Tororo–Opuyo–Lira High Voltage Power Line

Last updated
Tororo–Opuyo–Lira High Voltage Power Line
Location
Country Uganda
Coordinates 01°40′39″N33°40′37″E / 1.67750°N 33.67694°E / 1.67750; 33.67694
General direction South to North
From Tororo, Uganda
Passes through Mbale, Opuyo, Dokolo
To Lira, Uganda
Ownership information
Owner Government of Uganda
Partners African Development Bank
Operator Uganda Electricity Transmission Company Limited
Construction information
Construction started 2013
Expected 2017
Technical information
Type of current AC
Total length 264 km (164 mi)
AC voltage 132kV
No. of circuits 2

The Tororo–Opuyo–Lira High Voltage Power Line is a high voltage electricity power line, connecting the high voltage substation at Tororo, to another high voltage substation at Lira, in Uganda. [1]

High voltage electrical energy at voltages high enough to inflict harm on living organisms (numerical definition depends on context)

The term high voltage usually means electrical energy at voltages high enough to inflict harm on living organisms. Equipment and conductors that carry high voltage warrant particular safety requirements and procedures. In certain industries, high voltage means voltage above a particular threshold (see below). High voltage is used in electrical power distribution, in cathode ray tubes, to generate X-rays and particle beams, to demonstrate arcing, for ignition, in photomultiplier tubes, and in high power amplifier vacuum tubes and other industrial, military and scientific applications.

Electrical substation part of an electrical generation, transmission, and/or distribution system

A substation is a part of an electrical generation, transmission, and distribution system. Substations transform voltage from high to low, or the reverse, or perform any of several other important functions. Between the generating station and consumer, electric power may flow through several substations at different voltage levels. A substation may include transformers to change voltage levels between high transmission voltages and lower distribution voltages, or at the interconnection of two different transmission voltages.

Tororo Place in Eastern Region of Uganda, Uganda

Tororo is a town in the Eastern Region of Uganda. It is the main municipal, administrative, and commercial center of Tororo District. There are many shops, banks, supermarkets here. Tororo is a trading hub where many people come from the surrounding villages to work. There are a number of ATM's around town with one at Barclay's accepting all major cards. MTN and Airtel mobile agents are throughout the town.

Contents

Location

The 132kV power line, begins at the 132kV substation at Tororo, in Tororo District, in the Eastern Region of Uganda. The line travels in a northerly direction through Mbale, to the Uganda Electricity Transmission Company Limited high voltage substation at Opuyo, outside of Soroti, in Soroti District. From there, it takes a general north-westerly course, through Dokolo District, to end at Lira, in Lira District, in the Northern Region of Uganda, a total distance of approximately 264 kilometres (164 mi). [1]

Tororo District District in Uganda

Tororo District is a district in the Eastern Region of Uganda. The town of Tororo hosts the district headquarters.

Eastern Region, Uganda Region in Eastern, Uganda

The Eastern region is one of four regions in the country of Uganda. As of Uganda's 2014 census, the region's population was 9,042,422.

Mbale Place in Eastern Uganda, Uganda

Mbale is a city in Eastern Region of Uganda. It is the main municipal, administrative, and commercial center of Mbale District and the surrounding sub-region.

Overview

The power line is the major electricity conduit to the Eastern Region of Uganda, with extension to Northern Uganda. It is a 132 kilo-Volt, double-circuit installation, that harnesses power from the hydroelectric power stations on the Victoria Nile and the thermal and solar power plants in Tororo and Soroti, for onward transmission to the east and north of country. [2]

Construction

Prior to 2013, the power line was primarily constructed of wooden poles, which were vulnerable to lightning, wild fires and termite damage. In 2013, the government of Uganda, using money borrowed from the African Development Bank, began replacing the wooden poles with metal structures. The main objective is to improve the availability, quality and reliability of power supply. [1] [2] Kalpataru Power Transmission Limited (KPTL), based in India, is the main contractor on this project. The engineering supervisor is Hifab Oy of Finland. [1] [2] Construction stated in 2013, [2] with completion expected in 2017. [1]

The African Development Bank Group (AfDB) or Banque Africaine de Développement (BAD) is a multilateral development finance institution. The AfDB was founded in 1964 and comprises three entities: The African Development Bank, the African Development Fund and the Nigeria Trust Fund. The AfDB's mission is to fight poverty and improve living conditions on the continent through promoting the investment of public and private capital in projects and programs that are likely to contribute to the economic and social development of the region. The AfDB is a financial provider to African governments and private companies investing in the regional member countries (RMC). While it was originally headquartered in Abidjan, Côte d'Ivoire, the bank's headquarters moved to Tunis, Tunisia, in 2003, due to the Ivorian civil war; before returning in September 2014.

India Country in South Asia

India, also known as the Republic of India, is a country in South Asia. It is the seventh largest country by area and with more than 1.3 billion people, it is the second most populous country as well as the most populous democracy in the world. Bounded by the Indian Ocean on the south, the Arabian Sea on the southwest, and the Bay of Bengal on the southeast, it shares land borders with Pakistan to the west; China, Nepal, and Bhutan to the northeast; and Bangladesh and Myanmar to the east. In the Indian Ocean, India is in the vicinity of Sri Lanka and the Maldives, while its Andaman and Nicobar Islands share a maritime border with Thailand and Indonesia.

