1 (MBTA bus)

Last updated

1
MBTA route 1 bus nearing Southwest Corridor, September 2022.JPG
A route 1 bus on Massachusetts Avenue in September 2022
Overview
System MBTA bus
Garage Albany Garage and Cabot Garage
Began serviceMay 16, 1896 (1896-05-16) (as streetcar line)
Route
Locale Boston and Cambridge, Massachusetts
Start Harvard Square
End Nubian station
Length
  • 4.6 miles (7.4 km) eastbound
  • 4.4 miles (7.1 km) westbound
Daily ridership12,000 (2018)
Timetable Route 1
 {{{previous_line}}}  MBTA bus   4  

Route 1 is a local bus route in Boston and Cambridge, Massachusetts, operated by the Massachusetts Bay Transportation Authority (MBTA) as part of MBTA bus service. It operates between Harvard Square and Nubian station, primarily along Massachusetts Avenue. A major crosstown route, it is among the highest-ridership routes in the system, with service every 15 minutes or less during all operating hours.

Contents

Most portions of the route originated as horsecar lines opened by three companies between 1856 and 1887. Several portions were electrified beginning in 1889, and the Harvard Bridge opened to streetcars in 1892. The West End Street Railway began operating a crosstown through route between Harvard Square and Dudley Square (now Nubian Square) in 1896. Its successor, the Boston Elevated Railway (BERy), extended the line to North Cambridge carhouse by 1907 but cut it back to Harvard Square in 1912.

Traffic congestion on Massachusetts Avenue prompted several changes to the route in the 1930s, culminating in a 1936 split into Harvard–Massachusetts and Massachusetts–Dudley routes. The Harvard–Massachusetts route was partially operated with buses in 1939–1942 and 1946–1949. It was converted fully to buses in 1949, then to trolleybuses from 1950 to 1961. Off-peak service on the Massachusetts–Dudley route was converted to buses in 1948; peak service was converted in 1953. The two routes were merged into a Harvard–Dudley route in September 1962. It was designated route 1 later that decade.

Route 1 was temporarily rerouted over the Boston University Bridge from 1983 to 1987 during rebuilding of the Harvard Bridge. It was rerouted in 1987 to serve Boston City Hospital (later Boston Medical Center). The MBTA added crosstown route CT1, a limited-stop service between Central Square and the hospital, in 1994. A number of stops were closed in 2013 to reduce travel times, while several segments of bus lanes were added beginning in 2018. A 2018–19 MBTA review of its bus system found that route 1 suffered from crowding and poor reliability. Route CT1 was merged into route 1 in 2019.

Route

1 (MBTA bus) Route 1 runs between Harvard Square in Cambridge and Nubian station in the Roxbury neighborhood of Boston. From Nubian, the route runs northeast on Washington Street, southeast on Melnea Cass Boulevard, and northeast on Albany Street to the Boston Medical Center. It continues northwest on Massachusetts Avenue, passing through the South End and Back Bay neighborhoods before crossing the Charles River on the Harvard Bridge. Entering Cambridge, it passes through the Massachusetts Institute of Technology campus and Central Square. The route terminates on Massachusetts Avenue at Holyoke Street on the east side of Harvard Square. Nubian-bound buses loop on Dunster Street and Mount Auburn Street, rejoining Massachusetts Avenue at Putnam Square. [1] [2] [3]

Scheduled one-way running times range from about 40 minutes off-peak to 50 minutes at peak, with shorter times during early mornings and late nights. Service operates from about 5:00 am to 1:00 am Monday through Thursday, from about 5:00 am to 2:00 am Fridays and Saturdays, and from about 6:00 am to 1:00 am on Sundays. As of August 2025, headways are 15 minutes or less at all operating hours (except after 1:00 am on Friday and Saturday nights). [3] It operates as a crosstown route, with MBTA subway connections at Harvard (Red Line), Central (Red Line), Hynes Convention Center (Green Line B, C, and D branches), Symphony (Green Line E branch), and Massachusetts Avenue (Orange Line), plus Silver Line connections at Massachusetts Avenue, Melnea Cass Boulevard, and Nubian. [1] [2] [3]

Route 1 runs as a local route with standard local bus fare. In 2018, the route averaged 12,000 boardings on weekdays, placing it among the highest-ridership routes in the MBTA bus system. Average weekend ridership was 9,600 on Saturdays and 6,700 on Sundays. [2] The route is operated with standard 40-foot (12 m) transit buses based at Albany Garage and Cabot Garage in Boston. [4]

History

Early history

Map showing the horsecar systems around Boston as of 1886 Map of Boston Horsecar Lines 1886.svg
Map showing the horsecar systems around Boston as of 1886

Most portions of the route originated as horsecar lines by three companies:

The West End Street Railway purchased and merged all the horse railroads in the Boston area in 1887. [8] :163 On January 3, 1889, the West End opened its first electric line – the Beacon Street line. It used West Chester Park between Beacon Street and Boylston Street; the block between Beacon and Marlborough was new trackage. [17] :55 [15] :209 The eastern portion of the line, including West Chester Park, used conduit electrification until it was converted to conventional overhead lines on July 9, 1889. [17] :57 [18] The Brattle Square–Boston line was electrified on February 16, 1889. [15] :209

