A1 (Guangzhou Metro car)

Last updated
A1
A1 Train (1x25-26) leaving Kengkou Station, Guangzhou Metro 20191013-A.jpg
Set 1x25-26 departing from Kengkou station on October 13, 2018
Stock typeClass A EMU
In service28 June 1997-present
Manufacturer Adtranz and Siemens Mobility
Built at Berlin, Germany
Constructed1996-1997
Entered service28 June 1997
Refurbished2021–2024 by CRRC Zhuzhou Locomotive
Number built126
Number in service120 (6 cars under testing)
FormationTcp-M-M+M-M-Tcp
Fleet numbers1A01~1A02-1A41~1A42
Capacity310 per car [1]
Operators Guangzhou Metro Group
DepotsXilang Depot
Lines served  1  
Specifications
Car body construction Aluminum alloy
Train length139.98 m (459 ft 3 in)
Car length23.54 m (77 ft 3 in)
Width3 m (9 ft 10 in)
Height3.8 m (12 ft 6 in)
DoorsPneumatic doors
Refurbishment: Electric doors
Maximum speed80 km/h (50 mph)
Traction system AEG DASU GTO-VVVF [2] [3]
Refurbishment: Zhuzhou CRRC Times Electric tPower-TN28 IGBT-VVVF
(Set 1x09-10: Zhuzhou CRRC Times Electric tPower-TN34; Set 1x21-22: Jiangsu Kingway Rail Equipment WIND-TCM-1B1200FU02)
Traction motors Siemens Mobility 1TB2010-0GA02 3-phases AC induction motors
(Refurbished set 1x09-10: CRRC Zhuzhou Institute PMSM; Refurbished set 1x21-22: Jiangsu Kingway Rail Equipment WIND-TMM-1T506-659YNJ02 Hybrid-reluctance motor)
Acceleration Maximum 1.0 km/(h⋅s) (0.621 mph/s) [1]
Deceleration 1.0 km/(h⋅s) (0.621 mph/s) (service)
1.2 km/(h⋅s) (0.746 mph/s) (emergency) [1]
Electric system(s) 1,500 V DC
Current collector(s) Single-arm Pantograph
UIC classification 2′2′+Bo′Bo′+Bo′Bo′+Bo′Bo′+Bo′Bo′+2′2′
Bogies DUEWAG or Simens Mobility SF2100 [4]
Track gauge 4 ft 8+12 in (1,435 mm)

The A1 (also known as Guangzhou Metro Line 1 Trains) is a rolling stock built by the Adtranz and Siemens Mobility from 1996 to 1997 for the Line 1, with operation in Guangzhou Metro. [1] They are refurbished from 2021 to 2024 by CRRC Guangzhou Rail Transit Equipment in Dazhou Depot.

Contents

Since 29 December 2002, A1 trains were assigned for service of Line 2 until the A2 trains delivered.

History

On 16 November 1993, the Siemens Mobility awarded the contract to build the rolling stock for the Line 1 of Guangzhou Metro. The first train was delivered on 9 April 1997, entering service on 28 June 1997, with the final train delivered on 15 March 1999. [5]

Details

The design of the A1 is identical to the AC01 and AC02, which are in operation in Shanghai Metro. A1 trains have livery in yellow and red. The train length is about 140m, with car height is 3.8m and width is 3m. The Tcp cars (Trailer car with cab and pantograph) have halogen headlights and every car have five-color indicators originally. [6]

Modernization

First overhaul

In 2008, A1 trains underwent an overhaul. Set 1x01-02 was the first to be overhauled and backed to service. [7] [8] This set's doors were also converted to electric doors.

Refurbishment

The entire fleet was refurbished within a period of three years between 2021 and 2024. [9] The first refurbished train put into service on 30 May 2022. [10]

See also

Related Research Articles

<span class="mw-page-title-main">Urban rail transit in China</span>

Urban rail transit in China encompasses a broad range of urban and suburban electric passenger rail mass transit systems including subway, light rail, tram and maglev. Some classifications also include non-rail bus rapid transport.

