USS E-2

Last updated

USS E-2;0802506.jpg
USS E-2, ex-Sturgeon, underway prior to World War I
History
US flag 48 stars.svgUnited States
NameSturgeon
NamesakeThe sturgeon
Builder Fore River Shipyard, Quincy, Massachusetts
Cost$390,930.12 (hull and machinery) [1]
Laid down22 December 1909
Launched16 June 1911
Sponsored byMiss Margaret Nelson Little
Commissioned14 February 1912
Decommissioned13 March 1916
Recommissioned25 March 1918
Decommissioned20 October 1921
RenamedE-2 (Submarine No.25), 17 November 1911
Stricken20 October 1921
Identification
FateSold for scrapping, 19 April 1922
General characteristics [2]
Class & type E-class submarine
Displacement
  • 287 long tons (292 t) surfaced
  • 342 long tons (347 t) submerged
Length135 ft 3 in (41.22 m)
Beam14 ft 7 in (4.45 m)
Draft11 ft 8 in (3.56 m)
Installed power
  • 700 hp (522 kW) (diesel)
  • 600 hp (447 kW) (electric)
Propulsion
Speed
  • 13.5  kn (25.0 km/h; 15.5 mph) surfaced
  • 11.5 kn (21.3 km/h; 13.2 mph) submerged
Range
  • 2,100  nmi (3,900 km; 2,400 mi) at 11 kn (20 km/h; 13 mph) surfaced
  • 100 nmi (190 km; 120 mi) at 5 kn (9.3 km/h; 5.8 mph) submerged
Test depth200 ft (61 m)
Capacity8,486 US gal (32,120 L; 7,066 imp gal) fuel
Complement
  • 1 officer
  • 19 enlisted
Armament4 × 18 inch (450 mm) bow torpedo tubes (4 torpedoes)

USS Sturgeon/E-2 (SS-25), also known as "Submarine No. 25", was an E-class submarine of the United States Navy.

Contents

Construction

Sturgeon was laid down on 22 December 1909, by the Fore River Shipbuilding Company, in Quincy, Massachusetts. She was launched on 16 June 1911, sponsored by Miss Margaret Nelson Little. She was renamed E-2 on 17 November 1911; and commissioned on 14 February 1912. [3]

Service history

Serving in the Atlantic Submarine Flotilla, E-2 sailed out of Newport, Rhode Island, for developmental exercises and training. From 5 January–21 April 1914, she cruised to Guantanamo Bay and the Gulf of Mexico. She returned to Naval Station Newport, on 27 July, for training operations for the remainder of the summer and from February–May 1915 off Florida. [3]

On 19 June 1915, she entered New York Navy Yard, for overhaul. [3] While sitting in dry dock Number 2, [4] E-2 suffered a violent explosion and fire, on 15 January 1916, when hydrogen gas ignited during conditions of severe battery testing; tests made under the direction of the Edison Storage Battery Company. [3] At the time, E-2 was the test submarine for new nickel–iron battery designed to eliminate the danger from chlorine gas asphyxiation. There were 32 men aboard the submarine at the time of the explosion, consisting of both Navy and civilian electricians and mechanics making repairs. [4] Four men were killed and seven injured. [3] The government investigation, led by then Lieutenant Chester W. Nimitz, pointed blame away from the submarine's commanding officer, then Lieutenant Charles M. Cooke, Jr. [5]

On 13 March, E-2 was placed out of commission for use as a laboratory, for exhaustive tests of the Edison storage battery. Recommissioned on 25 March 1918, E-2 served in training and experimental work at New London, until 16 May. Two days later she arrived at Norfolk, to operate against enemy submarines off Cape Hatteras. From 21 May–27 August, she made four war patrols, sighting a large enemy submarine for which she made extended submerged search on her last patrol. E-2 was commended by the Chief of Naval Operations for two of these anti-submarine patrols, which were exceptionally long for a submarine of her size. [3]

Returning to New London, on 31 August 1918, E-2 made two more patrols before the end of the war, then returned to training student officers and qualifying men for duty in submarines. [3]

Fate

She sailed from New London to Norfolk, on 19 April 1920, arriving two days later. There she was placed in commission in ordinary, on 18 July 1921. On 17 September, she sailed for Philadelphia Navy Yard, where she was decommissioned on 20 October 1921, and sold on 19 April 1922. [3]

References

Bibliography