage tracks and buildings and a Multiple Unit Depot (MUD) for servicing EMUs. A rail line under the overhead stadium walkway goes to the container terminal and other freight facilities on the Port wharves, with a level crossing on Aotea Quay. [30]

The principal Wellington signal box known as the "A Box" is near the overhead stadium walkway with a commanding view of the station platforms and main lines entering the station. In 2021/2022 additional crossovers and connections to the station approaches will provide extra capacity and resilience ($4.5 million) and the signal interlocking may be replaced with a computer based system ($8 million). A second lead track is to be provided to the train storage yards to facilitate faster platform clearance (2020; $5.9 million). [31]

When a derailed goods wagon [32] near the Interisland terminal damaged both tracks through the yard out of Wellington on 3 July 2019 [33] commuter service to the Hutt Valley and Kapiti lines were seriously disrupted for two days. The closed Kaiwharawhara railway station is to be developed as an emergency Wellington terminal. [34]

Services

"Matangi" trains at Wellington railway station in 2013 Matangi trains lined up at Wellington Railway Station.jpg
"Matangi" trains at Wellington railway station in 2013
New Snapper card scanners at Wellington railway station, July 2022. Snapper Card scanners at Wellington Railway Station.jpg
New Snapper card scanners at Wellington railway station, July 2022.

The station copes with large daily passenger numbers with very little alteration having proved necessary. In its first year, 7,600 passengers made 15,200 trips on 140 trains daily. In the 1960s it was estimated that over 42,000 people used the station each day. Today, 29,000 passengers make 44,000 trips on 390 trains, excluding long-distance services.

Work from 2019 as part of the Wellington Metro upgrade improved the station approaches, and new foundations were built for 80 masts for the traction overhead as steel masts are to replace wooden masts. [35]

Rail

Two companies operate train services from Wellington.

Transdev operates the Wellington suburban rail network on behalf of the Greater Wellington Regional Council. This includes the electrified lines serving the Wellington and Kapiti urban areas, plus the Wairarapa Connection service to Masterton via the Hutt Valley and the Remutaka Tunnel. At off-peak, 8–10 trains per hour leave Wellington, broken down they are:

The Great Journeys of New Zealand (KiwiRail) operates one long-distance service from Wellington up the North Island Main Trunk, the Northern Explorer to Auckland Strand. The service ran three times per week until December 2021, [36] and is due to resume in September 2022. [37] The Capital Connection service operates to Palmerston North once daily on weekdays.

Bus

The bus terminal, formerly Lambton Interchange, is served by most Wellington bus routes and is connected to the station by a subway under Featherston St. It is served by the following bus routes: 1, 3, 7, 12e, 14, 17, 20, 22, 23, 24, 25, 26, 27, 29, 30x, 31x, 32x, 35, 36, 39, 52, 56, 57, 58, 60e, 83 and 84

A small roadway opposite Platform 9 is also served by train replacement buses, Interislander shuttle buses, and InterCity and Newmans long-distance coaches.

See also

Related Research Articles

<span class="mw-page-title-main">Rail transport in New Zealand</span>

Rail transport in New Zealand is an integral part of New Zealand's transport network, with a nationwide network of 4,375.5 km (2,718.8 mi) of track linking most major cities in the North and South Islands, connected by inter-island rail and road ferries. Rail transport in New Zealand has a particular focus on bulk freight exports and imports, with 19 million net tonnes moved by rail annually, accounting for more than half of rail revenue.

<span class="mw-page-title-main">Public transport in the Wellington Region</span> Overview of public transport in Wellington, New Zealand

Public transport in the Wellington Region, branded under the name Metlink, is the public transport system serving Wellington and its surrounding region. It is the most used public transport system in New Zealand per capita, and consists of electric and diesel buses, suburban trains, ferries and a funicular. It also included trams until 1964, and trolleybuses until 2017.