The West End quickly electrified its system and built new lines. [8] :165 Northampton Street between Shawmut Avenue and Washington Street was part of a line electrified on May 10, 1890. [19] The Washington Street line was electrified on November 28, 1891. [20] Northampton Street between Shawmut Avenue and Tremont Street was electrified by December 1891. [21] Northampton Street west of Tremont Street, Columbus Avenue, and West Chester Park between Columbus Avenue and Huntington Avenue were electrified by October 1892. [22] [23] By late 1895, the entire system was electric except the Marlborough Street line. [24]

On August 15, 1892, the West End opened an electric streetcar line over the new Harvard Bridge, including new trackage on Front Street in Cambridge between Lafayette Square and the bridge. Service ran between Harvard Square and downtown Boston. [25] [15] :209 Over the next several years, additional lines from Cambridge and beyond were routed over the bridge. [26] [27] West Chester Park was renamed Massachusetts Avenue on March 1, 1894; Front Street and Main Street (between Lafayette Square and Harvard Square) in Cambridge were similarly renamed later that year. [28] [29] On May 16, 1896, the West End began operating a crosstown through route between Harvard Square and Dudley Square via Massachusetts Avenue, Columbus Avenue, Northampton Street, and Washington Street. [30] Service initially operated every 10 minutes. [31]

Streetcar changes

Postcard of a Harvard-Dudley streetcar on the Harvard Bridge, c. 1907-1915 Streetcar on Harvard Bridge postcard.jpg
Postcard of a Harvard–Dudley streetcar on the Harvard Bridge, c.1907–1915

The first phase of the Tremont Street subway opened on September 1, 1897. Routes on Boylston Street could enter the subway through the Boylston Street portal to reach Park Street station. Several of the Harvard Bridge routes were rerouted into the subway when it opened; others were rerouted over the following year. [32] [33] [17] :23 On October 1, 1897, the Boston Elevated Railway (BERy) acquired the West End Street Railway. [17] :35 By April 1898, ridership over the bridge had almost doubled. [34] The first part of the Main Line Elevated opened on June 19, 1901, with Dudley Street Terminal as its southern end. [35] Overnight "Owl" service on the line was added on August 8, 1906. [36] :16

By 1907, the Harvard–Dudley line had been extended north along Massachusetts Avenue from Harvard Square to the North Cambridge carhouse. It shared track with numerous other routes, including 10 routes that used the Harvard Bridge to reach the subway from Cambridge and further points. [37] :21 Construction of the Cambridge Subway under Massachusetts Avenue caused detours in 1910. Temporary tracks were used on Austin Street (now Bishop Allen Boulevard) between Central Square and Lafayette Square, and on Mount Auburn Street between Harvard Square and Putnam Square. [38] [39] Work between Central Square and Putnam Square was done by shield tunneling, which allowed the surface streetcar tracks on that segment to stay in use. [39] [40]

The Cambridge Subway opened between Harvard station and downtown Boston on March 23, 1912. The through routes from northern and western suburbs were cut back from downtown Boston to Harvard station. The North Cambridge–Dudley line was shortened to a Harvard–Dudley line. It still shared the Harvard Bridge with several other routes, including a Harvard Square–Park Street line and a North Cambridge–Roxbury Crossing line. [41] [42] On September 3, 1912, the BERy added a North Cambridge–Dudley streetcar line that supplemented the Harvard–Dudley line. [43] It ran less frequently than the Harvard–Dudley line, with service every 15 minutes at peak hours and every 30 minutes at other times. [44] That month, the BERy also began testing a double-articulated streetcar on the Harvard–Dudley line. It was constructed from two older streetcars and was intended to provide additional capacity on busy lines. [45] [46]

Double-articulated streetcar on the Harvard-Dudley line in 1913 BERy Articulated number 2 on a curve, 1913.jpg
Double-articulated streetcar on the Harvard–Dudley line in 1913

The Boylston Street subway opened on October 3, 1914, as a westward extension of the Tremont Street subway. It prompted a number of changes to streetcar lines; a line running between Central Square and Park Street via the Harvard Bridge was discontinued. Transfer was available between the other Harvard Bridge lines and the subway at Massachusetts station. [47] Other lines supplemented the Harvard–Dudley line on portions of its route. By November 1914, afternoon peak service between Central Square and Dudley Square operated every 90 seconds (40 streetcars per hour). [48]

By 1917, the Harvard–Dudley line operated every five minutes (12 streetcars per hour) outside of peak hours. The only other all-day line to use the Harvard Bridge operated between River Street (in Cambridge) and Park Street station. [49] That year, the Massachusetts General Court passed legislation allowing the BERy to construct prepayment streetcar transfer areas (where passengers paid upon entering the transfer area, rather than on board the streetcar) at existing subway and elevated stations. [50] On November 29, 1919, the BERy opened a prepayment transfer station at Massachusetts station. It was located slightly east of Massachusetts Avenue; streetcars on the Harvard–Dudley line detoured into the transfer station via Newbury Street and Boylston Street. [51] [52]

On August 23, 1924, the deteriorated Harvard Bridge was closed to all traffic. [53] The Harvard–Dudley line was temporarily separated into two sections. One operated in Cambridge between Harvard Square and Memorial Drive; the other operated between Massachusetts station and Dudley Square. [54] Harvard–Dudley streetcar service resumed on November 4, 1924, after repairs to the bridge. [55] By that time, service on the line typically operated with center-entrance streetcars, which were sometimes operated as two-car trains. By 1930, Type Five streetcars were used instead. [36] :12

