Value-stream mapping

Last updated
Value-stream mapping usually employs standard symbols to represent items and processes, therefore knowledge of these symbols is essential to correctly interpret the production system problems. ValueStreamMapParts.png
Value-stream mapping usually employs standard symbols to represent items and processes, therefore knowledge of these symbols is essential to correctly interpret the production system problems.

Value-stream mapping, also known as material- and information-flow mapping, [1] is a lean [2] -management method for analyzing the current state and designing a future state for the series of events that take a product or service from the beginning of the specific process until it reaches the customer. A value stream map is a visual [2] tool that displays all critical steps in a specific process and easily quantifies the time and volume taken at each stage. Value stream maps show the flow of both materials and information as they progress through the process. [3]

Contents

Whereas a value stream map represents a core business process that adds value to a material product, a value chain diagram shows an overview of all activities within a company. [3] Other business activities may be represented in "value stream diagrams" and/or other kinds of diagram that represent business processes that create and use business data.

Purpose

The purpose of value-stream mapping is to identify and remove or reduce "waste" in value streams, [2] thereby increasing the efficiency of a given value stream. Waste removal is intended to increase productivity by creating leaner operations which in turn make waste and quality problems easier to identify. [4]

Applications

Value-stream mapping has supporting methods that are often used in Lean environments to analyze and design flows at the system level (across multiple processes).

Although value-stream mapping is often associated with manufacturing, it is also used in logistics, supply chain, service related industries, healthcare, [5] [6] software development, [7] [8] product development, [9] project management, [2] and administrative and office processes. [10]

Identifying waste

Types of waste

Daniel T. Jones (1995) identifies seven commonly accepted types of waste. These terms are updated from Toyota's operating model "The Toyota Way" (Toyota Production System, TPS) original nomenclature (muda): [11]

  1. Faster-than-necessary pace: creating too much of a good or service that damages production flow, quality, and productivity. Previously referred to as overproduction, and leads to storage and lead time waste.
  2. Waiting: any time goods are not being transported or worked on.
  3. Conveyance: the process by which goods are moved around. Previously referred to as transport, and includes double-handling and excessive movement.
  4. Processing: an overly complex solution for a simple procedure. Previously referred to as inappropriate processing, and includes unsafe production. This typically leads to poor layout and communication, and unnecessary motion.
  5. Excess stock: an overabundance of inventory which results in greater lead times, increased difficulty identifying problems, and significant storage costs. Previously referred to as unnecessary inventory.
  6. Unnecessary motion: ergonomic waste that requires employees to use excess energy such as picking up objects, bending, or stretching. Previously referred to as unnecessary movements, and usually avoidable.
  7. Correction of mistakes: any cost associated with defects or the resources required to correct them.

Waste removal operations

Yasuhiro Monden (1994) identifies three types of operations: [12]

  1. Non-value adding operations (NVA): actions that should be eliminated, such as waiting.
  2. Necessary but non-value adding (NNVA): actions that are wasteful but necessary under current operating procedures. [11]
  3. Value-adding (VA): conversion or processing of raw materials via manual labor. [11]

NNVA activities may also be referred to as "sustaining non-value adding", i.e. they have to be done, or they are necessary to sustain the business but do not contribute to customer requirements. [13]

For additional views on waste, see Lean manufacturing.

Using the method

There are two kinds of value stream maps, current state and future state. The current state value stream map is used to determine what the process currently looks like, the future state value stream map focuses on what the process will ideally look like after process improvements have occurred to the value stream. [3]

Value stream mapping common symbols Value stream mapping symbols.png
Value stream mapping common symbols

The current state value stream map must be created before the future state map and is created by observing the process and tracking the information and material flow. [14] The value stream map is then created using the following symbols: [15]

In a build-to-the-standard form, Shigeo Shingo [16] suggests that the value-adding steps be drawn across the centre of the map and the non–value-adding steps be represented in vertical lines at right angles to the value stream. Thus, the activities become easily separated into the value stream, which is the focus of one type of attention, and the "waste" steps, another type. He calls the value stream the process and the non-value streams the operations. The thinking here is that the non–value-adding steps are often preparatory or tidying up to the value-adding step and are closely associated with the person or machine/workstation that executes that value-adding step. Therefore, each vertical line is the "story" of a person or workstation whilst the horizontal line represents the "story" of the product being created.