<span class="mw-page-title-main">Wairarapa Line</span> Secondary railway line in New Zealand

The Wairarapa Line is a secondary railway line in the south-east of the North Island of New Zealand. The line runs for 172 kilometres (107 mi), connects the capital city Wellington with the Palmerston North - Gisborne Line at Woodville, via Lower Hutt, Upper Hutt and Masterton.

<span class="mw-page-title-main">Wairarapa Connection</span> New Zealand railway

The Wairarapa Connection is a New Zealand interurban commuter rail service along the Wairarapa Line between Masterton, the largest town in the Wairarapa, and Wellington. It is operated by Wellington suburban operator Transdev under contract from the Greater Wellington Regional Council. It is a diesel-hauled carriage service, introduced by the New Zealand Railways Department in 1964 after passenger demand between Masterton to Wellington exceeded the capacity of the diesel railcars then used.

<span class="mw-page-title-main">Kaiwharawhara railway station</span> Railway station in New Zealand

Kaiwharawhara railway station, a former railway station on the North Island Main Trunk and the Wairarapa Line in Wellington in New Zealand, closed in 2013. It was the first station north of Wellington, serving the early suburb of Kaiwharawhara. Prior to its closure it was served by trains operated by Tranz Metro as part of the Metlink network on the Melling Line, the Hutt Valley Line and the Kapiti Line.

<span class="mw-page-title-main">Ngauranga railway station</span> Railway station in New Zealand

Ngauranga railway station is a single island platform railway station in the mainly industrial and commercial suburb of Ngauranga on the Wairarapa Line in Wellington, New Zealand. It is on the Wellington suburban rail network and is served by Melling Line trains and some only Hutt Valley Line trains. Wairarapa Connection trains pass this station but do not stop. All trains are run by Transdev as part of the Metlink network.

<span class="mw-page-title-main">Hutt Valley Line</span> Train service in New Zealand

The Hutt Valley Line is the electrified train service operated by Transdev Wellington on behalf of Metlink on the section of the Wairarapa Line railway between Wellington and Upper Hutt, New Zealand.

<span class="mw-page-title-main">Melling Branch</span> Commuter Branch Line New Zealand

The Melling Branch is a railway branch line in the Hutt Valley, north of Wellington, New Zealand. It is part of the national rail network and formerly part of the Wairarapa Line. Until 2010 it was one of only two passenger-only lines in the country, since that year the two being joined by the Onehunga Branch and later by the Manukau Branch.

<span class="mw-page-title-main">Johnsonville Branch</span> Railway line in New Zealand

The Johnsonville Branch, also known as the Johnsonville Line, is a commuter branch line railway from the main Railway Station of Wellington, New Zealand to the northern suburb of Johnsonville via Ngaio and Khandallah.

<span class="mw-page-title-main">Featherston railway station</span> Railway station in New Zealand

Featherston railway station is a single-platform, urban railway station serving the town of Featherston in the Wairarapa district of New Zealand. The station lies on the Wairarapa Line, between Harrison Street West and Harrison Street East. It is thirty-five minutes journey time to Masterton, or fifty five minutes journey time to Wellington.

<span class="mw-page-title-main">Maymorn railway station</span> Railway station in New Zealand

Maymorn railway station is a twin platform, rural request stop railway station serving the small settlement of Maymorn on the Maymorn Plateau, east of Upper Hutt, in New Zealand’s North Island. It is served by the Wairarapa Connection, and sees five services each way Monday to Thursday, six on Friday and two on Saturday and Sunday.

<span class="mw-page-title-main">Upper Hutt railway station</span> Railway station in New Zealand

Upper Hutt railway station is a suburban railway station serving central Upper Hutt, New Zealand. The station is on the Wairarapa Line, 32.4 km (20.1 mi) north of Wellington, and is served by Transdev Wellington on behalf of the Greater Wellington Regional Council. The station is the northern terminus for the electrified Hutt Valley Line to and from Wellington. The diesel-hauled Wairarapa Connection stops at Upper Hutt on its route between Wellington and Masterton.

