Zimmerberg Base Tunnel

Last updated
Zimmerberg Base Tunnel
Overview
Line Gotthard Line
Location Zürich, Switzerland
Coordinates 47°19′40″N8°31′52″E / 47.3277°N 8.5312°E / 47.3277; 8.5312
StatusActive since 2003
System Swiss Federal Railways (SBB CFF FFS)
Start Zürich
End Thalwil
Operation
OpenedApril 2003 [1]
Owner SBB Infrastructure
OperatorSBB CFF FFS
TrafficRailway
CharacterPassenger and freight
Technical
Length9.4 km (5.8 mi) [2]
No. of tracks 2 [2]
Track gauge 1,435 mm (4 ft 8+12 in) (standard gauge)
Electrified 15 kV 16.7 Hz
Operating speed160 km/h (99 mph)
The NRLA project (Gotthard Base Tunnel and Zimmerberg Base Tunnel) is the centerpiece of the Central European rail network. Alptransit project overview engl.jpg
The NRLA project (Gotthard Base Tunnel and Zimmerberg Base Tunnel) is the centerpiece of the Central European rail network.

The Zimmerberg Base Tunnel (ZBT) is a railway tunnel under the Zimmerberg mountains in Switzerland. Phase I of the tunnel was opened to traffic during April 2003.

Contents

The ZBT has been divided into two phases of work; as of 2024, only Phase I is operational while Phase II remains in the planning and preparation stages. Zimmerberg I is about 10 km long; it links Zürich with Thalwil, bypassing a section of the Lake Zürich left-bank railway line, which allows rail traffic to traverse the mountains more efficiently.

Phase I

During the 1990s, Switzerland embarked upon a major programme of modernization and improvements across its railway infrastructure. [3] The NRLA initiative sought to provide better alternatives to the steep mountain railways across Gotthard, Ceneri and Lötschberg through the construction of a number of base-level tunnels that enabled trains to more rapidly and efficiently traverse the Swiss Alps. The Zimmerberg Base Tunnel (ZBT) was one such tunnel constructed under the initiative. [4]

Phase I of the Zimmerberg Base Tunnel is a major feature of the route between Zürich and Thalwil. The tunnel was the longest double-track tunnel to have been constructed by Switzerland in over 100 years, a milestone in Swiss railway infrastructure. [5] The tunnel was designed to accommodate high speed transit, with trains traversing at peak speeds of up to 200 km/h. The projected cost of the 10.7 km Phase I section was reportedly 820 million Swiss francs. Construction of the tunnel commenced in September 1997. [5] [6]

The local geography and location of the tunnel posed some challenges to the construction effort, such as the need to avoid impacting nearby urban development, as well as little cover being available at key areas. [7] [8] Boring operations through the rock incorporated both the use of a tunnel boring machine and conventional techniques, such as blasting, soil injection, and pipe arches amongst other auxiliary construction measures intended to reduce the risk of excessive settlement. [7] Approximately 315 meters of the tunnel's length features a continuous grouted ceiling, which was done to reduce deformation and permeability as well as a potential loss of cover. This was created by injecting a precise mixture of cement and slurry via pressurized grouting pipes across 120,000 valves; areas were tested for potential weaknesses and promptly re-grouted where appropriate. [8]

From an early stage of the project, the tunnel's opening was projected for June 2003. [5] This target was met on time. [8]

Phase II

The proposed Phase II of the Zimmerberg Base Tunnel is one element of the wider Rail 2030 programme, which has an overall projected budget of 21 billion Swiss francs. [9] However, during 2010, it was reported that further work on the project had been put on hold indefinitely. At the time, work was underway on multiple other base tunnels, including the Ceneri Base Tunnel and the Gotthard Base Tunnel. [10]

If it is built as per the original plans, Phase II of the tunnel will bring its length to about 20 km, and will link Zürich with Zug. Even following its completion, it is planned to retain the intermediate exit to Thalwil, which would still be used by passenger and freight trains going to Chur as well as by international trains to Austria. Until Phase II is completed, capacity and speeds both remain heavily constrained by traditional routes; the Swiss Federal parliament has voted to include the work in its long term expansion plan for 2030–2035. [11] [12]

See also

Related Research Articles

<span class="mw-page-title-main">Transport in Switzerland</span>

Switzerland has a dense network of roads and railways. The Swiss public transport network has a total length of 24,500 kilometres and has more than 2600 stations and stops.