Splitting and merging

The Harvard–Dudley line was among the last surface streetcar lines to operate near downtown Boston. [56] :125 Traffic congestion on Massachusetts Avenue – one of the region's main roads – increased during the 1920s. [a] This prompted changes to the Harvard–Dudley line in an attempt to make service more reliable. [36] :16 On June 7, 1930, the northwest end of the route was cut back to Central Square. The Harvard–Central segment was served instead by a Harvard–Kendall Square bus route. [60] [61]

On July 26, 1930, the corridor was instead split into two routes. One route operated between Harvard Square and Lenox Street Carhouse (on Tremont Street just south of Massachusetts Avenue); the other operated between Massachusetts station and Dudley Square. Additional rush hour short turn service operated between Central Square and Lenox Street Carhouse. Owl service continued to operate over the full Harvard–Dudley route. [62] [63] By August 1931, service again operated the full route between Harvard and Dudley. [64] Owl service on the line was converted to buses on June 23, 1934; by 1937, the Owl service operated hourly. [65] [36] :16

Several additional service configurations were tried during the 1930s. The route was ultimately split into Harvard–Massachusetts and Massachusetts–Dudley routes in 1936. [36] :12,14 In 1940–41, the BERy reassigned the public route numbers used for its services; those numbers have remained relatively consistent since. [56] :27 The Harvard–Massachusetts route was numbered 76; the Massachusetts–Dudley route was numbered 47. [56] :vi [66] Rationing of rubber tires and gasoline began after the United States entered World War II. On June 20, 1942, Owl service on the Harvard–Dudley route and several other routes was converted back to streetcars. [67] The routes were converted back to bus in 1945. [56] :20 [68] The BERy was replaced by the Metropolitan Transit Authority (MTA) in 1947. [56] :vii

Harvard–Massachusetts route

The surface transfer station at Massachusetts station being modified in 1949 for trolleybus use Modification of Massachusetts surface station, 1949.jpg
The surface transfer station at Massachusetts station being modified in 1949 for trolleybus use

On September 9, 1939, route 76 was cut back to a Central–Massachusetts route at most times. It continued to operate to Harvard at weekday rush hours, Saturdays until 9 am, and Sundays. At other times, buses operated between Harvard Square and Lafayette Square. [69] [70] [56] :127 The buses were extended to MIT on November 18, 1939, supplementing the streetcars between Central Square and MIT. [56] :127 Effective February 10, 1940, streetcar service only operated at peak hours; at other times, buses operated the full route between Harvard and Massachusetts station. All weekend service was converted to buses on September 14, 1940. [56] :127 However, beginning May 2, 1942, all service on the route was operated by streetcars due to wartime rationing. [56] :127

In the 1940s, streetcars on route 76 were based out of Bennett Street Carhouse near Harvard Square. They ran a short distance on Mount Auburn Street and Brattle Street to Harvard Square, then followed Massachusetts Avenue to Boylston Street. There, they looped on Boylston Street and onto the east track at the Massachusetts surface station, then onto Newbury Street and Massachusetts Avenue for the return trip. Round-trip running time was scheduled for 36 minutes. [56] :125 In April 1945, the line every 3.5 minutes during the morning peak, every 9 minutes during midday, every 4 minutes at the afternoon peak, and every 10 minutes during the evening, for a total of 164 daily round trips. Rush hour service required 11 streetcars. [56] :203 Concrete "safety islands" (boarding platforms) were located at many stops. [56] :125 All service was provided by Type Five streetcars. [56] :116

The mixed bus and streetcar operation resumed on March 30, 1946, after wartime rationing was loosened. Three additional round trips operating between Harvard Square and a crossover at the Cambridge Armory near Vassar Street in the afternoon peak were added on June 23, 1947. [56] :125 Streetcar operation on the full Harvard–Massachusetts line ended on September 12, 1949, when the Harvard Bridge was closed for repaving. The MTA installed a temporary crossover at Memorial Drive. For one week, streetcar service operated between Harvard Square and Memorial Drive. A bus route between Harvard Square and Lafayette Square was added. Owl service north of Massachusetts station was replaced with a Harvard Square–Scollay Square route via Massachusetts Avenue and Vassar Street. [56] :128 [71]

The MTA began removal of the Harvard Bridge tracks on September 16, 1949. On September 19, the Watertown–Central Square streetcar service was extended to Memorial Drive, and the Harvard Square–Memorial Drive service ended. In October, the MTA removed the switches at Harvard Square and Central Square that allowed streetcars to access the tracks between those point. The tracks were removed by the city soon after. The bridge reopened on November 11, 1949; shortly thereafter, the Harvard–Massachusetts route resumed as an all-bus route, with a supplementary Quincy Square–Vassar Street route at peak hours. Harvard–Dudley Owl service also resumed. [56] :128

On April 22, 1950, the MTA replaced buses on the Harvard–Massachusetts route with trackless trolleys (trolleybuses) – part of a larger system in the area. The supplementary route was also converted. [b] At peak hours, the full route and the supplementary route each operated on six-minute headways, collectively using 15 trolleybuses. Service on the full route operated every 8–9 minutes middays and 7+12–12 minutes evenings. [72] The trolleybuses were based out of Bennett Street Carhouse. [73] :10 The conversion to trolleybuses required reconstruction of one end of the Massachusetts surface station, which took place in late 1949. [56] :125 [74]

