USS Cachalot (SS-170)

Last updated

USS Cachalot - 19-N-14689.jpg
USS Cachalot SS-170
History
US flag 48 stars.svgUnited States
NameUSS Cachalot
Namesake sperm whale
Builder Portsmouth Naval Shipyard, Seavey's Island, Kittery, Maine [1]
Laid down21 October 1931 [1]
Launched19 October 1933 [1]
Commissioned1 December 1933 [1]
Decommissioned17 October 1945 [1]
Stricken1 November 1945, reinstated 28 November 1945, stricken again 8 July 1946 [1]
Honors and
awards
Bronze-service-star-3d.png 3 × battle stars
FateSold for breaking up, 26 January 1947 [1]
General characteristics
Class and typeV-8 (Cachalot)-class composite direct drive diesel and diesel-electric submarine [2]
Displacement1,110 tons (1,130 t) surfaced, standard, [3] 1,650 tons (1,680 t) submerged [3]
Length271 ft 11 in (82.88 m) [2]
Beam24 ft 11 in (7.59 m) [2]
Draft16 ft 3 in (4.95 m) maximum [2]
Propulsion
Speed17 kn (31 km/h) surfaced, [3] 8 kn (15 km/h) submerged, [3] 7 knots (13 km/h) submerged, service, 1939 [3]
Range6,000 nautical miles (11,000 km) @ 10 kn (19 km/h), [3] 14,000 nmi (26,000 km) @ 10 kn (19 km/h) with fuel in main ballast tanks, [3] 83,290 US gallons (315,300 L) oil fuel [9]
Endurance10 hours at 5 kn (9.3 km/h) [3]
Test depth250 ft (80 m) [3]
Complement6 officers, 39 enlisted (peacetime); [3] 7 officers, 48 enlisted (war) [9]
Armament6 × 21 inch (533 mm) torpedo tubes (four forward, two aft, 16 torpedoes), [3] 1 × 3 inch (76 mm)/50 caliber deck gun [3]

USS Cachalot (SC-4/SS-170), a United States Navy submarine and the lead ship of her class, known as the "V-boats", was the only ship of the United States Navy to be named for the sperm whale. Her keel was laid down by the Portsmouth Navy Yard. She was launched on 19 October 1933 as V-8 (SC-4) sponsored by Miss K. D. Kempff, and commissioned on 1 December 1933 with Lieutenant Commander Merril Comstock [10] in command. Cachalot was the first submarine to have the Torpedo Data Computer, Arma Corporation's Mark 1, [11] installed.

Contents

Design

Cachalot was built by the Portsmouth Navy Yard, as were most of the previous V-boats. Design conservatism and economic realities forced Portsmouth to continue to use riveting in the construction of the inner and outer hulls, although non-critical areas like the superstructure, piping brackets, support framing, and interior tankage were actually welded. Her sister, Cuttlefish (the first submarine built by Electric Boat since the S-class of 1925) had most of the outer hull and fuel tanks welded, while retaining riveting for the inner hull. [12] Both were medium-sized submarines built under the tonnage limits of the London Naval Treaty of 1930. An extensive study was conducted to determine the optimum submarine size under the treaty restrictions, factoring in total force, endurance, and percentage of the force that could be maintained on station far from a base, as in a Pacific war scenario. [13] Despite the calculation process, size reduction had gone too far with the Cachalots, limiting their patrol endurance. [9] After three Pacific war patrols, Cachalot was relegated to training duties in September 1942, once numerous Gato-class boats became available. [14]

The as-built engine specifications were two BuEng-built, MAN-designed M9Vu 40/46 nine-cylinder [8] two-cycle direct drive main diesel engines, 1,535 hp (1,145 kW) each, [3] [5] with one BuEng MAN [6] two-cycle auxiliary diesel engine, [6] driving a 330 kW (440 hp) electric generator. [7] The auxiliary engine was for charging batteries or for increased surface speed via a diesel-electric system providing power to the main electric motors. As with most V-boats, the main engines proved troublesome, and were replaced in 1937-38 by two Winton GM 16-278 16-cylinder four-cycle diesels, 1,600 hp (1,200 kW) each. [6]

Service history

Inter-war period

After shakedown, further construction, tests, and overhaul, Cachalot sailed for San Diego, California, where on 17 October 1934 she joined the Submarine Force, U.S. Fleet. Operating until 1937 principally on the West Coast, she engaged in fleet problems, torpedo practice, and antisubmarine, tactical, and sonar training exercises. She cruised twice to Hawaiian waters and once to the Panama Canal Zone to participate in large-scale fleet exercises.

