Wairere Power Station | |
---|---|
Country | New Zealand |
Location | Aria Road, Piopio, Waikato |
Coordinates | 38°31′54″S175°00′30″E / 38.53167°S 175.00833°E Coordinates: 38°31′54″S175°00′30″E / 38.53167°S 175.00833°E |
Purpose | Power |
Status | Operational |
Construction began | 1924 |
Opening date | 1926 |
Owner(s) | Wairere Electric Power Board (1924-1978) Waitomo Electric Power Board (1978-1992) Waitomo Energy Services (1993-1999) King Country Energy (1999-present day) |
Operator(s) | Trustpower |
Dam and spillways | |
Type of dam | Earth |
Impounds | Mokau River |
Height (thalweg) | 3.5 m |
Reservoir | |
Surface area | 2 ha [1] |
Operator(s) | Trustpower |
Commission date | December 1925 |
Type | Conventional |
Hydraulic head | 19.6 m [2] |
Turbines | Two |
Installed capacity | 4.6 MW (6,200 hp) [3] |
Annual generation | 17 GWh (61 TJ) [2] |
Website King Country Energy |
The Wairere Power Station is a hydroelectric power facility in the Waikato region in New Zealand which makes use of water from the Mokau River. Water is drawn from behind a dam above the Wairere Falls, which diverts the water through two penstocks to the Wairere Power Station, before being discharged back into the Mokau River. The station was commissioned in 1925 with the first generating unit. Three more generating units were added between 1938 and 1981 before a major refurbishment resulted in three of the units being replaced by a single generating unit in 2013-2014.
After being hired in 1903 by the Public Works Minister William Hall-Jones to investigate the hydro-electric potential of New Zealand, American electrical engineer L. M. Hancock identified 41 locations in 1904. Wairere Falls was ranked number 27. Lawrence Birks had become the chief electrical engineer of the Public Works Department (PWD) in 1919 was familiar with the falls and was able to convince a number of residents of Aria and Piopio that the Mokau River and Wairere Falls should be developed. [4]
As a result, in November 1919 a group of citizens in Aria and Piopio formed a committee to undertake the work. They engaged experienced engineer Henry "Harry" Richmond Climie (1884-1961) of consulting engineers H.W. Clime & Son to undertake an investigation which he reported on at two meetings that were held recently at Piopio and Aria respectively. Climie estimated that a turbine capacity of 125 hp would be ample to supply present requirements within a 10 mi (16.09 km) radius of the proposed power station and that double this amount would meet the demand for many years, provided no large industry such as a freezing or lime works required a supply. He estimated that the location had a potential total capacity of 1,500 hp [5]
As work progressed the committee were invited by an offer in August 1922 to amalgamate their efforts with the new created Te Kuiti provisional power board. Wishing to maintain their independence and aware that they were remote from Te Kuiti they decided to continue on their own. Despite the withdraw of some of the potential customers who had initially expressed their support the Wairere Electric Power Board was established in January 1923. [4]
The new board's first official meeting was in Piopio in May 1923, which Harry Climie attended. He was subsequently engaged to design the power station and the associated distribution system.
Climie submitted his design within several weeks. Following acceptance, the board began the process of obtaining the required water, power and distribution licences, as well as polling the ratepayers in their area to raise a loan to pay for the works. Climie had estimated that the construction of the power station and associated distribution network would cost £38,500 plus an additional amount to pay for the first three years of operation until sufficient customers could be connected. [4] [6] Unfortunately no one was prepared to provide the money. With the assistance of their local MP the board was able to obtain enough funds to commence construction of the power station. It was several more months before a loan for the full amount was able to be obtained. [4]
Construction of the power station was undertaken by a workforce under the control of the board’s engineer, F. Harvey.
The power station commenced commercial generation in December 1925, with 80 customers receiving a supply in Aria and Piopio and surrounding districts by January 1926.
The new power station was officially opened on 27 May 1926 by Prime Minister Gordon Coates [7] with a single generating unit (G1) which had a Boving & Co horizontal Francis turbine driving a ASEA generator which gave an original installed capacity of 480 kW, which was generated at 6.6 kV. [8] The generating unit was supplied with water via a concrete and steel 1.15 m (3.8 ft) diameter, 43 m (141 ft) long penstock with a capacity of up to 3.1 cumecs. [1]
By 1936 the Wairere Power Board had an annual revenue of £5,000, with the power station supplying about 350 consumers via approximately 120 miles of transmission line. [9]
On 9 January 1936 while in the process of assisting in installing a new and more efficient stator on the generating unit Francis Rosengrave Harvey, an engineer employed by the Wairere Power Board was electrocuted and killed at the power station when a ruler with which he was taking measurements, came into contact with live equipment. [10]
In September 1937 the board gave approval for its consulting engineer Lloyd Mandeno to purchase a second machine.