Massachusetts–Dudley route

Route 47 streetcar on Columbus Avenue in 1942 Streetcar on Columbus Avenue at Northampton Street, 1942.jpg
Route 47 streetcar on Columbus Avenue in 1942

In the 1940s, streetcars on route 47 were based out of City Point Carhouse in South Boston. Streetcars looped clockwise on Massachusetts Avenue and Newbury Street through the Massachusetts surface station, boarding on the western track. They turned onto Boylston Street then Massachusetts Avenue, which they followed as far as Columbus Avenue. After jogging southwest for a block on Columbus, they followed Northampton Street and Washington Street to Dudley Square station. They pulled into the south surface boarding area at the station to discharge passengers, then looped on Warren Street to pick up passengers in the north boarding area. Round-trip running time was scheduled for 28 minutes. [56] :64 In March 1945, streetcars operated every 2.6 minutes during the morning peak, every 9 minutes during midday, every 4 minutes at the afternoon peak, and every 6 minutes during the evening, for a total of 207 daily round trips. Rush hour service required 13 streetcars in the morning and 9 in the afternoon. [56] :202  All service was provided by Type Five streetcars. [56] :44

In early 1947, streetcars began using the east track at Massachusetts station sharing it with route 76. [56] :64 On April 17, 1948, most route 47 service was replaced by buses. Streetcars continued to operate at weekday peak hours and on Saturdays until 9:40 am. Unlike streetcars, buses were routed directly on Massachusetts Avenue between Columbus Avenue and Washington Street. The Owl buses were also changed to this routing. [56] :64 [75] By September 1950, streetcars operated every 3 minutes during the morning peak and 4 minutes in the afternoon peak. [76] :231 The other streetcar lines based at City Point – routes 7, 9, and 10 – were all converted to bus in 1953. [76] :55 With the carhouse set to close, route 47 was converted fully to buses on September 12, 1953. [76] :71

MBTA

All Owl service ended on June 25, 1960. [77] By that time, Owl service on the corridor was a Central Square–Dudley Square–Cleary Square route. [78] Route 76 was converted from trackless trolley to bus on March 31, 1961. [73] :II Construction of the Massachusetts Turnpike into Boston required the Massachusetts surface station to be closed. [36] :16 Routes 47 and 76 were merged into Harvard–Dudley route 47 in September 1962; the surface station closed on March 21, 1963. [78] [79] [80] A large dedicated bus shelter was built on the west side of Massachusetts Avenue for southbound riders in 1963. A pedestrian tunnel between the subway station and the shelter opened on November 16, 1964. [79]

The Massachusetts Bay Transportation Authority (MBTA) took over service from the MTA in August 1964. [78] The route was renumbered 1 around 1967, with the new number reflecting its high ridership. [81] :39 From June to December 1972, midday Dudley-bound buses looped via Massachusetts Avenue, Harrison Avenue, and Northampton Street to serve Boston City Hospital. [78] On March 24, 1979, parts of Harvard Square were closed to traffic for construction of the Red Line Northwest Extension. [82] Route 1 was cut back from Brattle Square to Harvard Square. It initially looped via Dunster Street; this was soon changed to a loop around Harvard Yard via Quincy Street and Bow Street. [78]

In September 1979, some late-night service was routed via Boston City Hospital. [78] In July 1983, the Harvard Bridge was closed to buses and trucks due to structural deterioration. Route 1 was detoured over via Commonwealth Avenue, the Boston University Bridge, and Vassar Street. [83] The detour was initially operated without stops; local stops on Commonwealth Avenue were added in December 1983. [78] Route 1 resumed its normal routing in May 1987 when the first phase of bridge repairs was completed. [78] [84]

A route CT1 bus in Cambridge in 2015 MBTA route CT1 bus at Central Square, April 2015.jpg
A route CT1 bus in Cambridge in 2015

On May 2, 1987, a number of MBTA bus routes were modified as the Orange Line was relocated from the Washington Street Elevated to the Southwest Corridor. Route 1 was rerouted via Albany Street and Melnea Cass Boulevard to serve Boston City Hospital. [85] [c] By 1988, route 1 was the busiest MBTA bus route, averaging 15,861 weekday riders. [87] On September 26, 1994, the MBTA began three crosstown bus routes intended as a precursor to the Urban Ring. Route CT1 operated between Boston City Hospital and Central Square via Massachusetts Avenue. Except for a loop around the hospital, it used the same routing as part of route 1, albeit with limited stops. [88] [78]

21st century

On September 7, 2001, the MBTA added late-night service on Friday and Saturday nights. A set of bus routes following the subway network, plus seven regular routes including route 1, were operated until 2:30 am. [89] [90] The late-night service was discontinued on June 25, 2005. [91] [92] In 2004–2005, the MBTA designated a set of 15 high-ridership routes, including route 1, as "key bus routes" to be prioritized for service improvements. [93] The first round of adjustments, made in 2006–07, did not include significant changes to route 1. [94] By 2007, route 1 was the third-busiest MBTA bus route, averaging 12,758 daily boardings. It was a frequent source of passenger complaints due to bunching. [95]

