Poro-O-Tarao railway station

Last updated

Poro-O-Tarao railway station
Porootarao Railway Station ATLIB 257160.png
Poro-O-Tarao railway station about 1910
General information
LocationNew Zealand
Coordinates 38°32′59″S175°18′51″E / 38.549743°S 175.314288°E / -38.549743; 175.314288
Elevation339 m (1,112 ft)
Line(s) North Island Main Trunk
Distance Wellington 443.58 km (275.63 mi)
History
Opened1 April 1901
Closed10 May 1976
ElectrifiedJune 1988
Services
Preceding station Historical railways Following station
Mangapehi
Line open, station closed
  North Island Main Trunk
KiwiRail
  Waimiha
Line open, station closed

Poro-O-Tarao (or Porootarao) [1] was a flag station on the North Island Main Trunk line, in the Waitomo District of New Zealand. Between the watersheds of the upper Mōkau and Whanganui rivers, the NIMT enters Poro-O-Tarao tunnel under Tihikārearea hill, before descending the Ōngarue valley. [2] It was 9.68 km (6.01 mi) north of Waimiha and 5.89 km (3.66 mi) south of Mangapehi. [3]

Contents

For 2 years, from 1 April 1901 until the line to Taumarunui opened on 1 December 1903, Poro-O-Tarao was the terminus of the line from Auckland, though the rails reached Poro-O-Tarao on 1 December 1896 [4] and, from 18 January 1897, a weekly goods train ran through from Puketutu. [5] Work on the Mōkau station to Poro-O-Tarao tunnel section had started in September 1892. It was officially open for traffic on 21 December 1896. [2] Work on the Ohinemoa section (Poro-O-Tarao tunnel to Te Kawakawa, south of Ōngarue) started by December 1897. [2]

Although the station closed for goods in 1976, it remained open for Ministry of Works traffic, during construction of the new tunnel, until 10 November 1980. There was also a station at Porootarao South from about November 1898 till about November 1902. [4]

Train coming out of Poro-O-Tarao tunnel about 1910 Train coming out of the Porootarao tunnel ATLIB 257131.png
Train coming out of Poro-O-Tarao tunnel about 1910

Poro-O-Tarao Tunnel

The tunnel to the south of the station was 53 ch (3,500 ft; 1,100 m) long. [2] The Public Works Department awarded a contract to J. J. O'Brien for the Poro-O-Tarao section (including tunnel) in August 1885. [2] The PWD originally required an impossible contract time of two years, and also that it be built before the railway reached Te Kuiti (the railhead did not reach the site until 1897) so materials had to be taken over 46 miles (74 km) of roadless wilderness. Richard Seddon later said that if the line had been built to the site first, the tunnel could have been built more cheaply and easily. [6]

Work began on the tunnel in 1886 and was complete by 27 August 1890. [2]

1886 construction camp at Poro-O-Tarau 1886 construction camp at Poro-O-Tarau.jpg
1886 construction camp at Poro-O-Tarau

Te Ihingārangi had been promised the railway would go around Tihikārearea, home to 23 sacred healing trees and other tapu sites. Local hapū were only alerted to the Government's plans to construct the railway directly through Tihikārearea when construction workers arrived to begin work on the tunnel, around 1886. They told the workers not to put the track through the sacred ground, and tapu poles were put in the railway's path by tohunga. However, the sacred grove was felled before tohunga could remove the tapu, and was said to have caused people to die of illnesses that traditional Māori medicine could have cured. The trees were used for railway sleepers. Also, construction polluted a puna wai tapu (holy spring) where tohunga lived. [2]

In 1935 the driver and fireman of a northbound goods train were overcome by fumes in the tunnel and the Class AA locomotive crashed and overturned at the station, along with 12 of the train's 46 trucks. Several cattle and sheep were killed, but there were no other casualties. [7]

Poro-O-Tarao was one of the smallest tunnels on the NIMT. As a result, prior to 1920, it had had its invert lowered to allow larger rolling stock. The tunnel is in weak mudstones with considerable ground water. Steel props supported the base of the walls above the lowered invert. Failures of these props and the tunnel's drainage resulted in areas of significant inward cracking of the brickwork. In 1934 a 45 m (148 ft) bulging length was rebuilt to the original profile with a reinforced concrete invert. In 1965 a further 12 m (39 ft) was replaced to improve clearance and to investigate the feasibility of enlarging the old tunnel. The proposal was abandoned as it would have taken at least 9 years and cost twice as much. [8]

Thus, when the railway was electrified, a new 6 m (20 ft) diameter, [9] 1,272 m (4,173 ft) tunnel was built to the west. [8] It goes through Mahoenui Group soft sedimentary rocks, including landslides; the cause of hummocky ground and many small scarps. A drive at the north portal showed gently-dipping massive interbedded weak claystone, siltstone and sandstone. Bedding planes and joints weaken the rock, which is weak anyway. Narrow zones of crushed rock allow water in. The southern approaches to the new tunnel are largely unstable landslide debris, formed of silty clay with rock fragments. [10]