Finland Republic in Northern Europe

Finland, officially the Republic of Finland is a country in Northern Europe bordering the Baltic Sea, Gulf of Bothnia, and Gulf of Finland, between Norway to the north, Sweden to the northwest, and Russia to the east. Finland is a Nordic country and is situated in the geographical region of Fennoscandia. The capital and largest city is Helsinki. Other major cities are Espoo, Vantaa, Tampere, Oulu and Turku.

See also

Bujagali–Tororo–Lessos High Voltage Power Line is a high voltage electricity power line, under construction, connecting the high voltage substation at Bujagali, in Uganda to another high voltage substation at Lessos, in Kenya.

The Nkenda–Fort Portal–Hoima High Voltage Power Line is a high voltage electricity power line, in operation, connecting the high voltage substation at Nkenda, Kasese District, to another high voltage substation at Kabaale, Buseruka sub-county, Hoima District, all in the Western Region of Uganda.

Related Research Articles

Lira, Uganda Place in Northern Region of Uganda, Uganda

Lira is a city in the Northern Region of Uganda. It is the main municipal, administrative, and commercial centre of Lira District. Lira was the main city of the defunct Lango District, which corresponds geographically with the current Lango sub-region.

Karuma Hydroelectric Power Station

The Karuma Hydroelectric Power Station is a 600 MW hydroelectric power project under construction in Uganda. When completed, it will be the largest power-generating installation in the country.

Tororo Solar Power Station, also Tororo Solar North Power Station, is a 10 megawatts (13,000 hp) solar power plant in Uganda, the third-largest economy in the East African Community.

The Soroti Power Station is a 10 MW (13,000 hp) solar power plant in Uganda. It is the largest grid-connected, "privately-funded solar power plant in Sub-Saharan Africa, outside of South Africa".

Namugoga Solar Power Station is a proposed 50 megawatt solar power plant in Uganda.

Kawanda Place in Uganda

Kawanda is a town in Wakiso District, Central Uganda.

The Uganda Electricity Transmission Company Limited (UETCL) is a parastatal company whose primary purpose is to make bulk electricity purchases and transmit the electricity along high voltage wires to local and foreign distribution points. UETCL is the sole authorized national bulk energy purchaser and the sole authorized electricity importer and exporter in Uganda.

Achwa 2 Hydroelectric Power Station

Achwa 2 Hydroelectric Power Station is a 42 megawatts (56,000 hp) hydroelectric power plant, under construction in Uganda.

Kawanda–Birembo High Voltage Power Line is a high voltage electricity power line, under construction, connecting the high voltage substation at Kawanda, in Uganda to another high voltage substation at Birembo, in Rwanda.

The Karuma–Kawanda High Voltage Power Line is a high voltage electricity power line, under construction, connecting the high voltage substation at Karuma Hydroelectric Power Station, in the Western Region of Uganda, to another high voltage substation at Kawanda, in the Central Region of Uganda.

The Nkenda–Mpondwe–Beni High Voltage Power Line is a proposed high voltage electricity power line, connecting the high voltage substation at Nkenda, in Kasese District, in the Western Region of Uganda, to another high voltage substation at Beni, in North Kivu Province, in the Democratic Republic of the Congo.

The Masaka–Mutukula–Mwanza High Voltage Power Line is a proposed high voltage electricity power line, connecting the high voltage substation at Masaka, in Masaka District, in the Central Region of Uganda, to another high voltage substation at Mwanza, in Mwanza Region, in the Republic of Tanzania.

The Lira–Gulu–Nebbi–Arua High Voltage Power Line is a high voltage electricity power line, under construction in Uganda. It connects the high voltage substation at Lira, in Lira District, to another high voltage substation at Arua, in Arua District, all in the Northern Region of the country.

Suswa–Isinya–Rabai High Voltage Power Line is an operational high voltage electricity power line connecting the high voltage substation at Suswa, Kenya to another high voltage substation at Rabai, Kenya.

Achwa 1 Hydroelectric Power Station

The Achwa 1 Hydroelectric Power Station (A1HPS), also Achwa I Hydroelectric Power Station, is a planned hydroelectric power station in Uganda, with a proposed installed capacity of 41 megawatts (55,000 hp).

The Opuyo–Moroto High Voltage Power Line is a high voltage electricity power line, under construction, connecting the high voltage substation at Opuyo, a southern suburb of the town of Soroti, in the Eastern Region to another high voltage substation at Moroto, in the Northern Region of Uganda.

The Karuma–Juba High Voltage Power Line is a planned high voltage electricity power line, connecting the high voltage substation at Karuma, in Kiryandongo District, in the Western Region of Uganda, to another high voltage substation at Juba, in Jubek State, in South Sudan.

References

  1. 1 2 3 4 5 UETCL (29 January 2014). "Projects Under Implementation". Kampala: Uganda Electricity Transmission Company Limited (UETCL). Retrieved 3 January 2018.
  2. 1 2 3 4 Kolyangha, Mudangha (21 April 2013). "Rehabilitation of Tororo-Lira power transmission lines start". Daily Monitor . Kampala. Retrieved 3 January 2018.