A second round of changes to the key routes were funded by the American Recovery and Reinvestment Act of 2009. Preliminary recommendations for route 1 released in 2011 included wider stop spacing, lengthening of stops to allow buses to pull fully to the curb, and additional amenities at stops. The 69 existing stops (36 southbound / 33 northbound) were to be reduced to 54 (28 southbound / 26 northbound). [96] [97] Construction of the changes took place in 2013. [98] [99] Beginning March 28, 2014, the MBTA again added late-night service on Friday and Saturday nights. This consisted of service until 2:30 am on the subway system and the key bus routes. The late-night service was cut back to 2:00 am in June 2015 and eliminated on March 18, 2016. [100] [101]

Route 1 bus on the 2018-installed bus lane in Cambridge MBTA route 1 bus south of Lafayette Square, July 2021.jpg
Route 1 bus on the 2018-installed bus lane in Cambridge

In May and June 2017, the intersection of Massachusetts Avenue and Brookline Avenue in Cambridge was one of six intersections systemwide where the MBTA tested transit signal priority (TSP). The pilot was deemed successful; TSP was installed on other portions of route 1 in Cambridge in 2018. [102] Several segments of bus lanes for the route have also been installed. A southbound lane from Sidney Street to Albany Street and Vassar Street to Memorial Drive was installed in November 2018. [103] [104] The gap between Albany Street and Vassar Street was filled in November 2021, along with a slight extension northwest to Douglass Street. [105] Two blocks of eastbound bus/bike lane were added to Mount Auburn Street in 2020. [106] [107] In November 2022, MassDOT added sections of bus lanes to the ends of the Harvard Bridge as part of a road diet. [108] [109]

A 2018–19 MBTA review of its bus system found that route 1 had issues with service quality. Overall reliability was 71% on weekdays and lower on weekends. More than 20% of passenger time on weekends was in crowded conditions – the highest rate on the bus system. [2] It found that route CT1 had poor reliability; it had limited frequency and was not coordinated with route 1, leading to the routes being duplicative rather than complementary. [110] [2] The review recommended that route CT1 be discontinued in favor of increased service on route 1 in order to provide more consistent service across the corridor. It also recommended that the loop at Harvard Square be shortened, with buses routed via Dunster Street and Mount Auburn Street. [111]

The MBTA board approved the changes in May 2019. [112] The two routes were merged on September 1, 2019, resulting in increased frequency on route 1. [113] [114] The Harvard Square loop was changed on March 15, 2020. [115] In May 2022, the MBTA released a draft plan for a systemwide network redesign. The draft called for the 1 to keep its existing route. Frequency would be increased at night to be every 15 minutes or less at all service hours. [116] [117] A revised proposal in November 2022 called for the same change. [118] [119] Service changes effective August 24, 2025, implemented the increased frequency. Service also began operating about one hour longer on Friday and Saturday evenings. [120]

A 2024 report by advocacy group TransitMatters rated the 1 bus the slowest and most-bunched MBTA bus route in 2023, with an average speed of 6.55 miles per hour (10.54 km/h) and 17.7% of buses bunched. [121] Average speed for the route fell to 6.02 miles per hour (9.69 km/h) in 2024, with bunching remaining at 17.6%. [122]