<span class="mw-page-title-main">Bern-Lötschberg-Simplon-Bahn</span> Former Swiss railway company

The Bern-Lötschberg-Simplon-Bahn (BLS), known between 1997 and 2006 as the BLS Lötschbergbahn, was a Swiss railway company. In 2006 the company merged with Regionalverkehr Mittelland AG to form a new company called BLS AG.

<span class="mw-page-title-main">Rail transport in Switzerland</span>

The Swiss rail network is noteworthy for its density, its coordination between services, its integration with other modes of transport, timeliness and a thriving domestic and trans-Alp freight system. It is made necessary by strong regulations on truck transport, and is enabled by properly coordinated intermodal logistics.

<span class="mw-page-title-main">Gotthard Base Tunnel</span> Railway tunnel through the Swiss Alps

The Gotthard Base Tunnel is a railway tunnel through the Alps in Switzerland. It opened in June 2016 and full service began the following December. With a route length of 57.09 km (35.5 mi), it is the world's longest railway and deepest traffic tunnel and the first flat, low-level route through the Alps. It lies at the heart of the Gotthard axis and constitutes the third tunnel connecting the cantons of Uri and Ticino, after the Gotthard Tunnel and the Gotthard Road Tunnel.

<span class="mw-page-title-main">NRLA</span> Swiss rail project

The New Railway Link through the Alps, is a Swiss construction project for faster north–south rail links across the Swiss Alps. It consists of two axes with several improvements along these rails including three new base tunnels several hundred metres below the existing apex tunnels, the 57-kilometre (35 mi) Gotthard Base Tunnel, the 35-kilometre (22 mi) Lötschberg Base Tunnel, and the 15-kilometre (9.3 mi) Ceneri Base Tunnel. Swiss Federal Railways subsidiary AlpTransit Gotthard AG and BLS AG subsidiary BLS Alp Transit AG were founded for this project and built the tunnels.

<span class="mw-page-title-main">Gotthard Pass</span> Mountain pass through the Swiss Alps

The Gotthard Pass or St. Gotthard Pass at 2,106 m (6,909 ft) is a mountain pass in the Alps traversing the Saint-Gotthard Massif and connecting northern Switzerland with southern Switzerland. The pass lies between Airolo in the Italian-speaking canton of Ticino, and Andermatt in the German-speaking canton of Uri, and connects further Bellinzona and Lugano to Lucerne, Basel, and Zürich. The Gotthard Pass lies at the heart of the Gotthard, a major transport axis of Europe, and it is crossed by three traffic tunnels, each being the world's longest at the time of their construction: the Gotthard Rail Tunnel (1882), the Gotthard Road Tunnel (1980) and the Gotthard Base Tunnel (2016). With the Lötschberg to the west, the Gotthard is one of the two main north-south routes through the Swiss Alps.

<span class="mw-page-title-main">Lötschberg Base Tunnel</span> Railway tunnel through the Bernese Alps

The Lötschberg Base Tunnel (LBT) is a 34.57 km (21.48 mi) railway base tunnel on the BLS AG's Lötschberg line cutting through the Bernese Alps of Switzerland some 400 m (1,300 ft) below the existing Lötschberg Tunnel. It runs between Frutigen, Bern, and Raron, Valais.

<span class="mw-page-title-main">Simplon Tunnel</span> Tunnel between the Pennines and Lepontine Alps between Italy and Switzerland

The Simplon Tunnel is a railway tunnel on the Simplon railway that connects Brig, Switzerland and Domodossola, Italy, through the Alps, providing a shortcut under the Simplon Pass route. It is straight except for short curves at either end. It consists of two single-track tunnels built nearly 15 years apart. The first to be opened is 19,803 m (64,970 ft) long; the second is 19,824 m (65,039 ft) long, making it the longest railway tunnel in the world for most of the twentieth century, from 1906 until 1982, when the Daishimizu Tunnel opened.