In 1938 the powerhouse was extended which allowed an additional 240 kW machine (G2) with a Boving & Co horizontal Francis turbine driving a ASEA generator to be installed which increased the total installed capacity to 624 kW. [8] [11] This generating unit was supplied via a dual end concrete 2.6 m (8.5 ft) diameter, 35 m (115 ft) long penstock with a capacity of up to 7.1 cumecs to G2. [1]
Eels were initially a problem at the power station, which was solved in 1939 by suspending an electrified rod in the surge chamber.
Following a period of dry weather which reduced the station's output and faced with increasing demand the board installed a second hand 200 kW diesel generator at the power station to supplement the station's output.
The commissioning of the second generating unit (G2) allowed essential loads to be supplied while G1 to be taken out of service and overhauled after having been in practically continuous operation since its installation. Taken out of service on the evening of 20 June 1939, G1 was dismantled overnight, transported up the hill from the power-house, from where all parts requiring repair were transported to Hamilton, where for the next two days it was refurbished and by the midnight on the following Tuesday last the machinery was returned to the power station and returned to service in time to carry the evening load on Thursday. While this repair was being carried out opportunity was taken install a new and more efficient stainless-steel runner, a rubber-lined submerged bearing was installed in place of the old oil circulation bearing, and improvements made to the lubrication system. These improvements lead to a 12 per cent, increase in output. [12] [13] To impound more water a weir was built across the head of the falls and flashboards installed to raise the river level. The tailrace was deepened in order to utilise all of the available head, while the riverbed downstream from the power station was blasted to remove the rock bars which have impeded the flow of the stream below the station. [13]
Associated with the expansion of the power station the capacity of the transmission line which conveyed power from the power station to Piopio was doubled to cope with the heavy increase in consumption in this part of the Board's district.
Following the death of the power station's operator in October 1942 the offer of his widow Isobel Gibbs to undertake his duties as a contribution to the war effort was accepted at a salary of £4 10 shillings, which was 25% less than her late husbands. She worked seven days a week from 6 am to 10 pm. [4] Following the end of the Second World War the board hired Lloyd Mandeno to about improving the power station and its connection to the system. He recommended that the board build a tie-line to connect the power station's output to the State Hydro-Electric Department's (SHD) system which would allow the board to supply its customers when the station was unable to supply all of its load as well as allowing them during periods of low load to sell any surplus generation from Wairere to the SHD. A condition of the connection to the SHD system was that the power station had to be staffed 24 hours a day, which led to a second operator joining Mrs Gibbs at the power station. Upon her resignation in 1952 the board paid her a gift of £20. [4]
In August 1952 a major upgrade of the power station was completed which included the installation of an additional generating unit (G3) which had a horizontal Francis turbine driving a 825 kW Lancashire Dynamo & Crypto generator. [1]
Following discussions that had been going on intermittently since the early 1930s the Wairere Electric Power Board merged with the Waitomo Electric Power Board in 1978 and took its name. [4]
Between 1978 and 1981 the Wairere Power Station was upgraded at a cost of NZ$2 million and a new machine (G4) was added in 1981 which improved efficiency and maximized the use of the river flow. [4]
In response to the introduction of the Energy Companies Act in 1992, the Waitomo Electric Power Board changed its financial structure to become Waitomo Energy Services Ltd. [4]
In 1998 the New Zealand Government passed the Electricity Industry Reform Act which was intended to change the structure of the electricity industry to encourage competition. This Act required the operational separation of lines and generation business activities by 1 July 1999 and separation of the ownership by 1 January 2004. To lead after a period of consultation to King Country Energy on 1 April 1999 purchasing the generation and retail assets of Waitomo Energy Services while the later company purchased the network assets of King Country Energy and changed its name to "The Lines Company". [4] As a result in 1999 Wairere became owned by King Country Energy. [4]
In 2005 upstream and downstream fish passages were commissioned with a monitoring programme which includes maintaining video footage. During the summer period of 2009 it was estimated that 1000 eels migrated downstream through the fish passage while approximately 160 kg (350 lb) of juvenile eels (elvers) had moved upstream.