<span class="mw-page-title-main">Line 1 (Guangzhou Metro)</span> Line of the Guangzhou Metro

Line 1 of the Guangzhou Metro runs from Xilang to Guangzhou East Railway Station. Apart from Kengkou and Xilang, all stations in Line 1 are underground. The first section, from Xilang to Huangsha, opened on 28 June 1997, making Guangzhou the fourth city in mainland China to have a metro system. Construction took a total of 66 months. The total investment is 12.2616 billion yuan with an average cost per kilometer of 662.9 million yuan. The full line started operation on 28 June 1999. Line 1 is coloured yellow.

<span class="mw-page-title-main">Line 3 (Guangzhou Metro)</span> Line of the Guangzhou Metro

Line 3 of the Guangzhou Metro is a 65.43-kilometer (40.66 mi) rapid transit line connects Panyu Square to Tianhe Coach Terminal. The entire line, including all track and stations, is located in tunnels. Its 57.93 km (36.00 mi) main branch, excluding the 7.5 km (4.66 mi) branch between Tianhe Coach Terminal and Tiyu Xilu, is now the third longest continuous subway tunnel in the world, and the longest rail tunnel of any kind.

<span class="mw-page-title-main">Line 5 (Guangzhou Metro)</span> Line of the Guangzhou Metro

Line 5 of the Guangzhou Metro runs from Liwan District to Huangpu District. It starts at Jiaokou running 41.7 km (25.91 mi) in a wide "∩" shape and ends at Huangpu New Port. Like lines 4 and 6, it is equipped with linear induction motor technology. Line 5's color is red. Line 5 began operation on 28 December 2009, from Jiaokou to Wenchong. On December 31, 2009, Line 5 set a record of 567,000 daily passengers, surpassing the ten year ridership projections in the span of just 4 days after its opening. As of May 2017, Line 5 carries an average of 1.05 million passengers per day and is extremely congested throughout the day, operating at over 100% capacity during rush hours. The opening of Phase I of Line 13 further increased traffic demand on the west end of Line 5 and pushing congestion to over 130% capacity. Prompting the Guangzhou Metro to limit passenger traffic at a number of subway stations on Line 5. In 2018, the busiest section of Line 5 reaches over 50,000 pphpd of traffic volume during peak periods. By 2019, the line was used by 1.18 million passengers each day. In the future Line 13 Phase II will provide relief for Line 5. On 28 December 2023, the line was extended to the east from Wenchong to Huangpu New Port.

<span class="mw-page-title-main">Beijing Subway rolling stock</span>

All Beijing Subway trains run on 1,435 mmstandard gauge rail and draw power from the 750 V DC third rail, except those on Lines 6, 11 14, 16, 17 and 19, which use 1,500 V DC overhead wires. Lines 6, 15, Fangshan, and Changping lines have a designed maximum service speed of 100 km/h (62 mph). The Airport Line is linear motor driven with a designed maximum service speed of 110 km/h (68 mph) All other Lines have a maximum service speed of 80 km/h (50 mph). Currently, Lines 1, 2, 4, 5, 8, 9, 10, 13, 15, Batong, Daxing, Changping, Fangshan, Yanfang, and Yizhuang lines use 6 car B size trains. Initially, the Batong line and Line 13 was originally used 4 car trains and now expanded into six.