Cachalot cleared San Diego on 16 June 1937, bound for New London, Connecticut, and duty in experimental torpedo firing for the Newport Torpedo Station and sonar training for the New London Submarine School until 26 October 1937, when she began a lengthy overhaul at the New York Navy Yard. This included replacement of her troublesome engines with General Motors Winton engines. A year later, she sailed for participation in a fleet problem, torpedo practice and sound training in the Caribbean Sea and off the Canal Zone, and on 16 June 1939 reported at Pearl Harbor for duty with the Submarine Force and the Scouting Force.

World War II

War came to Cachalot as she lay in Pearl Harbor Navy Yard in overhaul. In the Japanese attack on Pearl Harbor of 7 December 1941, one of her men was wounded, but the submarine suffered no damage. Yard work on her was completed at a furious pace, and on 12 January 1942 she sailed on her first war patrol. After fueling at Midway Island, she conducted a reconnaissance of Wake Island, Eniwetok, Ponape, Truk, Namonuito, and the Hall Islands, returning to Pearl Harbor on 18 March with vitally needed intelligence of Japanese bases. Her second war patrol, for which she cleared from Midway on 9 June, was conducted off the Japanese home islands, where she damaged an enemy tanker. Returning to Pearl Harbor on 26 July, she cleared on her final war patrol on 23 September, penetrating the frigid waters of the Bering Sea in support of the Aleutian Islands operations.

Over-age and lacking endurance for strenuous war patrols, Cachalot still had a key role to play, acting as training ship for the Submarine School at New London. She served there from late 1942 until 30 June 1945, when she sailed to Philadelphia, Pennsylvania, being decommissioned there on 17 October. She was sold for scrap on 26 January 1947.

Awards

See also

Notes

  1. 1 2 3 4 5 6 7 Friedman, Norman (1995). U.S. Submarines Through 1945: An Illustrated Design History. Annapolis, Maryland: United States Naval Institute. pp. 285–304. ISBN   1-55750-263-3.
  2. 1 2 3 4 Bauer, K. Jack; Roberts, Stephen S. (1991). Register of Ships of the U.S. Navy, 1775–1990: Major Combatants. Westport, Connecticut: Greenwood Press. pp. 266–267. ISBN   0-313-26202-0.
  3. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 U.S. Submarines Through 1945 pp. 305–311
  4. Alden, John D., Commander, USN (retired). The Fleet Submarine in the U.S. Navy (Annapolis, MD: Naval Institute Press, 1979), p.211.
  5. 1 2 U.S. Submarines Through 1945 pp. 360
  6. 1 2 3 4 5 Alden, p.210.
  7. 1 2 Friedman, p. 310
  8. 1 2 3 Alden, p.211.
  9. 1 2 3 Alden, p.38.
  10. He would later replace Stuart S. Murray as Admiral Lockwood's Chief of Staff. Blair, Clay, Jr. Silent Victory (Philadelphia: Lippincott, 1975), p.549.
  11. Blair, p.986.
  12. Johnston, pp. 49, 57-60
  13. Friedman, pp. 189-193
  14. Alden, p.39.

Related Research Articles

<i>Gato</i>-class submarine US Navy fleet submarine class

The Gato class of submarines were built for the United States Navy and launched in 1941–1943. Named after the lead ship of the class, USS Gato, they were the first mass-production U.S. submarine class of World War II.

