USS Cuttlefish (SS-171)

Last updated

USS Cuttlefish SS171.jpg
History
US flag 48 stars.svgUnited States
NameUSS Cuttlefish
Builder Electric Boat Company, Groton, Connecticut [1]
Laid down7 October 1931 [1]
Launched21 November 1933 [1]
Commissioned8 June 1934 [1]
Decommissioned24 October 1945 [1]
Stricken3 July 1946 [1]
FateSold for breaking up, 12 February 1947 [1]
General characteristics
Class and typeV-8 (Cachalot)-class direct-drive diesel and electric submarine [2]
Displacement1,130 tons (1,150 t) surfaced, standard, [2] 1,650 tons (1,680 t) submerged [2]
Length274 ft (83.5 m) [2]
Beam24 ft 9 in (7.54 m) [2]
Draft16 ft 3 in (4.95 m) maximum [2]
Propulsion
Speed17 kn (31 km/h) surfaced; [2] 8 kn (15 km/h) submerged [2]
Range6,000 nmi (11,000 km) @ 10 kn (19 km/h), [8] 14,000 nmi (26,000 km) @ 10 kn with fuel in main ballast tanks, [8] 83,290 US gal (315,300 L) oil fuel [9]
Endurance10 hours at 5 knots (9 km/h) [8]
Test depth250 ft (80 m) [8]
Complement6 officers, 39 men (peacetime); 7 officers, 48 men (war) [9]
Armament

USS Cuttlefish (SC-5/SS-171), a Cachalot-class submarine and one of the "V-boats," was the second ship of the United States Navy to be named for the cuttlefish. Her keel was laid down by Electric Boat Company in Groton, Connecticut. She was launched on 21 November 1933 sponsored by Mrs. B. S. Bullard, and commissioned on 8 June 1934, Lieutenant Commander Charles W. "Gin" Styer in command. Cuttlefish was the first submarine built entirely at Electric Boat's facility in Groton, Connecticut; construction of previous Electric Boat designs had been subcontracted to other shipyards, notably Fore River Shipbuilding of Quincy, Massachusetts. Four Peruvian R-class submarines had previously been finished in Groton, using material from cancelled S-boats salvaged from Fore River. [9] [10]

Contents

Design

Cuttlefish differed from her sister Cachalot (built by the Portsmouth Navy Yard) mainly in her different internal arrangements and the incorporation of the first air conditioning plant in a USN submarine. Like all of the other V-boats (except V-1, 2, and 3), she was built to a partial riveted/partial welded construction. [11] Electric Boat expanded on the use of welding pioneered by Portsmouth, with most of Cuttlefish's outer hull and fuel tanks welded, but with the internal pressure hull still riveted. This was entirely successful as it virtually eliminated the problem of fuel leakage caused by the riveted fuel tanks on earlier boats. [12] Both were medium-sized submarines built under the tonnage limits of the London Naval Treaty of 1930. An extensive study was conducted to determine the optimum submarine size under the treaty restrictions, factoring in total force, endurance, and percentage of the force that could be maintained on station far from a base, as in a Pacific war scenario. [13] Despite the calculation process, size reduction had gone too far with the Cachalots, limiting their patrol endurance. [9] After three Pacific war patrols, Cuttlefish was relegated to training duties in September 1942, once numerous Gato-class boats became available. [14]

The as-built engine specifications were two BuEng-built, MAN-designed M9Vu 40/46 nine-cylinder [7] two-cycle direct drive main diesel engines, 1,535 hp (1,145 kW) each, [4] [8] with one BuEng MAN [15] two-cycle auxiliary diesel engine, [15] driving a 330 kW (440 hp) electric generator. [6] The auxiliary engine was for charging batteries or for increased surface speed via a diesel-electric system providing power to the main electric motors. As with most V-boats, the main engines proved troublesome, and were replaced in 1937-38 by two Winton GM 16-278 16-cylinder four-cycle diesels, 1,600 hp (1,200 kW) each. [15]

Service history

Inter-War Period

Departing New London, Connecticut on 15 May 1935, Cuttlefish arrived at San Diego, California on 22 June. She sailed on torpedo practice and fleet tactics exercises along the West Coast and in the Hawaiian Islands until 28 June 1937, when she sailed for the Panama Canal, Miami, Florida, New York City, and New London, Connecticut.

Arriving at New London on 28 July, she conducted experimental torpedo firing, sound training, and other operations for the Submarine School. At this time her troublesome MAN engines were replaced with Winton GM engines at the New York Navy Yard in 1937–38, as were her sister's. [10] She sailed from New York City on 22 October 1938 for Coco Solo, where she conducted diving operations and other exercises for the training of submariners until 20 March 1939, sailing then for the Mare Island Navy Yard, California.