References

  1. 1 2 "Winter 2026 System Map". Massachusetts Bay Transportation Authority. December 14, 2025.
  2. 1 2 3 4 5 "Route 1" (PDF). Massachusetts Bay Transportation Authority. December 2018.
  3. 1 2 3 "1 Harvard Square–Nubian Station" (PDF). Massachusetts Bay Transportation Authority. August 24, 2025.
  4. Belcher, Jonathan (January–February 2025). "MBTA Vehicle Inventory as of February 28, 2025". Rollsign. Vol. 62, no. 1–2. Boston Street Railway Association. pp. 19, 23. ISSN   0035-7898.
  5. George Glover Crocker (1900). From the Stage Coach to the Railroad Train and the Street Car. W.B. Clarke. p. 25 via Google Books.
  6. "The Passing of the Horse Car". Street Railway Supplement of the Commercial & Financial Chronicle. William B. Dana. November 16, 1901. pp. 2–3 via Google Books.
  7. "Miscellaneous Items". New England Farmer. March 29, 1856. p. 2 via Newspapers.com.
  8. 1 2 3 4 5 Humphrey, Thomas J. (January 2023). Hourly Coaches, Omnibuses, and Horse Railroads: A History of Horse-Drawn Transit in Massachusetts (PDF). Boston Street Railway Association. Archived from the original (PDF) on January 22, 2024.
  9. "Metropolitan Railroad". The Liberator. September 26, 1856. p. 2 via Newspapers.com.
  10. "The Columbus-avenue Horse Railroad Line". Boston Evening Transcript. June 30, 1877. p. 8 via Newspapers.com.
  11. "Highland Street Railway Co. Columbus Avenue Line". Boston Evening Transcript. July 12, 1877. p. 2 via Newspapers.com.
  12. "Columbus Avenue Line". Boston Evening Transcript. July 5, 1877. p. 5 via Newspapers.com.
  13. "The Highland Railway". The Boston Globe. October 28, 1877. p. 2 via Newspapers.com.
  14. "Street-Car Regulations". The Boston Globe. October 22, 1877. p. 5 via Newspapers.com.
  15. 1 2 3 4 Humphrey, Thomas J. (August 2020). "Origin and Development of the Fixed-Route Local Bus Transportation Network in the Cities and Towns of the Massachusetts Bay Transportation Authority District as of December 31, 1973: Revised Edition" (PDF). NETransit.
  16. "Chester Park Horse Cars". Boston Evening Transcript. October 3, 1879. p. 1 via Newspapers.com.
  17. 1 2 3 4 Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. ISBN   0938315048.
  18. "Only Test Trips Now". The Boston Globe. January 3, 1889. p. 8 via Newspapers.com.
  19. "New Electric Lines". Boston Post. May 7, 1890. p. 8 via Newspapers.com.
  20. "Goodby Old Horse Car". The Boston Globe. November 28, 1891. p. 3 via Newspapers.com.
  21. "Changes in Car Service". The Boston Globe. December 11, 1891. p. 3 via Newspapers.com.
  22. "It Has Long Been Needed". Boston Evening Transcript. October 7, 1892. p. 3 via Newspapers.com.
  23. "Brief Locals". Boston Evening Transcript. October 18, 1892. p. 10 via Newspapers.com.
  24. "Horse Car To Go". The Boston Globe. December 21, 1900. p. 2 via Newspapers.com.
  25. "Electric Over Harvard Bridge". The Boston Globe. August 15, 1892. p. 5 via Newspapers.com.
  26. "New Electric Line in Cambridge". January 16, 1893. p. 5 via Newspapers.com.
  27. "New Line of Electrics Opened Today". The Boston Globe. April 14, 1894. p. 5 via Newspapers.com.
  28. "Massachusetts Avenue Now Runs to the Arlington Line". Boston Evening Transcript. December 1, 1894. p. 3 via Newspapers.com.
  29. "Massachusetts Avenue After Next Week". Boston Evening Transcript. February 24, 1894. p. 9 via Newspapers.com.
  30. "More Transfers". Boston Post. May 16, 1896. p. 8 via Newspapers.com.
  31. "From Roxbury To Cambridge". Boston Evening Transcript. April 9, 1896. p. 3 via Newspapers.com.
  32. West End Street Railway Company (August 30, 1897). "Subway Notice". Boston Evening Transcript. p. 5 via Newspapers.com.
  33. "Now For Speed". The Boston Globe. September 1, 1897. pp. 1, 7 via Newspapers.com.
  34. "Extend Subway". The Boston Globe. April 7, 1898. p. 7 via Newspapers.com.
  35. "Boston L Road Opened Today". Boston Post. June 10, 1901. p. 1 via Newspapers.com.
  36. 1 2 3 4 5 6 "A History of Route 1, the Harvard–Dudley Line". Rollsign. Vol. 20, no. 1. Boston Street Railway Association. January–February 1983. pp. 9–16. ISSN   0035-7898.
  37. Chasson, George Jr. (1987). Lonto, Arthur J. (ed.). "Boston's Main Line El: The Formative Years 1879-1908". Headlights. 49. Electric Railroader's Association.
  38. "Line Opened Up Again". The Boston Globe. September 3, 1910. p. 9 via Newspapers.com.
  39. 1 2 "Work on Subway at Harvard Sq". The Boston Globe. January 20, 1910. p. 11 via Newspapers.com.
  40. "Pushing Work on the Cambridge Subway". The Boston Globe. March 21, 1910. p. 11 via Newspapers.com.
  41. "Cambridge Subway to be Formally Opened to the Public This Morning". The Boston Globe. March 23, 1912. p. 9 via Newspapers.com.
  42. "New Subway to Open March 23". The Boston Globe. March 15, 1912. p. 3 via Newspapers.com.
  43. "Cambridge Car Changes". The Boston Globe. September 2, 1912. p. 8 via Newspapers.com.
  44. "Cambridge Service on L". Boston Evening Transcript. April 15, 1913. p. 8 via Newspapers.com.
  45. "New Style of Electric Cars". Boston Evening Transcript. September 10, 1912. p. 1 via Newspapers.com.
  46. "The Boston Articulated Car". Electric Railway Journal. Vol. 40, no. 14. October 5, 1912. pp. 606–609.
  47. "Changes Made by New Subway". Boston Globe. October 1, 1914. p. 3 via Newspapers.com.