<span class="mw-page-title-main">Line 6 (Guangzhou Metro)</span> Line of the Guangzhou Metro

Line 6 of the Guangzhou Metro runs from Liwan District to Huangpu District. It starts at Xunfenggang and ends at Xiangxue, interchanging with Line 5 at Tanwei and Ouzhuang; Line 1 at Huangsha and Dongshankou; Line 8 at Cultural Park; Line 2 at Haizhu Square; Line 21 at Suyuan; Line 3 at Yantang and Tianhe Coach Terminal. The total length is 41.9 km (26.04 mi) with 32 stations. Line 6 serves densely populated areas including residential communities in Jinshazhou, the pedestrian street in Beijing Lu and wholesale markets in Shahe. Nevertheless, Line 6, which runs four-car trains, has long had a questionable train capacity. The phase one section between Xunfenggang and Changban began to provide service from 28 December 2013 with the exception of Yide Lu and Shahe stations. Yide Lu opened over a year later on 28 January 2015. The second phase of Line 6 from Changban to Xiangxue has been in operation since 28 December 2016. Like Lines 4 and 5, Line 6 is equipped with linear induction motor technology. Line 6's color is maroon.

<span class="mw-page-title-main">Line 7 (Guangzhou Metro)</span> Line of the Guangzhou Metro

Line 7 of the Guangzhou Metro is a rapid transit line in Guangzhou and Foshan, Guangdong Province, China. It is envisioned as tangential line that runs across southeast Guangzhou and Foshan, allowing for orbital traffic between the suburbs of Shunde, Panyu and Huangpu to avoid the crowded stations in the city center. Line 7's color is light green.

<span class="mw-page-title-main">Line 1 (Wuhan Metro)</span> Line of Wuhan Metro

The Line 1 of Wuhan Metro is an elevated metro line in the city of Wuhan, Hubei. It is the longest continuous metro viaduct in the world. Line 1 opened on 28 July 2004, making Wuhan the fifth city in mainland China to have a metro system after Beijing, Tianjin, Shanghai and Guangzhou. This is the first Metro line in China incorrectly referred to as a light rail line in Chinese terminology because it is elevated. Originally a branch line was planned to cross the Yangtze to Wuchang District via the Second Wuhan Yangtze River Bridge. The Second Wuhan River Bridge even had a provision in the central median where Line 1 trains would run in anticipation for the branch line when it opened in 1995. However, by 2003 the reservation was removed to allow for more traffic lanes when the bridge was undergoing renovation.

<span class="mw-page-title-main">Guangzhou–Zhaoqing intercity railway</span> Railway line in China

Guangzhou–Zhaoqing intercity railway, also known as Guangzhao intercity railway or Foshan–Zhaoqing intercity railway, is a regional railway within Guangdong province, China. It connects between Foshan and Zhaoqing, with through trains to Guangzhou, the capital of Guangdong province. It is a part of the Pearl River Delta Metropolitan Region intercity railway network. It commenced operations on March 30, 2016.

<span class="mw-page-title-main">Line 17 (Chengdu Metro)</span> Rapid transit line in Chengdu, China

Line 17 of the Chengdu Metro is a metro line in Chengdu. The whole line will be 30.286 km when Phase 2 opens. The line uses 8-car Type-A trains operating up to 140 km/h speed powered by 25kV AC overhead lines.

Liuzhou Rail Transit is a monorail metro system currently under construction in Liuzhou, Guangxi Zhuang autonomous region, China. Currently, Lines 1 and 2 are under construction using monorails manufactured under a JV between Bombardier Transportation and CRRC. It is planned to consist of lines 1, 2, 3 and 4 and suburban lines S1, S2 and S3.

<span class="mw-page-title-main">Line 24 (Guangzhou Metro)</span> Proposed metro line in Guangzhou, China

Line 24 of Guangzhou Metro is an under construction rapid transit line in Guangzhou, Guangdong Province, China. The whole line runs roughly from north to south, connecting Huadu District, Baiyun District, Yuexiu District and Haizhu District, and connects two railway hubs, Guangzhou North railway station and Guangzhou Baiyun railway station. Line 24 will use 6-car Type A trains similar to Line 8.

Line 12 of the Guangzhou Metro is a fully automated rapid transit line under construction in Guangzhou, China. It was originally planned to open for operation in 2023, but due to the obstruction of the construction progress, it was announced in 2022 that it was expected to be completed in 2024, and the opening has since been delayed into 2025.