Cuttlefish arrived at Pearl Harbor on 16 June and was based there on patrol duty, as well as joining in battle problems and exercises in the Hawaiian area. That autumn, she cruised to the Samoan Islands, and in 1940 to the West Coast. On 5 October 1941, she cleared Pearl Harbor for an overhaul at the Mare Island Navy Yard.

World War II

After returning to Pearl Harbor, Cuttlefish put to sea on her first war patrol on 29 January 1942. On 13 February, she performed a reconnaissance of Marcus Island, gaining valuable information, and after patrolling in the Bonin Islands, returned to Midway Island on 24 March. She refitted there and at Pearl Harbor, and on 2 May cleared Midway for her second war patrol. From 18 to 24 May, she reconnoitered Saipan and the northern part of the Mariana Islands. On 19 May, she attacked a patrol ship, and while maneuvering for a second attack, was detected. She was forced deep to endure four hours of severe depth charging, more of which came her way on 24 May when she challenged three enemy destroyers. The next day an alert enemy plane caught her on the surface and dropped two bombs as she went under, both of them misses.

As it became obvious the Japanese Fleet was out in strength, Cuttlefish was ordered to patrol about 700 nautical miles (1,300 km) west of Midway, remaining on station during the Battle of Midway from 4–6 June 1942. She returned to Pearl Harbor on 15 June, and there and at Midway prepared for her third war patrol, for which she sailed on 29 July under the command of Lieutenant Commander Elliot E. Marshall. Patrolling off the Japanese homeland, she attacked a destroyer on 18 August, and received a punishing depth charge attack. Three days later, she launched a spread of torpedoes, three of which hit a freighter and one of which hit an escort. Explosions were seen, but the sinking could not be confirmed. On 5 September, she attacked a tanker which, it is believed, she sank.

Returning to Pearl Harbor on 20 September 1942, Cuttlefish was ordered to New London, where she served the Submarine School as a training ship from December 1942 to October 1945. On 8 December 1944, she suffered minor damage in a collision with USS Bray (DE-709). She was decommissioned at Philadelphia on 24 October 1945, and sold for scrap on 12 February 1947.

Awards

Related Research Articles

USS <i>Dolphin</i> (SS-169) "V-boat" class submarine

USS Dolphin (SF-10/SC-3/SS-169), a submarine and one of the "V-boats", was the sixth ship of the United States Navy to be named for that aquatic mammal. She also bore the name V-7 and the classifications SF-10 and SC-3 prior to her commissioning. She was launched on 6 March 1932 by the Portsmouth Navy Yard, sponsored by Mrs. E.D. Toland, and commissioned on 1 June 1932.

USS <i>Argonaut</i> (SM-1) Submarine of the United States

USS Argonaut (V-4/SF-7/SM-1/A-1/APS-1/SS-166) was a submarine of the United States Navy, the first boat to carry the name. Argonaut was laid down as V-4 on 1 May 1925 at Portsmouth Navy Yard. She was launched on 10 November 1927, sponsored by Mrs. Philip Mason Sears, the daughter of Rear Admiral William D. MacDougall, and commissioned on 2 April 1928. Although never officially designated as "SS-166", at some point she displayed this number on her conning tower.

USS <i>Nautilus</i> (SS-168) Submarine of the United States

USS Nautilus (SF-9/SS-168), a Narwhal-class submarine and one of the "V-boats", was the third ship of the United States Navy to bear the name.

USS <i>Shark</i> (SS-174) Submarine of the United States

USS Shark (SS-174) was a Porpoise-class submarine, the fifth ship of the United States Navy to be named for the shark.

USS <i>Pickerel</i> (SS-177) Submarine of the United States

USS Pickerel (SS-177), a Porpoise-class submarine, was the first ship of the United States Navy to be named for the pickerel, species of freshwater fish native to the eastern United States and Canada.

USS <i>Permit</i> (SS-178) Submarine of the United States

USS Permit (SS-178), a Porpoise-class submarine, was the first ship of the United States Navy to be named for the permit. She was laid down as Pinna.

USS <i>Pompano</i> (SS-181) Porpoise-class submarine of the US Navy

USS Pompano (SS-181), a United States Porpoise-class submarine, was the second ship of the United States Navy to be named for the pompano.

USS <i>Narwhal</i> (SS-167) Submarine of the United States

USS Narwhal (SS-167), the lead ship of her class of submarine and one of the "V-boats", was the second ship of the United States Navy to be named for the narwhal. She was named V-5 (SC-1) when her keel was laid down on 10 May 1927 by the Portsmouth Navy Yard in Kittery, Maine.

V-boat Group of U.S. Navy submarines and classes derived from them

The V-boats were a group of nine United States Navy submarines built between World War I and World War II from 1921 to 1934 under authorization as the "fleet boat" program.