  48. "Some of Old Lines are Discontinued". Boston Globe. November 20, 1914. p. 11 via Newspapers.com.
  49. Beeler, John A. (November 1917). "Exhibit 133: Surface Cars per Hour departing from Rapid Transit Stations". Report on the Methods and Practices of the Boston Elevated Railway Company, Boston, Massachusetts, to the Public Service Commission, Commonwealth of Massachusetts. pp. 230, 232. hdl:2027/hvd.hb0kzy.
  50. Secretary of the Commonwealth (1917). "Chapter 373: An Act Relative to the Property, Service, and Capitalization of the Boston Elevated Railway". Special Acts and Resolves Passed by the General Court of Massachusetts in the Year 1917. Wright and Potter. pp. 416–417 via Internet Archive.
  51. "New Loop Station at Massachusetts Av Mutually Benefits Public and Company". Boston Globe. November 24, 1919. p. 16 via Newspapers.com.
  52. ""L" Opens Loop Back Bay Station". Boston Globe. November 30, 1919. p. 16 via Newspapers.com.
  53. "Wilson Closes Harvard Bridge". The Boston Globe. August 24, 1924. p. 4 via Newspapers.com.
  54. "Claim Little Loss of Time by Stopping Harvard Bridge Cars". The Boston Globe. August 22, 1924. p. 10 via Newspapers.com.
  55. "Street Car Service Over Harvard Bridge Resumed as Repair Work Nears Completion". The Boston Globe. November 4, 1924. p. 20 via Newspapers.com.
  56. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Clarke, Bradley H. (2003). Streetcar Lines of the Hub – The 1940s. Boston Street Railway Association. ISBN   0938315056.
  57. "Underpass to be Opened Today". The Boston Globe. December 31, 1931. p. 12 via Newspapers.com.
  58. "Mass. Av. Underpass Opened". The Boston Globe. January 27, 1938. pp. 1, 8 via Newspapers.com.
  59. "Mayor Opens Huntington Av. Underpass". The Boston Globe. November 6, 1941. p. 30 via Newspapers.com.
  60. "Several Changes in "L" Service Effective Today". The Boston Globe. June 7, 1930. p. 9 via Newspapers.com.
  61. "Service Changes". Co-operation. Vol. 9, no. 6. Boston Elevated Railway. June 1930. p. 106.
  62. "Changes in Elevated's Harvard–Dudley Service". The Boston Globe. July 25, 1930. p. 13 via Newspapers.com.
  63. "Change in Harvard–Dudley Service". Co-operation. Vol. 9, no. 8. Boston Elevated Railway. August 1930. p. 140.
  64. "Elevated to Move Massachusetts-av Tracks to Aid Work on Memorial Drive Underpass". The Boston Globe. August 7, 1931. p. 22 via Newspapers.com.
  65. "Several Changes in El Railway Summer Service". The Boston Globe. June 22, 1934. p. 28 via Newspapers.com.
  66. Lufkin, Richard F. (1942). System Route Map (Map). Boston Elevated Railway via Wikimedia Commons.
  67. "'L' Bus Conversion Back to Street Cars Today to Save Rubber". The Boston Globe. June 20, 1942. p. 9 via Newspapers.com.
  68. Twenty-seventh Annual Report of the Board of Public Trustees of the Boston Elevated Railway Company: Year Ended December 31, 1945. Boston Elevated Railway. 1946. p. 31.
  69. "Schedule Changes on Elevated Are Announced". The Boston Globe. September 8, 1939. p. 28 via Newspapers.com.
  70. Twenty-first Annual Report of the Board of Public Trustees of the Boston Elevated Railway Company for the Year Ended December 31, 1939. Boston Elevated Railway. 1940. p. 11.
  71. "M. T. A. Changes Service Over Harvard Bridge". The Boston Globe. September 8, 1949. p. 2 via Newspapers.com.
  72. 1 2 "15 Trackless Trolleys For Cambridge Lines". Co-operation. Vol. 29, no. 2. Metropolitan Transit Authority. April 1950. p. 48.
  73. 1 2 Clarke, Bradley H. (1970). The Trackless Trolleys of Boston. Boston Street Railway Association. LCCN   74014950.
  74. "'MTA' News Notes". Co-operation. Vol. 28, no. 4. Metropolitan Transit Authority. December 1949. p. 94.
  75. "Operating Three New Bus Services". Co-operation. Vol. 27, no. 2. Metropolitan Transit Authority. August 1948. p. 32.
  76. 1 2 3 Clarke, Bradley H. (2015). Streetcar Lines of the Hub: Boston's MTA Through Riverside and Beyond. Boston Street Railway Association. ISBN   9780938315070.
  77. "M.T.A. Starts Summer Runs; 'Owl' All Done". The Boston Globe. June 25, 1960. p. 5 via Newspapers.com.
  78. 1 2 3 4 5 6 7 8 9 Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
  79. 1 2 A Chronicle of the Boston Transit System. Massachusetts Bay Transportation Authority. 1981. pp.  3–6 via Internet Archive.
  80. 16th Annual Report (Year Ended — December 31, 1962) of the Board of Trustees of the Metropolitan Transit Authority. Metropolitan Transit Authority. 1963. p. 15.
  81. Boucher, Norman (March 28, 1993). "On board the No. 1". The Boston Globe Magazine. pp. 14, 15, 37, 38, 39, 40, 41, 42 via Newspapers.com.
  82. "New MBTA layout for Harvard sq". The Boston Globe. March 17, 1979. p. 17 via Newspapers.com.
  83. "Mass. avenue bridge flaws may have escaped check". The Boston Globe. July 6, 1983. p. 22 via Newspapers.com.
  84. Rosenberg, Ronald (September 12, 1990). "Mass. Ave. bridge to reopen four lanes after seven years". The Boston Globe. p. 35 via Newspapers.com.
  85. Massachusetts Bay Transportation Authority (May 1, 1987). "Effective May 2, 1987 with the opening of the new Orange Line, the following bus routes will change". The Boston Globe. p. 22 via Newspapers.com.
  86. Knox, Richard A.; Walker, Adrian (June 30, 1996). "Council approves merger of hospitals". The Boston Globe. p. 29 via Newspapers.com.