USS <i>Dolphin</i> (SS-169) "V-boat" class submarine

USS Dolphin (SF-10/SC-3/SS-169), a submarine and one of the "V-boats", was the sixth ship of the United States Navy to be named for that aquatic mammal. She also bore the name V-7 and the classifications SF-10 and SC-3 prior to her commissioning. She was launched on 6 March 1932 by the Portsmouth Navy Yard, sponsored by Mrs. E.D. Toland, and commissioned on 1 June 1932.

USS <i>Barracuda</i> (SS-163) Submarine of the United States

USS Barracuda (SF-4/SS-163), lead ship of her class and first of the "V-boats," was the second ship of the United States Navy to be named for the barracuda.

USS <i>Argonaut</i> (SM-1) Submarine of the United States

USS Argonaut (V-4/SF-7/SM-1/A-1/APS-1/SS-166) was a submarine of the United States Navy, the first boat to carry the name. Argonaut was laid down as V-4 on 1 May 1925 at Portsmouth Navy Yard. She was launched on 10 November 1927, sponsored by Mrs. Philip Mason Sears, the daughter of Rear Admiral William D. MacDougall, and commissioned on 2 April 1928. Although never officially designated as "SS-166", at some point she displayed this number on her conning tower.

USS <i>Nautilus</i> (SS-168) Submarine of the United States

USS Nautilus (SF-9/SS-168), a Narwhal-class submarine and one of the "V-boats", was the third ship of the United States Navy to bear the name.

USS <i>Bonita</i> (SS-165) Submarine of the United States

USS Bonita (SF-6/SS-165), a Barracuda-class submarine and one of the "V-boats," was the third ship of the United States Navy to be named for the bonito. Her keel was laid down by the Portsmouth Navy Yard. She was launched on 9 June 1925 as V-3 (SF-6), sponsored by Mrs. L.R. DeSteiguer, wife of Rear Admiral DeSteiguer, and commissioned on 22 May 1926, Lieutenant Commander Charles A. Lockwood, Jr. in command. Like her sisters, Bonita was designed to meet the fleet submarine requirement of 21 knots (39 km/h) surface speed for operating with contemporary battleships.

USS <i>Pompano</i> (SS-181) Porpoise-class submarine of the US Navy

USS Pompano (SS-181), a United States Porpoise-class submarine, was the second ship of the United States Navy to be named for the pompano.

USS <i>Narwhal</i> (SS-167) Submarine of the United States

USS Narwhal (SS-167), the lead ship of her class of submarine and one of the "V-boats", was the second ship of the United States Navy to be named for the narwhal. She was named V-5 (SC-1) when her keel was laid down on 10 May 1927 by the Portsmouth Navy Yard in Kittery, Maine.

V-boat Group of U.S. Navy submarines and classes derived from them

The V-boats were a group of nine United States Navy submarines built between World War I and World War II from 1921 to 1934 under authorization as the "fleet boat" program.

USS <i>Bass</i> (SS-164) Submarine of the United States

USS Bass (SF-5/SS-164), a Barracuda-class submarine and one of the "V-boats", was the first ship of the United States Navy to be named for the bass.

USS <i>Cuttlefish</i> (SS-171) Submarine of the United States

USS Cuttlefish (SC-5/SS-171), a Cachalot-class submarine and one of the "V-boats," was the second ship of the United States Navy to be named for the cuttlefish. Her keel was laid down by Electric Boat Company in Groton, Connecticut. She was launched on 21 November 1933 sponsored by Mrs. B. S. Bullard, and commissioned on 8 June 1934, Lieutenant Commander Charles W. "Gin" Styer in command. Cuttlefish was the first submarine built entirely at Electric Boat's facility in Groton, Connecticut; construction of previous Electric Boat designs had been subcontracted to other shipyards, notably Fore River Shipbuilding of Quincy, Massachusetts. Four Peruvian R-class submarines had previously been finished in Groton, using material from cancelled S-boats salvaged from Fore River.