Value-stream mapping is a recognised method used as part of Lean Six Sigma methodologies. [17]

Value-stream mapping analyzes both material (artifact) and information flow. [18] The following two resources exemplify the use of VSM in the context of software process improvement in industrial settings:

Associated analysis methods

Hines and Rich (1997) defined seven value-stream mapping tools. [21] These are:

  1. Process activity mapping: the initial step of constructing a map which consists of a study of process flows, waste identification, and business process re-engineering.
  2. Supply chain response matrix: identifying critical bottlenecks for processes in a simple diagram.
  3. Production variety funnel: helps draw connections to other industries that may have solutions to existing problems.
  4. Forrester effect mapping : line graphs showing the customer demand and production, allowing visualisation of supply and demand and potential delays.
  5. Quality filter mapping : locates product and service defects in the supply chain.
  6. Decision point analysis: determines inflection points for push-and-pull demand in the supply chain. [22]
  7. Physical structure mapping: combined model that overviews supply chain from an industry level. [11]

See also

Citations

  1. Manos, Tony (June 2006). "Value Stream Mapping—an Introduction". Quality Progress. American Society for Quality. p. 64 via University of Washington.
  2. 1 2 3 4 Project Management Institute 2021, §4.6.6 Focus on Value.
  3. 1 2 3 Rother, Mike; Shook, John (1999). Learning to See: value-stream mapping to create value and eliminate muda. Brookline, Massachusetts: Lean Enterprise Institute. ISBN   0-9667843-0-8.
  4. Depository, Book. "34 for Quality : John Bicheno : 9780951382943". www.bookdepository.com. Retrieved 2018-03-22.
  5. Graban, Mark (2011). Lean Hospitals: Improving Quality, Patient Safety, and Employee Engagement. Boca Raton, Florida: CRC Press. ISBN   9781439870433.
  6. Graban, Mark; Swartz, Joseph (2011). Healthcare Kaizen: Engaging Front-Line Staff in Sustainable Continuous Improvements. Boca Raton, Florida: CRC Press. ISBN   9781439872963.
  7. Plenert, Gerhard (2011). Lean Management Principles for Information Technology. Boca Raton, Florida: CRC Press. ISBN   9781420078602.
  8. Bell, Steven; Orzen, Michael (2010-09-14). Lean IT: Enabling and Sustaining Your Lean Transformation. Boca Raton, Florida: CRC Press. ISBN   9781439817568.
  9. Mascitelli, Ronald (2011). Mastering lean product development: a practical, event-driven process for maximizing speed, profits and quality. Northridge, California: Technology Perspectives. ISBN   9780966269741.
  10. Keyte, Beau; Locher, Drew (2004). The Complete Lean Enterprise: Value Stream Mapping for Administrative and Office Processes. New York: Productivity Press. ISBN   9781563273018.
  11. 1 2 3 4 Hines, Peter; Rich, Nick (1997-01-01). The seven value stream mapping tools. Vol. 17.
  12. Toyota Production System - An Integrated Approach to Just-In-Time | Y. Monden | Springer.
  13. Cain, M., Business Process Improvement: the Hambleton Story, accessed 13 August 2020
  14. Ali N.B., Operationalization of lean thinking through value-stream mapping with simulation and FLOW [dissertation]. Karlskrona: Department of Software Engineering, Blekinge Institute of Technology; 2015.
  15. "Value Stream Mapping symbols : From Clarity to Chaos The Unintended consequences". Leandemy. 2023-09-08. Retrieved 2024-01-13.
  16. Shingo, Shigeo (1985). A Revolution in Manufacturing: The SMED System. Stamford, Connecticut: Productivity Press. pp.  5. ISBN   0915299097.
  17. "Value Stream Mapping" Article Source: http://www.isixsigma.com/index.php?option=com_k2&view=itemlist&layout=category&task=category&id=90&Itemid=222#
  18. Rother, Mike, and John Shook. Learning to see: value stream mapping to add value and eliminate muda. Lean Enterprise Institute, 2003.
  19. Ali NB, Petersen K, Breno Bernard Nicolau de França. Evaluation of simulation-assisted value-stream mapping for software product development: Two industrial cases. Information and Software Technology . 2015;68:45.
  20. Ali NB, Petersen K, Schneider K. FLOW-assisted value-stream mapping in the early phases of large-scale software development. Journal of Systems and Software. 2016;111:213-27.
  21. Rich, Nick; Esain, Ann; Bateman, Nicola (1997). Lean Evolution: Lessons from the Workplace. Cambridge University Press.
  22. Hoekstra, Sjoerd; Romme, Jac (1992). Integral Logistic Structures: Developing Customer-oriented Goods Flow. Industrial Press Inc. ISBN   9780831130374.