Towards the end of the construction of the new tunnel, it was feared the old one might collapse. It was shrinking 2-3mm a year when tunnel drainage was working and effective strutting was in place, and 8-10mm per year when it wasn't. The central invert drain had blocked and some steel props were buckling. It was so bad, a contingency plan for reopening the old tunnel in the event of it collapsing, was designed. Fortunately it wasn't needed. [8]

Porootarau Tunnel northern portal and station site (to left) in 2018 Porootarau Tunnel northern portal and station site (to left).jpg
Porootarau Tunnel northern portal and station site (to left) in 2018

Related Research Articles

<span class="mw-page-title-main">North Island Main Trunk</span> Railway line in New Zealand running between Auckland and Wellington

The North Island Main Trunk (NIMT) is the main railway line in the North Island of New Zealand, connecting the capital city Wellington with the country's largest city, Auckland. The line is 682 kilometres (424 mi) long, built to the New Zealand rail gauge of 1,067 mm and serves the large cities of Palmerston North and Hamilton.

<span class="mw-page-title-main">Stratford–Okahukura Line</span> Railway line in New Zealand

The Stratford–Okahukura Line (SOL) is a secondary railway line in the North Island of New Zealand, between the Marton - New Plymouth Line (MNPL) and the North Island Main Trunk (NIMT) Railway, with 15 intermediate stations. It is 144 km (89 mi) long through difficult country, with 24 tunnels, 91 bridges and a number of sections of 1 in 50 grade. Near Okahukura there is an unusual combined road-rail bridge over the Ongarue River, with the one-lane road carriageway below the single rail track. The line is not currently in service for rail traffic and is under a 30-year lease for a tourist venture. In July 2019 KiwiRail's CEO stated that reopening the line was a priority. Minister of Transport Michael Wood announced the government's 10-year plan for rail investment on 6 May 2021, which specifically stated that plans could include re-opening the Stratford to Okahukura line.

<span class="mw-page-title-main">Harry Burnand</span> New Zealand engineer and sawmiller

John Henry Davis Burnand, known as Harry Burnand, was a New Zealand engineer and sawmiller. He was born in London, England on 2 December 1850.

<span class="mw-page-title-main">Mangaonoho railway station</span> Railway station in New Zealand

Mangaonoho railway station was a station on the North Island Main Trunk in New Zealand. For almost a decade, from 1893 to 1902, Mangaonoho was important as the northern terminus of the NIMT's southern section; even a refreshment room was planned. The route north was delayed by construction of major viaducts, the first being Makōhine. To build Makōhine a railway workshop was set up just north of Mangaonoho. Unlike many other NIMT construction camps, Mangaonoho gradually declined after the line was completed. By 1911 the population was down to 167. Decline continued, with removal of the stockyards in 1973 and closure in 1982. There is now only a single line through the former station site.

<span class="mw-page-title-main">Hangatiki railway station</span> Defunct railway station in New Zealand

Hangatiki railway station was a flag station on the North Island Main Trunk in New Zealand.

<span class="mw-page-title-main">Ngaroto railway station</span> Defunct railway station in New Zealand

Ngaroto railway station was a station on the North Island Main Trunk in New Zealand, 3.42 km (2.13 mi) south of Lake Rd, 2 mi (3.2 km) north of Te Awamutu, beside the entrance to Yarndley's Bush. Lake Ngaroto is visible from the railway to the north of the station.

<span class="mw-page-title-main">Ohaupo railway station</span> Defunct railway station in New Zealand

Ōhaupō railway station was a station located at Ōhaupō on the North Island Main Trunk in New Zealand. It was the terminus of the line from Auckland from 1878 to 1880 and closed in 1982. Only a passing loop remains.

<span class="mw-page-title-main">Taumarunui railway station</span> Railway station in New Zealand

Taumarunui railway station is the main railway station in Taumarunui, New Zealand, serving the Northern Explorer service between Auckland and Wellington. Historically, it was an important intermediate stop with a refreshment room on the North Island Main Trunk line; the subject of the ballad "Taumarunui on the Main Trunk Line" by Peter Cape.

<span class="mw-page-title-main">Te Awamutu railway station</span> Defunct railway station in New Zealand

Te Awamutu was a temporary terminus, serving the border town of Te Awamutu, on the North Island Main Trunk (NIMT) in New Zealand from 1880, when the line was extended from Ōhaupō, until 1887, when the line was extended south to Ōtorohanga.