USS <i>Cachalot</i> (SS-170) Submarine of the United States

USS Cachalot (SC-4/SS-170), a United States Navy submarine and the lead ship of her class, known as the "V-boats", was the only ship of the United States Navy to be named for the sperm whale. Her keel was laid down by the Portsmouth Navy Yard. She was launched on 19 October 1933 as V-8 (SC-4) sponsored by Miss K. D. Kempff, and commissioned on 1 December 1933 with Lieutenant Commander Merril Comstock in command. Cachalot was the first submarine to have the Torpedo Data Computer, Arma Corporation's Mark 1, installed.

USS <i>Tarpon</i> (SS-175) Submarine of the United States

USS Tarpon (SS-175), second United States Navy ship of this name, was a Porpoise-class diesel-electric submarine. Tarpon conducted war patrols in the Pacific Ocean during World War II.

USS <i>Porpoise</i> (SS-172) Submarine of the United States

USS Porpoise (SS–172), the fifth United States Navy ship to bear her name, was the lead ship of her class of submarines.

USS <i>Hoe</i> Ship of the United States Navy named for the hoe shark

USS Hoe (SS-258), a Gato-class submarine, was a ship of the United States Navy named for the hoe, one of various sharks, especially the dogfish.

USS <i>Mingo</i> (SS-261) Submarine of the United States

USS Mingo (SS-261) — a Gato-class submarine — was the first ship of the United States Navy to be named for the mingo snapper.

USS <i>Muskallunge</i> Submarine of the United States

USS Muskallunge (SS-262), a Gato-class submarine, was a ship of the United States Navy named for the muskallunge.

USS <i>Paddle</i> Submarine of the United States

USS Paddle (SS-263), a Gato-class submarine, was a ship of the United States Navy named for the paddlefish.

USS <i>Caiman</i> Submarine of the United States

USS Caiman (SS-323), a Balao-class submarine, was a ship of the United States Navy that was later transferred to the Turkish Naval Forces in 1972 under the Security Assistance Program, where she was recommissioned as the third TCG Dumlupınar. She was retired in 1986.

USS <i>Carp</i> (SS-338) Submarine of the United States

USS Carp (SS/AGSS/IXSS-338), a Balao-class submarine, was the second ship of the United States Navy to be named for the carp.

USS <i>Entemedor</i> Submarine of the United States

USS Entemedor (SS-340), a Balao-class submarine, was a ship of the United States Navy named for the entemedor, a fish of the electric ray family found in shallow waters from Baja California to Panama.

<i>Cachalot</i>-class submarine

The Cachalot-class submarines were a pair of medium-sized submarines of the United States Navy built under the tonnage limits of the London Naval Treaty of 1930. They were originally named V-8 and V-9, and so were known as "V-boats" even though they were unrelated to the other seven submarines constructed between World War I and World War II. An extensive study was conducted to determine the optimum submarine size under the treaty restrictions, factoring in total force, endurance, and percentage of the force that could be maintained on station far from a base, as in a Pacific war scenario. Joseph W. Paige of the Navy's Bureau of Construction and Repair (BuC&R) developed the basic design, but the builder, Electric Boat, was responsible for detailed arrangement; this was fairly bold, since Electric Boat had not built any new submarines since finishing four obsolescent boats for Peru. The previous V-boats were all built in naval shipyards. Cuttlefish was the first submarine built at EB's facility in Groton, Connecticut; construction of previous Electric Boat designs had been subcontracted to other shipyards, notably Fore River Shipbuilding of Quincy, Massachusetts.

References

  1. 1 2 3 4 5 6 7 Friedman, Norman (1995). U.S. Submarines Through 1945: An Illustrated Design History. Annapolis, Maryland: United States Naval Institute. pp. 285–304. ISBN   1-55750-263-3.
  2. 1 2 3 4 5 6 7 8 Bauer, K. Jack; Roberts, Stephen S. (1991). Register of Ships of the U.S. Navy, 1775–1990: Major Combatants. Westport, Connecticut: Greenwood Press. pp. 266–267. ISBN   0-313-26202-0.
  3. Alden, John D., Commander, USN (retired). The Fleet Submarine in the U.S. Navy (Annapolis, MD: Naval Institute Press, 1979), p.211.
  4. 1 2 U.S. Submarines Through 1945 pp. 360
  5. 1 2 Alden, p.210"
  6. 1 2 Friedman, p. 310
  7. 1 2 3 Alden, p.211.
  8. 1 2 3 4 5 6 7 U.S. Submarines Through 1945 pp. 305–311
  9. 1 2 3 4 Alden, p.38.
  10. 1 2 Friedman, p. 193
  11. Johnston, pp. 57
  12. Johnston, pp. 56 & 61
  13. Friedman, pp. 189-193
  14. Alden, p.39.
  15. 1 2 3 Alden, p.210.