Installation of a tipping gate which would minimize upstream impacts in low to medium flood events was completed in 2006.
In 2009 G4 was overhauled and fitted with replacement runner blades.
In 2010 the company reviewed the operation of Wairere and identified the option of either overhauling the three old units or install a single new one. At the time the station was generating a combined mean output of 18 GWh a year. [1] The company opted for the latter and in December 2013 decommissioned units 1, 2 and 3 and replaced them with a single new generating unit, G5. [14] The commissioning of the new generating unit in June 2014, lead to a five per cent improvement in efficiency compared to what the older three units produced altogether. [15] [16]
As well as the installation of a new penstock, draft tube, main inlet valve, turbine, and generator, two of the existing turbines and associated draft tubes were removed. At the same time the powerhouse was seismically strengthened and the existing tailrace lowered by 0.5 m (1.6 ft). [17]
In 2015 Trustpower became a majority shareholder of King Country Energy, which lead in 2017 to Trustpower taking over operation of all of KCE’s power stations following the signing of an operation and maintenance contract with KCE.
Water is impounded by a 3.5 m (11 ft) high concrete dam with a spillway flap gate, that can discharge up to 110 cumecs in normal conditions and up to 320 cumecs in a flood. [1]
There are two sets of intakes both fitted with an automatic screen cleaner and hydraulic gate. The original intake which supplied G1 is now decommissioned.
From each intake a single penstock transports the water to respectively the powerhouse, which was built in the late 1980s to house machine G4 and to a second powerhouse containing machine G5 which was commissioned in 2014. The penstock that supplies G4 has a capacity of 17.55 cumecs, is of concrete construction, has a diameter of 2.6 m (8.5 ft) and is 50.3 m (165 ft) in length. [1]
Generating unit G4 which was installed in 1989 consists of a Kaplan turbine driving a Parsons Peebles 3 MW generator. [1] Generating unit G5 which was installed in 2014 consists of a Turab 1.12 m dia horizontal Francis turbine driving a 1.2 MW generator.
The power station is embedded within The Lines Company network behind Transpower's Hangitaki Substation, but can also be switched within The Lines Company network to support Transpower's Whakamaru substation on a limited supply basis. [18]
Operation of the power station is covered by the requirements of three resource consents which expire in December 2032. [4]
{{cite book}}
: |last1=
has generic name (help)The Roxburgh Dam is the earliest of the large hydroelectric projects in the lower half of the South Island of New Zealand. It lies across the Clutha River / Mata-Au, some 160 kilometres (99 mi) from Dunedin, some 9 kilometres (5.6 mi) to the north of the town of Roxburgh. The settlement of Lake Roxburgh Village is close to the western edge of the dam.
Manawa Energy Limited, formerly Trustpower, is a New Zealand electricity generation company that offers bespoke electricity products to commercial and industrial customers across New Zealand. Manawa Energy has 26 hydro-electricity schemes, with a total of 47 power stations and is New Zealand's fifth largest electricity generator.
Ghazi-Barotha Hydropower Project is a 1,450 MW run-of-the-river hydropower connected to the Indus River about 10 km (6.2 mi) west of Attock in Punjab and east of Swabi and Haripur districts in Khyber Pakhtunkhwa, Pakistan. Construction of the project that began in 1995 consists of 5 generators each with a maximum power generation capacity of 290MW. Inauguration of the plant on 19 August 2003 by President General Pervez Musharraf also saw the commissioning of the first 2 of the 5 generators i.e. Unit 1 and Unit 2. The last generator was commissioned on 6 April 2004 and the project was completed by that December. It cost US$2.1 billion with funding from Pakistan's Water and Power Development Authority, the World Bank, Asian Development Bank, Japan Bank for International Cooperation, Kreditanstalt für Wiederaufbau, European Investment Bank and Islamic Development Bank.
A black start is the process of restoring an electric power station or a part of an electric grid to operation without relying on the external electric power transmission network to recover from a total or partial shutdown.
The Monowai Power Station, fed by the Monowai River from Lake Monowai in Southland, New Zealand, was one of the earliest hydroelectric power stations in the country. Originally commissioned in 1925, it was refurbished between 2005 and 2007 and now contains modern turbines and plant, though the original buildings are still in use.
The Coleridge Power Station is a hydroelectric facility at Lake Coleridge on the Rakaia River in Canterbury, New Zealand. The power station is owned and operated by TrustPower.