Related Research Articles

<span class="mw-page-title-main">Lean manufacturing</span> Methodology used to improve production

Lean manufacturing is a production method aimed primarily at reducing times within the production system as well as response times from suppliers and to customers. It is closely related to another concept called just-in-time manufacturing. Just-in-time manufacturing tries to match production to demand by only supplying goods which have been ordered and focuses on efficiency, productivity, and reduction of "wastes" for the producer and supplier of goods. Lean manufacturing adopts the just-in-time approach and additionally focuses on reducing cycle, flow, and throughput times by further eliminating activities which do not add any value for the customer. Lean manufacturing also involves people who work outside of the manufacturing process, such as in marketing and customer service.

Kaizen is a concept referring to business activities that continuously improve all functions and involve all employees from the CEO to the assembly line workers. Kaizen also applies to processes, such as purchasing and logistics, that cross organizational boundaries into the supply chain. It has been applied in healthcare, psychotherapy, life coaching, government, manufacturing, and banking.

Lean software development is a translation of lean manufacturing principles and practices to the software development domain. Adapted from the Toyota Production System, it is emerging with the support of a pro-lean subculture within the agile community. Lean offers a solid conceptual framework, values and principles, as well as good practices, derived from experience, that support agile organizations.

Lean thinking is a management framework made up of a philosophy, practices and principles which aim to help practitioners improve efficiency and the quality of work. Lean thinking encourages whole organisation participation. The goal is to organise human activities to deliver more benefits to society and value to individuals while eliminating waste.

<span class="mw-page-title-main">5S (methodology)</span> Workplace organisation method

5S is a workplace organization method that uses a list of five Japanese words: seiri (整理), seiton (整頓), seisō (清掃), seiketsu (清潔), and shitsuke (躾). These have been translated as 'sort', 'set in order', 'shine', 'standardize', and 'sustain'. The list describes how to organize a work space for efficiency and effectiveness by identifying and sorting the items used, maintaining the area and items, and sustaining the new organizational system. The decision-making process usually comes from a dialogue about standardization, which builds understanding among employees of how they should do the work.

Muda is a Japanese word meaning "futility", "uselessness", or "wastefulness", and is a key concept in lean process thinking such as in the Toyota Production System (TPS), denoting one of three types of deviation from optimal allocation of resources. The other types are known by the Japanese terms mura ("unevenness") and muri ("overload"). Waste in this context refers to the wasting of time or resources rather than wasteful by-products and should not be confused with Waste reduction.

Genba is a Japanese term meaning "the actual place". Japanese detectives call the crime scene genba, and Japanese TV reporters may refer to themselves as reporting from genba. In business, genba refers to the place where value is created; in manufacturing, the genba is the factory floor. It can be any "site" such as a construction site, sales floor or where the service provider interacts directly with the customer.

<span class="mw-page-title-main">Taiichi Ohno</span> Japanese businessman and engineer (1912–1990)

Ohno Taiichi was a Japanese industrial engineer and businessman. He is considered to be the father of the Toyota Production System, which inspired Lean Manufacturing in the U.S. He devised the seven wastes as part of this system. He wrote several books about the system, including Toyota Production System: Beyond Large-Scale Production.

Business process mapping refers to activities involved in defining what a business entity does, who is responsible, to what standard a business process should be completed, and how the success of a business process can be determined.