The Hutt Railway Workshops is a major railway engineering facility in the Lower Hutt suburb of Gracefield in the Wellington region of New Zealand's North Island. It is state-owned enterprise KiwiRail's only workshops, and was opened in 1930.

<span class="mw-page-title-main">Wallaceville railway station</span> Railway station in New Zealand

Wallaceville railway station is a suburban railway station serving Wallaceville in Upper Hutt, New Zealand. The station is located on the Hutt Valley section of the Wairarapa Line, 31.3 km (19.4 mi) north of Wellington, and is served by Metlink on behalf of the Greater Wellington Regional Council. Trains between Upper Hutt and Wellington stop at Wallaceville.

<span class="mw-page-title-main">Thorndon railway station</span> Defunct railway station in New Zealand

Thorndon railway station in Wellington, New Zealand, was opened in 1885 as the southern terminus of the Wellington and Manawatu Railway Company’s Wellington-Manawatu Line and then known as Wellington and Manawatu railway station. This line is now part of the Kapiti section of the North Island Main Trunk.

Pipitea Point railway station, a temporary building for the Hutt and Masterton railway, was Wellington's first railway station opened on 14 April 1874 with the Hutt Valley Line. The railway line from Wellington to Lower Hutt was started in 1872 and opened in 1874.

<span class="mw-page-title-main">Te Aro railway station</span> Defunct railway station in New Zealand

Te Aro railway station was a station in Wellington, New Zealand, near what is now the corner of Wakefield and Tory Streets. Opened in 1893 it was one of only three stations in the city - the other two were Wellington railway station on Featherston Street, renamed Lambton railway station in December 1908, which was the main New Zealand Railways Department station, and Thorndon railway station off Thorndon Quay, the southern terminus of the private Wellington and Manawatu Railway.

Railway electrification in New Zealand consists of three separate electric systems, all on the North Island. Electrification was initially adopted by the New Zealand Railways for long tunnels; the Otira Tunnel, the Lyttelton Rail Tunnel and the two Tawa Tunnels of the Tawa Flat Deviation. Electrification of Wellington suburban services started with the Johnsonville Line and Kapiti Line out of Wellington from the 1930s. Auckland suburban services were electrified in 2014–2015. Electrification of long-distance services on the North Island Main Trunk (NIMT) dates from 1986. New long tunnels, for example the Rimutaka Tunnel and the Kaimai Tunnel, were operated by diesels, and the Otira and Lyttelton Tunnels have converted to diesel operation.

<span class="mw-page-title-main">Lambton railway station</span> Defunct railway station in Wellington, New Zealand

Lambton railway station in Featherston Street, Wellington, New Zealand was the southern passenger terminus for the Hutt Valley Line and the Wairarapa Line from 1885 to 1936 and for lines further north until December 1908. It was originally known as Wellington railway station. Wellington's third railway station, it had been preceded by station buildings temporarily at Pipitea Point and a site further south on Featherston Street beside Wellington's rail freight depot and its Railway Wharf.

<span class="mw-page-title-main">Railway signalling in New Zealand</span>

The first railway line in New Zealand was the line from Christchurch to Ferrymead opened in 1863. Under the "Grand Go-ahead Policy" of public works instituted by Sir Julius Vogel in 1870 the network was rapidly expanded. Initially lines went from the main town and port to the rural hinterland, but the line between the cities of Christchurch and Dunedin section of the South Island Main Trunk Railway opened in 1878.