The Arnold Power Station is a hydroelectric facility fed from Lake Brunner on the Arnold River in West Coast, New Zealand, owned and operated by TrustPower. Commissioned in 1932, the plant is rated at 3 megawatts (4,000 hp) and has an average annual output of 25 gigawatt-hours (90 TJ).
Ātiamuri Power Station is a hydroelectric power station on the Waikato River, in the North Island of New Zealand. It is the third of eight hydroelectric power stations on the Waikato River. The station can easily be seen from State Highway 1 between Taupō and Tokoroa.
Maraetai Power Station is a hydroelectric power station on the Waikato River, in the North Island of New Zealand. It is the fifth of the eight hydroelectric power stations on the Waikato River, and at 360 MW, is the largest hydroelectric station on the Waikato.
The Cruachan Power Station is a pumped-storage hydroelectric power station in Argyll and Bute, Scotland. The scheme can provide 440 MW of power and produced 705 GWh in 2009.
The Snoqualmie Falls Hydroelectric Plant is located just north of Snoqualmie in King County, Washington state, US. It is situated about 22 mi (35 km) east of Seattle. Located just below the Snoqualmie Falls, the power plant consists of two power houses, Plant 1 and Plant 2. Plant 1 was completed in 1899 and is located underground. It is the first completely underground hydroelectric power plant ever built in the world. Plant 2 was built in 1910 and is located along the right bank of the Snoqualmie River. Both plants receive water from a small reservoir created by a weir atop the falls. Plant 1 has an installed capacity of 13.7 MW and Plant 2 a capacity of 40.2 MW for a total installed capacity of 53.9 MW, enough to power 40,000 homes.
The Pupu Hydro Power Scheme is a small hydroelectric power station near Tākaka in the Golden Bay region of the South Island of New Zealand. It opened in 1929 as the first power station in the region and was the first public electricity supply in Golden Bay. After closing in 1980 following damage to the generator, the power scheme was fully restored by the local Pupu Hydro Society and many volunteer groups over the course of seven years and re-opened in 1988, again supplying electricity to the national grid.
The Omanawa Falls Power Station is a run of the river hydroelectric facility on the Omanawa River, in the Bay of Plenty in New Zealand. Built in 1915 to supply electricity to the town of Tauranga, it was the Southern Hemisphere's first underground power station.
The Motukawa Power Station is a hydroelectric power facility in Taranaki in New Zealand which makes use of water from the Manganui River and Waitara River catchments. Water is drawn from behind a weir on the Manganui River near Tariki and diverts this water through a race to Lake Ratapiko and then through penstocks to the Motukawa Power Station. The power station discharges into the Mākara Stream, a tributary of the Waitara River.
The Mangorei Power Station is a hydroelectric power facility near Mangorei in Taranaki in New Zealand which makes use of water from the Waiwhakaiho River and the Mangamahoe Stream catchments.
The Kuratau power station is a hydroelectric power facility in Kuratau on the western side of Lake Taupo in New Zealand which makes use of water from the Kuratau River. The river is impounded behind a dam to form Lake Kuratau before discharging through the power station back into the river. The scheme is operated by Trustpower on behalf of its owner King Country Energy.
The Piriaka power station is a hydroelectric power facility in Manawatū-Whanganui in New Zealand which draws water from behind a weir on the Whanganui River near Piriaka and diverts it through a canal and penstock to the Piriaka Power Station, which is located approximately 9 km southeast of the town of Taumarunui, via SH4. The power station discharges back into the Whanganui River.
The Colley Wobbles Power Station is a hydroelectric power facility located approximately 30 km east of Dutywa in the Amathole District Municipality of the Eastern Cape of South Africa. Water is drawn from behind a dam on the Mbhashe River and diverted through a penstock to the Colley Wobbles Power Station. The power station discharges into the Mbhashe River.
The Aniwhenua power station is a hydroelectric power facility in Bay of Plenty in New Zealand located on the Rangitaiki River upstream of the Matahina Power Station. Water is drawn from behind a dam above the Aniwhenua Falls and diverted through a canal and a headpond to the power station before being discharged back into the river. The power station is named after the falls which are adjacent to the power station.
The Matahina power station is a hydroelectric power facility in Bay of Plenty in New Zealand located in the Bay of Plenty on the Rangitaiki River downstream of the Aniwhenua Power Station. The river was dammed to form Lake Matahina from which water is drawn and diverted through the power station before being discharged back into the river. The Matahina dam is the largest earth embankment dam in the North Island of New Zealand.