<span class="mw-page-title-main">Gotthard railway</span> Key central Swiss transport link

The Gotthard railway is the Swiss trans-alpine railway line from northern Switzerland to the canton of Ticino. The line forms a major part of an important international railway link between northern and southern Europe, especially on the Rotterdam-Basel-Genoa corridor. The Gotthard Railway Company was the former private railway company that financed the construction of and originally operated that line.

<span class="mw-page-title-main">Ceneri Base Tunnel</span> Railway tunnel through the Swiss Alps

The Ceneri Base Tunnel is a Swiss railway base tunnel in the canton of Ticino. It passes under Monte Ceneri between Camorino in the Magadino Flat and Vezia near Lugano; it bypasses the former high-altitude rail route through the Monte Ceneri Tunnel. It is composed of two single-track tunnels, each 15.4 km (9.6 mi) long. It is part of the New Railway Link through the Alps (NRLA) project for faster north-south rail links across the Swiss Alps.

<span class="mw-page-title-main">Monte Ceneri</span> Mountain pass in Ticino, Switzerland

Monte Ceneri is a mountain pass in the canton of Ticino in Switzerland. It connects the Magadino Plain and the Vedeggio Valley across the Lugano Prealps at an elevation of 554 metres (1,818 ft) above sea level. It provides the most direct route between the cities of Bellinzona and Lugano. Despite its name, Monte Ceneri is the lowest point on the crest between Monte Tamaro and the Camoghè.

<span class="mw-page-title-main">Rail 2000</span> Large-scale project of the Swiss Federal Railways

Rail 2000 is a large-scale project of the Swiss Federal Railways (SBB CFF FFS) established in 1987 to improve the quality of the Swiss rail network for the New millennium. It includes measures to accelerate a number of existing connections and the modernisation of rolling stock. The federal government decision to support the project in 1986 was approved by a referendum in 1987. In 2004 the first phase was completed consisting of around 130 projects with a budget of around CHF 5.9 billion.

The construction and operation of Swiss railways during the 19th century was carried out by private railways. The first internal line was a 16 km line opened from Zürich to Baden in 1847. By 1860 railways connected western and northeastern Switzerland. The first Alpine railway to be opened was under the Gotthard Pass in 1882. A second alpine line was opened under the Simplon Pass in 1906.

<span class="mw-page-title-main">Bellinzona railway station</span> Railway station in Switzerland

Bellinzona railway station serves the town of Bellinzona, in the canton of Ticino, Switzerland. It is on the Swiss Federal Railways' Gotthard line. The station is nicknamed Porta del Ticino since the opening of the Gotthard Base Tunnel in 2016.

<span class="mw-page-title-main">Giubiasco railway station</span> Railway station in Switzerland

Giubiasco railway station is a railway station in the Swiss canton of Ticino and municipality of Bellinzona. The station is on the Swiss Federal Railways Gotthard railway, between Bellinzona and Lugano, and is a junction point with several other lines.

<span class="mw-page-title-main">Zurich–Affoltern am Albis–Zug railway</span> Railway line in Switzerland

The Zurich–Affoltern am Albis–Zug railway is a railway connecting the Swiss cities of Zurich and Zug via Affoltern am Albis. It was opened by the Zurich–Zug–Lucerne Railway on 1 June 1864. The Zug–Lucerne line was opened by the same company on the same day. The line officially begins in Zürich Altstetten, which was still an independent municipality at that time. The line's only significant traffic consists of services on Zurich S-Bahn line S5. Long distance trains between Zurich, Zug and Lucerne now run via the Zimmerberg Base Tunnel, the Thalwil–Arth-Goldau line and the Zug–Lucerne line.

<span class="mw-page-title-main">High-speed rail in Switzerland</span>

High-speed rail in Switzerland consists of two new lines and three new base tunnels, including the world's longest railway and deepest traffic tunnel: the Gotthard Base Tunnel whose length is 57 km (35 mi). Each of these tunnels have a technical maximum speed of 250 km/h (155 mph), which is reduced, at least in the Gotthard Base Tunnel and the Ceneri Base Tunnel, to a maximum authorized speed of 230 km/h (145 mph), for environmental and economic reasons.