  87. Howe, Peter J. (May 23, 1988). "Drivers, riders suggest best places to hail a cab". The Boston Globe. p. 20 via Newspapers.com.
  88. Palmer, Thomas C. Jr (September 26, 1994). "MBTA inaugurates 'Crosstown' buses". The Boston Globe. p. 36 via Newspapers.com.
  89. Palmer, Thomas C. Jr. (September 9, 2001). "Late-night transit picks up party animals". The Boston Globe. pp. B1, B4 via Newspapers.com.
  90. "MBTA's "Night Owl" Service To Begin September 7th" (Press release). Massachusetts Bay Transportation Authority. August 27, 2001. Archived from the original on October 23, 2001.
  91. "New England in Brief". The Boston Globe. June 24, 2005. p. B2 via Newspapers.com.
  92. "Night Owl Service To Be Discontinued" (Press release). Massachusetts Bay Transportation Authority. June 14, 2005.
  93. "Key Bus Route Improvement Program". Massachusetts Bay Transportation Authority. 2010. Archived from the original on November 27, 2010.
  94. "Key Bus Routes Improvement Program" (PDF). Massachusetts Bay Transportation Authority. 2006. p. 2. Archived from the original (PDF) on July 21, 2011.
  95. Masis, Julie (August 5, 2007). "No. 1 drag". Boston Globe City Weekly. pp. 1, 10 via Newspapers.com.
  96. "MBTA Key Bus Route Improvement Program Community Meeting: Route 1 - Boston" (PDF). Massachusetts Bay Transportation Authority. June 13, 2011. pp. 2, 25, 26. Archived from the original (PDF) on October 27, 2012.
  97. "MBTA Key Bus Route Improvement Program" (PDF). Massachusetts Bay Transportation Authority. June 2011. Archived from the original (PDF) on October 27, 2012.
  98. Rocheleau, Matt (June 18, 2013). "MBTA to improve 15 heavily used bus routes". The Boston Globe. Archived from the original on June 22, 2013.
  99. "Complaint Under Title VI of the Civil Rights Act of 1964, Executive Order 12898, Executive Order 5610.2(a), and Federal Transit Circular 4702.1a" (PDF). Conservation Law Foundation. July 26, 2016. p. 3–4.
  100. "MBTA Late Night Service Begins" (Press release). Massachusetts Bay Transportation Authority. March 28, 2014.
  101. "Transit Signal Priority to Expand on Green Line". Rollsign. Vol. 54, no. 9–10. Boston Street Railway Association. September–October 2017. p. 4. ISSN   0035-7898.
  102. Annear, Steve (November 29, 2018). "'Big change' for bikes, buses comes to Mass. Ave. in Cambridge". Boston Globe. Archived from the original on November 29, 2018.
  103. "Annotated Design Roll Plan" (PDF). City of Cambridge. September 27, 2018.
  104. "Share Feedback on South Mass Ave Bus Only Lanes and Separated Bike Lane Proposal". City of Cambridge. November 1, 2025.
  105. "Inner Mt. Auburn Corridor Safety Improvement Project". City of Cambridge. 2023. Archived from the original on January 19, 2024.
  106. "Inner Mount Auburn Corridor Safety Improvement Project Roll Plan" (PDF). City of Cambridge. August 20, 2020.
  107. Gulliver, Jonathan (October 19, 2022). "Highway Administrator's Report". Massachusetts Department of Transportation. pp. 2, 3.
  108. "Roll Plan for the Proposed Safety Improvements on Mass Ave Between Beacon Street and Memorial Drive". Massachusetts Department of Transportation. October 2022. Archived from the original on October 27, 2022.
  109. "Route CT1" (PDF). Massachusetts Bay Transportation Authority. December 2018.
  110. "Better Bus Project Route Proposals" (PDF). Massachusetts Bay Transportation Authority. January 2019. pp. 1, 2.
  111. "Board Approves 36 Bus Route Updates" (Press release). Massachusetts Bay Transportation Authority. May 29, 2019.
  112. "See How Your Bus Route Changed on September 1". Massachusetts Bay Transportation Authority. September 9, 2019.
  113. "Bus Schedule Changes for Fall 2019". Massachusetts Bay Transportation Authority. August 15, 2019.
  114. "Bus Schedule Changes for Spring 2020". Massachusetts Bay Transportation Authority. February 29, 2020.
  115. "A better bus network: new connections, more service, more frequency. See what this means in Cambridge" (PDF). Massachusetts Bay Transportation Authority. May 2022.
  116. "Draft Bus Network Redesign Map" (PDF). Massachusetts Bay Transportation Authority. May 2022.
  117. "What we changed from the May 2022 Proposal" (PDF). Massachusetts Bay Transportation Authority. November 7, 2022.
  118. "Revised Bus Network Fall 2022" (PDF). Massachusetts Bay Transportation Authority. November 3, 2022.
  119. Coholan, Ryan D. (July 29, 2025). "Fall 2025 Service Changes" (PDF). Massachusetts Bay Transportation Authority.
  120. "The Pokey/Schleppie Awards". TransitMatters. Spring 2024.
  121. "The Pokey/Schleppie Awards 2025" (PDF). TransitMatters. Fall 2025.

Notes

  1. Three underpasses were built to allow cross traffic to pass under Massachusetts Avenue in attempts to alleviate traffic congestion. They opened at Memorial Drive in 1931, Commonwealth Avenue in 1938, and Huntington Avenue in 1941. [57] [58] [59]
  2. In the morning, short turn trolleybuses looped counterclockwise on Massachusetts, Vassar, and Main. They looped clockwise in the afternoon. [72]
  3. Boston City Hospital merged into Boston Medical Center in 1996. [86]
Template:Attached KML/1 (MBTA bus)
KML is not from Wikidata

Commons-logo.svg Media related to 1 (MBTA bus) at Wikimedia Commons