<span class="mw-page-title-main">Otorohanga railway station</span> Railway station in New Zealand

Otorohanga railway station serves the town of Ōtorohanga, on the North Island Main Trunk in New Zealand. The current station dates from 1924.

<span class="mw-page-title-main">Te Kuiti railway station</span> Railway station in New Zealand

Te Kuiti railway station is a station on the North Island Main Trunk in New Zealand. The station was important in the growth of Te Kūiti.

<span class="mw-page-title-main">Hamilton railway station, New Zealand</span> Railway station in New Zealand

Hamilton railway station serves the city of Hamilton in the Waikato region of New Zealand. It is located in the suburb of Frankton, hence the station's former name Frankton Junction, its name for most of its existence. The station is a Keilbahnhof, located at the junction of the North Island Main Trunk (NIMT) and East Coast Main Trunk (ECMT) lines. The station is served by the regional Te Huia service, which runs to Auckland via Rotokauri Transport Hub and Huntly railway station twice daily in the morning, with return services in the evening and by the 6-days a week, Northern Explorer passenger service, between Auckland and Wellington.

The Paeroa-Pokeno railway line or deviation in the upper North Island of New Zealand between Paeroa on the East Coast Main Trunk (ECMT) and Pokeno on the North Island Main Trunk (NIMT) was a proposed route with construction started but abandoned. The proposal has been revived in recent years as part of a more direct route between Auckland and Tauranga.

<span class="mw-page-title-main">Okahukura railway station</span> Former railway station in New Zealand

Okahukura railway station was a station on the North Island Main Trunk in New Zealand.

<span class="mw-page-title-main">Puketutu railway station</span> Railway station in New Zealand

Puketutu was a flag station on the North Island Main Trunk line, in the Waitomo District of New Zealand.

<span class="mw-page-title-main">Mangapehi railway station</span> Defunct railway station in New Zealand

Mangapehi was a flag station on the North Island Main Trunk line, in the Waitomo District of New Zealand. It was 5.89 km (3.66 mi) north of Poro-O-Tarao and 5.15 km (3.20 mi) south of Kopaki.

<span class="mw-page-title-main">Kopaki railway station</span> Defunct railway station in New Zealand

Kopaki was a flag station on the North Island Main Trunk line, in the Waitomo District of New Zealand.

Te Koura was flag station on the North Island Main Trunk line, in the Ruapehu District of New Zealand in the Ōngarue valley. When opened in 1903 it had sidings, a platform and a goods shed, The line was useable from February 1903 and goods traffic started on 22 June 1903.

<span class="mw-page-title-main">Oio railway station</span> Railway station in New Zealand

Oio was a station on the North Island Main Trunk line, in the Ruapehu District of New Zealand. It served the hamlet of Oio, which lay to the north of the station. It was 8.29 km (5.15 mi) north of Raurimu and 5.64 km (3.50 mi) south of Ōwhango. It was one of the many temporary railheads along the route, with work going on from 1904 to 1908.

<span class="mw-page-title-main">Pokaka railway station</span> Railway station in New Zealand

Pokaka was a station on the North Island Main Trunk line, in the Ruapehu District of New Zealand. It served the small village of Pokaka and lay to the south of Makatote Viaduct, the late completion of which held up opening of the station.

References

  1. "Porootarao, Waikato". NZ Topo Map. Retrieved 28 March 2020.
  2. 1 2 3 4 5 6 7 "Te Mana Whatu Ahuru Waitangi Tribunal Report 2018" (PDF).
  3. New Zealand Railway and Tramway Atlas (Fourth ed.). Quail Map Co. 1993. ISBN   0 900609 92 3.
  4. 1 2 Scoble, Juliet. "Names & Opening & Closing Dates of Railway Stations in New Zealand 1863 to 2010" (PDF). Rail Heritage Trust of New Zealand.
  5. "PORO-O-TARAO TUNNEL. KING COUNTRY CHRONICLE". paperspast.natlib.govt.nz. 24 June 1933. Retrieved 27 March 2020.
  6. McLean, John (2020). Sweat and Toil: The Building of Ner Zealand. Wellington: Tross Publishing. pp. 113–118. ISBN   978 18729 70707.
  7. "THE RUNAWAY TRAIN. WAIKATO TIMES". paperspast.natlib.govt.nz. 31 July 1935. Retrieved 13 September 2022.
  8. 1 2 3 Ramsay, Graham (1980). "Beca Infrastructure Ltd. Repair and Modification of NZ Railway Tunnels".
  9. Borrie, G. W.; Riddolls, B. W. (1980). "Engineering geological investigations in soft rock terrain, Poro-o-tarao tunnel, New Zealand". Third Australia-New Zealand conference on Geomechanics: Wellington, May 12–16, 1980: 2.
  10. "Poro-o-tarao tunnel duplication: summary of engineering geological investigations". GNS. 1975. Retrieved 28 March 2020.