References

Citations

  1. "New Zealand Railways Corporation – Results for announcement to the market" (PDF). 30 August 2013. Archived from the original (PDF) on 22 October 2013. Retrieved 21 October 2013.
  2. Metlink. "Text description of fare zone boundaries". Greater Wellington Regional Council. Archived from the original on 18 December 2007. Retrieved 27 November 2007.
  3. 1 2 3 4 "Wellington railway station". New Zealand Heritage List/Rārangi Kōrero. Heritage New Zealand . Retrieved 8 July 2008.
  4. Parsons 2010, p. 49.
  5. Parsons 2010, pp. 45, 48.
  6. Parsons 2010, p. 71.
  7. Parsons 2010, p. 7.
  8. Smith 2009, p. 194.
  9. IPENZ, Engineering Publications Co Ltd. "Wellington Railway Station" (PDF). Engineering to 1990: 36. Archived from the original (PDF) on 12 February 2012.
  10. Smith 2009, p. 195.
  11. Smith 2009, p. 198.
  12. Smith 2009, p. 196.
  13. Smith 2009, p. 197.
  14. Smith 2009, pp. 198 and 330.
  15. Parsons 2010, pp. 56, 57.
  16. "Wellington Railway Station". Metlink Wellington. Archived from the original on 15 April 2017. Retrieved 25 August 2018.
  17. "The Post".
  18. "Wellington Railway Station celebrates 75th". Stuff. 19 June 2012. Archived from the original on 12 November 2020. Retrieved 12 November 2020.
  19. "Railways Department roll of honour board, Wellington | NZHistory, New Zealand history online". nzhistory.govt.nz. Retrieved 11 August 2020.
  20. "Heritage New Zealand - Historic Places Categories" . Retrieved 25 August 2023.
  21. "Wellington Railway Station". Rail Heritage Trust of New Zealand . Retrieved 25 August 2023.
  22. "TV Advertising Campaign". thetrainline.com. Archived from the original on 5 April 2009.
  23. "Lawson filming at Wellington station". Stuff/Fairfax. 6 May 2014.
  24. APNZ (6 May 2014). "Nigella Lawson causes a stir in Wellington". New Zealand Herald.
  25. 1 2 3 "Airspace scheme "not dead"". Rails . 6 (10). Southern Press Ltd: 14. May 1977. ISSN   0110-6155.
  26. "$500m development for Wellington station". Rails : 81. November 1986. ISSN   0110-6155.
  27. Hamish Rutherford (8 September 2017). "Grand central station: Railway to stadium plan could transform 'poorly presented' part of Wellington" . Retrieved 20 August 2023.
  28. Vance, Andrea (31 August 2018). "Kiwirail's $80m Wellington railway station headache". Stuff (Fairfax).
  29. Devlin, Collette (21 September 2016). "Trust will not buy Wellington railway station but looking at other sites". Stuff (Fairfax).
  30. Parsons 2010, pp. 123–126.
  31. Taylor, Bruce (June–July 2018). "Wellington Timetable Changes and Infrastructure Upgrades". The New Zealand Railway Observer. Vol. 75, no. 2. pp. 62, 63.
  32. Hunt, Tom (3 July 2019). "The 55-year old wagon that sent Wellington rail into turmoil". Stuff (Fairfax).
  33. "Derailed freight train in Wellington cancels services for 20,000 commuters". Stuff (Fairfax). 3 July 2019.
  34. George, Damian (4 July 2019). "Wellington rail meltdown would have been averted if planned contingency was in place". Stuff (Fairfax).
  35. "Wellington Metro Upgrade". KiwiRail. 2020.
  36. "Urgent calls for long-distance passenger services to stay as KiwiRail cuts operations". Newshub. Retrieved 29 January 2022.
  37. "Even Greater Journeys for 2022!". Great Journeys of New Zealand. April 2022. Archived from the original on 10 July 2022. Retrieved 5 June 2022.

Bibliography

  • Parsons, David (2010). Wellington's Railway: Colonial Steam to Matangi. Wellington: New Zealand Railway & Locomotive Society. ISBN   978-0-908573-88-2.
  • Smith, Jack (2009). No Job Too Big – A History of Fletcher Construction Volume I: 1909–1940 (hardback). Wellington: Steele Roberts. p. 342. ISBN   978-1-877448-69-0.

Further reading