<span class="mw-page-title-main">Zurich–Zug–Lucerne Railway</span> Swiss railway company

The Zurich–Zug–Lucerne Railway (Zürich-Zug-Luzern-Bahn) is a former railway company that built railway lines in the Swiss cantons of Zurich, Zug and Lucerne from the 1860s. It was absorbed by the Swiss Federal Railways (SBB) in 1902. Its lines now form the Zurich–Zug railway and the Zug–Lucerne railway.

<span class="mw-page-title-main">Thalwil–Arth-Goldau railway</span> Swiss rail line

The Thalwil–Arth-Goldau railway is a Swiss railway that acts as a feeder route to the Gotthard Railway. It was opened for this purpose on 1 June 1897, with the Thalwil–Zug section owned by the Swiss Northeastern Railway and the Zug–Arth-Goldau section owned by the GB. Since the nationalisation of the GB in 1909, the entire route has belonged to the Swiss Federal Railways.

<span class="mw-page-title-main">InterCity (Switzerland)</span> Type of long-distance passenger trains in Switzerland

The InterCity, abbreviated IC, are mainline trains in Switzerland connecting the country's major agglomerations, the range of services of which is located between InterRegio (IR) (inter-regional) and EuroCity (EC). These trains are generally equipped with air-conditioned equipment, a CFF restaurant or a CFF bistro, a mini-bar service, a quiet area and a business area in 1st class as well as a family area or, occasionally, a family car in 2nd class.

References

  1. "Gotthard Base Tunnel". railway-technology.com. Retrieved 9 June 2020.
  2. 1 2 "Project data – raw construction Gotthard Base Tunnel" (PDF). Lucerne, Switzerland: AlpTransit Gotthard AG. 1 June 2016. Retrieved 15 December 2016.
  3. Zbinden, Peter (2000). "New Gotthard Rail Link: a Technical Challenge". Structural Engineering International. 10 (1): 28–29. doi:10.2749/101686600780620937. eISSN   1683-0350. ISSN   1016-8664. S2CID   110985378 . Retrieved 23 March 2018.
  4. Zuber, Peter (July 1997). "The AlpTransit scheme: New railway lines in base tunnels under the Swiss Alps". Tunnelling and Underground Space Technology. 12 (3): 357–360. doi:10.1016/S0886-7798(97)00029-1. ISSN   0886-7798.
  5. 1 2 3 Bosshard, Martin and Matter, Jürg (2000). "How the Zimmerberg-Base Tunnel is Being Built in the City of Zurich". IABSE Congress Report. 16: 782–789. doi:10.2749/222137900796356080. ISBN   3-85748-101-3.{{cite journal}}: CS1 maint: multiple names: authors list (link)
  6. Amberg, F (14 February 2014). "Gotthard Basetunnel: Aspects of Long Tunnels" (PDF). indico.cern.ch.
  7. 1 2 "SBB Zimmerberg base tunnel". Basler & Hofmann. Archived from the original on 14 June 2021. Retrieved 9 June 2020.
  8. 1 2 3 Matter, J.; Portner, J. (July 2004). "Successful grouting for the Zimmerberg Base Tunnel". Tunnelling and Underground Space Technology. Underground Space for Sustainable Urban Development. Proceedings of the 30th ITA-AITES World Tunnel Congress Singapore, 22–27 May 2004. 19 (4–5). trid.trb.org. ISSN   0886-7798 . Retrieved 10 June 2020.
  9. "Zimmerberg Base Tunnel". Archived from the original on 20 August 2010. Retrieved 3 May 2010. Official project site
  10. Booth, Martina (29 April 2010). "Gotthard: A titanic tunnel". newcivilengineer.com.
  11. Raaflaub, Christian (1 June 2017). "Swiss obsession with tunnels continues". swissinfo.ch.
  12. Vosman, Quintus (14 November 2019). "Swiss adopt SFr 13bn plan to increase rail capacity by 2035". railjournal.com.