<span class="mw-page-title-main">Shuixi station</span> Metro station in Guangzhou, China

Shuixi station, is an interchange station between Line 7 and Line 21 of the Guangzhou Metro. Line 21 opened on 20 December 2019., whilst Line 7 opened on 28 December 2023.

This article lists the rolling stock of the Shanghai Metro, a rapid transit system serving Shanghai. The table below contain the 1,190 trains with 7,394 carriages on the Shanghai Metro operational as of January 2021. There are 49 stocks in service as of June 2024.

<span class="mw-page-title-main">Line 6 (Changsha Metro)</span> Metro line in Changsha, China

Line 6 of the Changsha Metro is a rapid transit line in Changsha, Hunan, China. The line opened on 28 June 2022, running 48.11 kilometres (29.89 mi) with 34 stations.

<span class="mw-page-title-main">Hengli station</span> Guangzhou Metro station

Hengli Station is a station on Line 18 of the Guangzhou Metro, located underground at the west side of Fenghuang Dadao on Hengli Island in Guangzhou's Nansha District. It opened on 28 September 2021.

<span class="mw-page-title-main">Shanghai Metro DC01</span> Shanghai Metro rolling stock

The 01A01 and the 01A02 train are current rolling stocks used on the Line 1 of Shanghai Metro. They are built by Adtranz and Siemens Mobility, with first delivery in 1992. These cars are numbered 92011–92241, 93011-93481 and 94011-94241.

Line 10 of Xi'an Metro is a rapid transit line in Xi'an. It's the first metro line in Gaoling District, Xi'an.

<span class="mw-page-title-main">Shanghai Metro AC01 and AC02</span>

The 01A03, 01A04 and the 02A01 train are current rolling stocks used on the Line 1 and Line 2 of Shanghai Metro. They are built by Adtranz, Siemens Mobility and CSR Zhuzhou Locomotive, with modified by Shentong Metro between 2023 and 2024.

References

  1. 1 2 3 4 陈穗九 (1997). "广州地铁一号线车辆" [Guangzhou Metro Line 1 vehicles]. 地铁与轻轨 (in Simplified Chinese) (2). 北京交通大学; 北京城建设计研究总院: 20–25. ISSN   1672-6073.
  2. 胡引娥,程月平 (2003). "广州地铁1号线车辆的牵引逆变器". 机车电传动 (1): 42–44. Archived from the original on 2021-06-05. Retrieved 2021-06-05.
  3. 张振生 (1999). "DASU6型逆变器". 地铁与轻轨 (1). Peking University; 北京城建设计研究总院: 34–43. ISSN   1672-6073. Archived from the original on 2021-09-14. Retrieved 2021-09-14.
  4. "First Class Bogies" (PDF). Siemens Mobility . Archived from the original (PDF) on 2019-07-22.
  5. 梁怿韬 刘勇.【广州地铁20岁】 市民讲述我的地铁记忆 .金羊网.2017-06-27.[2020-04-30]
  6. 广州地铁集团有限公司 (2013-12-24). "一号线列车介绍". Archived from the original on 2021-11-08. Retrieved 2021-11-28.
  7. 广州地铁集团有限公司 (2008-09-19). "1号线首列车完成自主大修,成功下线". Archived from the original on 2008-11-21. Retrieved 2018-02-24.{{cite web}}: CS1 maint: unfit URL (link)
  8. 金羊网 (2008-09-19). "地铁一号线"1号车"完成大修今日下线". 新浪新闻. Archived from the original on 2022-07-24. Retrieved 2022-07-24.
  9. 广州地铁集团有限公司. "A1型车电气系统更新改造项目及车体维修项目". 广州公共资源交易中心. Archived from the original on 2020-07-30.
  10. "广州最"老"地铁上线首列翻新车,有这些惊喜". 羊城晚报金羊网. 2022-06-01. Archived from the original on 2022-06-01.