<i>Tambor</i>-class submarine US Navy submarine class of World War II

The Tambor-class submarine was a United States Navy submarine design, used primarily during World War II. They were the USN's first fully successful fleet submarine, and began the war close to the fighting. Six of the class were in Hawaiian waters or the Central Pacific on 7 December 1941, with Tautog at Pearl Harbor during the attack. They went on to see hard service; seven of the twelve boats in the class were sunk before the survivors were withdrawn from front-line service in early 1945; this was the highest percentage lost of any US submarine class. Tautog was credited with sinking 26 ships, the largest number of ships sunk by a US submarine in World War II. The Tambors attained the top speed of 21 knots (39 km/h) and range of 11,000 nautical miles (20,000 km) of the preceding Sargo class, and improvements included six bow torpedo tubes, a more reliable full diesel-electric propulsion plant, and improved combat efficiency with key personnel and equipment relocated to the conning tower. In some references, the Tambors are called the "T Class", and SS-206 through SS-211 are sometimes called the "Gar class".

<i>Sargo</i>-class submarine US Navy submarine class of World War II

The Sargo-class submarines were among the first United States submarines to be sent into action after the Japanese attack on Pearl Harbor, starting war patrols the day after the attack, having been deployed to the Philippines in late 1941. Similar to the previous Salmon class, they were built between 1937 and 1939. With a top speed of 21 knots, a range of 11,000 nautical miles (20,000 km), and a reliable propulsion plant, along with the Salmons they were an important step in the development of a true fleet submarine. In some references, the Salmons and Sargos are called the "New S Class", 1st and 2nd Groups.

USS <i>Tarpon</i> (SS-175) Submarine of the United States

USS Tarpon (SS-175), second United States Navy ship of this name, was a Porpoise-class diesel-electric submarine. Tarpon conducted war patrols in the Pacific Ocean during World War II.

USS <i>Porpoise</i> (SS-172) Submarine of the United States

USS Porpoise (SS–172), the fifth United States Navy ship to bear her name, was the lead ship of her class of submarines.

<i>Salmon</i>-class submarine US Navy submarine class of World War II

The United States Navy Salmon-class submarines were an important developmental step in the design of the "fleet submarine" concept during the 1930s. An incremental improvement over the previous Porpoise class, they were the first US submarine class to achieve 21 knots with a reliable propulsion plant, allowing them to operate with the Standard-type battleships of the surface fleet. Also, their 11,000 nautical miles (20,000 km) unrefueled range would allow them to operate in Japanese home waters. These rugged and dependable boats provided yeoman service during World War II, along with their immediate successors, the similar Sargo class. In some references, the Salmons and Sargos are called the "New S Class", 1st and 2nd Groups.

United States <i>Porpoise</i>-class submarine Class of US Navy submarine

The Porpoise class were submarines built for the United States Navy in the late 1930s, and incorporated a number of modern features that would make them the basis for subsequent Salmon, Sargo, Tambor, Gato, Balao, and Tench classes. In some references, the Porpoises are called the "P" class.

USS <i>Mingo</i> (SS-261) Submarine of the United States

USS Mingo (SS-261) — a Gato-class submarine — was the first ship of the United States Navy to be named for the mingo snapper.

USS <i>Muskallunge</i> Submarine of the United States

USS Muskallunge (SS-262), a Gato-class submarine, was a ship of the United States Navy named for the muskallunge.

<i>Cachalot</i>-class submarine

The Cachalot-class submarines were a pair of medium-sized submarines of the United States Navy built under the tonnage limits of the London Naval Treaty of 1930. They were originally named V-8 and V-9, and so were known as "V-boats" even though they were unrelated to the other seven submarines constructed between World War I and World War II. An extensive study was conducted to determine the optimum submarine size under the treaty restrictions, factoring in total force, endurance, and percentage of the force that could be maintained on station far from a base, as in a Pacific war scenario. Joseph W. Paige of the Navy's Bureau of Construction and Repair (BuC&R) developed the basic design, but the builder, Electric Boat, was responsible for detailed arrangement; this was fairly bold, since Electric Boat had not built any new submarines since finishing four obsolescent boats for Peru. The previous V-boats were all built in naval shipyards. Cuttlefish was the first submarine built at EB's facility in Groton, Connecticut; construction of previous Electric Boat designs had been subcontracted to other shipyards, notably Fore River Shipbuilding of Quincy, Massachusetts.

References