Overstock, excessive stock, or excess inventory arise when there is more than the "right quantity" of goods available for sale, or when "the potential sales value of excess stock, less the expected storage costs, does not match the salvage value". It arises as a result of poor management of stock demand or of material flow in process management. Excessive stock is also associated with loss of revenue owing to additional capital bound with the purchase or simply storage space taken. Excessive stock can result from over delivery from a supplier or from poor ordering and management of stock by a buyer for the stock. Excess or unnecessary inventory is listed as one of the seven wastes or "muda" in Taiichi Ohno's Toyota production system.

Mura is a Japanese word meaning "unevenness; irregularity; lack of uniformity; nonuniformity; inequality", and is a key concept in the Toyota Production System (TPS) as one of the three types of waste. Waste in this context refers to the wasting of time or resources rather than wasteful by-products and should not be confused with Waste reduction. Toyota adopted these three Japanese words as part of their product improvement program, due to their familiarity in common usage.

<span class="mw-page-title-main">Norman Bodek</span> American teacher and consultant

Norman Bodek was a teacher, consultant, author and publisher who published over 100 Japanese management books in English, including the works of Taiichi Ohno and Dr. Shigeo Shingo. He taught a course on "The Best of Japanese Management Practices" at Portland State University. Bodek created the Shingo Prize with Dr. Vern Beuhler at Utah State University. He was elected to Industry Week's Manufacturing Hall of Fame and founded Productivity Press. He was also the President of PCS Press. He died on December 9, 2020, at the age of 88.

Value-stream-mapping software is a type of software that helps prepare and/or analyze value stream maps. The software typically helps design maps through utilizing a series of symbols representing activity and information/material flow, and as a supplement to manual calculations

A lean laboratory is one which is focused on processes, procedures, and infrastructure that deliver results in the most efficient way in terms of cost, speed, or both. Lean laboratory is a management and organization process derived from the concept of lean manufacturing and the Toyota Production System (TPS). The goal of a lean laboratory is to reduce resource usage and costs while improving productivity, staff morale, and laboratory-driven outcomes.

Lean Six Sigma is a process improvement approach that uses a collaborative team effort to improve performance by systematically removing operational waste and reducing process variation. It combines Lean Management and Six Sigma to increase the velocity of value creation in business processes.

Lean IT is the extension of lean manufacturing and lean services principles to the development and management of information technology (IT) products and services. Its central concern, applied in the context of IT, is the elimination of waste, where waste is work that adds no value to a product or service.

Lean project management is the application of lean concepts such as lean construction, lean manufacturing and lean thinking to project management.

Lean enterprise is a practice focused on value creation for the end customer with minimal waste and processes. The term has historically been associated with lean manufacturing and Six Sigma due to lean principles being popularized by Toyota in the automobile manufacturing industry and subsequently the electronics and internet software industries.

Design for lean manufacturing is a process for applying lean concepts to the design phase of a system, such as a complex product or process. The term describes methods of design in lean manufacturing companies as part of the study of Japanese industry by the Massachusetts Institute of Technology. At the time of the study, the Japanese automakers were outperforming the American counterparts in speed, resources used in design, and design quality. Conventional mass-production design focuses primarily on product functions and manufacturing costs; however, design for lean manufacturing systematically widens the design equation to include all factors that will determine a product's success across its entire value stream and life-cycle. One goal is to reduce waste and maximize value, and other goals include improving the quality of the design and the reducing the time to achieve the final solution. The method has been used in architecture, healthcare, product development, processes design, information technology systems, and even to create lean business models. It relies on the definition and optimization of values coupled with the prevention of wastes before they enter the system. Design for lean manufacturing is system design.

<span class="mw-page-title-main">A3 problem solving</span> Structured problem improvement approach

A3 problem solving is a structured problem-solving and continuous-improvement approach, first employed at Toyota and typically used by lean manufacturing practitioners. It provides a simple and strict procedure that guides problem solving by workers. The approach typically uses a single sheet of ISO A3-size paper, which is the source of its name. More contemporary versions include the Systems-oriented A3

References